CN204023510U CN201420371714.9U CN201420371714U CN204023510U CN 204023510 U CN204023510 U CN 204023510U CN 201420371714 U CN201420371714 U CN 201420371714U CN 204023510 U CN204023510 U CN 204023510U
Authority
CN
China
Prior art keywords
monitoring instrument
instrument
rockfill
vertical
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420371714.9U
Other languages
English (en)
Inventor
史鹏飞
程瑞林
湛正刚
何福娟
齐卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Huaneng Lancang River Hydropower Co Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201420371714.9U priority Critical patent/CN204023510U/zh
Application granted granted Critical
Publication of CN204023510U publication Critical patent/CN204023510U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

本实用新型公开了一种便于变形监测的超高心墙堆石坝,包括下游堆石体,所述下游堆石体内布置有多条纵向混凝土廊道和横向混凝土廊道,所述纵向混凝土廊道和横向混凝土廊道上设有多个变形监测仪器。本实用新型通过在下游堆石体内分层分段布设廊道,将传统监测仪器也进行分层分段布置,弥补了传统监测仪器无法适应超高堆石坝管线较深、较长测读时间和测读精度的不足的缺陷,增强了仪器的适用性和可选型式,提高了仪器的测读精度。

Description

一种便于变形监测的超高心墙堆石坝
技术领域
本实用新型涉及堆石坝技术领域,尤其涉及一种便于变形监测的超高心墙堆石坝。
背景技术
我国已建的心墙堆石坝中,仅在坝基设廊道,用于灌浆和一部分基础监测,下游堆石体中基本不设廊道,下游堆石体的变形监测仪器直接安装在下游堆石体内部。在常规大坝中因坝高不高、坝体宽度较小,传统仪器的应用较好,但是面对超高堆石坝,坝高较高、坝体宽度较长,传统仪器将面临垂直向和水平向管线超长、承受水压和土体压力超大等问题,继而影响仪器的测读时间和精度。
实用新型内容
本实用新型主要是解决现有技术中所存在的技术问题,从而提供一种仪器适用性强、测读精度高的便于变形监测的超高心墙堆石坝。
本实用新型的上述技术问题主要是通过下述技术方案得以解决的:
本实用新型的便于变形监测的超高心墙堆石坝,包括下游堆石体,所述下游堆石体内布置有多条纵向混凝土廊道和横向混凝土廊道,所述纵向混凝土廊道和横向混凝土廊道上设有多个变形监测仪器。
进一步地,所述变形监测仪器包括绝对位移监测仪器、水平监测仪器和竖直监测仪器,所述绝对位移监测仪器设置在所述纵向混凝土廊道的主要监测横断面处,所述水平监测仪器和竖直监测仪器分别设置在所述横向混凝土廊道的内部。
进一步地,所述水平监测仪器和竖直监测仪器的数量有多个,且沿所述横向混凝土廊道的长度方向均布。
与现有技术相比,本实用新型的优点在于:通过在下游堆石体内分层分段布设廊道,将传统监测仪器也进行分层分段布置,弥补了传统监测仪器无法适应超高堆石坝管线较深、较长测读时间和测读精度的不足的缺陷,增强了仪器的适用性和可选型式,提高了仪器的测读精度。
附图说明
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1是本实用新型的便于变形监测的超高心墙堆石坝的结构示意图。
具体实施方式
下面结合附图对本实用新型的优选实施例进行详细阐述,以使本实用新型的优点和特征能更易于被本领域技术人员理解,从而对本实用新型的保护范围做出更为清楚明确的界定。
参阅图1所示,本实用新型的便于变形监测的超高心墙堆石坝,包括下游堆石体1,下游堆石体1内沿不同高程分层分段布置有纵向混凝土廊道3和横向混凝土廊道2,纵向混凝土廊道3和横向混凝土廊道2上设有多个变形监测仪器。
具体的,变形监测仪器包括绝对位移监测仪器4、水平监测仪器5和竖直监测仪器6,绝对位移监测仪器4设置在纵向混凝土廊道3的主要监测横断面处,主要监测横断面一般有多个,每个监测横断面处均设有一个位移监测仪器4,通过位移监测仪器4测出相对变形,进而转化为下游堆石体绝对变形,检测方便、直观。水平监测仪器5和竖直监测仪器6分别设置在横向混凝土廊道2的内部,用于监测堆石体的竖向和水平向位移变形情况水平,监测仪器5和竖直监测仪器6的数量优选有多个,且沿横向混凝土廊道2的长度方向均布,便于提高其检测精度。本实用新型也在纵向混凝土廊道3和横向混凝土廊道2设置其他的监测仪器,用于超高心墙堆石坝的变形监测。
本实用新型通过在下游堆石体内分层分段布设廊道,将传统监测仪器也进行分层分段布置,弥补了传统监测仪器无法适应超高堆石坝管线较深、较长测读时间和测读精度的不足的缺陷,增强了仪器的适用性和可选型式,提高了仪器的测读精度。
以上,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何不经过创造性劳动想到的变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应该以权利要求书所限定的保护范围为准。

