CN203990771U - A kind of intermediate-speed bowl mill - Google Patents

A kind of intermediate-speed bowl mill Download PDF

Info

Publication number
CN203990771U
CN203990771U CN201420369907.0U CN201420369907U CN203990771U CN 203990771 U CN203990771 U CN 203990771U CN 201420369907 U CN201420369907 U CN 201420369907U CN 203990771 U CN203990771 U CN 203990771U
Authority
CN
China
Prior art keywords
bull ring
coal
mill
bowl
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420369907.0U
Other languages
Chinese (zh)
Inventor
李鹏飞
贾文豹
骆明明
蒙东明
周军
马立虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATANG GANGU POWER PLANT
Original Assignee
DATANG GANGU POWER PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DATANG GANGU POWER PLANT filed Critical DATANG GANGU POWER PLANT
Priority to CN201420369907.0U priority Critical patent/CN203990771U/en
Application granted granted Critical
Publication of CN203990771U publication Critical patent/CN203990771U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Crushing And Grinding (AREA)

Abstract

The utility model provides a kind of intermediate-speed bowl mill to comprise: machine body, a wind entrance, separator, mill bowl and grinding roller, and the first bull ring being connected with mill bowl; It is characterized in that, also comprise the second bull ring being connected with the first bull ring.The capacity that can increase like this mill bowl, can mill raw coal more fully, and the eliminating amount of pebble coal lowers greatly, improves the efficiency of coal pulverizer.

