CN203948037U - 分段定量注入管柱 - Google Patents
分段定量注入管柱 Download PDFInfo
- Publication number
- CN203948037U CN203948037U CN201320825382.2U CN201320825382U CN203948037U CN 203948037 U CN203948037 U CN 203948037U CN 201320825382 U CN201320825382 U CN 201320825382U CN 203948037 U CN203948037 U CN 203948037U
- Authority
- CN
- China
- Prior art keywords
- injection valve
- leather cup
- plugging agent
- packer
- pipe column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000002347 injection Methods 0.000 title claims abstract description 41
- 239000007924 injection Substances 0.000 title claims abstract description 41
- 239000010985 leather Substances 0.000 claims abstract description 21
- 239000002981 blocking agent Substances 0.000 claims description 27
- 210000002445 nipple Anatomy 0.000 claims description 15
- 239000012530 fluid Substances 0.000 claims description 12
- 238000010276 construction Methods 0.000 abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 5
- 239000007788 liquid Substances 0.000 abstract description 3
- 238000006243 chemical reaction Methods 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000012856 packing Methods 0.000 abstract description 2
- 239000003795 chemical substances by application Substances 0.000 abstract 8
- 238000006073 displacement reaction Methods 0.000 abstract 2
- 230000011218 segmentation Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000011010 flushing procedure Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本实用新型公开了一种分段定量注入管柱,是为实现堵剂的定量注入而设计的。在本管柱由短节连接的油管内,自上向下依次设有上皮碗、后置液、上堵剂、中皮碗、下堵剂、下皮碗和前置液,油管下端通过短节连接上封隔器,上封隔器下端通过短节连接上分级注入阀,上分级注入阀下端通过短节连接下封隔器,下封隔器下端通过短节连接下分级注入阀。本管柱用几组外径不同的皮碗将堵剂封隔,从而能有效防止堵剂在管柱内与水接触反应,实现定量注入,安全可靠。各段堵剂挤注完毕后,通过皮碗关闭该段分级注入阀,可防止过顶替或顶替不足现象,施工质量高。堵剂完全注完以后,打掉各堵头,能方便解封和向地面显示剂注信息。本管柱结构合理,可靠,易于制造和安装。
Description
技术领域
本实用新型涉及一种分段定量注入管柱,属于石油开采堵水及管外封窜技术领域。
背景技术
目前,油田应用的化学堵水管柱大多采用封隔器和定压阀等工具组配而成,通过压差使封隔器坐封。施工中,通过地面人工计量和附加值法计算堵剂顶替量,再将堵剂注入地层。由于高强度堵剂不能显示一次注完,所以会出现顶替量不足或过顶替的现象。若表现顶替量不足,堵剂则不能完全进入地层,部分留在管柱中,造成洗井不通、管柱“灌肠”、封隔器不能解封、管柱遇卡及大修等问题。若表现过顶替,堵剂则进入地层的远井地带,失去封堵效果。再者,将高强度堵剂挤入地层后,管柱迅速泄压,使部分堵剂在地层压力的作用下“回吐”进入管柱,造成封隔器解封不可靠。
发明内容
本实用新型的目的在于提供一种分段定量注入管柱,其能精确显示堵剂的注入信息,实现堵剂的定量注入。
本实用新型的具体技术方案如下:
在本管柱由短节连接的油管内,自上向下依次设有上皮碗、后置液、上堵剂、中皮碗、下堵剂、下皮碗和前置液,油管下端通过短节连接上封隔器,上封隔器下端通过短节连接上分级注入阀,上分级注入阀下端通过短节连接下封隔器,下封隔器下端通过短节连接下分级注入阀。
本管柱用几组外径不同的皮碗将堵剂封隔,从而能有效防止堵剂在管柱内与水接触反应,实现定量注入,安全可靠。各段堵剂挤注完毕后,通过皮碗关闭该段分级注入阀,可防止过顶替或顶替不足现象,施工质量高。堵剂完全注完以后,打掉各堵头,能方便解封和向地面显示剂注信息。本管柱结构合理,可靠,易于制造和安装。
附图说明
图1为分段定量注入管柱上部示意图。
图2为分段定量注入管柱中部示意图。
图3为分段定量注入管柱下部示意图。
图4为上、下分级注入阀示意图。
具体实施方式
参照图1至4对本实用新型的实施例进一步说明:
实施例:
本管柱主要包括油管1、上皮碗2、后置液3、上堵剂4、中皮碗5、下堵剂6、下皮碗7、前置液8、上封隔器9、上分级注入阀10、下封隔器11和下分级注入阀12;
在本管柱由短节连接的油管1内,自上向下依次设有上皮碗2、后置液3、上堵剂4、中皮碗5、下堵剂6、下皮碗7和前置液8,油管1下端通过短节连接扩张式的上封隔器9,上封隔器9下端通过短节连接上分级注入阀10,上分级注入阀10下端通过短节连接下封隔器11,下封隔器11下端通过短节连接下分级注入阀12。
本分段定量注入管柱的工作过程如下:
当本管柱下到预定深度时,从地面向管柱内泵入清水。油管1内压上升至一定程度后,上皮碗2开始下行,推动后置液3和上堵剂4下移,坐封封隔器7。各级皮碗继续下移,管内压力升高,先打开下分级注入阀12,下皮碗7推动前置液8经下分级注入阀12的出液孔排出,出液孔周围的液体被前置液8置换,从而可避免高强度的堵剂在套管内反应,影响堵剂正常注入。下皮碗7继续下行,坐在下分级注入阀12底座上,封堵下部尾管。继续打压,推动上皮碗2下移,中皮碗5推动下堵剂6经下分级注入阀12出液孔排出,进入地层,封堵该目的层段。当中皮碗5下行并坐入下分级注入阀12中心管内台阶处时,在压力的作用下,推动下分级注入阀12中心管下行,关闭出液孔,完成下段挤注施工。油管1内继续加压,打开上分级注入阀10,上皮碗2推动上堵剂4经上分级注入阀10出液孔排出,进入地层,封堵该目的层段。当上皮碗2下行并坐入上分级注入阀10中心管内台阶处时,在压力的作用下,推动上分级注入阀10中心管下行,关闭出液孔,完成上段挤注施工。继续加压,打掉各堵头,直至压力突降,实现油套连通,以便封隔器解封和洗井,降低管柱起出难度,给地面工作人员显示堵剂已完全注完的信息,起出管柱,完成挤注施工。
