CN203946515U - Pipe conveyer charging transition phase frame - Google Patents

Pipe conveyer charging transition phase frame Download PDF

Info

Publication number
CN203946515U
CN203946515U CN201420411713.2U CN201420411713U CN203946515U CN 203946515 U CN203946515 U CN 203946515U CN 201420411713 U CN201420411713 U CN 201420411713U CN 203946515 U CN203946515 U CN 203946515U
Authority
CN
China
Prior art keywords
main body
frame main
transition phase
frame
structural constituent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420411713.2U
Other languages
Chinese (zh)
Inventor
杨聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIDFORE ENGINEERING Co Ltd
Original Assignee
TIDFORE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIDFORE ENGINEERING Co Ltd filed Critical TIDFORE ENGINEERING Co Ltd
Priority to CN201420411713.2U priority Critical patent/CN203946515U/en
Application granted granted Critical
Publication of CN203946515U publication Critical patent/CN203946515U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

A pipe conveyer charging transition phase frame, comprises structural constituent; The stern barrel (2) being rotationally connected with described structural constituent; Be connected to the carrying roller group in described structural constituent; Be connected to cover panel, protection assembly in described structural constituent, described structural constituent comprises frame main body (14), is connected to deflector chute (6), safety screen (12) in described frame main body (14); Described carrying roller group comprises transition carrier roller (5), impact idler (7), backhaul supporting carrier roller (8), the press-roller device (11) being connected in described frame main body (14) and becomes conduit saddle roller group (16); Described cover panel comprises stern barrel guard shield (1), upper cover plate (10) and side protective cover (15); Described protection assembly comprises deviation switch (3), backhaul swabbing pig (4), anti-tear switch (9) and pull switch (13).

