CN203924675U - Construction work aerial work platform - Google Patents

Construction work aerial work platform Download PDF

Info

Publication number
CN203924675U
CN203924675U CN201420360141.XU CN201420360141U CN203924675U CN 203924675 U CN203924675 U CN 203924675U CN 201420360141 U CN201420360141 U CN 201420360141U CN 203924675 U CN203924675 U CN 203924675U
Authority
CN
China
Prior art keywords
hedge
row
building row
building
work platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420360141.XU
Other languages
Chinese (zh)
Inventor
王庆丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XUESHI CLASS FURNITURE MANUFACTURE Co Ltd
Original Assignee
ZHEJIANG XUESHI CLASS FURNITURE MANUFACTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XUESHI CLASS FURNITURE MANUFACTURE Co Ltd filed Critical ZHEJIANG XUESHI CLASS FURNITURE MANUFACTURE Co Ltd
Priority to CN201420360141.XU priority Critical patent/CN203924675U/en
Application granted granted Critical
Publication of CN203924675U publication Critical patent/CN203924675U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a kind of construction work aerial work platform, include a plurality of building row hedges, supporting steel pipe and building row hedge connector, described building row hedge is made by plastic-steel, described building row hedge is arranged on supporting steel pipe, building is arranged the connecting hole that is provided with of hedge, and building row's hedge is connected together building row hedge by connecting hole.The utility model adopts plastic-steel material to be used on building row hedge, and life of fine quality is long, and Practical Performance is high, and weight is former bamboo raft 2/3rds, and installation carrying is easy to operate, durable in the outdoor UV sunlight of keeping out again, can reach the more than a times of mao bamboon application life.By snap fit, connect simultaneously, the work efficiency that plastic-steel row hedge is installed be former tied silk send out more than five times, install fast, location is fixing, safe and reliable, be easy to the advantages such as dismounting, has also greatly improved the work efficiency that installation plastic-steel is arranged hedge simultaneously.

