CN204004824U - Vehicle spray painting workshop flanging airduct - Google Patents

Vehicle spray painting workshop flanging airduct Download PDF

Info

Publication number
CN204004824U
CN204004824U CN201420306637.9U CN201420306637U CN204004824U CN 204004824 U CN204004824 U CN 204004824U CN 201420306637 U CN201420306637 U CN 201420306637U CN 204004824 U CN204004824 U CN 204004824U
Authority
CN
China
Prior art keywords
airduct
flanging
spray painting
utility
vehicle spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420306637.9U
Other languages
Chinese (zh)
Inventor
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Zhaohe Air System Co ltd
Original Assignee
DALIAN MEGAUNITY Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN MEGAUNITY Inc filed Critical DALIAN MEGAUNITY Inc
Priority to CN201420306637.9U priority Critical patent/CN204004824U/en
Application granted granted Critical
Publication of CN204004824U publication Critical patent/CN204004824U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Body Structure For Vehicles (AREA)

Abstract

The utility model discloses a kind of vehicle spray painting workshop flanging airduct, body is the cavity rectangular configuration that four zinc-plated panels are welded, and the two ends of above-mentioned each panel are all bent with the flanging of 90 ° outside body, and flanging is provided with hole.The airduct that the utility model has effectively solved high pressure ventilation system needs a large amount of angle steel flanges and makes the problem of high cost, flanging is to be formed by each panel bending of body itself, effectively ensure the bulk strength of airduct, do not need the materials processing outside volumn of purchase, effectively reduce cost of material and the processing cost of airduct, between the flanging of each airduct, be bolted, ensured intensity and sealing between airduct.

Description

Vehicle spray painting workshop flanging airduct
Technical field
The utility model relates to airduct technical field, relates in particular to a kind of vehicle spray painting workshop flanging airduct.
Background technique
The high pressure ventilation system supply and exhaust pipe that coating workshop is used, conventionally air quantity and blast are larger, airduct intensity and airduct sealing are had to higher requirement, the airduct of traditional high pressure ventilation system uses angle steel flange to connect, every joint airduct will use two angle steel flanges, angle steel flange is suitable for rivet with airduct and is connected, and the airduct of this form is because needs are made a large amount of angle steel flanges, and cost of material and processing cost are higher.
Model utility content
The technical problems to be solved in the utility model is to provide a kind of vehicle spray painting workshop flanging airduct, is ensureing, on the intensity of airduct and the basis of sealing, to reduce cost of material and the processing cost of airduct.
For solving the problems of the technologies described above, the technical solution of the utility model is: vehicle spray painting workshop flanging airduct, body is the cavity rectangular configuration that four zinc-plated panels are welded, and the two ends of above-mentioned each panel are all bent with the flanging of 90 ° outside body, and flanging is provided with hole.
Between each described flanging, be welded with supplementary angle.
Described supplementary angle is provided with hole.
Between airduct described in several, be bolted.
The airduct that the utility model has effectively solved high pressure ventilation system needs a large amount of angle steel flanges and makes the problem of high cost, flanging is to be formed by each panel bending of body itself, effectively ensure the bulk strength of airduct, do not need the materials processing outside volumn of purchase, effectively reduce cost of material and the processing cost of airduct, between the flanging of each airduct, be bolted, ensured intensity and sealing between airduct.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model plan view;
Fig. 3 is the utility model left view;
Fig. 4 is that A-A is to view.
Wherein: 1. flanging, 2. supplementary angle, 3. body, 4. hole.
Embodiment
As Figure 1-Figure 4, vehicle spray painting workshop flanging airduct, body 3 is the cavity rectangular configuration that four zinc-plated panels are welded, the two ends of above-mentioned each panel are all bent with the flanging 1 of 90 ° outside body 3, flanging 1 is processed by bender, effectively ensure the bulk strength of airduct, do not need the materials processing outside volumn of purchase, effectively reduce cost of material and the processing cost of airduct, flanging 1 is provided with hole 4, between each described flanging 1, be welded with supplementary angle 2, supplementary angle 2 is provided with hole 4, and hole 4 is stamped to form; Between airduct described in several, be bolted, ensured intensity and sealing between airduct.
The above; it is only preferably embodiment of the utility model; but protection domain of the present utility model is not limited to this; any be familiar with those skilled in the art the utility model disclose technical scope in; be equal to replacement or changed according to the technical solution of the utility model and model utility design thereof, within all should being encompassed in protection domain of the present utility model.