Description

Pipe conveyer charging transition phase frame
Technical field
The utility model relates to pipe conveyer, especially relates to a kind of pipe conveyer charging transition phase frame.
Background technology
Along with the requirement of modernization development, environmental protection has become increasingly important problem of current era, and has worldwide caused attention widely.The dust that bulk material delivery system produces in the course of the work and remove material, the pollution of environment has been caused to the departments such as countries in the world conveying machinery design, manufacture, use and government more and more pay close attention to, the pollution producing in order to reduce course of conveying, advocates environmental protection and Harmless and carries bulk material.Various countries engineering staff develop the closed belt conveyer of various ways at present.By its cross sectional shape, roughly can be summarized as two large classes: first class is tubular belt conveyer, and Equations of The Second Kind is special-shaped tubular belt conveyer.Wherein the circular pipe belt type conveyer in the first kind (conventional is regular hexagon carrying roller group) be in numerous closed belt conveyers exploitation the earliest, with fastest developing speed, in mine, the industry such as power plant, harbour, chemical industry, metallurgy and building materials is widely used.
Pipe conveyer interlude is because its belt becomes pipe parcel by material, thereby inhibition airborne dust has good environmental protection characteristic.Circular pipe belt type conveyer can be in horizontal surface or in vertical surface or curvature of space arrange, can clear the jumps or other facilities, in the middle of not needing, do not reprint, do not realize a captain apart from the object of complicated circuit convey materials.But at transition phase end to end, must be straight-though arrangement, generally be divided into head transition phase and afterbody transition phase.Because of the transition phase that conveyer two ends exist, cannot avoid, its belt progressively launches, and environmental protection characteristic is difficult to well be guaranteed.The one, powder material there will be airborne dust, contaminated environment, and the 2nd, the sideslip that belt easily occurs herein and torsion can cause the unrestrained of material, and impact is produced.
At present, pipe conveyer charging transition phase frame adopts traditional general belt conveyor structure, steel structure is mainly comprised of afterbody frame, middle frame and Gao Shi supporting leg etc., pipe-forming machine frame and transition frame are Split type structure, stern barrel is fixed in afterbody frame, transition phase place carrying roller adopts traditional general groove profile carrier roller, and deflector chute adopts traditional general belt conveyer gathering sill; The material impact belt falling by inlet point more there will be airborne dust, easily contaminated environment.In addition, at least also there is one of following defect:
1, main steel structure poor stability, the relative ordinary straps machine of pipe conveyer stressed large;
2, sealing environment protecting performance can not be guaranteed, and can not embody the advantage of pipe conveyer environmental protection;
3, independent general groove profile carrier roller can not meet the requirement that progressively becomes pipe;
4, general deflector chute does not limit the function of excessive supplied materials, pipe conveyer expand tube not in the time of cannot guaranteeing that supplied materials is unstable;
5, the built on stilts inconvenience of arranging, increases civil engineering cost.
Utility model content
In order to overcome the defect of prior art, the technical matters that the utility model solves is: a kind of pipe conveyer charging transition phase frame is provided, for spread weak seal position, plays package action, can effectively prevent airborne dust; Convenient adjustment, has the multistage expand tube function that prevents simultaneously.
In order to solve the problems of the technologies described above, the pipe conveyer charging transition phase frame that the utility model provides, comprises structural constituent; The stern barrel being rotationally connected with described structural constituent; Be connected to the carrying roller group in described structural constituent; Be connected to cover panel, protection assembly in described structural constituent, described structural constituent comprises frame main body, is connected to deflector chute, safety screen in described frame main body; Described carrying roller group comprises transition carrier roller, impact idler, backhaul supporting carrier roller, the press-roller device being connected in described frame main body and becomes conduit saddle roller group; Described cover panel comprises stern barrel guard shield, upper cover plate and side protective cover; Described protection assembly comprises deviation switch, backhaul swabbing pig, anti-tear switch and pull switch.
As further improvement project: the pipe conveyer charging transition phase frame that the utility model provides, described structural constituent is whole truss structure, caudad cylinder lateral section area is greater than away from stern barrel lateral section area, and two sections variation place adopts transition phase smooth transition.
As further improvement project: the pipe conveyer charging transition phase frame that the utility model provides, described stern barrel guard shield is semi-closed structure, is wrapped in stern barrel, is removably connected with described frame main body.
As further improvement project: the pipe conveyer charging transition phase frame that the utility model provides, described upper cover plate is removably connected to the top of frame main body, described side protective cover is removably connected to the two sides of frame main body, and described upper cover plate, side protective cover and drum shield make whole frame main body capped.
As further improvement project: the pipe conveyer charging transition phase frame that the utility model provides, has watch window on described side protective cover.
As further improvement project: the pipe conveyer charging transition phase frame that the utility model provides, described transition carrier roller and impact idler are trench structure, grooved angle is adjustable, described transition carrier roller and impact idler are removably connected on the carrying surface of frame main body, and described impact idler is arranged in the below of described deflector chute.
As further improvement project: the pipe conveyer charging transition phase frame that the utility model provides, described press-roller device is arranged near becoming conduit saddle roller group front end, when tubular belt is transitioned into circular tube shaped from open and flat section, works the pipe effect of assisting into.
