CN203941267U - A kind of integrated high-voltage test device of exempting to install - Google Patents
A kind of integrated high-voltage test device of exempting to install Download PDFInfo
- Publication number
- CN203941267U CN203941267U CN201420361065.4U CN201420361065U CN203941267U CN 203941267 U CN203941267 U CN 203941267U CN 201420361065 U CN201420361065 U CN 201420361065U CN 203941267 U CN203941267 U CN 203941267U
- Authority
- CN
- China
- Prior art keywords
- voltage
- supporting plate
- install
- test device
- guide piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
The utility model discloses a kind of integrated high-voltage test device of exempting to install, comprise base and vertical fixing guide piece on base, describedly integratedly exempt to install high-voltage test device and comprise supporting plate, on described supporting plate, the position of corresponding guide piece is provided with pilot hole, guide piece is through the pilot hole of supporting plate, and described guide piece is provided with locking device; High voltage reactor, high-voltage bleeder are installed on supporting plate, dicyclo grading shield system is installed on high voltage reactor, high-voltage bleeder, described supporting plate makes supporting plate drive high voltage reactor, high-voltage bleeder to move up and down by jack effect.By the way, the utility model can reach integrated apparatus exempts to install, the compact transport of overall shrinkage, man-power lift launches, and can complete onboard the object of test, significantly improves work efficiency, save auxiliary machine tool expense, on-the-spot high-voltage test is more convenient.To shortening electric power first-aid and power off time, there is positive effect the quickening power construction duration.
Description
Technical field
The utility model relates to high-voltage test device field, particularly relates to a kind of integrated high-voltage test device of exempting to install.
Background technology
Variable-frequency series resonance test device is the major equipment that high voltage AC voltage withstand test is carried out at power equipment scene.Mainly form complete equipment by each discrete part such as variable-frequency power sources, exciting transformer, high pressure resonance reactor and insulator foot thereof, high-voltage bleeder, balanced pressure system, insulating supporting annexes.Especially other high voltage components except variable-frequency power sources and exciting transformer all need to rely at the scene hoisting machine tool and install, test complete or on-the-spot displacement and also need repetition dismounting, thereby integrated level is low, must rely on outside facility installs, non-cutting time is long, inefficiency, very trouble.
Utility model content
The technical matters that the utility model mainly solves is to provide a kind of integrated high-voltage test device of exempting to install, can reach integrated apparatus exempts to install, the compact transport of overall shrinkage, man-power lift launches, can complete onboard the object of test, significantly improve work efficiency, save auxiliary machine tool expense, on-the-spot high-voltage test is more convenient.To shortening electric power first-aid and power off time, there is positive effect the quickening power construction duration.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of integrated high-voltage test device of exempting to install is provided, comprise base and vertical fixing guide piece on base, describedly integratedly exempt to install high-voltage test device and comprise supporting plate, on described supporting plate, the position of corresponding guide piece is provided with pilot hole, guide piece is through the pilot hole of supporting plate, and described guide piece is provided with locking device; High voltage reactor, high-voltage bleeder are installed on supporting plate, dicyclo grading shield system is installed on high voltage reactor, high-voltage bleeder, described supporting plate makes supporting plate drive high voltage reactor, high-voltage bleeder to move up and down by jack effect.
Preferably, described dicyclo grading shield system comprises the lifting structure between grading shield, lower grading shield and upper grading shield, lower grading shield, and locking mechanism is installed on lifting structure.
Preferably, described grading shield lifting structure is pulley blocks 10.
Preferably, described guide piece is guidepost, and guidepost is insulation guidepost.
Preferably, described supporting plate is provided with the jack acting on supporting plate except three sides of high-voltage bleeder direction.
The beneficial effects of the utility model are: a kind of integrated high-voltage test device of exempting to install of the utility model, the each single part disperseing is combined into an entirety, can realize by the man-driven lifting gearing of device self the oscilaltion campaign of dicyclo grading shield system and high voltage reactor, high-voltage bleeder, and support by the locking device on corresponding insulation guidepost and insulation guidepost.Realize not superelevation and the gravity centre distribution decline of high-pressure test device whole Transporting, when test, can certainly give rise to position, meet safe insulation distance and magnetic-leakage preventing eddy-current heating over the ground.Reach integrated apparatus and exempted to install, the compact transport of overall shrinkage, man-power lift launches, and can complete onboard the object of test, significantly improves work efficiency, saves auxiliary machine tool expense, and on-the-spot high-voltage test is more convenient.To shortening electric power first-aid and power off time, there is positive effect the quickening power construction duration, and therefore society and economic benefit are obvious.
