CN203998717U - A kind of crane barge ship with piece building stones suspension bucket device - Google Patents

A kind of crane barge ship with piece building stones suspension bucket device Download PDF

Info

Publication number
CN203998717U
CN203998717U CN201420405745.1U CN201420405745U CN203998717U CN 203998717 U CN203998717 U CN 203998717U CN 201420405745 U CN201420405745 U CN 201420405745U CN 203998717 U CN203998717 U CN 203998717U
Authority
CN
China
Prior art keywords
pulley
suspension bucket
crane barge
barge ship
steel rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420405745.1U
Other languages
Chinese (zh)
Inventor
唐蔚东
鲁彬
王俊杰
宋超
朱首军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201420405745.1U priority Critical patent/CN203998717U/en
Application granted granted Critical
Publication of CN203998717U publication Critical patent/CN203998717U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of crane barge ship with piece building stones suspension bucket device, comprise crane barge ship hull, driver train, be located at arm and suspension bucket on hull, the arm end that it is characterized in that described crane barge ship is provided with tandem the first pulley and the second pulley, arm middle part is provided with the 3rd pulley, also comprises the first steel rope, the second steel rope, the 3rd steel rope that coordinate with the first pulley, the second pulley, the 3rd pulley; Described suspension bucket is connected to form Kei-shaped by parallel biside plate, base plate, rear panel, biside plate edge is at least arranged with two pairs of hangers, and rear panel edge is provided with at least one hanger.The utlity model has simple in structure, easy to operately, improved the accuracy rate of jackstone, reduced building stones and fallen while arranging above the impulsive force of arranging, avoided the breakage of building stones, kept the evenly attractive in appearance of building stones.