Description

A kind of intermediate-speed bowl mill
Technical field
The utility model relates to a kind of technical field of coal pulverizer, relates in particular to a kind of intermediate-speed bowl mill.
Background technology
Coal pulverizer is by coal crusher and wears into the machinery of coal dust, and it is the important auxiliary equipment of coal-powder boiler.According to coal-grinding speed, conventionally can be divided three classes: low-speed coal mill, medium-speed pulverizer and high speed coal mill.
As shown in Figure 1, be conventional intermediate-speed bowl mill in a kind of thermal power plant of the prior art.This coal pulverizer 100 comprises: the top cover 103 of coal spout 101, drain 102, separator, separator 104, impeller unit 105, reduction box 106, pebble coal outlet 107, wind entrance 108, mill bowl 109, side body 110, three equally distributed in a circumferential direction grinding rollers 111, elasticity charger 112, interior centrum 113, venturi tubes 114, be folded to an adjusting device 115, coal export 116.The operation principle of this coal pulverizer 100 is: raw coal enters into the bull ring of mill bowl 109 from coal spout 101, bull ring is transported to raw coal to mill on track by means of centrifugal force, 112 pairs of grinding rollers 111 of elasticity charger apply the power of milling, and by the rotation between grinding roller 111 and mill bowl 109, raw coal are pulverized; Simultaneously also can be to coal be dried, particularly, a wind entrance 108 of side body 110 enters around bull ring equably by nozzle ring, the separator 104 on coal pulverizer top is dried and be delivered to the coal mixture tangentially throwing away from bull ring milling, be difficult to shatter heavier pebble coal that device and a wind do not rise etc. and fall the dreg discharging box of an air compartment below by nozzle ring, pebble coal 107 outlets, finally with scraper plate, hang up.
Inventor is realizing process discovery of the present utility model, and above-mentioned coal pulverizer exists some problems: 1, coal pulverizer coal-grinding efficiency is low, and pebble coal amount is large, and in pebble coal, contains raw coal; 2, in air compartment, pebble coal is deposited when serious, if artificial, does not get rid of in time, and the scraper plate that pebble coal is rotated is pushed into air channel one time, and the circulation area in air channel will reduce, and causes that primary air flow is not enough, the decline of exerting oneself.
Utility model content
In order to solve the above-mentioned technical problem existing in coal pulverizer in prior art, the utility model provides the intermediate-speed bowl mill that a kind of coal-grinding efficiency is high, reduce pebble coal amount.
A kind of intermediate-speed bowl mill that the utility model provides comprises: machine body, a wind entrance, separator, mill bowl and grinding roller, and the first bull ring being connected with mill bowl; It is characterized in that, also comprise the second bull ring being connected with the first bull ring.
Preferably, the height of aspect ratio first bull ring of above-mentioned the second bull ring is high.
Preferably, the height of above-mentioned the second bull ring is 100mm, than the height of described the first bull ring, exceeds 60mm.
Preferably, the thickness of above-mentioned the second bull ring is 10nm.
Preferably, the girth of above-mentioned the second bull ring is 10400mm.
Preferably, above-mentioned the second bull ring is made by wear-resisting steel plate.
Preferably, above-mentioned intermediate-speed bowl mill, is characterized in that, also comprises air throttle ring, and the impeller nozzle between described the second bull ring and described air throttle ring.
After adopting technique scheme, can increase the capacity of mill bowl, raw coal can be milled more fully, the eliminating amount of pebble coal lowers greatly, improves the efficiency of coal pulverizer.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of coal pulverizer of the prior art;
Figure 2 shows that the partial schematic diagram of a kind of intermediate-speed bowl mill that the utility model embodiment relates to;
Figure 3 shows that a kind of intermediate-speed bowl mill that the utility model embodiment relates to is at the partial schematic diagram at another visual angle.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in detail, it should be noted that, these specific descriptions just allow those of ordinary skills be more prone to, clearly understand the utility model, but not to limited explanation of the present utility model.
Embodiment
As shown in Figure 2, preferably, a kind of coal pulverizer that the present embodiment provides is mainly on coal pulverizer, to improve in Fig. 1, main improvement is: provide a kind of intermediate-speed bowl mill to comprise: machine body, a wind entrance, separator, mill bowl 1 and grinding roller, and the first bull ring 2 being connected with mill bowl; Also comprise the second bull ring 3 being connected with the first bull ring 2.And the height of aspect ratio first bull ring 2 of the second bull ring 3 is high.
Preferably, the parameter of the second bull ring 3 is as follows: be highly 100mm, than the height of described the first bull ring exceed 60mm, thickness is that 10nm, girth are 10400mm.Other parameters are: the present embodiment provides the dischargeable capacity of mill bowl to increase about 0.44m; As temperature, it is 285 ℃; Extended loop place wind speed is 55-60m/s.
Preferably, above-mentioned the second bull ring 3 is made by wear-resisting steel plate; Every coal pulverizer needs 1m2 left and right.In each overhaul life (6000h), only need the second bull ring 3 of mill bowl 1 to change like this, and needn't change former mill bowl extended loop (the first bull ring 2), the replacement cycle of former mill bowl extended loop is brought up to 3 overhaul lifes by 1 overhaul life.
As described in Fig. 2, Fig. 3, preferably, a kind of coal pulverizer that the present embodiment provides also comprises air throttle ring 4, and air throttle ring 4 is connected with the shell of rotary blade 5; Impeller nozzle 7 between the second bull ring 3 and air throttle ring 4; And the wind speed collector plate 6 that is positioned at impeller nozzle; The second bull ring 3 is also connected with air throttle ring 4 by vane 8.
Preferably, the second bull ring 3 is welded on the side of the first bull ring 2, and the second bull ring 3 is enough to enclose full the first bull ring 2, and the mode by welding can be so that the second bull ring 3 comes off in running, thereby avoids coal pulverizer stoppage in transit accident.
Project Before enforcement After enforcement Remarks
Pebble coal ash-retention efficiency About > 1.2% Approximately 0.65% Qualitative rough contrast
Be grinding into the consumption of one's intention as revealed in what one says amount 46t/h 40t/h 35t/h coal-supplying amount
Motor of coal crusher electric current 39A 37A 35t/h coal-supplying amount
The pebble coal deslagging cycle 0.5h 1.5h 35t/h coal-supplying amount
Deslagging fine powder content Many Seldom 35t/h coal-supplying amount
Mill bowl pressure reduction 4.5kPa 7.0-7.5kPa 35t/h coal-supplying amount
Impeller nozzle place effective wind speed 45~50m/s 55-60m/s 25-35t/h coal-supplying amount
Slag is blocked up in entrance air channel Often occur Do not occur 30-35t/h coal-supplying amount
One time air compartment catches fire Regularly occur Do not occur 30-35t/h coal-supplying amount
The mill bowl extended loop replacement cycle 6000h 18000h Average 30t/h coal-supplying amount
Table 2. coal pulverizer increases after the second bull ring and parameter comparison before
The beneficial effect that the technical scheme that the present embodiment adopts as can be seen from Table 2 can be brought comprises: 1, coal pulverizer stone bed drain purge amount is down to below 0.65% by original 1.2% left and right, in pebble coal almost without raw coal, improve greatly exerting oneself of coal pulverizer, reduced production cost.2, adopt after the scheme that this enforcement provides, because coal pulverizer pebble coal amount reduces, effectively avoided air compartment and air channel Ignition Phenomena, there is not air compartment and air channel Ignition Phenomena for 2 years so far in the coal pulverizer that the present embodiment provides, coking phenomenon does not occur.3, pebble coal discharge capacity reduces, and the cycle of clapping pebble coal lengthens, and has greatly reduced stone coal discharge personnel's workload, only needs 4-6 name row pebble coal personnel during duplex running.
Finally it should be noted that, above-mentioned explanation is only most preferred embodiment of the present utility model, not the utility model is done to any pro forma restriction.Any those of ordinary skill in the art; do not departing within the scope of technical solutions of the utility model; all can utilize way and the technology contents of above-mentioned announcement to make many possible changes and simple replacement etc. to technical solutions of the utility model, these all belong to the scope of technical solutions of the utility model protection.

