CN203938383U - For the fixture of handling steel pipe - Google Patents

For the fixture of handling steel pipe Download PDF

Info

Publication number
CN203938383U
CN203938383U CN201420276375.6U CN201420276375U CN203938383U CN 203938383 U CN203938383 U CN 203938383U CN 201420276375 U CN201420276375 U CN 201420276375U CN 203938383 U CN203938383 U CN 203938383U
Authority
CN
China
Prior art keywords
steel pipe
ring
semi
fixture
connecting bore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420276375.6U
Other languages
Chinese (zh)
Inventor
陈沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420276375.6U priority Critical patent/CN203938383U/en
Application granted granted Critical
Publication of CN203938383U publication Critical patent/CN203938383U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a kind of fixture for handling steel pipe, comprise one first semi-ring and one second semi-ring, one end of the first described semi-ring is connected by pin with one end of the second described semi-ring, and the described fixture for handling steel pipe also comprises one first fixed part and one second fixed part; The end of the first described semi-ring is provided with one first engaging lug, and the end of the second described semi-ring is provided with the second engaging lug; The first described fixed part comprises an arc connecting panel, and one end of described arc connecting panel is provided with a pair of the first connecting bore, and the other end is provided with one second connecting bore; One end of the second described fixed part is provided with a pair of the 3rd connecting bore.The advantage of the fixture for handling steel pipe of the present utility model is: with fast fastening structure, can fix steel pipe by fast fastening, and can easier open, efficiency is higher, and fastening power is larger, safe and reliable.