As further improvement project: the pipe conveyer charging transition phase frame that the utility model provides; described safety screen is removably connected in frame main body; at the beginning of tubular belt becomes pipe, arrange 3~5 groups, described deflector chute and safety screen are provided with protection switch.When supplied materials surpasses rated quantity, touch the protection switch on deflector chute or safety screen, described protection switch also sends instruction stop.
In the situation that not conflicting, above-mentioned improvement project can be implemented alone or in combination.
The beneficial effects of the utility model: the pipe conveyer charging transition phase frame providing, cover panel (upper cover plate, side protective cover and drum shield) makes whole frame main body capped, can effectively prevent airborne dust, reaches environmental protection truly; Adopt whole truss structure, convenient built on stilts layout, structural stability is good, adapts to different spaces and arranges demand, is convenient to universalization; Each arrangement of components of frame is reasonable, compact conformation; Adopt deflector chute, in the time of restriction bulk materials, can also limit inflow-rate of water turbine.Adopt multigroup safety baffle plate, multistage protection prevents that supplied materials inequality from causing expand tube.
Accompanying drawing explanation
Accompanying drawing is used to provide further understanding of the present utility model, forms the application's a part, and schematic description and description of the present utility model is used for explaining the utility model, does not form improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the feed main TV structure schematic diagram of transition phase frame of embodiment;
Fig. 2 is the feed plan structure schematic diagram of transition phase frame of embodiment;
Fig. 3 is that the A of Fig. 1 is to structural representation;
Fig. 4 be Fig. 1 1-1 to structural representation;
Fig. 5 be Fig. 1 2-2 to structural representation;
Fig. 6 be Fig. 1 3-3 to structural representation;
Fig. 7 be Fig. 1 4-4 to structural representation;
Fig. 8 be Fig. 1 5-5 to structural representation;
Fig. 9 be Fig. 1 6-6 to structural representation.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in further detail.
Pipe conveyer charging transition phase frame as shown in Figures 1 to 9, comprise structural constituent, structural constituent is whole truss structure, caudad cylinder lateral section area is greater than away from stern barrel lateral section area, two sections variation place adopts transition phase smooth transition, this structure meets functional requirement on the one hand, simultaneously maximized minimizing steel structure use amount.Structural constituent comprises frame main body 14, is connected to deflector chute 6 and safety screen 12 in frame main body 14; Stern barrel 2 is rotationally connected with frame main body 14; Carrying roller group is connected in frame main body 14, and carrying roller group comprises transition carrier roller 5, impact idler 7, backhaul supporting carrier roller 8, the press-roller device 11 being connected in frame main body 14 and becomes conduit saddle roller group 16; Idler assembly arranges for carrying tubular belt and material, and standard transition carrier roller 5 and impact idler 7 are trench structure, and its grooved angle is all adjustable, to adapt to belt, becomes pipe characteristic, is all bolted on the carrying surface of frame main body 14, before belt becomes pipe, holds; Both steel structures are identical, and different is that the former is common carrying roller, or the carrying roller of band buffering; Impact idler 7 mainly plays the buffer action after material falls, and is arranged under the discharging point of below of deflector chute 6; Backhaul supporting carrier roller 8 is arranged in pairs, is arranged on backhaul face, is in tubular belt 17 transition phases, mainly plays the effect of back-up belt; Paired two groups of press-roller device 11, two groups of homonymies are arranged on carrying surface, and near becoming conduit saddle roller group 16 front ends, when tubular belt 17 is transitioned into circular tube shaped from open and flat section, play certain pipe effect of assisting into; Become conduit saddle roller group 16 for hexagon combination, be arranged in 14 one-tenth pipeline sections of frame main body, to wrap up tubular belt 17, allow it keep smoothly round tube shape, it supports the effect of tubular belt 17 and transported material simultaneously.Stern barrel guard shield 1 is semi-closed structure, be wrapped in stern barrel 2, by bolt, be connected with described frame main body 14, stern barrel guard shield 1 can be wrapped on the one hand tumbler and avoid personnel near dangerous, can, with cover panel in closed region of the interior formation of frame main body 14, play the effect that prevents dust diffusion on the other hand; Upper cover plate 10 is removably connected to the top of frame main body 14, and side protective cover 15 is removably connected to the two sides of frame main body 14, on side protective cover 15, has window, and service personnel can conveniently be seen the running condition of material on belt by this window; Described upper cover plate 10, side protective cover 15 and drum shield 1 make whole frame main body 14 capped; When material falls into the dust of kicking up after belt spread, can effectively be sheltered from, caused aerial contamination in the middle of can not being diffused into air, played the effect of environmental protection; Secondly can also play windproof and rainproof effect, protection material can not be blown away and be drenched; The tubular belt of the carrying roller of high speed rotating and motion can be kept apart, protection personnel are near not causing danger.Deflector chute 6 is bolted in frame main body 14, is arranged under movable loading point on impact idler 7.Described safety screen 12 is removably connected to frame main body 14) upper, at the beginning of 17 one-tenth pipes of tubular belt, arrange 3~5 groups, described deflector chute 6 and safety screen 12 are equipped with protection switch.Frame main body 14 is provided with deviation switch 3, backhaul swabbing pig 4, anti-tear switch 9, pull switch 13 protection assemblies; deflector chute 6 and safety screen 12 are all with safety guard; when supplied materials surpasses rated quantity; all can touch the protection switch on deflector chute 6 or safety screen 12, protection switch sends instruction stop.Tubular belt 17 runs in the guide among idler assembly, walks around frame main body 14 stern barrels 2.
Obviously, the utility model is not limited to above preferred implementation, also can be in the spirit of the utility model claim and specification sheets restriction, carry out conversion and the improvement of various ways, can solve same technical matters, and obtain the technique effect of expection, therefore do not repeat.Those of ordinary skill in the art can be from the disclosed content of the utility model directly or all schemes of associating, as long as within the spirit limiting in claim, also belong to protection domain of the present utility model.