Description

A kind of crane barge ship with piece building stones suspension bucket device
Technical field
The utility model relates to waterway regulation jackstone technical field, refers to particularly a kind of crane barge ship with piece building stones suspension bucket device.
Background technology
In waterway regulation bank protection, the above region near bank slope of foam line needs throwing stone to carry out spats, and storm pavement directly affects domatic stability, jettisoninging of storm pavement is a difficult point of waterway regulation always, when water level is high, directly carry out throwing with digging machine, precision is lower; When water level is low, be subject to the impact of digging machine brachium, jettisoning not.Available technology adopting grab dredger is equipped with plum blossom grab bucket and jettisonings, and it is few that stone amount is grabbed in plum blossom grab bucket at every turn, and effect is low, and dredger expense is high.
Summary of the invention
The purpose of this utility model is exactly the deficiency that will solve above-mentioned background technology, and a kind of crane barge ship with piece building stones suspension bucket device is provided, and solves the lifting of piece building stones.
The technical solution of the utility model is: a kind of crane barge ship with piece building stones suspension bucket device, comprise crane barge ship hull, driver train, be located at arm and suspension bucket on hull, the arm end that it is characterized in that described crane barge ship is provided with tandem the first pulley and the second pulley, arm middle part is provided with the 3rd pulley, also comprises the first steel rope, the second steel rope, the 3rd steel rope that coordinate with the first pulley, the second pulley, the 3rd pulley;
Described suspension bucket is connected to form dustpan type by parallel biside plate, rear panel, base plate, wherein said rear panel is installed on base plate, described biside plate is connected with base plate and rear panel, wherein biside plate edge is at least arranged with two pairs of hangers, rear panel edge is at least provided with a hanger, and described suspension bucket is formed by Plate Welding;
Described crane barge ship hull is provided with drawing mechanism, described first steel rope one end is connected on crane barge ship drawing mechanism, the other end connects a pair of hanger in suspension bucket biside plate front through the first pulley, described second steel rope one end is connected on crane barge ship drawing mechanism, and the other end connects a pair of hanger at suspension bucket biside plate rear through the second pulley; Described the 3rd steel rope one end is connected on crane barge ship drawing mechanism, and the other end connects the hanger at suspension bucket rear panel edge through the 3rd pulley.
Preferably, described suspension bucket latus inframedium is up big and down small trapezoidal, and described base plate is inclined upwardly to extend to the waist of biside plate and is connected.
Preferably, rear panel is installed perpendicular to base plate.
Preferably, between described hanger and steel rope, use snap ring to be connected, convenient changeing suspension bucket.
In the utility model, the arm end of crane barge ship is provided with the first pulley and the second pulley, arm middle part is provided with the 3rd pulley, first steel wire penetrating the first pulley connects a pair of hanger in suspension bucket biside plate front, second steel wire penetrating the second pulley connects a pair of hanger at suspension bucket biside plate rear, and the 3rd steel wire penetrating the 3rd pulley connects the hanger at suspension bucket rear panel edge.Hanger on side plate has coordinated lifting effect with steel rope, the hanger on rear panel is connected suspension bucket direction is positioned with steel rope, avoids its left-right rotation.
Initial movable arm is placed on suspension bucket on the building stones carrier that building stones are housed, the other excavating machine carrier that excavating machine is housed that is also provided with of building stones carrier, utilize the excavating machine on excavating machine carrier long-armed by piece stone threading suspension bucket, then the first steel rope stretches, the second steel rope moves to suspension bucket in the air, the arm direction of mobile crane barge ship, suspension bucket is turned to the position of the piece stone of need to jettisoninging, the 3rd steel rope that suitably tightens up connection suspension bucket rear panel hanger can make the Way out of suspension bucket aim at position and the no longer left-right rotation of suspension bucket in arm dead ahead, slightly adjust again and make the outlet of suspension bucket aim at the region contacting with the region of jettisoninging of jettisoninging, again the second steel rope is stretched, the perk of suspension bucket rear end is upside down in target by the stone in suspension bucket and jettisonings in region.
The utlity model has simple in structure, easy to operately, improved the accuracy rate of jackstone, reduced building stones and fallen while arranging above the impulsive force of arranging, avoid the breakage of building stones, kept the evenly attractive in appearance of building stones, its comprehensive cost is lower than plum blossom grab dredger, and efficiency is high.
Brief description of the drawings
Fig. 1 is suspension bucket structural representation
Fig. 2 is that crane barge ship loads building stones view
Fig. 3 is crane barge ship transhipment building stones view
Fig. 4 is crane barge ship positionning view
Fig. 5 is that crane barge ship unloads building stones schematic diagram
Wherein: 1. rear hanger 2.3 rear panel hanger 3. crane barge ship hull 4. arm 5. first pulley 6. second pulley 7. the 3rd pulley 8. first steel rope 9. second steel rope 10. the 3rd steel rope 11. building stones carrier 12. excavating machine carrier 13. excavating machines of the front hanger 2.2 of suspension bucket 1.1 side plate 1.2 rear panel 1.3 base plate 2. hanger 2.1
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1, suspension bucket 1 is connected to form Kei-shaped by parallel biside plate 1.1, base plate 1.3, rear panel 1.2, wherein rear panel 1.2 is installed on base plate 1.3, biside plate 1.1 is connected with base plate 1.3 and rear panel 1.2, biside plate edge is arranged with two pairs of hangers 2, is respectively front hanger 2,1 and rear hanger 2.2, front hanger 2.1 closes on suspension bucket opening, and rear panel 1.2 edges are provided with a rear panel hanger 2.3.Biside plate 1.1 is up big and down small right-angled trapezium, and rear panel 1.2 is vertical plate, is connected with the right angle waist of biside plate 1.1 right-angled trapezium, and base plate 1.3 is inclined upwardly to extend to the oblique waist of biside plate and is connected.
The present embodiment comprises crane barge ship hull 3, driver train, is located at arm 4 and suspension bucket 1 on hull 3, arm 4 ends of crane barge ship hull 3 are provided with tandem the first pulley 5 and the second pulley 6, arm 4 middle parts are provided with the 3rd pulley 7, also comprise the first steel rope 8, the second steel rope 9, the 3rd steel rope 10 that coordinate with the first pulley 5, the second pulley 6, the 3rd pulley 7.Crane barge ship hull 3 is provided with drawing mechanism, first steel rope 8 one end are connected on crane barge ship hull 3 drawing mechanisms, the other end connects a pair of front hanger 2.1 through the first pulley by snap ring, second steel rope 9 one end are connected on crane barge ship hull 3 drawing mechanisms, hanger 2.2 after the other end connects by snap ring through the second pulley; The 3rd steel rope 10 one end are connected on crane barge ship hull 3 drawing mechanisms, and the other end connects rear panel hanger 2.3 through the 3rd pulley by snap ring.
Front hanger 2.1, rear hanger 2.2 on side plate coordinate arm lifting with steel rope, on rear panel, hanger 2.3 is connected suspension bucket direction is positioned with steel rope, avoids its left-right rotation.
As shown in Figure 2-5, while loading building stones, mobile arm 4 is placed on suspension bucket 1 on the building stones carrier 11 that building stones are housed, the other excavating machine carrier 12 that excavating machine 13 is housed that is also provided with of building stones carrier 11, utilize the excavating machine on excavating machine carrier 12 long-armed by piece stone threading suspension bucket 1, then mobile arm 4 moves to suspension bucket in the air, suspension bucket 1 is turned to the position of the piece stone of need to jettisoninging, the 3rd steel rope 10 that suitably tightens up connection suspension bucket rear panel hanger 2.3 can make the Way out of suspension bucket aim at the position in arm dead ahead and ensure not left-right rotation of suspension bucket 1, slightly adjust again and make the outlet of suspension bucket 1 aim at the region contacting with the region of jettisoninging of jettisoninging, again second steel rope 9 one end are stretched, suspension bucket 1 rear end perk is upside down in target by the stone in suspension bucket 1 and jettisonings in region.
The above; be only detailed description of the invention of the present utility model, it should be pointed out that any those of ordinary skill in the art are in the disclosed technical scope of the utility model; the variation that can expect easily or replacement, within all should being encompassed in protection domain of the present utility model.