Claims (1)
1.一种分段定量注入管柱,其特征在于:
在本管柱由短节连接的油管(1)内,自上向下依次设有上皮碗(2)、后置液(3)、上堵剂(4)、中皮碗(5)、下堵剂(6)、下皮碗(7)和前置液(8),油管(1)下端通过短节连接上封隔器(9),上封隔器(9)下端通过短节连接上分级注入阀(10),上分级注入阀(10)下端通过短节连接下封隔器(11),下封隔器(11)下端通过短节连接下分级注入阀(12)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320825382.2U CN203948037U (zh) | 2013-12-13 | 2013-12-13 | 分段定量注入管柱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320825382.2U CN203948037U (zh) | 2013-12-13 | 2013-12-13 | 分段定量注入管柱 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203948037U true CN203948037U (zh) | 2014-11-19 |
Family
ID=51890080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320825382.2U Expired - Fee Related CN203948037U (zh) | 2013-12-13 | 2013-12-13 | 分段定量注入管柱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203948037U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017000622A1 (zh) * | 2015-06-30 | 2017-01-05 | 安东柏林石油科技(北京)有限公司 | 存储式精密定量油气井井下工作剂注入系统及注入方法 |
CN107701143A (zh) * | 2016-08-09 | 2018-02-16 | 中国石油化工股份有限公司 | 一种基于一趟管柱的多层段封窜堵漏装置及其方法 |
CN108301785A (zh) * | 2018-01-29 | 2018-07-20 | 中国石油天然气股份有限公司 | 一种防砂完井管柱及方法 |
CN108979581A (zh) * | 2017-06-05 | 2018-12-11 | 中国石油化工股份有限公司 | 一种深井精确定量注剂堵水管柱系统 |
-
2013
- 2013-12-13 CN CN201320825382.2U patent/CN203948037U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017000622A1 (zh) * | 2015-06-30 | 2017-01-05 | 安东柏林石油科技(北京)有限公司 | 存储式精密定量油气井井下工作剂注入系统及注入方法 |
CN107701143A (zh) * | 2016-08-09 | 2018-02-16 | 中国石油化工股份有限公司 | 一种基于一趟管柱的多层段封窜堵漏装置及其方法 |
CN107701143B (zh) * | 2016-08-09 | 2019-08-30 | 中国石油化工股份有限公司 | 一种基于一趟管柱的多层段封窜堵漏装置及其方法 |
CN108979581A (zh) * | 2017-06-05 | 2018-12-11 | 中国石油化工股份有限公司 | 一种深井精确定量注剂堵水管柱系统 |
CN108301785A (zh) * | 2018-01-29 | 2018-07-20 | 中国石油天然气股份有限公司 | 一种防砂完井管柱及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105239965B (zh) | 盐穴储气库注气排卤方法 | |
CN203948037U (zh) | 分段定量注入管柱 | |
CN203808945U (zh) | 裸眼筛管完井水平井根部堵水控水工艺管柱 | |
CN105649585B (zh) | 自流注水一体化管柱及其操作工艺 | |
CN203188968U (zh) | 过电缆可洗井封隔器 | |
CN104120997A (zh) | 水平井用的管柱 | |
CN206458437U (zh) | 一种桥式偏心分层注水管柱 | |
CN102619493A (zh) | 筛管完井的稠油水平井调剖堵水方法及其组合装置 | |
CN204252929U (zh) | 采油堵水管柱 | |
CN203285385U (zh) | 液压控制封隔器 | |
CN106677736A (zh) | 移动式井筒动态找水堵水装置 | |
CN201778771U (zh) | 不动管柱水力喷射分层压裂一体化管柱 | |
CN204941345U (zh) | 一种带有封隔功能的径向井转向装置 | |
CN204175273U (zh) | 压裂有杆泵一体化管柱 | |
CN202467799U (zh) | 筛管完井的稠油水平井调剖堵水组合装置 | |
CN201354616Y (zh) | 水平井分注封隔器 | |
CN202954776U (zh) | 一种适应水平注水井分层密封能反洗反注的定位密封装置 | |
CN212774391U (zh) | 一种煤矿巷道内瓦斯抽采装置及其注浆部件 | |
CN205225206U (zh) | 一种用于抽油机井测井的抽汲装置 | |
CN201857941U (zh) | 水平井防漏失及延缓底水锥进一体化管柱 | |
CN204126618U (zh) | 上层笼统注聚下层笼统注水工艺管柱 | |
CN201106435Y (zh) | 水平井分层压裂滑套式封隔器 | |
CN207315294U (zh) | 可洗井双皮碗封隔器 | |
CN203531867U (zh) | 一次防砂留井工具及其二次补砂挤压充填工具 | |
CN110735619B (zh) | 多油层中单独对一层挤压充填管柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141119 Termination date: 20211213 |