CN203994215U - Pier nose is fixed in pipe of concrete pile cages end - Google Patents

Pier nose is fixed in pipe of concrete pile cages end Download PDF

Info

Publication number
CN203994215U
CN203994215U CN201420423494.XU CN201420423494U CN203994215U CN 203994215 U CN203994215 U CN 203994215U CN 201420423494 U CN201420423494 U CN 201420423494U CN 203994215 U CN203994215 U CN 203994215U
Authority
CN
China
Prior art keywords
bottom board
connecting bottom
pier nose
reinforcement cage
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420423494.XU
Other languages
Chinese (zh)
Inventor
李伯广
郎有余
王金福
陆国平
丁敬海
荚红杉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI QIANYUAN TUBE INDUSTRY Co Ltd
Original Assignee
ANHUI QIANYUAN TUBE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI QIANYUAN TUBE INDUSTRY Co Ltd filed Critical ANHUI QIANYUAN TUBE INDUSTRY Co Ltd
Priority to CN201420423494.XU priority Critical patent/CN203994215U/en
Application granted granted Critical
Publication of CN203994215U publication Critical patent/CN203994215U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The fixing pier nose in a kind of pipe of concrete pile cages end, relate to pile tube technical field, be connected in the two ends of steel reinforcement cage, comprise a circular connecting bottom board, in the middle of described connecting bottom board, be provided with a manhole, described connecting bottom board top is along the circumferential direction provided with a circle rib, for the end of steel reinforcement cage is surrounded, on described connecting bottom board, on the region between manhole cylindrical and connecting bottom board cylindrical, be provided with hole clipping, be connected in hole clipping for the end reinforced pier nose that forms steel reinforcement cage, formation is fixing to reinforcing bar, by whole steel reinforcement cage clamping.The utility model is simple in structure, and modern design changes traditional pier nose mounting structure, is convenient to the integral installation of steel reinforcement cage, has improved processing speed, has strengthened the structural of entirety.

Description

Pier nose is fixed in pipe of concrete pile cages end
Technical field
The utility model relates to pile tube technical field, is specifically related to the fixing pier nose in a kind of pipe of concrete pile cages end.
Background technology
Along with reform and opening-up and the development of economic construction, pretensioned prestressed concrete pipe pile starts to be widely used in Railway System, and expands the fields such as industry and civil buildings, municipal administration, metallurgy, harbour, highway to.In Yangtze River Delta and Delta of Pearl River, due to the handling characteristics of the applicable pile tube of geological conditions, the demand of pile tube is surged, thereby forms rapidly an emerging industry.According to incompletely statistics, to the end of the year in 2007, the existing 400 Duo Jia pile tube manufacturing enterprises in the whole nation (not containing Taiwan producer), produced 2.5 hundred million meters of left and right of all kinds of pile tubes, and the output value reaches more than 300 hundred million RMB.Be also nearly 25,000,000,000 yuan of the supporting subsidiary products annual value of production of tubular pile industry simultaneously, become a vigorous new industry, pile tube has accounted for 50% left and right of the national cement products industry output value at present.
The shortcomings such as tubular pile industry experiences more than 20 year, and each manufacturer, production technology layout are similar, and process layout all exists that artificial consumption is large, intensity is large, and automaticity is not high, and process equipment inaccurate coordination, high energy consumption, potential safety hazard are outstanding.
Utility model content
Technical problem to be solved in the utility model is to provide the fixing pier nose in pipe of concrete pile cages end a kind of simple in structure, easy for installation.
Technical problem to be solved in the utility model realizes by the following technical solutions:
The fixing pier nose in a kind of pipe of concrete pile cages end, be connected in the two ends of steel reinforcement cage, comprise a circular connecting bottom board, in the middle of described connecting bottom board, be provided with a manhole, described connecting bottom board top is along the circumferential direction provided with a circle rib, for the end of steel reinforcement cage is surrounded, on described connecting bottom board, on the region between manhole cylindrical and connecting bottom board cylindrical, be provided with hole clipping, be connected in hole clipping for the end reinforced pier nose that forms steel reinforcement cage, formation is fixing to reinforcing bar, by whole steel reinforcement cage clamping.
Described hole clipping comprises that a circle enters main aperture, described main aperture one side that enters is provided with a draw-in groove, one end of described draw-in groove with enter main aperture and be communicated with, the diameter that enters main aperture is greater than width or the diameter of draw-in groove, and end reinforced pier nose enters by entering main aperture, and end is connected to the bottom surface of connecting bottom board, then when connecting bottom board rotation is following, reinforcing bar snaps in draw-in groove again, thereby formation is fixing to reinforcing bar, and easy for installation, clamping is firm.
Described draw-in groove is a mounting hole structure, upper following curved structure, and round and smooth degree well, is convenient to reinforcing bar and is entered draw-in groove.
Described hole clipping is evenly arranged on connecting bottom board.
The beneficial effects of the utility model are: the utility model is simple in structure, and modern design changes traditional pier nose mounting structure, is convenient to the integral installation of steel reinforcement cage, has improved processing speed, have strengthened the structural of entirety.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Detailed description of the invention
For technological means, creation characteristic that the utility model is realized, reach object and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
As shown in Figure 1, the fixing pier nose in a kind of pipe of concrete pile cages end, be connected in the two ends of steel reinforcement cage, comprise a circular connecting bottom board 10, in the middle of connecting bottom board 10, be provided with a manhole 101, connecting bottom board 10 tops are along the circumferential direction provided with a circle rib 102, for the end of steel reinforcement cage is surrounded, on connecting bottom board 10, on the region between manhole 101 cylindricals and connecting bottom board 10 cylindricals, be provided with hole clipping 20, hole clipping 20 is evenly arranged on connecting bottom board 10, be connected in hole clipping 20 for the end reinforced pier nose that forms steel reinforcement cage, form fixing reinforcing bar, by whole steel reinforcement cage clamping.
Hole clipping 20 comprises that a circle enters main aperture 201, enter main aperture 201 1 sides and be provided with a draw-in groove 202, one end of draw-in groove 202 with enter main aperture 201 and be communicated with, the diameter that enters main aperture 201 is greater than width or the diameter of draw-in groove 202, and end reinforced pier nose enters by entering main aperture 201, and end is connected to the bottom surface of connecting bottom board 10, then when connecting bottom board 10 rotates, reinforcing bar snaps in draw-in groove 202 again, thereby formation is fixing to reinforcing bar, and easy for installation, clamping is firm.Draw-in groove 202 is a mounting hole structure, upper following curved structure, and round and smooth degree well, is convenient to reinforcing bar and is entered draw-in groove 202.
More than show and described general principle of the present utility model and principal character and advantage of the present utility model.The technical staff of the industry should understand; the utility model is not restricted to the described embodiments; that in above-described embodiment and description, describes just illustrates principle of the present utility model; do not departing under the prerequisite of the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (4)

