CN204007721U - A kind of pick-up unit for conticaster protection tube argon flow amount - Google Patents

A kind of pick-up unit for conticaster protection tube argon flow amount Download PDF

Info

Publication number
CN204007721U
CN204007721U CN201420493806.4U CN201420493806U CN204007721U CN 204007721 U CN204007721 U CN 204007721U CN 201420493806 U CN201420493806 U CN 201420493806U CN 204007721 U CN204007721 U CN 204007721U
Authority
CN
China
Prior art keywords
argon
protection tube
flow amount
flowmeter
conticaster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420493806.4U
Other languages
Chinese (zh)
Inventor
崔新潮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN201420493806.4U priority Critical patent/CN204007721U/en
Application granted granted Critical
Publication of CN204007721U publication Critical patent/CN204007721U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

A kind of pick-up unit for conticaster protection tube argon flow amount; it is mainly comprised of defeated argon pipe, the flowmeter one being connected with defeated argon pipe, the argon efferent duct being connected with flowmeter one, the mechanical arm connecting pipe being connected with argon efferent duct, the flexible pipe being connected with argon efferent duct and mechanical arm connecting pipe, argon envelope seat, the protection tube that is connected with argon envelope; it adds and is stamped U-shaped seal closure in the argon envelope seat upper end being connected with protection tube; medial surface and upper surface at U-shaped seal closure are connected with sealing gasket, in the upper surface of U-shaped seal closure, are communicated with flowmeter two.Argon flow amount in the on-line automatic accurate detection conticaster protection tube of the utility model energy, labour intensity significantly reduces, and can observe in time argon flow amount situation in protection tube, improves casting quality, prevents security incident generation, and simple in structure, easy to operate.

Description

A kind of pick-up unit for conticaster protection tube argon flow amount
Technical field
The utility model relates to a kind of pick-up unit, specifically belongs to the pick-up unit for conticaster protection tube argon flow amount.
Background technology
Casting low-carbon (LC) aluminium Series Steel ALS damages the ratio of large average △ Als≤150pp and only has 70%z left and right.Especially after reforming continuous casting machine, its automatization level is reached advanced world standards, but can not meet the demands to the detection of conticaster protection tube argon flow amount, and problem is very outstanding.
At present, the detection of conticaster protection tube argon flow amount adopts artificial experience inspection, and its inspection is the phenomenon that checks for leaks from argon gas input end to output terminal protection tube, and is to determine with feel.But in producing, often have two kinds of situations can cause protection tube argon flow amount not reach production requirement: the one, pipeline has leakage or stops up; The 2nd, because clear burning in protection tube has steel or slag to stop up protection tube seal closure ar gas passage.About detecting, owing to being the condition of high temperature in steel pouring process, manually cannot remove to experience argon flow amount with hand, otherwise unfavorable to operator's health, and there is potential safety hazard, therefore cannot detect in time.Therefore, only know the argon flow amount of inputting in protective casting system and do not know the argon flow amount that protection tube is exported.Finally will affect the control of lower stove molten steel composition.And the numerical value that argon gas stream scale shows only represents the flow after table, can not represent real argon flow amount in protection tube.If exist and reveal in argon gas pipeline, the flow of the argon gas at protection tube place and pressure will not reach the requirement of protective casting so.Between protection tube and collector nozzle of ladle, just can not form inert gas atmosphere.In casting cycle, because protection tube flow reduces, produce natural aspiration, and by air intake, make airborne oxygen and Als in molten steel react formation and be mingled with, this kind of situation also can form oxidisability and be mingled with and affect slab quality affecting molten steel composition.
Utility model content
The purpose of this utility model is to overcome the deficiency that prior art exists, and surplus argon gas in the on-line automatic accurate detection conticaster protection tube of a kind of energy is provided, and labour intensity significantly reduces, and prevents the pick-up unit for conticaster protection tube argon flow amount of security incident.
Realize the technical measures of above-mentioned purpose:
A kind of pick-up unit for conticaster protection tube argon flow amount; it is mainly comprised of defeated argon pipe, the flowmeter one being connected with defeated argon pipe, the argon efferent duct being connected with flowmeter one, the mechanical arm connecting pipe being connected with argon efferent duct, the flexible pipe being connected with argon efferent duct and mechanical arm connecting pipe, argon envelope seat, the protection tube that is connected with argon envelope; it is: in the argon envelope seat upper end being connected with protection tube, add and be stamped U-shaped seal closure; medial surface and upper surface at U-shaped seal closure are connected with sealing gasket, in the upper surface of U-shaped seal closure, are communicated with flowmeter two.
It is characterized in that: in protection tube bottom, stopper is housed.
Feature of the present utility model: argon flow amount in the on-line automatic accurate detection conticaster protection tube of energy, labour intensity significantly reduces, and can observe in time argon flow amount situation in protection tube, improves casting quality, prevents security incident generation, and simple in structure, easy to operate.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
In figure: 1-defeated argon pipe, 2-flowmeter, one, 3-argon efferent duct, 4-mechanical arm connecting pipe, 5-flexible pipe, 6-argon envelope seat, 7-protection tube, 8-U-shaped seal closure, 9-flowmeter, two, 10-sealing gasket, 11-stopper.
Embodiment
Below in conjunction with accompanying drawing, be described further:
A kind of pick-up unit for conticaster protection tube argon flow amount, it is mainly by defeated argon pipe 1, the flowmeter 1 being connected with defeated argon pipe 1, the argon efferent duct 3 being connected with flowmeter 1, the mechanical arm connecting pipe 4 being connected with argon efferent duct 3, the flexible pipe 5 being connected with argon efferent duct 3 and mechanical arm connecting pipe 4, argon envelope seat 6, form with argon envelope seat 6 protection tubes that are connected 7, it adds and is stamped U-shaped seal closure 8 in argon envelope seat 6 upper ends that are connected with protection tube 7, medial surface and upper surface at U-shaped seal closure 8 are placed with sealing gasket 10, upper surface at U-shaped seal closure 8 adopts bolt or the embedded flowmeter 29 that is communicated with.
In protection tube 7 bottoms, stopper 11 is housed.
Testing process is in the off time of changing ladle, and stopper 11 plugs, in protection tube 7 bottoms, are covered on U-shaped seal closure 8 on the argon envelope seat 6 of protection tube 7 connections.As found, the flow of flowmeter 29 and the flow of flowmeter one 2 demonstrations are without corresponding relation, illustrate that argon flow amount will start by this device progressively being examined and found the cause forward direction from flowmeter 1 extremely, be that pipeline is revealed or protection tube ar gas passage stops up.So just can accurately measure the argon gas real traffic of argon shield system.
This embodiment only exemplifies for the best, not the restricted enforcement to technical solutions of the utility model.

