CN204002912U - A kind of high drop shaft preventing clogging up device - Google Patents
A kind of high drop shaft preventing clogging up device Download PDFInfo
- Publication number
- CN204002912U CN204002912U CN201420330771.2U CN201420330771U CN204002912U CN 204002912 U CN204002912 U CN 204002912U CN 201420330771 U CN201420330771 U CN 201420330771U CN 204002912 U CN204002912 U CN 204002912U
- Authority
- CN
- China
- Prior art keywords
- drop shaft
- high drop
- wire rope
- preventing clogging
- ore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Combined Means For Separation Of Solids (AREA)
Abstract
The utility model provides a kind of high drop shaft preventing clogging up device that is applied to the high drop shaft implement of underground mine field, high drop shaft high outside installs back (1), many wire rope (2) one end of described preventing clogging up device is connected with back (1) respectively, many wire rope (2) other end is set to pierce into the structure in high drop shaft mouth (3), the wire rope (2) that pierces into high drop shaft mouth (3) extends to (4) position, high drop shaft bottom, high drop shaft preventing clogging up device described in the utility model, shoveling in drop shaft in the process of ore deposit, can just reduce Chao Kuang, fine ore stone is piled up in high drop shaft, cause the generation of high drop shaft blockage problem, stop up drop shaft problem even if there is ore, can, by unclamping fixed caliper, upwards be lifted through pulley by ore removal scraper haulage cable, so just can become flexible the ore of clogging drop shaft in drop shaft, reach the object of dredging drop shaft.
Description
Technical field
The utility model belongs to the high drop shaft implement of underground mine technical field, more particularly, relates to a kind of high drop shaft preventing clogging up device.
Background technology
In prior art, the high drop shaft of underground mine, in the time putting Chao Kuang, fine ore, mud ore deposit, often can run into drop shaft blockage problem, produces thereby have a strong impact on underground mines.Drop shaft is exploded in some mine inventions " mouse bullet ", but bad because of its effect, therefore gives it up; Also the mine having adopts the method for pouring water on drop shaft top, permeates dredging drop shaft downwards by water, and its effect is also undesirable.Also has a kind of method, to adopt the method for artificial fried drop shaft to dredge, although also can address this problem, but there are four aspect unfavorable factors in the method: 1, people will creep in the drop shaft of obstruction by the vibration ore dumping machine mouth of pit shaft bottom, instrument by bamboo bar and so on is laid explosive, the ore stopping up as pit shaft falls down in the time laying explosive, and people can run nowhere, has larger potential safety hazard.2, explosive is larger to drop shaft structural deterioration in blast process, gets off for a long time, and well bore wall, vibration ore dumping machine and basis are all damaged, and affect ore drawing.3, explosive consumption is large, and a drop shaft will explode many big guns and could explode sometimes, and cost is high.4, fried drop shaft effect is often not ideal, in most cases will repeatedly explode.
Utility model content
Technical problem to be solved in the utility model is: for the deficiencies in the prior art, provide a kind of in the time that drop shaft is put Chao Kuang, fine ore, mud ore deposit, can avoid ore to stop up the high drop shaft preventing clogging up device of drop shaft, adopt described high drop shaft preventing clogging up device, stop up drop shaft problem even if there is ore, also can dredge drop shaft quickly and easily, thereby guarantee that high drop shaft normally works, obviously improve ore drawing efficiency simultaneously.
Solve above-described technical problem, the technical scheme that the utility model is taked is:
The utility model is a kind of high drop shaft preventing clogging up device, high drop shaft high outside installs back, described preventing clogging up device comprises many wire rope, many wire rope one end are connected with back respectively, the many wire rope other ends are set to pierce into the structure in high drop shaft mouth, and the wire rope that pierces into high drop shaft mouth extends to high drop shaft bottom position.
Multiple pulleys are set on described back, and pulley is arranged on link, and link is connected with back, on each pulley, walks around steel cable, and wire rope one end of walking around pulley is connected with clamping unit, and the wire rope other end extends to high drop shaft bottom.
Described height slips pithead position latticed diagrid is set, and multiple fixed calipers are set on diagrid, and multiple fixed calipers are set to respectively many wire rope to be clamped to the structure on the grizzly bar of diagrid.
On described back, jarring machine is set, many wire rope are set to respectively the structure being connected with jarring machine, and jarring machine is connected with the control assembly of controlling jarring machine work, the structure that can drive many wire rope to rock when described jarring machine is set to work.