Description

For the fixture of handling steel pipe
Technical field
The utility model relates to a kind of fixture, more precisely a kind of fixture for handling steel pipe.
Background technology
Because steel pipe has cylindrical surface, and its length is longer, therefore in the time of handling steel pipe, steel pipe very easily with fixture generation relative sliding, therefore need to use handling after the fixing steel pipe of fixture, but after the fixing steel pipe of fixture of the prior art, fastening power is less, fasten undertighten, use is absolutely unsafe, and fastening that can not be faster and opening, and causes the efficiency of handling steel pipe lower.
Utility model content
The utility model is mainly to solve the existing technical matters of prior art, thereby provides a kind of with fast fastening structure, can fix steel pipe by fast fastening, and can easier open, efficiency is higher, and fastening power is larger, the safe and reliable fixture for handling steel pipe.
Above-mentioned technical matters of the present utility model is mainly solved by following technical proposals:
A kind of fixture for handling steel pipe, comprise one first semi-ring and one second semi-ring, one end of the first described semi-ring is connected by pin with one end of the second described semi-ring, and the described fixture for handling steel pipe also comprises one first fixed part and one second fixed part;
The end of the first described semi-ring is provided with one first engaging lug, and the end of the second described semi-ring is provided with the second engaging lug;
The first described fixed part comprises an arc connecting panel, and one end of described arc connecting panel is provided with a pair of the first connecting bore, and the other end is provided with one second connecting bore;
One end of the second described fixed part is provided with a pair of the 3rd connecting bore, and middle part is provided with a pair of the 4th connecting bore;
The first described connecting bore is connected by pin with the first described engaging lug, and the 3rd described connecting bore is connected by pin with the second described engaging lug, and the second described connecting bore is connected by pin with the 4th described connecting bore.
As the utility model preferred embodiment, one end of described arc connecting panel is also provided with a pair of tapped bore, described tapped bore vertically runs through the first described connecting bore, the first described connecting bore is oblate, the described fixture for handling steel pipe also comprises a pair of binding bolt, and described binding bolt is arranged in described tapped bore.
As the utility model preferred embodiment, the inner side of the first described semi-ring and the second described semi-ring is groove shape structure.
The advantage of the fixture for handling steel pipe of the present utility model is: with fast fastening structure, can fix steel pipe by fast fastening, and can easier open, efficiency is higher, and fastening power is larger, safe and reliable.
Brief description of the drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the perspective view of the fixture for handling steel pipe of the present utility model;
Fig. 2 is the front view of the fixture for handling steel pipe in Fig. 1;
Fig. 3 is the simplified structure schematic diagram of the fixture for handling steel pipe in Fig. 1;
Fig. 4 is the perspective view of the first fixed part in Fig. 1;
Fig. 5 is the perspective view at another visual angle of the first fixed part in Fig. 4;
Fig. 6 is the perspective view of the second fixed part in Fig. 1;
Wherein:
1, the first semi-ring; 11, the first engaging lug;
2, the second semi-ring; 21, the second engaging lug;
3, the first fixed part; 31, arc connecting panel; 32, the first connecting bore; 33, tapped bore; 34, the second connecting bore;
4, the second fixed part; 41, the 3rd connecting bore; 42, the 4th connecting bore;
5, binding bolt.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, thereby so that advantage of the present utility model and feature can be easier to be it will be appreciated by those skilled in the art that, protection domain of the present utility model is made to more explicit defining.
The advantage of the fixture for handling steel pipe of the present utility model is: with fast fastening structure, can fix steel pipe by fast fastening, and can easier open, efficiency is higher, and fastening power is larger, safe and reliable.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of fixture for handling steel pipe, comprise one first semi-ring 1 and one second semi-ring 2, one end of this first semi-ring 1 is connected by pin with one end of this second semi-ring 2, and this fixture that is used for handling steel pipe also comprises one first fixed part 3 and one second fixed part 4;
As shown in Figure 3, the end of this first semi-ring 1 is provided with one first engaging lug 11, and the end of this second semi-ring 2 is provided with the second engaging lug 21;
As shown in Figure 1, Figure 2, shown in Fig. 4, Fig. 5, this first fixed part 3 comprises an arc connecting panel 31, one end of this arc connecting panel 31 is provided with a pair of the first connecting bore 32, the other end is provided with one second connecting bore 34; Arrange after this arc connecting panel 31 makes this first fixed part 3 stressed and can be elongated, make the certain tension force of its inner maintenance, thereby can play the object of buckle.
As shown in Figure 6, one end of this second fixed part 4 is provided with a pair of the 3rd connecting bore 41, and middle part is provided with a pair of the 4th connecting bore 42;
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 6, this first connecting bore 32 is connected by pin with this first engaging lug 11, the 3rd connecting bore 41 is connected by pin with this second engaging lug 21, and this second connecting bore 34 is connected by pin with the 4th connecting bore 42.Lift the end of this second fixed part 4 and can open this fixture for handling steel pipe, then can take off steel pipe, the end of pressing this second fixed part 4 can fasten this fixture for handling steel pipe, thereby is closely connected with steel pipe.
As shown in Figure 4, Figure 5, one end of this arc connecting panel 31 is also provided with a pair of tapped bore 33, this tapped bore 33 vertically runs through this first connecting bore 32, this first connecting bore 32 is oblate, this fixture that is used for handling steel pipe also comprises a pair of binding bolt 5, this binding bolt 5 is arranged in this tapped bore 33, the end of this binding bolt 5 holds out against the pin that is positioned at this first connecting bore 32, it can not be come off, also can adjust the position of this pin, regulate this object for the fastening power of the fixture of handling steel pipe thereby reach simultaneously.
As shown in Figure 1, Figure 3, the inner side of this first semi-ring 1 and this second semi-ring 2 is groove shape structure, is conducive to anti-skidding.
Below only with an embodiment, mentality of designing of the present utility model is described, in the situation that system allows, the utility model can expand to external more functional module simultaneously, thereby expands to greatest extent its function.
The above, be only detailed description of the invention of the present utility model, but protection domain of the present utility model is not limited to this, and any variation of expecting without creative work or replacement, within all should being encompassed in protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain that claims were limited.