Brief description of the drawings
Fig. 1 is a kind of integrated perspective view of exempting to install high-voltage test device of the utility model;
Fig. 2 is a kind of integrated front elevation of exempting to install high-voltage test device of the utility model;
Fig. 3 is a kind of integrated side view of exempting to install high-voltage test device of the utility model;
Fig. 4 is a kind of integrated travel position structural representation of exempting to install high-voltage test device of the utility model;
Fig. 5 is a kind of integrated vertical view of exempting to install high-voltage test device of the utility model.
Embodiment
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, thereby so that advantage of the present utility model and feature can be easier to be it will be appreciated by those skilled in the art that, protection domain of the present utility model is made to more explicit defining.
Refer to Fig. 1 to Fig. 5, the utility model embodiment comprises: a kind of integrated high-voltage test device of exempting to install, comprise base 4 and vertical fixing insulation guidepost on base 4, describedly integratedly exempt to install high-voltage test device and comprise supporting plate 3, on described supporting plate 3, the position of corresponding insulation guidepost is provided with pilot hole, insulation guidepost is through the pilot hole of supporting plate 3, and described insulation guidepost is provided with locking device 6, high voltage reactor 1 is installed on supporting plate 3, high-voltage bleeder 2, high voltage reactor 1, dicyclo grading shield system 7 is installed on high-voltage bleeder 2, dicyclo grading shield system 7 comprises grading shield, pulley blocks 10 between lower grading shield and upper grading shield and lower grading shield, grading shield is realized elevating movement by pulley blocks 10, locking mechanism 9 is installed on lifting structure, except acting on, the jack supporting plate 8 of three side settings of high-voltage bleeder 2 directions make supporting plate 3 drive high voltage reactor 1 by supporting plate 3, high-voltage bleeder 2 moves up and down, by insulation guidepost, high voltage reactor 1 is lifted to specified altitude together with high-voltage bleeder 2, locking device 6 with insulation on guidepost is by after supporting plate latched position, jack 8 is removed.
A kind of integrated job step of exempting to install high-voltage test device of the utility model is:
1, use pulley blocks 10 that the upper grading shield of dicyclo grading shield is given rise to desired location, use locking mechanism 9 by the locking position of upper grading shield, lower grading shield;
2, by after jack 8 releases, be placed on predetermined jacking position, jack acts on supporting plate, and hand shaken jack is to range, locking device 6 is arranged on guide piece 5, and jack 8 is tested after being withdrawn into home;
3, after having tested, to range place, hold out against supporting plate 3 by hand jack 8, the device 6 that unlocks, slowly puts down both sides jack 8, then the locking mechanism of dicyclo grading shield system is removed, and puts down dicyclo grading shield system.
A kind of integrated high-voltage test device of exempting to install of the utility model, the each single part disperseing is combined into an entirety, can realize by the man-driven lifting gearing of device self the oscilaltion campaign of dicyclo grading shield system and high voltage reactor, high-voltage bleeder, and support by the locking device on corresponding insulation guidepost and insulation guidepost.Realize not superelevation and the gravity centre distribution decline of high-pressure test device whole Transporting, when test, can certainly give rise to position, meet safe insulation distance and magnetic-leakage preventing eddy-current heating over the ground.Reach integrated apparatus and exempted to install, the compact transport of overall shrinkage, man-power lift launches, and can complete onboard the object of test, significantly improves work efficiency, saves auxiliary machine tool expense, and on-the-spot high-voltage test is more convenient.To shortening electric power first-aid and power off time, there is positive effect the quickening power construction duration, and therefore society and economic benefit are obvious.
The foregoing is only embodiment of the present utility model; not thereby limit the scope of the claims of the present utility model; every equivalent structure or conversion of equivalent flow process that utilizes the utility model instructions and accompanying drawing content to do; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present utility model.