Claims (2)

1. the pick-up unit for conticaster protection tube argon flow amount; it is mainly comprised of defeated argon pipe, the flowmeter one being connected with defeated argon pipe, the argon efferent duct being connected with flowmeter one, the mechanical arm connecting pipe being connected with argon efferent duct, the flexible pipe being connected with argon efferent duct and mechanical arm connecting pipe, argon envelope seat, the protection tube that is connected with argon envelope; it is characterized in that: in the argon envelope seat upper end being connected with protection tube, add and be stamped U-shaped seal closure; medial surface and upper surface at U-shaped seal closure are connected with sealing gasket, in the upper surface of U-shaped seal closure, are communicated with flowmeter two.
2. a kind of pick-up unit for conticaster protection tube argon flow amount as claimed in claim 1, is characterized in that: in protection tube bottom, stopper is housed.
CN201420493806.4U 2014-08-29 2014-08-29 A kind of pick-up unit for conticaster protection tube argon flow amount Expired - Fee Related CN204007721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420493806.4U CN204007721U (en) 2014-08-29 2014-08-29 A kind of pick-up unit for conticaster protection tube argon flow amount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420493806.4U CN204007721U (en) 2014-08-29 2014-08-29 A kind of pick-up unit for conticaster protection tube argon flow amount

Publications (1)

Publication Number Publication Date
CN204007721U true CN204007721U (en) 2014-12-10

Family

ID=52047707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420493806.4U Expired - Fee Related CN204007721U (en) 2014-08-29 2014-08-29 A kind of pick-up unit for conticaster protection tube argon flow amount

Country Status (1)

Country Link
CN (1) CN204007721U (en)

Similar Documents

Publication Publication Date Title
CN206095546U (en) Sealed harmless testing arrangement of conticaster water cooled machine
CN104453985B (en) A kind of water-sealing fire-retardant explosion venting device and its control method
CN204007721U (en) A kind of pick-up unit for conticaster protection tube argon flow amount
CN106282462A (en) A kind of blast furnace sealed cooling system concentrates leakage detection apparatus and method
CN203887204U (en) Low-pressure holding furnace with continuous degassing function
CN104878162A (en) Device for monitoring water leakage of oxygen lance for vacuum refining furnace
CN208293030U (en) A kind of ladle bottom blowing air brick volume control device
CN203551180U (en) Converter opening micro-differential pressure measuring pressure tapping device
CN202903648U (en) Waterproof instrument used for detecting waterproof material
CN206459507U (en) One kind sintering oxygen enrichment system
CN201731267U (en) Rare gas bottle bottom gas blowdown device
CN201892031U (en) Gas pipeline drainer
CN103148352B (en) A kind of water seal for coal gas roof fall early warning system and method thereof
CN209174874U (en) A kind of evacuated die-casting process control system effectivelying prevent multistage line clogging
CN204981915U (en) Slag waste heat has vexed combustible gas safety prevention and control device of heat of pressure
CN202469496U (en) Beam tube leak detector
CN202281677U (en) Detecting device of self-exhaust medical liquid filter
CN203083793U (en) Valve leakage detection special device
CN202246735U (en) Intelligent detecting device for liquid surface of converter steel water
CN204608071U (en) A kind of device of monitoring vacuum refining furnace oxygen rifle and leaking
CN105039614A (en) Combustible gas safety monitoring and controlling device and method for steel slag waste heat pressure hot disintegration
CN205878209U (en) Flue gas is heat sink rapidly
CN205974570U (en) Controlling means is pressed to fire door elementary errors in converter flue gas dry process dust pelletizing system
CN204026640U (en) Pot water conductivity measurement mechanism in Steam Recovery boiler
CN104313247A (en) Ladle argon blowing fault automatic alarm apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170713

Address after: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2

Patentee after: Wuhan iron and Steel Company Limited

Address before: 430080 Wuhan, Hubei Friendship Road, No. 999, Wuchang

Patentee before: Wuhan Iron & Steel (Group) Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20180829