Claims (3)

1. the fixture for handling steel pipe, comprise one first semi-ring (1) and one second semi-ring (2), one end of described the first semi-ring (1) is connected by pin with one end of described the second semi-ring (2), it is characterized in that: the described fixture for handling steel pipe also comprises one first fixed part (3) and one second fixed part (4);
The end of described the first semi-ring (1) is provided with one first engaging lug (11), and the end of described the second semi-ring (2) is provided with the second engaging lug (21);
Described the first fixed part (3) comprises an arc connecting panel (31), one end of described arc connecting panel (31) is provided with a pair of the first connecting bore (32), and the other end is provided with one second connecting bore (34);
One end of described the second fixed part (4) is provided with a pair of the 3rd connecting bore (41), and middle part is provided with a pair of the 4th connecting bore (42);
Described the first connecting bore (32) is connected by pin with described the first engaging lug (11), the 3rd described connecting bore (41) is connected by pin with described the second engaging lug (21), and described the second connecting bore (34) is connected by pin with the 4th described connecting bore (42).
2. the fixture for handling steel pipe according to claim 1, it is characterized in that: one end of described arc connecting panel (31) is also provided with a pair of tapped bore (33), described tapped bore (33) vertically runs through described the first connecting bore (32), described the first connecting bore (32) is oblate, the described fixture for handling steel pipe also comprises a pair of binding bolt (5), and described binding bolt (5) is arranged in described tapped bore (33).
3. the fixture for handling steel pipe according to claim 1, is characterized in that: the inner side of described the first semi-ring (1) and described the second semi-ring (2) is groove shape structure.
CN201420276375.6U 2014-05-27 2014-05-27 For the fixture of handling steel pipe Expired - Fee Related CN203938383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420276375.6U CN203938383U (en) 2014-05-27 2014-05-27 For the fixture of handling steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420276375.6U CN203938383U (en) 2014-05-27 2014-05-27 For the fixture of handling steel pipe

Publications (1)

Publication Number Publication Date
CN203938383U true CN203938383U (en) 2014-11-12

Family

ID=51857718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420276375.6U Expired - Fee Related CN203938383U (en) 2014-05-27 2014-05-27 For the fixture of handling steel pipe

Country Status (1)

Country Link
CN (1) CN203938383U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107826969A (en) * 2017-10-19 2018-03-23 成都科盛石油科技有限公司 Suitable for the clamp system of pipeline transportation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107826969A (en) * 2017-10-19 2018-03-23 成都科盛石油科技有限公司 Suitable for the clamp system of pipeline transportation

Similar Documents

Publication Publication Date Title
UA104569C2 (en) Reinforcement bar coupler
CN203938383U (en) For the fixture of handling steel pipe
CN105174041A (en) Fixture for hoisting and transporting steel pipes
CN204609566U (en) A kind of active link structure of cabinet cover plate
CN204252623U (en) A kind of easy-to-mount bracing wire sheath
CN204179563U (en) The high tower pulley block of aluminium twisted wire with carbon fiber composite core
CN202518938U (en) Hanging hook with safety buckle
CN203308842U (en) Circular tube clamp
CN203734213U (en) Reliable wire-clamping device
CN204205429U (en) The automatic fixing-line device of a kind of aerofoil profile
CN203176000U (en) Fan fixing structure used for multimedia transmission platform
CN204454245U (en) Equalizing bar special hanger
CN204266420U (en) A kind of intelligent building curtain wall
CN204946816U (en) A kind of syndeton of relay
CN202180200U (en) Stopper
CN204731469U (en) Double embrace hoop drop wire clip
CN204166169U (en) Beaming type PLC optical branching device
CN204558697U (en) Being flexible coupling of a kind of direction-changeable
CN203418470U (en) General PIN fixture
CN201877633U (en) Pulling assister
CN202659671U (en) Stop mechanism
CN204200794U (en) A kind of coal machine coupling pin
CN202560699U (en) Monitoring device of high-pressure hydraulic source
CN204159022U (en) Sliding board-type perforation fixed mechanism
CN203879039U (en) Simple installing, connecting and reinforcing structure for building steel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141112

Termination date: 20150527