CN203976588U - Integrated small painting wastewater is processed complete process structure - Google Patents

Integrated small painting wastewater is processed complete process structure Download PDF

Info

Publication number
CN203976588U
CN203976588U CN201420384637.0U CN201420384637U CN203976588U CN 203976588 U CN203976588 U CN 203976588U CN 201420384637 U CN201420384637 U CN 201420384637U CN 203976588 U CN203976588 U CN 203976588U
Authority
CN
China
Prior art keywords
pipeline
settling tank
pond
basin
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420384637.0U
Other languages
Chinese (zh)
Inventor
丁剑峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN RUIWEISHENG ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Original Assignee
SHENZHEN RUIWEISHENG ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN RUIWEISHENG ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd filed Critical SHENZHEN RUIWEISHENG ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority to CN201420384637.0U priority Critical patent/CN203976588U/en
Application granted granted Critical
Publication of CN203976588U publication Critical patent/CN203976588U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

Integrated small painting wastewater is processed complete process structure, it relates to technical field of sewage, grid is connected with equalizing tank, equalizing tank is connected with air supporting settling tank, air supporting settling tank is adjusted pond with PH and is connected, PH adjusts pond and is connected with electrolyzer, electrolyzer is connected with intermediate pool, intermediate pool is connected with UASB anaerobic reation pool, UASB anaerobic reation pool is connected with Aerobic Pond by pipeline, Aerobic Pond is connected with coagulation basin by pipeline, coagulation basin is connected with flocculation basin by pipeline, flocculation basin is connected with settling tank by pipeline, settling tank is connected with clean water basin by pipeline, clean water basin are connected with filtering system by pipeline, sludge thickener is connected with pressure filter by pipeline, sludge thickener is connected with equalizing tank by pipeline.It adopts all steel structure, and rational deployment, makes full use of space, has easy construction, simple to operate, and building is compact attractive in appearance.