1. the fixing pier nose in pipe of concrete pile cages end, be connected in the two ends of steel reinforcement cage, it is characterized in that: comprise a circular connecting bottom board, in the middle of described connecting bottom board, be provided with a manhole, described connecting bottom board top is along the circumferential direction provided with a circle rib, for the end of steel reinforcement cage is surrounded, on described connecting bottom board, on the region between manhole cylindrical and connecting bottom board cylindrical, be provided with hole clipping.
2. the fixing pier nose in pipe of concrete pile cages according to claim 1 end, is characterized in that: described hole clipping comprises that a circle enters main aperture, described in enter main aperture one side and be provided with a draw-in groove, one end of described draw-in groove with enter main aperture and be communicated with.
3. the fixing pier nose in pipe of concrete pile cages according to claim 2 end, is characterized in that: described draw-in groove is a mounting hole structure.
4. the fixing pier nose in pipe of concrete pile cages according to claim 1 end, is characterized in that: described hole clipping is evenly arranged on connecting bottom board.
CN201420423494.XU 2014-07-29 2014-07-29 Pier nose is fixed in pipe of concrete pile cages end Expired - Fee Related CN203994215U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420423494.XU CN203994215U (en) 2014-07-29 2014-07-29 Pier nose is fixed in pipe of concrete pile cages end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420423494.XU CN203994215U (en) 2014-07-29 2014-07-29 Pier nose is fixed in pipe of concrete pile cages end

Publications (1)

Publication Number Publication Date
CN203994215U true CN203994215U (en) 2014-12-10

Family

ID=52034278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420423494.XU Expired - Fee Related CN203994215U (en) 2014-07-29 2014-07-29 Pier nose is fixed in pipe of concrete pile cages end

Country Status (1)

Country Link
CN (1) CN203994215U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110064877A (en) * 2019-04-26 2019-07-30 五冶集团上海有限公司 Cut the sub- welder of pile cages

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110064877A (en) * 2019-04-26 2019-07-30 五冶集团上海有限公司 Cut the sub- welder of pile cages

Similar Documents

Publication Publication Date Title
CN207131072U (en) A kind of super thick shear wall corner template reinforcing device
CN204152217U (en) The assembled moulding bed of the assembling that a kind of Construction of Steel Structure is general
CN203994215U (en) Pier nose is fixed in pipe of concrete pile cages end
CN204076457U (en) A kind of bucking ladder structure refractory mould
CN206385726U (en) A kind of SMA muscle plasticity hinge connectors for reinforced concrete structure
CN203429623U (en) Overwater pile foundation reinforcement cage structure
CN207360534U (en) Load-bearing construction platform locking device waterborne
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN204385786U (en) Multi-functional prestressed concrete pipe pile antibending shear resistance system
CN204825934U (en) Side slope drainage system
CN204210858U (en) Pcf plate storage rack
CN209585120U (en) A kind of prefabricated assembled lined with PVC sheets armored concrete anti-corrosion inspection shaft
CN204269208U (en) A kind of measuring apparatus
CN205024670U (en) Wedge tubular pile
CN202393340U (en) Steel bar correcting tool
CN204356528U (en) A kind of dyeing machine support with stiffening device
CN204152079U (en) Junked tire truss
CN202323999U (en) Reinforced structure used for reducing external wall cracking of basement
CN203021141U (en) Standard knob taper pipe of construction hoist
CN204530988U (en) A kind of large span lattice crane beam
CN209552136U (en) A kind of elevator bucket mixing plant promotion track structure
CN202787114U (en) Guideboard indication rod
CN204770459U (en) Foundry waste sand dealkalize regeneration treatment device
CN203190923U (en) Floorslab thickness detecting tool
CN203846680U (en) Steel reinforcement cage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20200729

CF01 Termination of patent right due to non-payment of annual fee