CN204001949U - A kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately - Google Patents

A kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately Download PDF

Info

Publication number
CN204001949U
CN204001949U CN201420410156.2U CN201420410156U CN204001949U CN 204001949 U CN204001949 U CN 204001949U CN 201420410156 U CN201420410156 U CN 201420410156U CN 204001949 U CN204001949 U CN 204001949U
Authority
CN
China
Prior art keywords
base
fixed
shaft tower
pole
plays
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420410156.2U
Other languages
Chinese (zh)
Inventor
何苍贵
何畅
周锐
朱本峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mudanjiang electric power industry school
State Grid Corp of China SGCC
Original Assignee
Mudanjiang electric power industry school
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mudanjiang electric power industry school, State Grid Corp of China SGCC filed Critical Mudanjiang electric power industry school
Priority to CN201420410156.2U priority Critical patent/CN204001949U/en
Application granted granted Critical
Publication of CN204001949U publication Critical patent/CN204001949U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Shaft tower plays the device that is connected and fixed of holding pole base and ground immediately, and it relates to a kind of device that is connected and fixed, and is specifically related to the device that is connected and fixed that a kind of shaft tower plays holding pole base and ground immediately.The utility model, for solving in present power system transmission line construction, rises immediately in Lifting Method in Pole Tower Integral Hoisting, and pole bottom and being fixedly connected with of ground exist the problem of potential safety hazard.A kind of shaft tower described in the utility model plays the device that is connected and fixed of holding pole base and ground immediately, it comprises pole turning cylinder, described a kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately and also comprises base, many anti-skid studs and a plurality of shackle, base is horizontally disposed with, pole turning cylinder is vertically set on the middle part of base upper surface, many anti-skid studs are uniform to be arranged on the soffit of base, on the upper surface of base, be laid with a plurality of installing holes, many anti-skid studs and a plurality of installing holes interval arrange, and a shackle is installed in each installing hole.The utility model is for power system.

Description

A kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately
Technical field
The utility model relates to a kind of device that is connected and fixed, and is specifically related to the device that is connected and fixed that a kind of shaft tower plays holding pole base and ground immediately.
Background technology
In power system transmission line construction and emergent repairing tower, stand up in construction, the most frequently used construction method is to adopt the aluminium alloys pole shaft tower that stands up.The base of aluminium alloys pole contacts with ground and need to make the base front, rear, left and right of pole not be moved.In practice of construction process, traditional welding procedure is prone to rosin joint, snaps phenomenon, and U-shaped ring and equipment connection loading angle bad, will make to occur in construction bar, the tower that falls, and serious construction safety accident will occur.
Utility model content
The utility model, for solving in present power system transmission line construction, rises immediately in Lifting Method in Pole Tower Integral Hoisting, and pole bottom exists the problem of potential safety hazard with being fixedly connected with of ground, and then proposes the device that is connected and fixed that a kind of shaft tower plays holding pole base and ground immediately.
The utility model is to address the above problem the technical scheme of taking to be: a kind of shaft tower described in the utility model plays the device that is connected and fixed of holding pole base and ground immediately, it comprises pole turning cylinder, described a kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately and also comprises base, many anti-skid studs and a plurality of shackle, base is horizontally disposed with, pole turning cylinder is vertically set on the middle part of base upper surface, many anti-skid studs are uniform to be arranged on the soffit of base, on the upper surface of base, be laid with a plurality of installing holes, many anti-skid studs and a plurality of installing holes interval arrange, a shackle is installed in each installing hole.
The beneficial effects of the utility model are: the utility model changes base into hole with the U-shaped weld ring of other equipment connections and is connected with shackle, four anti-skid studs have further strengthened the friction factor with ground, eliminate the potential safety hazard that Lifting Method in Pole Tower Integral Hoisting is stood up in process, guaranteed the safety that Lifting Method in Pole Tower Integral Hoisting is stood up in operation.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model; Fig. 2 is the top view of Fig. 1; Fig. 3 is the left view of Fig. 1, and Fig. 4 is the structural representation of shackle.
The specific embodiment
The specific embodiment one: present embodiment is described in conjunction with Fig. 1 to Fig. 4, described in present embodiment, a kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately, it comprises pole turning cylinder 1, described a kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately and also comprises base 2, many anti-skid studs 3 and a plurality of shackle 4, base 2 is horizontally disposed with, pole turning cylinder 1 is vertically set on the middle part of base 2 upper surfaces, many anti-skid studs 3 are uniform to be arranged on the soffit of base 2, on the upper surface of base 2, be laid with a plurality of installing hole 2-1, many anti-skid studs 3 arrange with a plurality of installing hole 2-1 interval, a shackle 4 is installed in each installing hole 2-1.
The specific embodiment two: present embodiment is described in conjunction with Fig. 1 to Fig. 3, described in present embodiment, base 2 is comprised of base mainboard 2-2 and base junction plate 2-3, one end of base junction plate 2-3 is connected with a side of base mainboard 2-2, and many anti-skid studs 3 are uniform to be arranged on the soffit of base mainboard 2-2.Other compositions are identical with the specific embodiment one with annexation.
The specific embodiment three: in conjunction with Fig. 1 to Fig. 3, present embodiment is described, the middle part of base junction plate 2-3 upper surface is provided with connecting hole 2-3-1 described in present embodiment.So arrange, can in connecting hole 2-3-1, connect other construction tools, be conveniently connected with shaft tower.Other compositions are identical with the specific embodiment two with annexation.
The specific embodiment four: in conjunction with Fig. 1 to Fig. 3, present embodiment is described, the middle part of pole turning cylinder 1 is provided with hole for hoist 1-1 described in present embodiment, and the central axis of hole for hoist 1-1 is horizontally disposed with.So arrange, can be in hole for hoist 1-1 connecting hanging holding tool, be conveniently connected with shaft tower.Other compositions are identical with the specific embodiment one with annexation.
Operating principle
The utility model is when work, 4 anti-skid studs 3 are inserted to ground, shackle 4 is arranged in installing hole 2-1, in shackle 4, connect other construction tools and steel wire loop, simultaneously, in the hole for hoist 1-1 arranging with pole turning cylinder 1 middle part in connecting hole 2-3-1 on base junction plate 2-3, all can be connected other construction tools, conveniently be connected with shaft tower.