Installing resin anchor rod on described back, the link that connects pulley is arranged on resin anchor.
Many described wire rope are all set to the structure that diameter dimension is greater than 30mm.
On every described wire rope by gap multiple fine steel ribs that are welded.
Adopt the technical solution of the utility model, can obtain following beneficial effect:
High drop shaft preventing clogging up device described in the utility model, by by high the steel wire penetrating of walking around pulley drop shaft mouth, extend to high drop shaft bottom, like this, shoveling in drop shaft in the process of ore deposit, the vibrations of jarring machine 10 drive wire rope shake, and ore collision wire rope also can ceaselessly produce shake, so just reduced Chao Kuang, fine ore stone is piled up in high drop shaft, causes the generation of high drop shaft blockage problem.By high drop shaft preventing clogging up device described in the utility model, stop up drop shaft problem even if there is ore, can be by unclamping fixed caliper 9, upwards lifted through pulley by ore removal scraper haulage cable, like this, the wire rope extending in high drop shaft moves up and down, and so just can become flexible the ore of clogging drop shaft in drop shaft, reaches the object of dredging drop shaft.
Brief description of the drawings
Mark in the each accompanying drawing of this manual expressed content and figure is made to brief description below:
Fig. 1 is the structural representation of high drop shaft preventing clogging up device described in the utility model;
Accompanying drawing acceptance of the bid note is respectively: 1, back; 2, wire rope; 3, high drop shaft mouth; 4, high drop shaft bottom; 5, pulley; 6, clamping unit; 7, diagrid; 9, fixed caliper; 10, jarring machine; 11, control assembly; 12, resin anchor; 13, fine steel rib.
Detailed description of the invention
Contrast accompanying drawing below, by the description to embodiment, detailed description of the invention of the present utility model is described in further detail as effect and the operating principle etc. of the mutual alignment between the shape of related each member, structure, each several part and annexation, each several part:
As shown in Figure 1, the utility model is a kind of high drop shaft preventing clogging up device, high drop shaft high outside installs back 1, described preventing clogging up device comprises many wire rope 2, many wire rope 2 one end are connected with back 1 respectively, many wire rope 2 other ends are set to pierce into the structure in high drop shaft mouth 3, and the wire rope 2 that pierces into high drop shaft mouth 3 extends to 4 positions, high drop shaft bottom.
Multiple pulleys 5 are set on described back 1, pulley 5 is arranged on link, and link is connected with back 1, on each pulley 5, walks around steel cable 2, wire rope 2 one end of walking around pulley 5 are connected with clamping unit 6, and wire rope 2 other ends extend to high drop shaft bottom 4.
Described high drop shaft mouth 3 positions arrange latticed diagrid 7, and multiple fixed calipers 9 are set on diagrid 7, and multiple fixed calipers 9 are set to respectively many wire rope 2 to be clamped on the structure on the grizzly bar 8 of diagrid 7.Distance in high drop shaft between wire rope is 1/3 of high drop shaft mouth 3 diameters, and every high drop shaft inwall of wire rope distance is 1/3 of high drop shaft mouth 3 diameters.
On described back 1, jarring machine 10 is set, many wire rope 2 are set to respectively the structure being connected with jarring machine 10, jarring machine 10 is connected with the control assembly 11 that control jarring machine 10 is worked, the structure that described jarring machine 10 can drive many wire rope 2 to rock while being set to work.
Installing resin anchor rod 12 on described back 1, the link that connects pulley 5 is arranged on resin anchor 12.Resin anchor 12 is arranged on high drop shaft mouth just on the back on top.If lithology is bad, can consider by consolidation by grouting resin anchor 12 reliability when guaranteeing that resin anchor 12 uses.
Described many wire rope 2 are all set to the structure that diameter dimension is greater than 30mm.
On described every wire rope 2 by gap multiple fine steel ribs 13 that are welded.In device of the present utility model, when drop shaft stops up, unclamp fixed caliper 9, be that one end of walking around pulley hangs on ore removal scraper by wire rope, upwards lift wire rope by pulley, wire rope moves upward in drop shaft, like this, the ore stopping up in drop shaft will become flexible `.Through verification experimental verification, on wire rope, keep at a certain distance away and be welded with fine steel rib, loosening ore effect is better.
