CN203977841U - Collapsible upright rod of suspension scaffold fastening devices - Google Patents

Collapsible upright rod of suspension scaffold fastening devices Download PDF

Info

Publication number
CN203977841U
CN203977841U CN201420432898.5U CN201420432898U CN203977841U CN 203977841 U CN203977841 U CN 203977841U CN 201420432898 U CN201420432898 U CN 201420432898U CN 203977841 U CN203977841 U CN 203977841U
Authority
CN
China
Prior art keywords
vertical rod
balladeur train
location
iron
recessed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420432898.5U
Other languages
Chinese (zh)
Inventor
林遵
陈建辉
游善文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN LIUJIAN GROUP Co Ltd
Original Assignee
FUJIAN LIUJIAN GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN LIUJIAN GROUP Co Ltd filed Critical FUJIAN LIUJIAN GROUP Co Ltd
Priority to CN201420432898.5U priority Critical patent/CN203977841U/en
Application granted granted Critical
Publication of CN203977841U publication Critical patent/CN203977841U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of Collapsible upright rod of suspension scaffold fastening devices, comprises hard vertical rod hole, location balladeur train, lock bolt; Its design feature is that vertical rod hole is made one with the upper end of location balladeur train, and two holes of balladeur train lower end, location are internal thread hole, and the internal diameter of vertical rod hole is greater than the external diameter of vertical rod.It is convenient to install, and without electric welding personnel, saves material, and base is reusable; Residual without electric welding vestige, ensure greatly the integrality of i iron; Owing to being that specialized factory provides, size is accurate, and vertical rod can steadily be placed on the i iron central authorities of encorbelmenting accurately, ensures both sides stress equalization, and support body is stable; Constructing operation is convenient, for later stage Demolition Construction brings convenience, reduces the consumption of talent's machine.

