CN203929922U - A kind of two period cable circulating-heating test unit - Google Patents
A kind of two period cable circulating-heating test unit Download PDFInfo
- Publication number
- CN203929922U CN203929922U CN201420234719.7U CN201420234719U CN203929922U CN 203929922 U CN203929922 U CN 203929922U CN 201420234719 U CN201420234719 U CN 201420234719U CN 203929922 U CN203929922 U CN 203929922U
- Authority
- CN
- China
- Prior art keywords
- control module
- plc control
- voltage regulator
- induction voltage
- transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Control Of Resistance Heating (AREA)
Abstract
The utility model provides a kind of pair of period cable circulating-heating test unit, comprise PLC control module, PLC control module connects induction voltage regulator, first group of loaded cable connects induction voltage regulator by the first transformer, and second group of loaded cable connects induction voltage regulator by the second transformer.The device that the utility model provides has overcome the deficiencies in the prior art, carry out two periods switchings by PLC control module, can within two periods, carry out circulating-heating test to different cables, not only greatly improved test efficiency, and saved occupation of land space, reduce experimentation cost.
Description
Technical field
The utility model relates to a kind of two period cable circulating-heating test units, cable is done to accelerated aging test for the different periods, belongs to the technical field of performance test of electric wire.
Background technology
Along with the development of national economy, electrified, robotization prosperity day by day.Various special electricity consumptions require constantly to propose, and this not only has higher requirement to the generation quantity of electric wire, and have also proposed diversified requirement in performance, serviceable life to electric wire.
In order further to popularize and improve production and the operation level of electric wire, ensure product quality, ensure the safe operation of electrical network, meet the requirement of the more Gao Gengxin of economic development to electric wire proposition, it is the detection that R&D institution or manufacturer all need electric wire to carry out performance, find in time defect, further reduce economic loss.
Traditional durability test for electric wire need to consume a large amount of time, and general 1 group of test need to be done 8 hours, stops 16 hours, then carries out lower battery of tests.Huge due to test quantity, and the raising of testing cost, is necessary to develop a kind of device of accelerated aging test, such device yet there are no open report in the prior art.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of device that cable is carried out to accelerated deterioration experiment.
In order to solve the problems of the technologies described above, the technical solution of the utility model is to provide a kind of two period cable circulating-heating test unit, it is characterized in that: comprise PLC control module, PLC control module connects induction voltage regulator, first group of loaded cable connects induction voltage regulator by the first transformer, and second group of loaded cable connects induction voltage regulator by the second transformer.
Preferably, described induction voltage regulator is connected with 380V AC power, and first group of loaded cable is all connected with sensor with second group of loaded cable, and sensor connects PLC control module by analog input/output module; Described induction voltage regulator connects wave filter, probe power input end and PLC control module power input by MDQ, and wave filter connects PLC control module.
Preferably, described the first transformer, the second transformer are open-type punching transformer.
Two period cable circulating-heating test units that the utility model provides carry out two periods switchings by PLC control module, the 1st period carried out the test of first group of loaded cable, the 2nd period carried out the test of second group of loaded cable, originally 1 group of test is to do 8 hours, stop 16 hours, switch and can carry out 2 groups of tests by two periods now, equal to have saved 8 hours.A set of PLC control module and 2 groups of testing transformers of a set of pressure regulator control for this device, drive 2 groups of test product loaded cables simultaneously, and point 2 periods test, and have saved occupation of land space, also saves and economized experimentation cost.
The device that the utility model provides has overcome the deficiencies in the prior art, carry out two periods switchings by PLC control module, can within two periods, carry out circulating-heating test to different cables, not only greatly improved test efficiency, and saved occupation of land space, reduce experimentation cost.
Brief description of the drawings
The structured flowchart of two period cable circulating-heating test units that Fig. 1 provides for the utility model;
Two period cable circulating-heating test unit application schematic diagram that Fig. 2 provides for the utility model.
Embodiment
For the utility model is become apparent, hereby with a preferred embodiment, and coordinate accompanying drawing to be described in detail below.
The structured flowchart of two period cable circulating-heating test units that Fig. 1 provides for the utility model, described two period cable circulating-heating test units comprise PLC control module, PLC control module connects induction voltage regulator, induction voltage regulator connects two groups of cables by two open-type punching transformers respectively, first group of loaded cable connects induction voltage regulator by the first open-type punching transformer, and second group of loaded cable connects induction voltage regulator by the second open-type punching transformer.
In conjunction with Fig. 2, when use, 380V AC power is connected with induction voltage regulator, induction voltage regulator connects wave filter, probe power input end and PLC control module power input by MDQ, wave filter connects PLC control module, induction voltage regulator is providing the variable AC-input voltage to ratings from 20V to open-type punching transformer, has starting potential output, electronic control, the function such as spacing, take-off potential startup up and down.Open-type punching transformer as main frame, produces the required large electric current of test by it in this device.Consider to facilitate the installation of test product loaded cable, transformer core is designed to openable structure.Two groups of loaded cables are all connected with sensor, sensor connects PLC control module by analog input/output module, sensor detects electric current, core temperature and the environment temperature of loaded cable, by analog input/output module, analog signals is converted to digital quantity signal, and is transferred to PLC control module.PLC control module connects industrial computer by 485/232 converter.