Description

Integrated small painting wastewater is processed complete process structure
Technical field:
The utility model relates to technical field of sewage, is specifically related to integrated small painting wastewater and processes complete process structure.
Background technology:
The existing little water yield (being less than 200m3/d) painting wastewater is processed engineering and is substantially continued to use traditional technology and related facility equipment, and technique is advanced not, and facility is too huge, utilization ratio is low, and equipment overflows, and directly causes the wasting of resources and enterprise cost to increase.And wastewater treatment efficiency is difficult for stablely, integral layout is subject to larger restriction to such an extent as to the architectural effect that is difficult to reach attractive in appearance etc.
Utility model content:
The purpose of this utility model is to provide integrated small painting wastewater and processes complete process structure, and it adopts all steel structure, and rational deployment, makes full use of space, has easy construction, simple to operate, and building is compact attractive in appearance.
In order to solve the existing problem of background technology, the utility model is by the following technical solutions: it comprises grid, equalizing tank, air supporting settling tank, PH adjusts pond, electrolyzer, intermediate pool, UASB anaerobic reation pool, Aerobic Pond, coagulation basin, flocculation basin, settling tank, clean water basin, filtering system, sludge thickener, pressure filter, grid is connected with equalizing tank by pipeline, equalizing tank is connected with air supporting settling tank by pipeline, air supporting settling tank is adjusted pond by pipeline with PH and is connected, PH adjusts pond and is connected with electrolyzer by pipeline, electrolyzer is connected with intermediate pool by pipeline, intermediate pool is connected with UASB anaerobic reation pool by pipeline, UASB anaerobic reation pool is connected with Aerobic Pond by pipeline, Aerobic Pond is connected with coagulation basin by pipeline, coagulation basin is connected with flocculation basin by pipeline, and flocculation basin is connected with settling tank by pipeline, and settling tank is connected with clean water basin by pipeline, clean water basin are connected with filtering system by pipeline, described air supporting settling tank, UASB anaerobic reation pool is connected with sludge thickener by pipeline with settling tank, and sludge thickener is connected with pressure filter by pipeline, and sludge thickener is connected with equalizing tank by pipeline.
Total of the present utility model adopts joist steel, square steel and channel-section steel setting support, firmly sturdy; Each system adopts all steel plate system to build, rational deployment, and seamless connection, space utilization maximizes; Be aided with stainless steel tube and pvc pipe, saved anticorrosion input; Surface of steel plate adopts angle steel reinforced, material-saving attractive in appearance; Between steel material, adopt full weld mode, inside and outsidely all weld, prevent from leaking; Pipeline tapping place that connects each system is used sealing material sealing.
Principle of work of the present utility model:
One, waste water is removed suspended substance through grid and is entered equalizing tank, after stopping aeration, smoke by submersible pump, one segment pipe mixing tank is set in submersible pump pipeline, waste water reacts with the PAC coagulating agent of access at this, after entering air flotation pool reaction zone, react with PAM flocculation agent again, simultaneously in pond, separate scum silica frost and mud by aeration, scum silica frost is scraped to deslagging weir and is entered Residue extraction pipeline by air flotation pool top slag scraper, mud by pond at the bottom of shore pipe take away.
Two, water body flows to clear water in the process of the air supporting settling tank the other end and comes together in body middle part, pond, enters and adjusts pond from air flotation pool opposite side middle part water shoot.Waste water passes through acid, alkali medicament regulating water quality pH value in adjustment pond, flowing to fully reaction in intermediate pool process, by the submersible pump suction bypass channel in intermediate pool.
Three, bypass channel bottom even distribution pore, connects water distributor water distribution uniformity at the bottom of UASB anaerobic reation pool.Waste water fully contacts digestion with the anerobe in active sludge in UASB anaerobic reation pool, removes the organism in waste water, mud-water separation in uphill process, and sludge settling, unnecessary mud is taken away by pool bottom sludge pipe; Clear water overflows into surrounding effluent weir, flows into Aerobic Pond bottom by water pipe.
Four, in Aerobic Pond, be covered with filler, aeration at the bottom of pond, allows active sludge carry out aerobic repiration, further organic substance decomposing is become to inorganics.Waste water to Aerobic Pond the other end top, flows into PAC reaction tank and coagulating agent contact reacts by water surface posticum by filler stream, and then at the bottom of pond, water hole enters PAM reaction tank and flocculation agent contact reacts.
Five, the waste water of confection flows into settling tank bottom, is covered with inclined tube and assists sludge settling in pond.Mud, by pond bottom pipeline suction sludge sump, overflows into effluent weir by the clear water of inclined tube and flows into clean water basin.Now in clean water basin, water quality is up to standard, meets emission standard or reuse condition.