Description

Collapsible upright rod of suspension scaffold fastening devices
Technical field
The utility model belongs to building suspension scaffold basis and sets up field, relates in particular to one collapsible upright rod of suspension scaffold fastening devices, be applicable to vertical rod location, suspension scaffold basis.
Background technology
Common upright rod of suspension scaffold foundation location method (seeing Fig. 3 and Fig. 4), it adopts bar dowel to be welded on Cantilever Beams i iron conventionally.The said goods structural disadvantages is: trouble is installed, and vertical rod cannot registration, and easily skew, greatly may cause the i iron unbalance stress of encorbelmenting, and danger coefficient promotes greatly, and the later stage is removed difficulty, affects i iron later stage recycling simultaneously.
Summary of the invention
The purpose of this utility model is to provide a kind of installation convenient, registration, and the later stage removes simple collapsible upright rod of suspension scaffold fastening devices.
The purpose of this utility model is achieved in that described collapsible upright rod of suspension scaffold fastening devices, comprise vertical rod hole and location balladeur train; Its design feature is that vertical rod hole is made one with the upper end of location balladeur train, two holes of balladeur train lower end, location are internal thread hole, two lock bolts screw in after two internal thread holes of balladeur train lower end, location its front end and can withstand on the relevant position below i iron and make to locate together with balladeur train is positioned at i iron, and the internal diameter of described vertical rod hole is greater than the external diameter of vertical rod.
When enforcement, vertical rod base is inserted in encorbelments on i iron, in the time arriving assigned position, fastens by fastening bolt, fixing vertical rod base, and vertical rod is directly inserted in the hole of vertical rod base, thereby starts to set up suspension scaffold.
Described vertical rod can adopt interior reinforcement helical bellows, the section bar that described interior reinforcement helical bellows is " recessed " font by a cross-sectional shape is entwined the tubing of helical bellows in a spiral manner, between the section bar of each " recessed " font, uses PUR to be welding together; Described " recessed " font section bar inside is hollow structure, be separated into four rectangle frames, symmetrical two short rectangle frames and be positioned at two symmetrical high rectangle frames on two short rectangle frame both sides in the middle of being respectively, after using PUR welding between the section bar of adjacent two " recessed " fonts, make there is welding layer between two adjacent high rectangle frames, adjacent two high rectangle frames and between welding layer jointly form the crest of tubing, welding layer in crest is brace rod, and middle adjacent two short rectangle frames form the trough of tubing.
Advantage of the present utility model: it is convenient to install, without electric welding personnel, saves material, and base is reusable; Residual without electric welding vestige, ensure greatly the integrality of i iron; Owing to being that specialized factory provides, size is accurate, and vertical rod can steadily be placed on the i iron central authorities of encorbelmenting accurately, ensures both sides stress equalization, and support body is stable; Constructing operation is convenient, for later stage Demolition Construction brings convenience, reduces the consumption of talent's machine.Vertical rod of the present utility model when reinforcement helical bellows, is convenient to fix in adopting, and is difficult for skidding.
Brief description of the drawings
Fig. 1 is of the present utility model collapsible upright rod of suspension scaffold fastening devicesbe arranged on the shaft side figures such as the structure of encorbelmenting on i iron.
Fig. 2 is of the present utility model collapsible upright rod of suspension scaffold fastening devicesbe arranged on the structure elevation of encorbelmenting on i iron.
Fig. 3 is existing detachable upright rod of suspension scaffold fastening devices detail drawing.
Fig. 4 is traditional suspension scaffold foundation location method schematic diagram.
Fig. 5 is that the master of the utility model vertical rod used cuts open structural representation.
Fig. 5-1 is the enlarged drawing of cross-sectional shape in Fig. 5 section bar that is " recessed " font.
Fig. 6 is the perspective view of the utility model vertical rod used.
Detailed description of the invention
Below in conjunction with accompanying drawing and example, method of the present utility model and installation process are elaborated:
As scheme as shown in l and Fig. 2, described in the utility model collapsible upright rod of suspension scaffold fastening devices, length can be 11cm, thickness can be 10mm, the high 15cm that can be of hole, the high 18cm that can be of entirety, its structure comprises vertical rod hole 1, location balladeur train 2, its design feature is that vertical rod hole 1 is made one with the upper end of location balladeur train 2, location balladeur train 2 is enclosed within outside i iron 4 and can moves along i iron 4, two holes of balladeur train 2 lower ends, location are internal thread hole, lock bolt 3 revolved after two internal thread holes of balladeur train 2 lower ends, location its front end and can withstand on i iron 4 relevant position below and reach and make to locate together with balladeur train 2 is positioned at i iron 4, the internal diameter of vertical rod hole 1 is greater than the external diameter of vertical rod.