Claims (4)

1. the crane barge ship with piece building stones suspension bucket device, comprise crane barge ship hull (3), driver train, be located at arm and suspension bucket (1) on hull (3), arm (4) end that it is characterized in that described crane barge ship (3) is provided with tandem the first pulley (5) and the second pulley (6), arm middle part is provided with the 3rd pulley (7), also comprise and the first pulley (5), the second pulley (6), the first steel rope (8) that the 3rd pulley (7) coordinates, the second steel rope (9), the 3rd steel rope (10),
Described suspension bucket (1) is connected to form Kei-shaped by parallel biside plate (1.1), rear panel (1.2), base plate (1.3), wherein said rear panel (1.2) is installed on base plate (1.3), described biside plate (1.1) is connected with base plate (1.3) and rear panel (1.2), wherein biside plate (1.1) edge is at least arranged with two pairs of hangers (2), and rear panel edge is at least provided with a hanger (2);
Described crane barge ship hull (3) is provided with drawing mechanism, the first steel rope (8) one end is connected on crane barge ship hull (3) drawing mechanism, the other end connects a pair of front hanger (2.1) in suspension bucket (1) biside plate (1.1) front through the first pulley (5), described the second steel rope (9) one end is connected on crane barge ship hull (3) drawing mechanism, the other end connects a pair of rear hanger (2.2) at suspension bucket (1) biside plate (1.1) rear through the second pulley (6), described the 3rd steel rope (10) one end is connected on crane barge ship hull (3) drawing mechanism, the other end connects the rear panel hanger (2.3) at rear panel (1.2) edge through the 3rd pulley (7).
2. a kind of crane barge ship with piece building stones suspension bucket device as claimed in claim 1, it is characterized in that, described suspension bucket side plate (1.1) is up big and down small trapezoidal, and described base plate (1.3) waist extending to biside plate (1.1) that is inclined upwardly is connected.
3. a kind of crane barge ship with piece building stones suspension bucket device as claimed in claim 1 or 2, is characterized in that, described rear panel (1.2) is installed perpendicular to base plate (1.3).
4. a kind of crane barge ship with piece building stones suspension bucket device as claimed in claim 1 or 2, is characterized in that, between described hanger (1) and steel rope, uses snap ring to be connected.
CN201420405745.1U 2014-07-22 2014-07-22 A kind of crane barge ship with piece building stones suspension bucket device Expired - Fee Related CN203998717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420405745.1U CN203998717U (en) 2014-07-22 2014-07-22 A kind of crane barge ship with piece building stones suspension bucket device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420405745.1U CN203998717U (en) 2014-07-22 2014-07-22 A kind of crane barge ship with piece building stones suspension bucket device

