CN203998861U - The tower machine cover Quick installation platform that climbs - Google Patents

The tower machine cover Quick installation platform that climbs Download PDF

Info

Publication number
CN203998861U
CN203998861U CN201420323346.0U CN201420323346U CN203998861U CN 203998861 U CN203998861 U CN 203998861U CN 201420323346 U CN201420323346 U CN 201420323346U CN 203998861 U CN203998861 U CN 203998861U
Authority
CN
China
Prior art keywords
platform
climbs
tower machine
quick installation
climbing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420323346.0U
Other languages
Chinese (zh)
Inventor
张春
向利华
张亚非
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Engineering Industry Co Ltd
Original Assignee
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Engineering Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Engineering Industry Co Ltd filed Critical Chongqing Construction Engineering Group Co Ltd
Priority to CN201420323346.0U priority Critical patent/CN203998861U/en
Application granted granted Critical
Publication of CN203998861U publication Critical patent/CN203998861U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to the technical field of tower crane, is specifically related to a kind of tower machine cover Quick installation platform that climbs; Comprise that the platform being arranged on tower machine climbing frame connects railing and the platform that climbs that is connected railing connection with platform, the described platform that climbs is fixed by connecting base plate and climbing frame, the described platform that climbs comprises several connection channel-section steels, connect channel-section steel one end and be connected railing welding with platform, one end is fixed with connection shrouding in addition, connects shrouding and is provided with corresponding connecting bore; On the column of climbing frame, be welded with platform seat board, on platform seat board, be provided with through hole; Adopt the tower machine of the technical solutions of the utility model cover Quick installation platform that climbs, manufacturing process is simple, installs, dismounting is quick.

