CN203998861U - The tower machine cover Quick installation platform that climbs - Google Patents
The tower machine cover Quick installation platform that climbs Download PDFInfo
- Publication number
- CN203998861U CN203998861U CN201420323346.0U CN201420323346U CN203998861U CN 203998861 U CN203998861 U CN 203998861U CN 201420323346 U CN201420323346 U CN 201420323346U CN 203998861 U CN203998861 U CN 203998861U
- Authority
- CN
- China
- Prior art keywords
- platform
- climbs
- tower machine
- quick installation
- climbing frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to the technical field of tower crane, is specifically related to a kind of tower machine cover Quick installation platform that climbs; Comprise that the platform being arranged on tower machine climbing frame connects railing and the platform that climbs that is connected railing connection with platform, the described platform that climbs is fixed by connecting base plate and climbing frame, the described platform that climbs comprises several connection channel-section steels, connect channel-section steel one end and be connected railing welding with platform, one end is fixed with connection shrouding in addition, connects shrouding and is provided with corresponding connecting bore; On the column of climbing frame, be welded with platform seat board, on platform seat board, be provided with through hole; Adopt the tower machine of the technical solutions of the utility model cover Quick installation platform that climbs, manufacturing process is simple, installs, dismounting is quick.
Description
Technical field
The utility model relates to the technical field of tower crane, is specifically related to a kind of tower machine cover Quick installation platform that climbs.
Background technology
Tower crane, is commonly called as " tower machine " or " tower crane ", is the jib-type crane that a kind of jib is placed in vertical tower body rotary top.Tower crane has a wide range of applications in departments such as building operation, engineering construction, harbour handling, particularly in industry and civil construction constructions, and a kind of indispensable construction machine especially.It can be arranged on the place near building, can bring into play fully its load-carrying ability, this be general crawler type or rubber tired crane can't be obtained.Tower crane is as the important main equipment of building operation, also more and more higher to its requirement.
As everyone knows, the existing tower machine cover that climbs comprises that climb cover institute of four columns, tower machine is used the single, double layer of platform that climbs mostly to be bolt connection, the mode of utilizing tilt prop to support.This kind of mode more or less can be made troubles when Assembly &Disassembly tower machine to installation personnel at the construction field (site): 1, need to arrange three people or the above staff of three people to cooperatively interact installation or removal, and the needed time is relatively long simultaneously; 2,, in the process of installing, often due to the connecting hinge plate position of weld on two bolt hole relative positions on tilt prop and platform, stock, cause that bolt and nut installs inaccurate and long and short platform the out-of-level detailed problem that waits is installed; When 3, platform is made in workshop, its welding process relative complex.
Utility model content
The technical problems to be solved in the utility model is: provide a kind of manufacturing process simple, the tower machine cover Quick installation platform that climbs is installed, is dismantled efficiently.
In order to solve the problems of the technologies described above, the utility model provides a kind of tower machine cover Quick installation platform that climbs, comprise that the platform being arranged on tower machine climbing frame connects railing and the platform that climbs that is connected railing connection with platform, the described platform that climbs is fixed by connecting base plate and climbing frame, the described platform that climbs comprises several connection channel-section steels, connect channel-section steel one end and be connected railing welding with platform, one end is fixed with connection shrouding in addition, connects shrouding and is provided with corresponding connecting bore; On the column of climbing frame, be welded with platform seat board, on platform seat board, be provided with through hole.