Before construction, install different with the vertical rod of traditional suspension frame.As shown in Figure 1,1. first determine Cantilever Beams vertical rod position; 2. upper outside two location balladeur trains 2 being slided into respectively in i iron 4 outrigger vertical rods, between general spacing 1m ~ 1.2m; 3. two internal thread holes that revolved balladeur train 2 lower ends, location by two lock bolts 3, make to locate balladeur train 2 and are fixed on position definite on i iron 4; 4. vertical rod is directly inserted in vertical rod hole 1.Finally make of the present utility model collapsible upright rod of suspension scaffold fastening devicesbe arranged on Cantilever Beams i iron 4 .
Described vertical rod can adopt steel pipe or plastic pipe, described plastic pipe adopts the plastic pipe of enhancement mode, as bellows structure, refer to shown in Fig. 5 and Fig. 5-1 and Fig. 6, it is vertical rod structural representation described in the utility model, it is interior reinforcement helical corrugation tubular structure, comprise helical bellows, the section bar that its design feature is described helical bellows is " recessed " font by a cross-sectional shape is entwined the tubing of helical bellows in a spiral manner, between the section bar of each " recessed " font, uses PUR to be welding together; Described " recessed " font section bar inside is hollow structure, be separated into four rectangle frames, symmetrical two short rectangle frames and be positioned at two symmetrical high rectangle frames on two short rectangle frame both sides in the middle of being respectively, after using PUR welding between the section bar of adjacent two " recessed " fonts, make there is welding layer between two adjacent high rectangle frames, adjacent two high rectangle frames and between welding layer jointly form the crest 8 of tubing, welding layer 7 in crest is brace rod, and the thickness D1 of described brace rod is 2~30mm; Middle adjacent two short rectangle frames form the trough of tubing, and the width D 5 that middle two adjacent short rectangle frames share a frame is 2~30mm.
The bottom of the tubing of the helical bellows that the section bar that described cross-sectional shape is " recessed " font forms by continuous winding is inwall, and inwall 5 is planomural shape; Crest and trough are the outer wall 6 of tubing, and the outer wall of tubing is corrugated.
The crest D2 of described outer wall ripple and the thickness of trough D3 are 2~30mm, the thickness D4 of described inwall is 1-20mm, the crest height H1 of described outer wall ripple is 30-400mm, width W 1 is 10~200mm, the trough height H 2 of outer wall ripple is 15-200mm, width W 2 is 10-200mm, described welding layer is that brace rod thickness D1 is 2-10mm, described hollow " recessed " font section bar and welding layer is modified polypropene or modified polyethylene material is made, the arc radius R of each corner of four rectangle frames of described hollow " recessed " font section bar is 5-50mm, the section bar that tubing overall structure is " recessed " font by continuous cross-sectional shape is formed by connecting after continuous winding becomes screw type and by welding layer 7 etc., the bottom of the corrugated pipe of screw type is inwall 5, thereby can greatly promote the ring stiffness of tubing, simultaneously because the specific area of its outer wall is larger, increase the contact area with soil, be conducive to form pipe-native acting in conjunction, thereby improve the compressive property of tubing.Cross-sectional shape is modified polypropene or modified polyethylene material (technology that can realize for general technology) for the section bar of " recessed " font and welding layer.
The production method of the vertical rod of interior reinforcement helical corrugation tubular structure described in the utility model is: first extrude " recessed " font section bar with A extruder, again " recessed " font section bar is wrapped on the running roller of a specific standard (diameter of running roller is consistent with pipe internal diameter specification), then extrude vertical bar shape PUR with B extruder, make the mutual welding of each " recessed " font section bar; Form interior reinforcement helical bellows finally by cooling and shaping.
In the time of vertical rod with interior reinforcement helical corrugation tubular structure, can adopt double-deck i iron 4 structures, below the i iron on upper strata, be provided with location balladeur train and the vertical rod hole 1 of handstand, and above the i iron of lower floor, be provided with location balladeur train and the vertical rod hole 1 of setting, in the vertical rod hole 1 between two location balladeur trains 2 of levels, be connected with the vertical rod of an interior reinforcement helical corrugation tubular structure of the present utility model, in, the vertical rod lower end of reinforcement helical corrugation tubular structure is inserted in the vertical rod hole 1 of the setting that is provided with above the i iron of lower floor, and the vertical rod upper end of interior reinforcement helical corrugation tubular structure is inserted in the vertical rod hole 1 of the handstand being provided with below the i iron on upper strata.