Description

The tower machine cover Quick installation platform that climbs
Technical field
The utility model relates to the technical field of tower crane, is specifically related to a kind of tower machine cover Quick installation platform that climbs.
Background technology
Tower crane, is commonly called as " tower machine " or " tower crane ", is the jib-type crane that a kind of jib is placed in vertical tower body rotary top.Tower crane has a wide range of applications in departments such as building operation, engineering construction, harbour handling, particularly in industry and civil construction constructions, and a kind of indispensable construction machine especially.It can be arranged on the place near building, can bring into play fully its load-carrying ability, this be general crawler type or rubber tired crane can't be obtained.Tower crane is as the important main equipment of building operation, also more and more higher to its requirement.
As everyone knows, the existing tower machine cover that climbs comprises that climb cover institute of four columns, tower machine is used the single, double layer of platform that climbs mostly to be bolt connection, the mode of utilizing tilt prop to support.This kind of mode more or less can be made troubles when Assembly &Disassembly tower machine to installation personnel at the construction field (site): 1, need to arrange three people or the above staff of three people to cooperatively interact installation or removal, and the needed time is relatively long simultaneously; 2,, in the process of installing, often due to the connecting hinge plate position of weld on two bolt hole relative positions on tilt prop and platform, stock, cause that bolt and nut installs inaccurate and long and short platform the out-of-level detailed problem that waits is installed; When 3, platform is made in workshop, its welding process relative complex.
Utility model content
The technical problems to be solved in the utility model is: provide a kind of manufacturing process simple, the tower machine cover Quick installation platform that climbs is installed, is dismantled efficiently.
In order to solve the problems of the technologies described above, the utility model provides a kind of tower machine cover Quick installation platform that climbs, comprise that the platform being arranged on tower machine climbing frame connects railing and the platform that climbs that is connected railing connection with platform, the described platform that climbs is fixed by connecting base plate and climbing frame, the described platform that climbs comprises several connection channel-section steels, connect channel-section steel one end and be connected railing welding with platform, one end is fixed with connection shrouding in addition, connects shrouding and is provided with corresponding connecting bore; On the column of climbing frame, be welded with platform seat board, on platform seat board, be provided with through hole.
Adopt the tower machine of the technique scheme cover Quick installation platform tool that climbs to have the following advantages: the platform that 1, climbs only needs 1 to 2 staff the platform that climbs is pried in advance in the platform seat board through hole being welded on climbing frame column when mounted, then connect climb platform and connecting base plate, after being climbed in position of platform in correction, unified erecting stage connects railing, installing/dismounting is quick, and the bolt and nut causing while also having avoided when mounted using tilt prop install inaccurate and and the platform that climbs the detailed problems such as out-of-level are installed; 2, by connection channel-section steel is set, channel-section steel attaching parts shearing resistance is strong, and the heavy distribution performance of shearing is good, and the edge of a wing can be played opposing platform connection railing simultaneously and be lifted role; 3, the model of connection channel-section steel is many, draws materials conveniently, and alternative scope is large, and manufacturing process is simple, and convenient transportation is also convenient to the manual welding of climbing frame simultaneously; While 4, installing, connect channel-section steel and fix with being connected shrouding by other one end, connect channel-section steel also can according to length need to is connected shrouding flexible assembling, flexible and convenient to use, without cutting or welding, splice again, can guarantee original material quality.
As preferred version, consider that Joint strenght is high, described connection channel-section steel be connected seal plate welding and fix.
As preferred version, in order to strengthen the intensity of channel steel support, between described every two connection channel-section steels, be provided with brace panel.
As preferred version, consider the comfort feature of the Assembly &Disassembly of climb platform and connecting base plate, described in climb with bolts between platform and connecting base plate.
accompanying drawing explanation
Fig. 1 be tower machine of the present utility model climb cover Quick installation platform structural representation;
Fig. 2 is that the climb platform of cover Quick installation platform of tower machine of the present utility model connects the structural representation that railing is connected with the platform that climbs;
Fig. 3 is the schematic cross-section that tower machine of the present utility model climbs and overlaps the connection channel-section steel of Quick installation platform and be connected shrouding, brace panel connection;
In figure: 1-column, 2-connects channel-section steel, and 3-connects shrouding, 4-connecting base plate, 5-platform seat board, 6-platform connects railing, the 7-platform that climbs, 8-block, 9-brace panel, 10-connecting bore, 11-oil cylinder crossbeam, 12-connecting panel, 13-angle steel, 14-hill holder otic placode.
the specific embodiment
Below in conjunction with drawings and Examples, technical solutions of the utility model are further illustrated:
As Fig. 1, shown in Fig. 2 and Fig. 3: the utility model provides a kind of tower machine cover Quick installation platform that climbs, comprise that the platform being arranged on tower machine climbing frame (not indicating in figure) connects railing 6 and the platform 7 that climbs that is connected railing 6 connections with platform, the platform 7 that climbs is fixed by connecting base plate 4 and climbing frame, connecting base plate 4 is rectangle, the platform 7 that climbs comprises several connection channel-section steels 2, connecting base plate 4 connects connection channel-section steel 2 and column 1, connect channel-section steel 2 one end and be connected railing 6 welding with platform, one end is welded with and connects shrouding 3 in addition, connect shrouding 3 and be provided with corresponding connecting bore 10, connecting bore 10 is bar hole, climb with bolts between platform 7 and connecting base plate 4, on each column 1 of climbing frame, respectively weld two platform seat boards 5, one is processed with through hole therein, also can block 8 be set in the platform one end of climbing, can play position-limiting action, at every two, connect between channel-section steel 2 and be provided with brace panel 9, between every two column 1 tops of socket of climbing, be provided with oil cylinder crossbeam 11, 1, oil cylinder crossbeam 11 and column are connected with angle steel 13, angle steel 13 two ends are fixing with oil cylinder crossbeam 11 and column 1 respectively by connecting panel 12, on oil cylinder crossbeam 11, weld a plurality of hill holder otic placodes 14, hill holder otic placode 14 is connected by bearing pin with hill holder otic placode 14, bearing pin two ends adopt spring cotter locking.During climbing frame work, be fixed by bolts on the wall or side bar of tubular construction, on four root posts of hoisting crane tower body, guide roller is housed, guide roller play the guiding role when climbing, for not accounting for architecture enclosing space, tower body is sleeved in climbing frame, and under the effect of jacking hydraulic actuating cylinder, climbing frame moves up with tower machine.
Above-described is only preferred implementation of the present utility model; should be understood that; for a person skilled in the art; do not departing under the prerequisite of the utility model principle; can also make some distortion and improvement; these also should be considered as protection domain of the present utility model, and these can not affect effect and practical applicability that the utility model is implemented.