Description

Construction work aerial work platform
Technical field
The utility model relates to a kind of construction work aerial work platform, particularly a kind of easy accessibility and the job platform of the environmental protection that can repeatedly utilize.
Background technology
China's building trade, workman's operation platform plate of work high above the ground, the historical bamboo hedge typesetting of always using so far mao bamboon to do, this tradition does not have other materials to change history with material, its main price is low, available again, but his rustic is not firm sturdy, speed of application and quality are impacted, particularly bamboo raft is fixed on steel pipe, past pricks with the rope made of hemp, used aluminium wire modern age instead, a bamboo raft is pricked four strands, seek up and down seam wear silk to spend a lot of man-hours, while being completed the row of tearing open, aluminium wire is clipped in bamboo raft seam, very effort is taken out aluminium wire, time-consuming again, inefficiency, the row of bundle and the row's of tearing open consumption power are consuming time again, this is the fatal shortcoming that old bamboo raft uses.
Summary of the invention
For solving above technical problem, the utility model provides a kind of construction work aerial work platform of easy accessibility.
The utility model is by the following technical solutions: a kind of construction work aerial work platform, it is characterized in that including a plurality of building row hedges, supporting steel pipe and building row hedge connector, described building row hedge is arranged on supporting steel pipe, building is arranged the connecting hole that is provided with of hedge, and building row's hedge is connected together building row hedge by connecting hole.
As a kind of improvement, described building row hedge is made by plastic-steel.
As a kind of improvement, described building row hedge connector is self-locking jump ring, self-locking jump ring includes the two perpendicular ends that are oppositely arranged, Access Division, abutting part and dismounting portion, described two perpendicular end one end that are oppositely arranged all bend inwards and form Access Division, described Access Division with by the member of clamping, connected, the described perpendicular end other end connects dismounting portion, dismounting portion is provided with the space that dismantling device passes, between two dismounting portions, be provided with abutting part, described abutting part is that the center of circle is at the arc section in self-locking jump ring outside, described perpendicular end, Access Division, on abutting part and dismounting portion integrated, it is inverted U.
As a kind of improvement, also comprise jump ring demolition part, jump ring demolition part includes handle, support plate and crow bar, described support plate is fixedly connected with handle and tie point is arranged on the middle part of support plate, and the two ends of described support plate are respectively provided with a crow bar, and described two crow bars be arranged in parallel, crow bar is circular, the head of each crow bar is provided with tip, and described tip is coniform, between described support plate and handle, by regulations and parameters rod, is connected.
As a kind of improvement, described building row hedge is provided with mesh, described mesh be shaped as oblong aperture or circular hole or anistree hole.
As a kind of improvement, described building row hedge comprises that plane layout has anti-skidding ripple.
As a kind of improvement, described building row hedge includes glazing bar, and described glazing bar below is provided with reinforcing rib, and described reinforcing rib and glazing bar form T-shaped, and the height of reinforcing rib is crisscross arranged.
The utlity model has following advantage:
(1) design is innovated with material
Design adopts multiple waste material to reclaim, turn waste into wealth, be processed into plastic-steel, not only tough but also hard, hot strength is good, wear-resistant, corrosion-resistant, make building row hedge volume little, weight is former bamboo raft 2/3rds, and installation carrying is easy to operate, durable in the outdoor UV sunlight of keeping out again, can reach the more than a times of mao bamboon application life.
(2) recycling economy innovation
Plastic-steel row hedge can secondary recovery regeneration after using and dying of old age.To give up, adjust and newly can economize basis 1/3rd, high by rear recovery residual value, be the recycling economy that the Chinese government advocates, environment-friendly products.
(3) practical innovation of fine quality
Plastic-steel row hedge is practical, excellent performance, and firmly, long service life, smooth sturdy safety again, is the high-quality frock of building trade work high above the ground.It has, and safety is good, use work efficiency is high, can improve workmanship, can a series of positive-effect of creative engineering.
(4) comprehensive assessment is advanced
The one, life of fine quality is long, and the 2nd, Practical Performance is high, and the 3rd, mounting or dismounting annex, and the 4th, save tied silk cost, the 5th, good equipment brings work efficiency high, and good engineering quality is created the renewal product that work high above the ground has good ample scope for abilities.
By snap fit, connect simultaneously, the work efficiency that plastic-steel row hedge is installed be former tied silk send out more than five times, install fast, location is fixing, safe and reliable, be easy to the advantages such as dismounting, has also greatly improved the work efficiency that installation plastic-steel is arranged hedge simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model construction work aerial work platform.
Fig. 2 is the top view of the utility model construction work aerial work platform.
Fig. 3 is the structural representation of the utility model parts building row hedge connector.
Fig. 4 is the structural representation of the utility model parts jump ring demolition part.
Fig. 5 is the structural representation of the utility model parts building row hedge.
Fig. 6 is the sectional view of the utility model parts building row hedge.
The specific embodiment
A kind of specific embodiment of construction work aerial work platform, as shown in accompanying drawing 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6, include a plurality of building row hedges 1, supporting steel pipe 2 and building row hedge connector 3, described building row hedge 1 is arranged on supporting steel pipe, building is arranged the connecting hole that is provided with of hedge 1, and building row's hedge 1 is connected together building row hedge by connecting hole.More excellent, described building row hedge 1 is made by plastic-steel.The present invention adopts plastic-steel material to be used on building row hedge, and life of fine quality is long, and Practical Performance is high, and weight is former bamboo raft 2/3rds, and installation carrying is easy to operate, durable in the outdoor UV sunlight of keeping out again, can reach the more than a times of mao bamboon application life.By snap fit, connect simultaneously, the work efficiency that plastic-steel row hedge is installed be former tied silk send out more than five times, install fast, location is fixing, safe and reliable, be easy to the advantages such as dismounting, has also greatly improved the work efficiency that installation plastic-steel is arranged hedge simultaneously.
As a kind of improved specific embodiment, as accompanying drawing 1, shown in Fig. 2 and Fig. 3, described building row hedge connector 3 is self-locking jump ring, self-locking jump ring includes the two perpendicular ends 31 that are oppositely arranged, Access Division 32, abutting part 33 and dismounting portion 34, described two perpendicular end 1 one end that are oppositely arranged all bend inwards and form Access Division 33, described Access Division 32 with by the member of clamping, connected, the described perpendicular end other end connects dismounting portion 34, dismounting portion 34 is provided with the space that dismantling device passes, between two dismounting portions 34, be provided with abutting part 33, described abutting part 33 is that the center of circle is at the arc section in self-locking jump ring outside, described perpendicular end 31, Access Division 32, on abutting part 33 and dismounting portion 34 integrateds, it is inverted U.The self-locking jump ring that building row's hedge is used is applied to plastic-steel row hedge 1 and arranges being connected of hedge 1 with plastic-steel, self-locking jump ring is inserted to the installing hole of building row hedge 1, through the row's of building hedge 1, is fixed on supporting steel pipe 2, just plastic-steel can be arranged to hedge and be fixed on supporting steel pipe 2.Compare with traditional row's hedge tied silk, the present invention have install fast, location is fixing, safe and reliable, be easy to the advantages such as dismounting, has also greatly improved the work efficiency that installation plastic-steel is arranged hedge simultaneously; It is one-body molded that each several part has processing, and result of use is good, easy to process, and structural strength is large; After the arc section and row's hedge butt of the center of circle outside self-locking jump ring, because arc section has good elastic force, connect compactness, installation is firm, and processing is simple.Its work efficiency that plastic-steel row hedge 1 is installed be former tied silk send out more than five times, capable of circulation the using decades of jump ring of plastic-steel row hedge 1, is this effective ways of construction work energy-saving.Plastic-steel row hedge 1 fixing firm, sturdy safety, work high above the ground is similar to Horizon, and construction effect is good, work efficiency is high.Plastic-steel row hedge 1 is fixing with jump ring, and a plastic-steel row hedge is with once economizing tied silk cost three maos, and an engineering labor and material saving, adds up to handle interests very big.
As a kind of improved specific embodiment, as shown in Figure 4, also comprise jump ring demolition part 4, jump ring demolition part 4 includes handle 41, support plate 42 and crow bar 43, described support plate 42 is fixedly connected with handle 41 and tie point is arranged on the middle part of support plate 42, the two ends of described support plate 42 are respectively provided with a crow bar 43, described two crow bars 43 be arranged in parallel, crow bar 43 is circular, the head of each crow bar 43 is provided with tip, described tip is coniform, between described support plate 42 and handle 41, by regulations and parameters rod 44, is connected.Adopt after said structure, completion of works is torn row open, is furnished with special-purpose jump ring demolition part 4 for lever card lifting, tears card open not only laborsaving but also soon just, plays a jump ring and only uses 2~3 second time, and work efficiency is to tear the more than ten times of tied silk open; The row's of tearing open work efficiency is high, and employment economizes, good management, and it is ten times of former tied silk method that these two work can economize wage.
As a kind of improved specific embodiment, as shown in Figure 5 and Figure 6, building row's hedge 1 is provided with mesh 11, described mesh 11 be shaped as oblong aperture or circular hole or anistree hole.More excellent, on building row's hedge 1, plane layout has anti-skidding ripple.Adopt after said structure, staff stands in plane, very steady, mesh is set to difform structure, has antiskid function, can be provided with anti-skidding ripple simultaneously, have dual non-slip function, guarantee that work high above the ground person walks safely on row, operation is dexterous, efficiency of construction is high, also can improve the workmanship of construction.
As a kind of improved specific embodiment, as shown in Figure 5 and Figure 6, building row's hedge 1 includes glazing bar 12, and described glazing bar below is provided with reinforcing rib 13, and described reinforcing rib 13 is T-shaped with glazing bar 12 formations, and the height of reinforcing rib 13 is crisscross arranged.Adopt after said structure, building row's hedge 1 intensity is high.