Claims (2)

1. one kind collapsible upright rod of suspension scaffold fastening devices, comprise vertical rod hole (1) and location balladeur train (2); It is characterized in that: vertical rod hole (1) is made one with the upper end of location balladeur train (2), two holes of balladeur train (2) lower end, location are internal thread hole, two lock bolts (3) screw in after two internal thread holes of balladeur train (2) lower end, location its front end and can withstand on i iron (4) relevant position below and make to locate together with balladeur train (2) is positioned at i iron (4), and the internal diameter of described vertical rod hole is greater than the external diameter of vertical rod.
2. according to claim 1 collapsible upright rod of suspension scaffold fastening devicesit is characterized in that: reinforcement helical bellows in described vertical rod adopts, the section bar that described interior reinforcement helical bellows is " recessed " font by a cross-sectional shape is entwined the tubing of helical bellows in a spiral manner, between the section bar of each " recessed " font, uses PUR to be welding together; Described " recessed " font section bar inside is hollow structure, be separated into four rectangle frames, symmetrical two short rectangle frames and be positioned at two symmetrical high rectangle frames on two short rectangle frame both sides in the middle of being respectively, after using PUR welding between the section bar of adjacent two " recessed " fonts, make there is welding layer between two adjacent high rectangle frames, adjacent two high rectangle frames and between welding layer jointly form the crest of tubing, welding layer in crest is brace rod, and middle adjacent two short rectangle frames form the trough of tubing.
CN201420432898.5U 2014-08-02 2014-08-02 Collapsible upright rod of suspension scaffold fastening devices Expired - Fee Related CN203977841U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420432898.5U CN203977841U (en) 2014-08-02 2014-08-02 Collapsible upright rod of suspension scaffold fastening devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420432898.5U CN203977841U (en) 2014-08-02 2014-08-02 Collapsible upright rod of suspension scaffold fastening devices

Publications (1)

Publication Number Publication Date
CN203977841U true CN203977841U (en) 2014-12-03

Family

ID=51975300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420432898.5U Expired - Fee Related CN203977841U (en) 2014-08-02 2014-08-02 Collapsible upright rod of suspension scaffold fastening devices

Country Status (1)

Country Link
CN (1) CN203977841U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113775A (en) * 2015-09-18 2015-12-02 中建七局(上海)有限公司 Basic structure of cantilever scaffold
CN108285097A (en) * 2017-01-07 2018-07-17 义乌市顺达塑胶有限公司 Across the floor handling goods overhead traveling crane of one kind

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113775A (en) * 2015-09-18 2015-12-02 中建七局(上海)有限公司 Basic structure of cantilever scaffold
CN108285097A (en) * 2017-01-07 2018-07-17 义乌市顺达塑胶有限公司 Across the floor handling goods overhead traveling crane of one kind

Similar Documents

Publication Publication Date Title
CN103790265B (en) A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall
CN103758291B (en) A kind of shearing enhancement mode half grout sleeve
CN203741997U (en) Steel bar pre-burying and connecting structure of beam and construction column
CN103758292B (en) The full grout sleeve of a kind of shearing enhancement mode
CN205969436U (en) Horizontal many storekeepers corridor mould
CN207277561U (en) Built-in profile steel high-strength concrete stem superposed column-girder steel group frame
CN203977841U (en) Collapsible upright rod of suspension scaffold fastening devices
CN212583186U (en) Adjustable pull rod type overhanging type steel scaffold for assembly structure
CN205989416U (en) A kind of horizontal single storekeeper corridor mould
CN106703290A (en) Detachable-assembly type concrete-filled steel tube column and construction method thereof
CN206530056U (en) Construction beam adjustable supporting device
CN206888509U (en) A kind of box culvert plate outer side template reinforcing device
CN204040043U (en) Adjustable support supporting movable end
CN206048468U (en) A kind of horizontal piping lane mould
CN211421171U (en) Cast-in-place utility tunnel movable support platform truck formwork system
CN104912322B (en) Early dismantling supporting system for plastic template and construction method thereof
CN203880255U (en) Helical bellows with inner reinforcements
CN207988486U (en) A kind of packaged type frame structure wall template system
CN203034615U (en) Novel outer sleeve tube type connecting node of cold-bending rectangular steel tube column and H-shaped steel girder
CN204112714U (en) Detachable template system
CN105442833A (en) Cast-in-situ template reinforcing device of T-shaped connection position between external assembly walls and internal cast-in-situ wall
CN211285276U (en) Assembly type continuous rigid frame 0# block bracket
KR101023770B1 (en) A sewer pipe of duplex wall
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN205010817U (en) Large -scale thin cylinder strutting arrangement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141203

Termination date: 20170802