Claims (8)

1. a pipe conveyer charging transition phase frame, comprises structural constituent; The stern barrel (2) being rotationally connected with described structural constituent; Be connected to the carrying roller group in described structural constituent; Be connected to cover panel, protection assembly in described structural constituent, it is characterized in that: described structural constituent comprises frame main body (14), is connected to deflector chute (6), safety screen (12) in described frame main body (14); Described carrying roller group comprises transition carrier roller (5), impact idler (7), backhaul supporting carrier roller (8), the press-roller device (11) being connected in described frame main body (14) and becomes conduit saddle roller group (16); Described cover panel comprises stern barrel guard shield (1), upper cover plate (10) and side protective cover (15); Described protection assembly comprises deviation switch (3), backhaul swabbing pig (4), anti-tear switch (9) and pull switch (13).
2. pipe conveyer according to claim 1 charging transition phase frame, it is characterized in that: described structural constituent is whole truss structure, caudad cylinder lateral section area is greater than away from stern barrel lateral section area, and two sections variation place adopts transition phase smooth transition.
3. pipe conveyer charging transition phase frame according to claim 1, is characterized in that: described stern barrel guard shield (1) is semi-closed structure, is wrapped in stern barrel (2), is removably connected with described frame main body (14).
4. pipe conveyer according to claim 1 charging transition phase frame, it is characterized in that: described upper cover plate (10) is removably connected to the top of frame main body (14), described side protective cover (15) is removably connected to the two sides of frame main body (14), and described upper cover plate (10), side protective cover (15) and drum shield (1) make whole frame main body (14) capped.
5. pipe conveyer charging transition phase frame according to claim 4, is characterized in that: on described side protective cover (15), have watch window.
6. pipe conveyer according to claim 1 charging transition phase frame, it is characterized in that: described transition carrier roller (5) and impact idler (7) are trench structure, grooved angle is adjustable, described transition carrier roller (5) and impact idler (7) are removably connected on the carrying surface of frame main body (14), and described impact idler (7) is arranged in the below of described deflector chute (6).
7. pipe conveyer according to claim 1 charging transition phase frame, it is characterized in that: described press-roller device (11) is arranged near becoming conduit saddle roller group (16) front end, when tubular belt (17) is transitioned into circular tube shaped from open and flat section, work the pipe effect of assisting into.
8. pipe conveyer according to claim 1 charging transition phase frame; it is characterized in that: described safety screen (12) is removably connected in frame main body (14); at the beginning of tubular belt (17) becomes pipe, arrange 3~5 groups, described deflector chute (6) and safety screen (12) are provided with protection switch.
CN201420411713.2U 2014-07-25 2014-07-25 Pipe conveyer charging transition phase frame Expired - Lifetime CN203946515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420411713.2U CN203946515U (en) 2014-07-25 2014-07-25 Pipe conveyer charging transition phase frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420411713.2U CN203946515U (en) 2014-07-25 2014-07-25 Pipe conveyer charging transition phase frame