Claims (4)

1. vehicle spray painting workshop flanging airduct, it is characterized in that: body (3) is the cavity rectangular configuration that four zinc-plated panels are welded, the two ends of above-mentioned each panel are all bent with the flanging (1) of 90 ° outside body (3), and flanging (1) is provided with hole (4).
2. vehicle spray painting according to claim 1 workshop flanging airduct, is characterized in that: between each described flanging (1), be welded with supplementary angle (2).
3. vehicle spray painting according to claim 2 workshop flanging airduct, is characterized in that: described supplementary angle (2) is provided with hole (4).
4. according to the vehicle spray painting workshop flanging airduct described in claim 1 or 2 or 3, it is characterized in that: between the airduct described in several, be bolted.
CN201420306637.9U 2014-06-10 2014-06-10 Vehicle spray painting workshop flanging airduct Expired - Lifetime CN204004824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420306637.9U CN204004824U (en) 2014-06-10 2014-06-10 Vehicle spray painting workshop flanging airduct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420306637.9U CN204004824U (en) 2014-06-10 2014-06-10 Vehicle spray painting workshop flanging airduct

Publications (1)

Publication Number Publication Date
CN204004824U true CN204004824U (en) 2014-12-10

Family

ID=52044827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420306637.9U Expired - Lifetime CN204004824U (en) 2014-06-10 2014-06-10 Vehicle spray painting workshop flanging airduct

Country Status (1)

Country Link
CN (1) CN204004824U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109230944A (en) * 2018-08-20 2019-01-18 郑州和生行金属制品工程有限公司 Elevator traffic pipeline connecting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109230944A (en) * 2018-08-20 2019-01-18 郑州和生行金属制品工程有限公司 Elevator traffic pipeline connecting structure

Similar Documents

Publication Publication Date Title
CN204004824U (en) Vehicle spray painting workshop flanging airduct
CN201487428U (en) Integrated hoop
CN204419794U (en) A kind of anticreep rifle nail
CN202719305U (en) Connection structure of sheet steel coupling flange rectangular air duct
CN202901616U (en) Connecting flange component
CN205896427U (en) Hem flange wallboard bolted connection tuber pipe
CN202733309U (en) Multi-stage throttling orifice plate group
CN202597912U (en) Novel anti-corrosion steel band clamp
CN206018050U (en) Hem flange wallboard bolt connection welds airduct
CN201580723U (en) Novel built-in air shot
CN204328260U (en) A kind of airduct and link thereof
CN202040454U (en) Ring-squeezing-type high-pressure water mist pipe fitting
CN204341615U (en) A kind of can the water tank assembly of remote mobile
CN203880263U (en) Air duct welded through flangings and used for automobile painting workshop
CN105124938A (en) Inner buckle plate
CN202532069U (en) Conical neck flange
CN204986056U (en) Steel ripple culvert pipe
CN204114370U (en) A kind of stainless steel composite pipe
CN204717176U (en) Have flange spiral shell of one's own and connect airduct
CN204611127U (en) A kind of compressor copper-plated tube assembly
CN204386360U (en) A kind of plug-in type inclined-plane fixed structure section bar
CN202532071U (en) Flange with gaps on edge
CN202220920U (en) Blower fan punching-riveting tuyere flange
CN204568595U (en) Space blanking device
CN205825357U (en) A kind of for connecting two air conditioning unit connection gussets

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 116600 Jinzhou Liaoning new area double D port number 3 Road No. 8, No.

Patentee after: MEGAUNITY ENVIRONMENTAL SOLUTIONS CO.,LTD.

Address before: 116600 Jinzhou Liaoning new area double D port number 3 Road No. 8, No.

Patentee before: Dalian Megaunity Inc.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Floor 4, No. 300, Dongxin Road, Xukou Town, Wuzhong District, Suzhou City, Jiangsu Province, 215156

Patentee after: Suzhou Zhaohe Air System Co.,Ltd.

Address before: 116600 No.8, digital3 Road, shuangd port, Jinzhou new district, Dalian City, Liaoning Province

Patentee before: MEGAUNITY ENVIRONMENTAL SOLUTIONS CO.,LTD.

CX01 Expiry of patent term

Granted publication date: 20141210