In the present embodiment, PLC control module is selected Siemens S7-200-CPU226 type, and MDQ is selected DQZ-220D35F type, and analog input/output module is selected Siemens EM235 type.
Two period cable circulating-heating test units that the utility model provides carry out two periods switchings by PLC control module, the 1st period carried out the test of first group of loaded cable, the 2nd period carried out the test of second group of loaded cable, originally 1 group of test is to do 8 hours, stop 16 hours, switch and can carry out 2 groups of tests by two periods now, equal to have saved 8 hours.A set of PLC control module and 2 groups of testing transformers of a set of pressure regulator control for this device, drive 2 groups of test product loaded cables simultaneously, and point 2 periods test, and have saved occupation of land space, also saves and economized experimentation cost.
Claims (3)
1. a two period cable circulating-heating test unit, it is characterized in that: comprise PLC control module, PLC control module connects induction voltage regulator, first group of loaded cable connects induction voltage regulator by the first transformer, and second group of loaded cable connects induction voltage regulator by the second transformer.
2. the two period cable circulating-heating test units of one as claimed in claim 1, it is characterized in that: described induction voltage regulator is connected with 380V AC power, first group of loaded cable is all connected with sensor with second group of loaded cable, and sensor connects PLC control module by analog input/output module; Described induction voltage regulator connects wave filter, probe power input end and PLC control module power input by MDQ, and wave filter connects PLC control module.
3. the two period cable circulating-heating test units of one as claimed in claim 1 or 2, is characterized in that: described the first transformer, the second transformer are open-type punching transformer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420234719.7U CN203929922U (en) | 2014-05-09 | 2014-05-09 | A kind of two period cable circulating-heating test unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420234719.7U CN203929922U (en) | 2014-05-09 | 2014-05-09 | A kind of two period cable circulating-heating test unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203929922U true CN203929922U (en) | 2014-11-05 |
Family
ID=51825719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420234719.7U Expired - Fee Related CN203929922U (en) | 2014-05-09 | 2014-05-09 | A kind of two period cable circulating-heating test unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203929922U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109521306A (en) * | 2018-12-29 | 2019-03-26 | 广东电网有限责任公司 | A kind of thermal cycling ageing temprature control method, device, equipment and storage medium |
-
2014
- 2014-05-09 CN CN201420234719.7U patent/CN203929922U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109521306A (en) * | 2018-12-29 | 2019-03-26 | 广东电网有限责任公司 | A kind of thermal cycling ageing temprature control method, device, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106054672B (en) | Real microgrid operation dynamic simulation test platform based on RT-LAB | |
CN204439747U (en) | A kind of pick-up unit of electric system harmonic inhabitation functional device | |
CN202033465U (en) | Electric grid simulated electric closure test system for testing photovoltaic grid-connected inverter | |
CN203786219U (en) | Multifunctional automated test system | |
CN202956445U (en) | Control platform for carrying out twin trawling test on high-voltage SVG power units | |
CN203929922U (en) | A kind of two period cable circulating-heating test unit | |
CN103312188B (en) | For power supply and the method for testing thereof of reactor performance test in power electronic equipment | |
CN202721612U (en) | Intelligent frequency-conversion variable-voltage test power supply | |
CN103869114A (en) | Manufacturing technology and device for high-voltage high-power adjustable simulative transformer substation | |
CN204190402U (en) | Building photovoltaic generation supply intelligent system | |
CN203630241U (en) | All-in-one device for testing power frequency parameters and switching test line for high-voltage power transmission line | |
CN204012719U (en) | A kind of two main transformer intelligent operation/cutting measure and control device | |
CN203734380U (en) | Integrated power supply monitoring system based on PLC | |
CN203376449U (en) | Device for testing contact service life of relay | |
CN203340031U (en) | Power frequency inductance regulation resonance device | |
CN206920526U (en) | A kind of multiterminal element test system | |
CN202474827U (en) | Countercurrent prevention controller | |
CN205104994U (en) | Transformer platform district load control ware | |
CN203481836U (en) | Dynamic reactive power compensation controller | |
CN204391897U (en) | A kind of integrated monitoring system | |
CN203732593U (en) | Device for monitoring real demand for reactive compensation of distribution transformer | |
CN204065340U (en) | Capacitor repeats superpotential test unit | |
CN202798087U (en) | Zero-loss photovoltaic output device | |
CN218917571U (en) | Test device for reliability test of household circuit breaker | |
CN203786167U (en) | High-voltage high-power adjustable simulation substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141105 |
|
CF01 | Termination of patent right due to non-payment of annual fee |