Publications (1)

Publication Number Publication Date
CN203946515U true CN203946515U (en) 2014-11-19

Family

ID=51888569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420411713.2U Expired - Lifetime CN203946515U (en) 2014-07-25 2014-07-25 Pipe conveyer charging transition phase frame

Country Status (1)

Country Link
CN (1) CN203946515U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109941668A (en) * 2019-03-07 2019-06-28 郑州三和水工机械有限公司 Cylinder belt conveyer
CN114890058A (en) * 2022-06-28 2022-08-12 江苏福运达输送机械制造有限公司 Pipe belt conveyor stable in operation and simple in structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109941668A (en) * 2019-03-07 2019-06-28 郑州三和水工机械有限公司 Cylinder belt conveyer
CN114890058A (en) * 2022-06-28 2022-08-12 江苏福运达输送机械制造有限公司 Pipe belt conveyor stable in operation and simple in structure
CN114890058B (en) * 2022-06-28 2024-04-30 江苏福运达输送机械制造有限公司 Smooth operation and simple structure's piping belt conveyer

Similar Documents

Publication Publication Date Title
CN203946515U (en) Pipe conveyer charging transition phase frame
CN104790958B (en) A kind of anti-prominent green safety high efficient driving method of anaerobic for protruding coal road
Ju et al. Vertical transportation system of solid material for backfilling coal mining technology
CN105417218A (en) Transfer station device and system
CN205555382U (en) Prevent stifled dirt streamline coal breakage pipe that presses down based on EDEM design
CN106044287A (en) Square automotive coal unloading chute
CN205204327U (en) Transfer post device and system
CN203020926U (en) Aluminum foil waste material recovery mechanism
CN207142073U (en) Unpowered totally-enclosed slide type deduster gathering sill device
CN204110745U (en) A kind of bad glass conveyer device
CN203835440U (en) Novel evacuation platform
CN204872442U (en) Seal stock ground
CN205421373U (en) Backfill conveyer belt
CN202226360U (en) Adjustable spring rubber-ring-type absorber idler
CN204416472U (en) A kind of cloth elephant trunk dolly
CN203921974U (en) A kind of fender guard of anti-belt feeder belt tearing
CN203975744U (en) A kind of belt anti-waft unit and the anti-waving apparatus of belt
CN207876637U (en) Full-closed material guide slot device
CN201961798U (en) Belt conveyor with protecting function
CN202193411U (en) Gliding prevention device in belt type conveying system
CN205906767U (en) Sintering gas cleaning active carbon storage device of unloading
CN107008528A (en) A kind of breaker of anti-dust pollution for building
CN103510982B (en) Coal feeder bunker channeling stopping device used for coal mine
CN210735463U (en) Coal leakage preventing device for belt
CN101913493A (en) Adjustable spring rubber ring type absorber idler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Charging transition segment tack of tubular belt conveyor

Effective date of registration: 20180503

Granted publication date: 20141119

Pledgee: Xiangtan Jiuhua Economic Construction Investment Co.,Ltd.

Pledgor: TIDFORE INTERNATIONAL ENGINEERING Co.,Ltd.|TIDFORE HEAVY INDUSTRY Co.,Ltd.|TIDFORE OCEAN ENGINEERING EQUIPMENT (TIANJIN) Co.,Ltd.

Registration number: 2018430000029

PE01 Entry into force of the registration of the contract for pledge of patent right
CX01 Expiry of patent term

Granted publication date: 20141119

CX01 Expiry of patent term