Six, scum silica frost and mud in air supporting settling tank, the whole suction sludge sumps of mud in UASB anaerobic reation pool and settling tank, further, after sedimentation, press mud machine by the pipeline suction at the bottom of sludge sump, are filtered dry mud, and filtrate is back to equalizing tank, and mud cake outward transport is processed.
The utlity model has following beneficial effect:
1, design technology is more advanced, scientific and reasonable;
2, system operates steadily, and water outlet continues up to standard;
3, building cost is cheap, and difficulty of construction is little, and building materials utilization ratio is high;
4, stainless steel integral structure, compact attractive in appearance, save anticorrosion expense;
5, whole project occupation of land area is little, and space availability ratio is high, and manual operation is easy.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Embodiment:
Referring to Fig. 1, this embodiment is by the following technical solutions: it comprises grid 1, equalizing tank 2, air supporting settling tank 3, PH adjusts pond 4, electrolyzer 5, intermediate pool 6, UASB anaerobic reation pool 7, Aerobic Pond 8, coagulation basin 9, flocculation basin 10, settling tank 11, clean water basin 12, filtering system 13, sludge thickener 14, pressure filter 15, grid 1 is connected with equalizing tank 2 by pipeline, equalizing tank 2 is connected with air supporting settling tank 3 by pipeline, air supporting settling tank 3 is adjusted pond 4 by pipeline with PH and is connected, PH adjusts pond 4 and is connected with electrolyzer 5 by pipeline, electrolyzer 5 is connected with intermediate pool 6 by pipeline, intermediate pool 6 is connected with UASB anaerobic reation pool 7 by pipeline, UASB anaerobic reation pool 7 is connected with Aerobic Pond 8 by pipeline, Aerobic Pond 8 is connected with coagulation basin 9 by pipeline, coagulation basin 9 is connected with flocculation basin 10 by pipeline, and flocculation basin 10 is connected with settling tank 11 by pipeline, and settling tank 11 is connected with clean water basin 12 by pipeline, clean water basin 12 are connected with filtering system 13 by pipeline, described air supporting settling tank 3, UASB anaerobic reation pool 7 is connected by concentrated 14 ponds of pipeline and mud with settling tank 11, and sludge thickener 14 is connected with pressure filter 15 by pipeline, and sludge thickener 14 is connected with equalizing tank 2 by pipeline.
The principle of work of this embodiment is as follows:
One, waste water is removed suspended substance through grid 1 and is entered equalizing tank 2, after stopping aeration, smoke by submersible pump, one segment pipe mixing tank is set in submersible pump pipeline, waste water reacts with the PAC coagulating agent of access at this, after entering air supporting settling tank 3 reaction zones, react with PAM flocculation agent again, simultaneously in pond, separate scum silica frost and mud by aeration, scum silica frost is scraped to deslagging weir and is entered Residue extraction pipeline by air flotation pool top slag scraper, mud by pond at the bottom of shore pipe take away.
Two, water body flows to clear water in the process of the air flotation pool the other end and comes together in body middle part, pond, enters and adjusts pond from air flotation pool opposite side middle part water shoot.Waste water is adjusted in pond 4 by acid, alkali medicament regulating water quality pH value, flowing to fully reaction in intermediate pool 6 processes, by the submersible pump suction bypass channel in intermediate pool 6 at PH.
Three, bypass channel bottom even distribution pore, connects water distributor at 7 end of UASB anaerobic reation pool water distribution uniformity.Waste water fully contacts digestion with the anerobe in active sludge in UASB anaerobic reation pool 7, removes the organism in waste water, mud-water separation in uphill process, and sludge settling, unnecessary mud is taken away by pool bottom sludge pipe; Clear water overflows into surrounding effluent weir, flows into Aerobic Pond bottom by water pipe.
Four, in Aerobic Pond 8, be covered with filler, aeration at the bottom of pond, allows active sludge carry out aerobic repiration, further organic substance decomposing is become to inorganics.Waste water to Aerobic Pond the other end top, flows into PAC reaction tank and coagulating agent contact reacts by water surface posticum by filler stream, and then at the bottom of pond, water hole enters PAM reaction tank and flocculation agent contact reacts.
Five, the waste water of confection flows into settling tank bottom, is covered with inclined tube and assists sludge settling in pond.Mud, by pond bottom pipeline suction sludge sump, overflows into effluent weir by the clear water of inclined tube and flows into clean water basin.Now in clean water basin, water quality is up to standard, meets emission standard or reuse condition.
Six, scum silica frost and mud in air supporting settling tank 3, the whole suction sludge sumps of mud in UASB anaerobic reation pool 7 and settling tank 11, further, after sedimentation, press mud machine by the pipeline suction at the bottom of sludge sump, are filtered dry mud, and filtrate is back to equalizing tank, and mud cake outward transport is processed.
This embodiment has following beneficial effect: it adopts all steel structure, and rational deployment, makes full use of space, has easy construction, simple to operate, and building is compact attractive in appearance.