Adopt after device described in the utility model, drop shaft stops up frequency and significantly declines, and drop shaft blockage problem occurs once in a while, is also resolved very soon by lifting wire rope, and ore drawing efficiency has improved a lot.
High drop shaft preventing clogging up device described in the utility model, by by high the steel wire penetrating of walking around pulley drop shaft mouth, extend to high drop shaft bottom, like this, shoveling in drop shaft in the process of ore deposit, the vibrations of jarring machine 10 drive wire rope shake, and ore collision wire rope also can ceaselessly produce shake, so just reduced Chao Kuang, fine ore stone is piled up in high drop shaft, causes the generation of high drop shaft blockage problem.By high drop shaft preventing clogging up device described in the utility model, stop up drop shaft problem even if there is ore, can be by unclamping fixed caliper 9, upwards lifted through pulley by ore removal scraper haulage cable, like this, the wire rope extending in high drop shaft moves up and down, and so just can become flexible the ore of clogging drop shaft in drop shaft, reaches the object of dredging drop shaft.
By reference to the accompanying drawings the utility model is carried out to exemplary description above; obviously the concrete realization of the utility model is not subject to the restrictions described above; as long as the various improvement that adopted method design of the present utility model and technical scheme to carry out; or without improving, design of the present utility model and technical scheme are directly applied to other occasions, all in protection domain of the present utility model.
Claims (7)
1. one kind high drop shaft preventing clogging up device, high drop shaft high outside installs back (1), it is characterized in that: described preventing clogging up device comprises many wire rope (2), many wire rope (2) one end is connected with back (1) respectively, many wire rope (2) other end is set to pierce into the structure in high drop shaft mouth (3), and the wire rope (2) that pierces into high drop shaft mouth (3) extends to (4) position, high drop shaft bottom.
2. high drop shaft preventing clogging up device according to claim 1, it is characterized in that: on described back (1), multiple pulleys (5) are set, pulley (5) is arranged on link, link is connected with back (1), on each pulley (5), walk around steel cable (2), wire rope (2) one end of walking around pulley (5) is connected with clamping unit (6), and wire rope (2) other end extends to high drop shaft bottom (4).
3. high drop shaft preventing clogging up device according to claim 1 and 2, it is characterized in that: described high drop shaft mouth (3) position arranges latticed diagrid (7), multiple fixed calipers (9) are set on diagrid (7), and multiple fixed calipers (9) are set to respectively many wire rope (2) to be clamped on the structure on the grizzly bar (8) of diagrid (7).
4. high drop shaft preventing clogging up device according to claim 3, it is characterized in that: on described back (1), jarring machine (10) is set, many wire rope (2) are set to respectively the structure being connected with jarring machine (10), jarring machine (10) is connected with the control assembly (11) of controlling jarring machine (10) work, the structure that described jarring machine (10) can drive many wire rope (2) to rock while being set to work.
5. high drop shaft preventing clogging up device according to claim 4, it is characterized in that: the upper installing resin anchor rod (12) of described back (1), the link that connects pulley (5) is arranged on resin anchor (12).
6. high drop shaft preventing clogging up device according to claim 5, is characterized in that: described many wire rope (2) are all set to the structure that diameter dimension is greater than 30mm.