Publications (1)

Publication Number Publication Date
CN203998717U true CN203998717U (en) 2014-12-10

Family

ID=52038748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420405745.1U Expired - Fee Related CN203998717U (en) 2014-07-22 2014-07-22 A kind of crane barge ship with piece building stones suspension bucket device

Country Status (1)

Country Link
CN (1) CN203998717U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112591598A (en) * 2020-12-30 2021-04-02 南通中远海运船务工程有限公司 Hoisting method of FPSO living area module
CN112942356A (en) * 2021-03-18 2021-06-11 汪清明 River course ecological management recovery system
CN113481883A (en) * 2021-07-17 2021-10-08 山东省高速路桥养护有限公司 Reinforcing and reinforcing construction method for bridge underwater structure
CN113718870A (en) * 2021-08-24 2021-11-30 中建三局绿色产业投资有限公司 A hanging fill for silt clearance under water

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112591598A (en) * 2020-12-30 2021-04-02 南通中远海运船务工程有限公司 Hoisting method of FPSO living area module
CN112942356A (en) * 2021-03-18 2021-06-11 汪清明 River course ecological management recovery system
CN113481883A (en) * 2021-07-17 2021-10-08 山东省高速路桥养护有限公司 Reinforcing and reinforcing construction method for bridge underwater structure
CN113718870A (en) * 2021-08-24 2021-11-30 中建三局绿色产业投资有限公司 A hanging fill for silt clearance under water

Similar Documents

Publication Publication Date Title
CN203998717U (en) A kind of crane barge ship with piece building stones suspension bucket device
CN204898505U (en) Floating -type wharf steel drawn bridge connecting device of self -adaptation water -level fluctuation
CN204432980U (en) Combination docking block
CN101648680A (en) Unit assembling method of large-size gantry crane
CN103832828A (en) Elevation LED panel mechanical arm
CN204110325U (en) Auxiliary hanging buoy arranging system
CN204078005U (en) Mud-suction dredging machine water surface registration device under water
CN203558192U (en) Raking ship
RU109157U1 (en) DEVICE FOR SHORE FASTENING OF FLOATING STRUCTURES
CN105002876B (en) Anchor pile downward placement head direction control and adjustment method
CN203238594U (en) Geotextile-laying vessel sliding plate supporting device
CN103215913A (en) Arrangement ship sliding plate support device and arrangement method
CN204038832U (en) A kind of steady tank arrangement for shaft cage guide
CN203992745U (en) A kind of suspension type semi auto cutting machine extension rail
CN202991067U (en) In-coal gangue drawing hydraulic support
JP2015178732A (en) Construction machine
CN203903929U (en) Novel multifunctional crane
CN203924159U (en) A kind of bucket device of many hydraulic connectings
CN204232824U (en) Adjustable type is linked up with
CN204493619U (en) A kind of double leval jib assists oscillator device
CN104131589A (en) Double-layer filter hole grab bucket for dredging and fishing
CN208882049U (en) A kind of ship anchor draw off gear of ship
CN205734069U (en) A kind of beveler
CN202756582U (en) Rope-falling-prevent device
CN204190335U (en) Mining cable sledge car

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20200722