Claims (1)

1. integrated small painting wastewater is processed complete process structure, it is characterized in that it comprises grid (1), equalizing tank (2), air supporting settling tank (3), PH adjusts pond (4), electrolyzer (5), intermediate pool (6), UASB anaerobic reation pool (7), Aerobic Pond (8), coagulation basin (9), flocculation basin (10), settling tank (11), clean water basin (12), filtering system (13), sludge thickener (14), pressure filter (15), grid (1) is connected with equalizing tank (2) by pipeline, equalizing tank (2) is connected with air supporting settling tank (3) by pipeline, air supporting settling tank (3) is adjusted pond (4) by pipeline with PH and is connected, PH adjusts pond (4) and is connected with electrolyzer (5) by pipeline, electrolyzer (5) is connected with intermediate pool (6) by pipeline, intermediate pool (6) is connected with UASB anaerobic reation pool (7) by pipeline, UASB anaerobic reation pool (7) is connected with Aerobic Pond (8) by pipeline, Aerobic Pond (8) is connected with coagulation basin (9) by pipeline, coagulation basin (9) is connected with flocculation basin (10) by pipeline, flocculation basin (10) is connected with settling tank (11) by pipeline, settling tank (11) is connected with clean water basin (12) by pipeline, clean water basin (12) are connected with filtering system (13) by pipeline, described air supporting settling tank (3), UASB anaerobic reation pool (7) is connected by concentrated (14) pond of pipeline and mud with settling tank (11), sludge thickener (14) is connected with pressure filter (15) by pipeline, sludge thickener (14) is connected with equalizing tank (2) by pipeline.
CN201420384637.0U 2014-07-09 2014-07-09 Integrated small painting wastewater is processed complete process structure Expired - Fee Related CN203976588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420384637.0U CN203976588U (en) 2014-07-09 2014-07-09 Integrated small painting wastewater is processed complete process structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420384637.0U CN203976588U (en) 2014-07-09 2014-07-09 Integrated small painting wastewater is processed complete process structure

Publications (1)

Publication Number Publication Date
CN203976588U true CN203976588U (en) 2014-12-03

Family

ID=51974052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420384637.0U Expired - Fee Related CN203976588U (en) 2014-07-09 2014-07-09 Integrated small painting wastewater is processed complete process structure

Country Status (1)

Country Link
CN (1) CN203976588U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106145554A (en) * 2016-08-30 2016-11-23 宜兴市中发水处理环保设备有限公司 A kind of processing system being applied to high-concentration garbage percolate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106145554A (en) * 2016-08-30 2016-11-23 宜兴市中发水处理环保设备有限公司 A kind of processing system being applied to high-concentration garbage percolate

Similar Documents

Publication Publication Date Title
CN103979750B (en) Reactor for sewage treatment and phosphorus recovery and method for recovering phosphorus by using same
CN204185333U (en) Integration advanced treatment system
CN203976588U (en) Integrated small painting wastewater is processed complete process structure
CN106745966A (en) A kind of steel wastewater and the device of municipal wastewater mixed regeneration reuse
CN204022523U (en) A kind of efficient and environment-friendly type inclined tube settling pond
CN203845858U (en) MBR membrane module aerating system
CN103922541B (en) For the full suspended active sludge integrated treatment unit of urban wastewater treatment
CN103508557B (en) Active sludge bed reaction treatment method and device
CN202322565U (en) Spraying system of paint spraying and water showering cabinet
CN205258241U (en) Printing and dyeing wastewater treatment system
CN209835896U (en) Novel bean product wastewater treatment system
CN204454831U (en) The printing and dyeing wastewater treatment system of high efficiente callback
CN203653326U (en) Aeration wastewater treatment device
CN207943987U (en) A kind of novel buried rural sewage treatment integration apparatus
CN208265964U (en) A kind of water treatment by membrane equipment
CN107585896B (en) Solid impurity sewage treatment device and method
CN202322464U (en) Device for treating waste water produced by aluminum processing
CN201240978Y (en) Combined type sewage in situ processing system
CN206408065U (en) The modular integrated processing equipment of complex media
CN103896461B (en) Deep well integrated reclaimed water regeneration system
CN105384206A (en) Defoaming method of coal chemical-industrial wastewater
CN105293814A (en) Mini-type paint spraying wastewater treatment process
CN203794749U (en) Integrated deep well water regeneration system
CN204939037U (en) A kind of clustered aggregates of periosteum process electroplating wastewater
CN203807306U (en) Efficient rural wastewater concentrated treatment device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141203

Termination date: 20200709