Claims (4)

1. a shaft tower plays the device that is connected and fixed of holding pole base and ground immediately, it comprises pole turning cylinder (1), it is characterized in that: described a kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately and also comprises base (2), many anti-skid studs (3) and a plurality of shackle (4), base (2) is horizontally disposed with, pole turning cylinder (1) is vertically set on the middle part of base (2) upper surface, many anti-skid studs (3) are uniform to be arranged on the soffit of base (2), on the upper surface of base (2), be laid with a plurality of installing holes (2-1), many anti-skid studs (3) arrange with a plurality of installing holes (2-1) interval, a shackle (4) is installed in each installing hole (2-1).
2. a kind of shaft tower according to claim 1 plays the device that is connected and fixed of holding pole base and ground immediately, it is characterized in that: described base (2) is comprised of base mainboard (2-2) and base junction plate (2-3), one end of base junction plate (2-3) is connected with a side of base mainboard (2-2), and many anti-skid studs (3) are uniform to be arranged on the soffit of base mainboard (2-2).
3. a kind of shaft tower according to claim 2 plays the device that is connected and fixed of holding pole base and ground immediately, it is characterized in that: the middle part of described base junction plate (2-3) upper surface is provided with connecting hole (2-3-1).
4. a kind of shaft tower according to claim 1 plays the device that is connected and fixed of holding pole base and ground immediately, it is characterized in that: the middle part of described pole turning cylinder (1) is provided with hole for hoist (1-1), and the central axis of hole for hoist (1-1) is horizontally disposed with.
CN201420410156.2U 2014-07-23 2014-07-23 A kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately Withdrawn - After Issue CN204001949U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420410156.2U CN204001949U (en) 2014-07-23 2014-07-23 A kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420410156.2U CN204001949U (en) 2014-07-23 2014-07-23 A kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately

Publications (1)

Publication Number Publication Date
CN204001949U true CN204001949U (en) 2014-12-10

Family

ID=52041972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420410156.2U Withdrawn - After Issue CN204001949U (en) 2014-07-23 2014-07-23 A kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately

Country Status (1)

Country Link
CN (1) CN204001949U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100124A (en) * 2014-07-23 2014-10-15 国家电网公司 Holding pole base connecting and fixing device
CN105003118A (en) * 2015-07-27 2015-10-28 中国电力科学研究院 Pole for assembling power transmission towers

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100124A (en) * 2014-07-23 2014-10-15 国家电网公司 Holding pole base connecting and fixing device
CN104100124B (en) * 2014-07-23 2016-05-11 国家电网公司 A kind of holding pole base is connected and fixed device
CN105003118A (en) * 2015-07-27 2015-10-28 中国电力科学研究院 Pole for assembling power transmission towers
CN105003118B (en) * 2015-07-27 2018-07-17 中国电力科学研究院 A kind of pole for assembling power transmission tower

Similar Documents

Publication Publication Date Title
CN103420264A (en) Stretcher jaw clamping device and mounting method thereof
CN204001949U (en) A kind of shaft tower plays the device that is connected and fixed of holding pole base and ground immediately
CN202124416U (en) Lifting beam tool
CN203889888U (en) Steel plate hoisting clamp
CN203112378U (en) Introduction device of tower crane standard knot
CN207170926U (en) Engine cylinder-body suspended core fixture
CN103010939A (en) Mine lifting hook device
CN103359604A (en) H steel hanger
CN104100124B (en) A kind of holding pole base is connected and fixed device
CN205772956U (en) Novel tower crane counterweight is from dismantling device
CN203959664U (en) Drum type inner hole part hoisting device
CN204490327U (en) Joist steel hoisting clamp
CN203781642U (en) Rectangular steel-plate lifting tool
CN203128019U (en) Mining lifting hook device
CN202556280U (en) Host machine oil injector tooling clamp
CN202643074U (en) Tail shaft polishing lifting tool
CN204659991U (en) A kind of for I shape vertical columns jacking apparatus in ship building process
CN203959662U (en) Axial workpiece hoisting device
CN204057672U (en) A kind of combined material suspender
CN203939815U (en) Be used in the suspension centre fixing device on emergency first-aid repair tower
CN202856550U (en) Motor rotor hanger tool
CN204138042U (en) Cable reel supporting rack device
CN203865932U (en) Portable lifting device
CN204022306U (en) The simple and easy rail clamping device of transfer crane
CN203382371U (en) Special lifting tool for lifting spindle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141210

Effective date of abandoning: 20160511

C25 Abandonment of patent right or utility model to avoid double patenting