Claims (8)

1. an intermediate-speed bowl mill, comprising: machine body, a wind entrance, separator, mill bowl and grinding roller, and the first bull ring being connected with mill bowl; It is characterized in that, also comprise the second bull ring being connected with the first bull ring.
2. a kind of intermediate-speed bowl mill as claimed in claim 1, is characterized in that, the height of aspect ratio first bull ring of described the second bull ring is high.
3. a kind of intermediate-speed bowl mill as claimed in claim 2, is characterized in that, the height of described the second bull ring is 100mm, than the height of described the first bull ring, exceeds 60mm.
4. a kind of intermediate-speed bowl mill as claimed in claim 2, is characterized in that, the thickness of described the second bull ring is 10nm.
5. a kind of intermediate-speed bowl mill as claimed in claim 2, is characterized in that, the girth of described the second bull ring is 10400mm.
6. a kind of intermediate-speed bowl mill as described in as arbitrary in claim 1~5, is characterized in that, described the second bull ring is made by wear-resisting steel plate.
7. a kind of intermediate-speed bowl mill as claimed in claim 1, is characterized in that, also comprises air throttle ring, and the impeller nozzle between described the second bull ring and described air throttle ring.
8. a kind of intermediate-speed bowl mill as claimed in claim 1, is characterized in that, described the second bull ring is welded on the side of described the first bull ring.
CN201420369907.0U 2014-07-03 2014-07-03 A kind of intermediate-speed bowl mill Expired - Fee Related CN203990771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420369907.0U CN203990771U (en) 2014-07-03 2014-07-03 A kind of intermediate-speed bowl mill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420369907.0U CN203990771U (en) 2014-07-03 2014-07-03 A kind of intermediate-speed bowl mill

Publications (1)

Publication Number Publication Date
CN203990771U true CN203990771U (en) 2014-12-10

Family

ID=52030841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420369907.0U Expired - Fee Related CN203990771U (en) 2014-07-03 2014-07-03 A kind of intermediate-speed bowl mill

Country Status (1)

Country Link
CN (1) CN203990771U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105833946A (en) * 2016-04-27 2016-08-10 江苏方天电力技术有限公司 Medium-speed coal mill with novel grinding bowl structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105833946A (en) * 2016-04-27 2016-08-10 江苏方天电力技术有限公司 Medium-speed coal mill with novel grinding bowl structure

Similar Documents

Publication Publication Date Title
CN205868473U (en) Rubbing crusher with environmental protection
CN204841880U (en) Special rubbing crusher of lithium cell cathode material and closed circulation smashes system thereof
CN203990771U (en) A kind of intermediate-speed bowl mill
CN103286010A (en) Isolation device in cyclone dust remover
CN203291900U (en) Ash smasher
CN205026718U (en) Feeding hopper
CN103301909B (en) Improved Raymond mill
CN203509043U (en) Permanent magnet alloy air jet pulverization grader
CN203842676U (en) Return device of vertical roller mill
CN202823026U (en) Dustproof dust collection device
CN205903954U (en) Particle crusher
CN204170759U (en) A kind of coal pulverizer comprising desanding system
CN205413265U (en) High -efficient fluid energy mill
CN204661561U (en) A kind of cement vertical mill system
CN208427205U (en) A kind of lead crushing conveying device of storage battery production
CN207371695U (en) A kind of Vertical Mill material guide device
CN202155158U (en) Homogenization separation mechanism of superfine powder concentrator
CN203886646U (en) Automatic rotary crushed ball removing machine
CN203440058U (en) Non-power rotary distributor for sorting zircon sand
CN202935943U (en) Dual adjustable pebble coal positive pressure force feeding device
CN104676623A (en) Coal-fired deashing and upgrading power plant coal pulverizing system and method
CN204404215U (en) Utilize the system of adjacent stove negative pressure bug dusting warehousing powder
CN205137510U (en) Prevent stifled star feeder of fuel card
CN203389739U (en) Hammer type universal pulverizer
CN204546827U (en) A kind of fluorine that reclaims moulds sheet material comminutor feeder unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20150703

EXPY Termination of patent right or utility model