Claims (4)

1. the tower machine cover Quick installation platform that climbs, comprise that the platform being arranged on tower machine climbing frame connects railing and the platform that climbs that is connected railing connection with platform, the described platform that climbs is fixed by connecting base plate and climbing frame, it is characterized in that: described in the platform that climbs comprise several connection channel-section steels, connect channel-section steel one end and be connected railing welding with platform, one end is fixed with connection shrouding in addition, connects shrouding and is provided with corresponding connecting bore; On the column of climbing frame, be welded with platform seat board, on platform seat board, be provided with through hole.
2. the tower machine according to claim 1 cover Quick installation platform that climbs, is characterized in that: described connection channel-section steel be connected seal plate welding and fix.
3. the tower machine according to claim 2 cover Quick installation platform that climbs, is characterized in that: described every two connect between channel-section steels and are provided with brace panel.
4. according to the cover Quick installation platform that climbs of the tower machine described in claim 1 or 3, it is characterized in that: described in climb with bolts between platform and connecting base plate.
CN201420323346.0U 2014-06-18 2014-06-18 The tower machine cover Quick installation platform that climbs Expired - Fee Related CN203998861U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420323346.0U CN203998861U (en) 2014-06-18 2014-06-18 The tower machine cover Quick installation platform that climbs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420323346.0U CN203998861U (en) 2014-06-18 2014-06-18 The tower machine cover Quick installation platform that climbs

Publications (1)

Publication Number Publication Date
CN203998861U true CN203998861U (en) 2014-12-10

Family

ID=52038892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420323346.0U Expired - Fee Related CN203998861U (en) 2014-06-18 2014-06-18 The tower machine cover Quick installation platform that climbs

Country Status (1)

Country Link
CN (1) CN203998861U (en)

Similar Documents

Publication Publication Date Title
CN105003090A (en) Temporary support frame for mounting assembly type steel structure
CN205224622U (en) Equipment operation platform with adjustable
CN203820313U (en) Labor protecting platform for gantry crane and capable of realizing folding
CN214834720U (en) Tool type unilateral formwork system
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN203998861U (en) The tower machine cover Quick installation platform that climbs
CN212129878U (en) Multi-functional construction is with rotatory top support strutting arrangement
CN204876631U (en) Assembled steel structure installation uses interim support frame
CN204590599U (en) A kind of corner internal corner formwork for aluminum alloy mould plate system
CN204024088U (en) The fast-positioning device of workshop steel column sectional lifting docking
CN205222516U (en) Stand and track crossbeam connection structure between assembled maintenance
CN205293909U (en) Mobilizable assembled transport auxiliary device
CN105178189A (en) Mounting operation platform for cantilever of steel box girder
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN213418456U (en) Building scaffold wall connecting piece
CN211775082U (en) Jig frame for large-span pipe truss
CN104386593A (en) Crane capable of being flexibly assembled and disassembled
CN211597642U (en) Scaffold for building convenient to installation
CN204265302U (en) One can dismounting loop wheel machine flexibly
CN205702936U (en) The flexible equipment that steel structure bridge manufactures
CN108411805B (en) Quick-laying helicopter apron unit and apron
CN204959608U (en) Arm installation jobs platform is chosen to steel case roof beam
CN205555917U (en) Interior jacking is with standard festival
CN212885825U (en) Assembling tool in side
CN107826989A (en) A kind of double tower for indirect cool tower installation hangs the installation method of adhering bar part

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20160618

CF01 Termination of patent right due to non-payment of annual fee