Adopt the tower machine of the technique scheme cover Quick installation platform tool that climbs to have the following advantages: the platform that 1, climbs only needs 1 to 2 staff the platform that climbs is pried in advance in the platform seat board through hole being welded on climbing frame column when mounted, then connect climb platform and connecting base plate, after being climbed in position of platform in correction, unified erecting stage connects railing, installing/dismounting is quick, and the bolt and nut causing while also having avoided when mounted using tilt prop install inaccurate and and the platform that climbs the detailed problems such as out-of-level are installed; 2, by connection channel-section steel is set, channel-section steel attaching parts shearing resistance is strong, and the heavy distribution performance of shearing is good, and the edge of a wing can be played opposing platform connection railing simultaneously and be lifted role; 3, the model of connection channel-section steel is many, draws materials conveniently, and alternative scope is large, and manufacturing process is simple, and convenient transportation is also convenient to the manual welding of climbing frame simultaneously; While 4, installing, connect channel-section steel and fix with being connected shrouding by other one end, connect channel-section steel also can according to length need to is connected shrouding flexible assembling, flexible and convenient to use, without cutting or welding, splice again, can guarantee original material quality.
As preferred version, consider that Joint strenght is high, described connection channel-section steel be connected seal plate welding and fix.
As preferred version, in order to strengthen the intensity of channel steel support, between described every two connection channel-section steels, be provided with brace panel.
As preferred version, consider the comfort feature of the Assembly &Disassembly of climb platform and connecting base plate, described in climb with bolts between platform and connecting base plate.
accompanying drawing explanation
Fig. 1 be tower machine of the present utility model climb cover Quick installation platform structural representation;
Fig. 2 is that the climb platform of cover Quick installation platform of tower machine of the present utility model connects the structural representation that railing is connected with the platform that climbs;
Fig. 3 is the schematic cross-section that tower machine of the present utility model climbs and overlaps the connection channel-section steel of Quick installation platform and be connected shrouding, brace panel connection;
In figure: 1-column, 2-connects channel-section steel, and 3-connects shrouding, 4-connecting base plate, 5-platform seat board, 6-platform connects railing, the 7-platform that climbs, 8-block, 9-brace panel, 10-connecting bore, 11-oil cylinder crossbeam, 12-connecting panel, 13-angle steel, 14-hill holder otic placode.
the specific embodiment
Below in conjunction with drawings and Examples, technical solutions of the utility model are further illustrated:
As Fig. 1, shown in Fig. 2 and Fig. 3: the utility model provides a kind of tower machine cover Quick installation platform that climbs, comprise that the platform being arranged on tower machine climbing frame (not indicating in figure) connects railing 6 and the platform 7 that climbs that is connected railing 6 connections with platform, the platform 7 that climbs is fixed by connecting base plate 4 and climbing frame, connecting base plate 4 is rectangle, the platform 7 that climbs comprises several connection channel-section steels 2, connecting base plate 4 connects connection channel-section steel 2 and column 1, connect channel-section steel 2 one end and be connected railing 6 welding with platform, one end is welded with and connects shrouding 3 in addition, connect shrouding 3 and be provided with corresponding connecting bore 10, connecting bore 10 is bar hole, climb with bolts between platform 7 and connecting base plate 4, on each column 1 of climbing frame, respectively weld two platform seat boards 5, one is processed with through hole therein, also can block 8 be set in the platform one end of climbing, can play position-limiting action, at every two, connect between channel-section steel 2 and be provided with brace panel 9, between every two column 1 tops of socket of climbing, be provided with oil cylinder crossbeam 11, 1, oil cylinder crossbeam 11 and column are connected with angle steel 13, angle steel 13 two ends are fixing with oil cylinder crossbeam 11 and column 1 respectively by connecting panel 12, on oil cylinder crossbeam 11, weld a plurality of hill holder otic placodes 14, hill holder otic placode 14 is connected by bearing pin with hill holder otic placode 14, bearing pin two ends adopt spring cotter locking.During climbing frame work, be fixed by bolts on the wall or side bar of tubular construction, on four root posts of hoisting crane tower body, guide roller is housed, guide roller play the guiding role when climbing, for not accounting for architecture enclosing space, tower body is sleeved in climbing frame, and under the effect of jacking hydraulic actuating cylinder, climbing frame moves up with tower machine.