Claims (3)

1.一种便于变形监测的超高心墙堆石坝,包括下游堆石体(1),其特征在于:所述下游堆石体(1)内沿不同高程分层分段布置有纵向混凝土廊道(3)和横向混凝土廊道(2),所述纵向混凝土廊道(3)和横向混凝土廊道(2)上设有多个变形监测仪器。
2.根据权利要求1所述的便于变形监测的超高心墙堆石坝,其特征在于:所述变形监测仪器包括绝对位移监测仪器(4)、水平监测仪器(5)和竖直监测仪器(6),所述绝对位移监测仪器(4)设置在所述纵向混凝土廊道(3)的主要监测横断面处,所述水平监测仪器(5)和竖直监测仪器(6)分别设置在所述横向混凝土廊道(2)的内部。
3.根据权利要求2所述的便于变形监测的超高心墙堆石坝,其特征在于:所述水平监测仪器(5)和竖直监测仪器(6)的数量有多个,且沿所述横向混凝土廊道(2)的长度方向均布。
CN201420371714.9U 2014-07-07 2014-07-07 一种便于变形监测的超高心墙堆石坝 Expired - Lifetime CN204023510U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420371714.9U CN204023510U (zh) 2014-07-07 2014-07-07 一种便于变形监测的超高心墙堆石坝

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420371714.9U CN204023510U (zh) 2014-07-07 2014-07-07 一种便于变形监测的超高心墙堆石坝

Publications (1)

Publication Number Publication Date
CN204023510U true CN204023510U (zh) 2014-12-17

Family

ID=52063397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420371714.9U Expired - Lifetime CN204023510U (zh) 2014-07-07 2014-07-07 一种便于变形监测的超高心墙堆石坝

Country Status (1)

Country Link
CN (1) CN204023510U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113251987A (zh) * 2021-04-28 2021-08-13 中国水利水电科学研究院 混凝土高拱坝施工早期倾倒变形监测系统及方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113251987A (zh) * 2021-04-28 2021-08-13 中国水利水电科学研究院 混凝土高拱坝施工早期倾倒变形监测系统及方法

Similar Documents

Publication Publication Date Title
Li et al. Investigation of steady water inflow into a subsea grouted tunnel
CN103487563B (zh) 一种模拟隔-降-灌联合作用下基坑三维渗流及地层变形机制的试验装置
CN104805822B (zh) 单孔多点孔隙水压力计预埋固定装置及其埋设方法
CN103487373B (zh) 边坡裂缝监测装置及其测量方法
CN204530633U (zh) 一种分区布置的软岩筑面板堆石坝坝体
CN104569341A (zh) 真空预压联合电渗试验装置以及真空预压联合电渗试验的方法
CN202899174U (zh) 管桩光纤光栅传感器测试系统
CN105696550B (zh) 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法
CN108802828A (zh) 钻孔注浆帷幕质量检测方法
CN104459069B (zh) 隧道突水对地下水环境影响监测模型试验装置及试验方法
CN204023510U (zh) 一种便于变形监测的超高心墙堆石坝
CN204059327U (zh) 降水区域的地层变形监测装置
CN204154307U (zh) 一种地质沉降监测装置
CN103344214B (zh) 一种1.6次抛物线型特大桥墩测量及墩身线形控制方法
CN101358449A (zh) 一种地基加固区内孔隙水压力测量装置
CN104389294B (zh) 一种深厚覆盖层上面板堆石坝及其施工方法
CN104316029A (zh) 一种地质沉降监测装置及监测方法
CN103397659B (zh) 超深地下连续墙成槽垂直度控制工艺
CN103471978B (zh) 深厚覆盖层上的面板坝渗漏量监测结构
CN102116170B (zh) 底板岩巷网格式穿层钻孔间距的测定方法
CN203298907U (zh) 土体压力盒固定装置
CN103512546B (zh) 一种土石坝内部变形非接触式监测方法
CN203716271U (zh) 基于水质在线监测的生态排水沟
CN203572746U (zh) 深厚覆盖层上的面板坝渗漏量监测装置
CN107022995B (zh) 利用静力触探比贯入阻力确定旁压试验基准水平基床系数的方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: 550081 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee after: POWERCHINA GUIYANG ENGINEERING CORPORATION LIMITED

Patentee after: HUANENG LANCANG RIVER HYDROPOWER Inc.

Address before: 550081 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16 in Guiyang hospital

Patentee before: POWERCHINA GUIYANG ENGINEERING CORPORATION LIMITED

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141217