Claims (5)
1. integratedly exempt to install high-voltage test device for one kind, it is characterized in that: comprise the upper vertical fixing guide piece (5) of base (4) and base (4), describedly integratedly exempt to install high-voltage test device and comprise supporting plate (3), the position of the upper corresponding guide piece (5) of described supporting plate (3) is provided with pilot hole, guide piece (5) is through the pilot hole of supporting plate (3), and described guide piece (5) is provided with locking device (6); High voltage reactor (1), high-voltage bleeder (2) are installed on supporting plate (3), on high voltage reactor (1), high-voltage bleeder (2), dicyclo grading shield system (7) is installed, described supporting plate makes supporting plate drive high voltage reactor (1), high-voltage bleeder (2) to move up and down by jack (8) effect.
2. one according to claim 1 is integrated exempts to install high-voltage test device, it is characterized in that: described dicyclo grading shield system (7) comprises the lifting structure between grading shield, lower grading shield and upper grading shield, lower grading shield, locking mechanism (9) is installed on lifting structure.
3. one according to claim 2 is integrated exempts to install high-voltage test device, it is characterized in that:
Described grading shield lifting structure is pulley blocks 10.
4. one according to claim 1 is integrated exempts to install high-voltage test device, it is characterized in that: described guide piece (5) is guidepost, and guidepost is insulation guidepost.
5. one according to claim 1 is integrated exempts to install high-voltage test device, it is characterized in that: described supporting plate (3) is provided with the jack (8) acting on supporting plate except three sides of high-voltage bleeder (2) direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420361065.4U CN203941267U (en) | 2014-07-01 | 2014-07-01 | A kind of integrated high-voltage test device of exempting to install |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420361065.4U CN203941267U (en) | 2014-07-01 | 2014-07-01 | A kind of integrated high-voltage test device of exempting to install |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203941267U true CN203941267U (en) | 2014-11-12 |
Family
ID=51860570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420361065.4U Expired - Fee Related CN203941267U (en) | 2014-07-01 | 2014-07-01 | A kind of integrated high-voltage test device of exempting to install |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203941267U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104101819A (en) * | 2014-07-01 | 2014-10-15 | 苏州华电电气股份有限公司 | Integrated installation-free high-voltage test device |
-
2014
- 2014-07-01 CN CN201420361065.4U patent/CN203941267U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104101819A (en) * | 2014-07-01 | 2014-10-15 | 苏州华电电气股份有限公司 | Integrated installation-free high-voltage test device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102996062B (en) | Maintenance lifting platform and application method thereof | |
CN203911299U (en) | Electronic auxiliary platform for changing respirator silica gel of large transformer | |
CN201619105U (en) | Equipment overhaul stand | |
CN202486159U (en) | Lifting insulated rod testing support | |
CN201852909U (en) | Detection mechanism for solar cell plate | |
CN204497632U (en) | A kind of novel portable electric power overhaul frame | |
CN201997019U (en) | Safety belt hanging device for channel steel | |
CN203941267U (en) | A kind of integrated high-voltage test device of exempting to install | |
CN103281886B (en) | The auxiliary assembling-disassembling structure of heavy components and using method in rack | |
CN104101819A (en) | Integrated installation-free high-voltage test device | |
CN205472516U (en) | Insulating elevating gear of high -voltage board maintenance with toolbox | |
CN103293452B (en) | Insulating ladder Withstand test device | |
CN203287481U (en) | Insulating ladder withstand voltage test device | |
CN205944736U (en) | Simple and easy installation device of transformer in box -type substation | |
CN203521960U (en) | Central-positioned switch chassis maintaining device | |
CN205045755U (en) | Distribution transformer handling device | |
CN204204695U (en) | High-pressure disconnecting switch motor structure assembly tool | |
CN203728491U (en) | Jacking device for heavy type parts for machining automobiles | |
CN103350975A (en) | Small size simple lifting device | |
CN202906257U (en) | Mobile workbench for mounting transformer station isolation switch | |
CN202900028U (en) | Overhaul lifting platform | |
CN206908169U (en) | A kind of electric apparatus Commissioning field job platform | |
CN204199800U (en) | A kind of box photovoltaic inversion room | |
CN203740956U (en) | Buried stacking device | |
CN204185197U (en) | A kind of electric operation insulated lift platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141112 Termination date: 20190701 |
|
CF01 | Termination of patent right due to non-payment of annual fee |