Above-described is only preferred implementation of the present utility model; should be understood that; for a person skilled in the art; do not departing under the prerequisite of the utility model principle; can also make some distortion and improvement; these also should be considered as protection domain of the present utility model, and these can not affect effect and practical applicability that the utility model is implemented.
Claims (4)
1. the tower machine cover Quick installation platform that climbs, comprise that the platform being arranged on tower machine climbing frame connects railing and the platform that climbs that is connected railing connection with platform, the described platform that climbs is fixed by connecting base plate and climbing frame, it is characterized in that: described in the platform that climbs comprise several connection channel-section steels, connect channel-section steel one end and be connected railing welding with platform, one end is fixed with connection shrouding in addition, connects shrouding and is provided with corresponding connecting bore; On the column of climbing frame, be welded with platform seat board, on platform seat board, be provided with through hole.
2. the tower machine according to claim 1 cover Quick installation platform that climbs, is characterized in that: described connection channel-section steel be connected seal plate welding and fix.
3. the tower machine according to claim 2 cover Quick installation platform that climbs, is characterized in that: described every two connect between channel-section steels and are provided with brace panel.
4. according to the cover Quick installation platform that climbs of the tower machine described in claim 1 or 3, it is characterized in that: described in climb with bolts between platform and connecting base plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420323346.0U CN203998861U (en) | 2014-06-18 | 2014-06-18 | The tower machine cover Quick installation platform that climbs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420323346.0U CN203998861U (en) | 2014-06-18 | 2014-06-18 | The tower machine cover Quick installation platform that climbs |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203998861U true CN203998861U (en) | 2014-12-10 |
Family
ID=52038892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420323346.0U Expired - Fee Related CN203998861U (en) | 2014-06-18 | 2014-06-18 | The tower machine cover Quick installation platform that climbs |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203998861U (en) |
-
2014
- 2014-06-18 CN CN201420323346.0U patent/CN203998861U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105003090A (en) | Temporary support frame for mounting assembly type steel structure | |
CN205224622U (en) | Equipment operation platform with adjustable | |
CN203820313U (en) | Labor protecting platform for gantry crane and capable of realizing folding | |
CN214834720U (en) | Tool type unilateral formwork system | |
CN103774838A (en) | Assembly type safe operation platform for elevator shaft construction and use method thereof | |
CN203998861U (en) | The tower machine cover Quick installation platform that climbs | |
CN212129878U (en) | Multi-functional construction is with rotatory top support strutting arrangement | |
CN204876631U (en) | Assembled steel structure installation uses interim support frame | |
CN204590599U (en) | A kind of corner internal corner formwork for aluminum alloy mould plate system | |
CN204024088U (en) | The fast-positioning device of workshop steel column sectional lifting docking | |
CN205222516U (en) | Stand and track crossbeam connection structure between assembled maintenance | |
CN205293909U (en) | Mobilizable assembled transport auxiliary device | |
CN105178189A (en) | Mounting operation platform for cantilever of steel box girder | |
CN201702544U (en) | Variable-paddle bearing installing walking table of wind power generator | |
CN213418456U (en) | Building scaffold wall connecting piece | |
CN211775082U (en) | Jig frame for large-span pipe truss | |
CN104386593A (en) | Crane capable of being flexibly assembled and disassembled | |
CN211597642U (en) | Scaffold for building convenient to installation | |
CN204265302U (en) | One can dismounting loop wheel machine flexibly | |
CN205702936U (en) | The flexible equipment that steel structure bridge manufactures | |
CN108411805B (en) | Quick-laying helicopter apron unit and apron | |
CN204959608U (en) | Arm installation jobs platform is chosen to steel case roof beam | |
CN205555917U (en) | Interior jacking is with standard festival | |
CN212885825U (en) | Assembling tool in side | |
CN107826989A (en) | A kind of double tower for indirect cool tower installation hangs the installation method of adhering bar part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20160618 |
|