7. high drop shaft preventing clogging up device according to claim 6, is characterized in that: described every wire rope (2) is upper by the gap multiple fine steel ribs (13) that are welded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420330771.2U CN204002912U (en) | 2014-06-19 | 2014-06-19 | A kind of high drop shaft preventing clogging up device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420330771.2U CN204002912U (en) | 2014-06-19 | 2014-06-19 | A kind of high drop shaft preventing clogging up device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204002912U true CN204002912U (en) | 2014-12-10 |
Family
ID=52042931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420330771.2U Expired - Fee Related CN204002912U (en) | 2014-06-19 | 2014-06-19 | A kind of high drop shaft preventing clogging up device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204002912U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107339106A (en) * | 2017-06-21 | 2017-11-10 | 远安县燎原矿业有限责任公司 | Kaolin suspension deposits the anti-deblocking technology of ore deposit in a kind of phosphorus ore exploitation |
CN111119989A (en) * | 2019-12-18 | 2020-05-08 | 山东科技大学 | Anti-blocking device suitable for feeding fine materials of filling pipe and assembling method thereof |
CN112302659A (en) * | 2020-09-25 | 2021-02-02 | 绍兴文理学院 | Multifunctional anti-blocking dredging device for blasting excavation of tunnel ventilation shaft |
CN112412468A (en) * | 2020-09-25 | 2021-02-26 | 浙江科技学院 | Multifunctional anti-blocking dredging method for tunnel ventilation shaft blasting excavation |
CN112696231A (en) * | 2021-01-27 | 2021-04-23 | 兖州中材建设有限公司 | System engineering of gravel adit shaft |
-
2014
- 2014-06-19 CN CN201420330771.2U patent/CN204002912U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107339106A (en) * | 2017-06-21 | 2017-11-10 | 远安县燎原矿业有限责任公司 | Kaolin suspension deposits the anti-deblocking technology of ore deposit in a kind of phosphorus ore exploitation |
CN111119989A (en) * | 2019-12-18 | 2020-05-08 | 山东科技大学 | Anti-blocking device suitable for feeding fine materials of filling pipe and assembling method thereof |
CN112302659A (en) * | 2020-09-25 | 2021-02-02 | 绍兴文理学院 | Multifunctional anti-blocking dredging device for blasting excavation of tunnel ventilation shaft |
CN112412468A (en) * | 2020-09-25 | 2021-02-26 | 浙江科技学院 | Multifunctional anti-blocking dredging method for tunnel ventilation shaft blasting excavation |
CN112302659B (en) * | 2020-09-25 | 2022-12-09 | 绍兴文理学院 | Multifunctional anti-blocking dredging device for blasting excavation of tunnel ventilation shaft |
CN112412468B (en) * | 2020-09-25 | 2023-10-17 | 浙江科技学院 | Multifunctional anti-blocking dredging method for blasting excavation of tunnel ventilation vertical shaft |
CN112696231A (en) * | 2021-01-27 | 2021-04-23 | 兖州中材建设有限公司 | System engineering of gravel adit shaft |
CN112696231B (en) * | 2021-01-27 | 2022-12-27 | 兖州中材建设有限公司 | Gravel adit drop shaft system engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204002912U (en) | A kind of high drop shaft preventing clogging up device | |
CN101736746B (en) | Construction method for vibrator pipe sinking high-pressure grouting underpinning pile extracting | |
CN107059906A (en) | A kind of method that utilization underground shaft robot applies major diameter open caisson | |
CN204000830U (en) | Merogenesis take-over type sand drain machine | |
CN103603342A (en) | Construction method of ultra-long bored concrete pile with large-diameter casing combination | |
CN104047620A (en) | Underground tunnel large dynamic water plugging method | |
CN110630321A (en) | Goaf on-well filling equipment and method thereof | |
CN104120723B (en) | Downwash static pressure pile-sinking method | |
CN202688991U (en) | Specially-made sleeve construction structure used for repairing head of reinforced concrete cast-in-situ pile | |
CN105064352A (en) | Building expanding head anchor rod pile construction technology and anchor rod pile adopting technology | |
CN102926654B (en) | Pile Hole Ring Cutting System and Pile Hole Ring Cutting Method | |
CN207260148U (en) | Service sleeve pile crown integrally abolishes device | |
CN205276285U (en) | Compound soil nail wall supporting construction | |
CN104563948A (en) | Impact holing boring slurry isolation device based on slurry outlet pipe | |
CN205444192U (en) | Bridge stake is towards pile driving construction system | |
CN102913121B (en) | Flexible swing pipe vibrator boring machine | |
CN202967921U (en) | Rotary lifting machine specially for crushed ballast stones | |
CN105544551B (en) | A kind of super-long filling pile quickly transfers the construction method of steel reinforcement cage | |
CN203361116U (en) | Drilling construction platform | |
CN104453966B (en) | Large mining height end is adopted fully-mechanized digging machine and is removed frame passage passing sunk pillars on full frame acnemia canopy construction method | |
CN207892530U (en) | A kind of impact holing formula shaft development device | |
CN203808899U (en) | Shaft sundry fishing anchor | |
CN202381110U (en) | Long anchor rod pre-supporting device applied in unstable stope roof | |
CN206815338U (en) | Hydraulic sheeting operation fluidic device | |
CN102493454A (en) | Ultrahigh-pressure aerodynamic force water-flushing pile extracting method of vibration-free flexible sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20210619 |
|