Claims (10)

1. a construction work aerial work platform, it is characterized in that including a plurality of building row hedges (1), supporting steel pipe (2) and building row hedge connector (3), described building row's hedge (1) is arranged on supporting steel pipe (2), building row's hedge (1) is provided with connecting hole (14), and building row's hedge connector (3) is connected together the row's of building hedge (1) by connecting hole (14).
2. construction work aerial work platform according to claim 1, is characterized in that described building row's hedge (1) made by plastic-steel.
3. according to construction work aerial work platform described in claim 1 or 2, it is characterized in that described building row's hedge connector (3) is for self-locking jump ring, self-locking jump ring includes the two perpendicular ends (31) that are oppositely arranged, Access Division (32), abutting part (33) and dismounting portion (34), described two perpendicular end (31) one end that are oppositely arranged all bend inwards and form Access Division (33), described Access Division (32) with by the member of clamping, connected, described perpendicular end (31) other end connects dismounting portion (34), dismounting portion (34) is provided with the space that dismantling device passes, between two dismounting portions (34), be provided with abutting part (33), described abutting part (33) is that the center of circle is at the arc section in self-locking jump ring outside, described perpendicular end (31), Access Division (32), on abutting part (33) and dismounting portion (34) integrated, it is inverted U.
4. construction work aerial work platform according to claim 3, it is characterized in that also comprising jump ring demolition part (4), jump ring demolition part (4) includes handle (41), support plate (42) and crow bar (43), described support plate (42) is fixedly connected with handle (41) and tie point is arranged on the middle part of support plate (42), the two ends of described support plate (42) are respectively provided with a crow bar (43), described two crow bars (43) be arranged in parallel, crow bar (43) is circular, the head of each crow bar (43) is provided with tip, described tip is coniform, between described support plate (42) and handle (41), by regulations and parameters rod (44), be connected.
5. according to construction work aerial work platform described in claim 1 or 2, it is characterized in that described building row's hedge (1) is provided with mesh (11), described mesh (11) be shaped as oblong aperture or circular hole or anistree hole.
6. construction work aerial work platform according to claim 4, is characterized in that described building row's hedge (1) is provided with mesh (11), described mesh (11) be shaped as oblong aperture or circular hole or anistree hole.
7. according to construction work aerial work platform described in claim 1 or 2, it is characterized in that the upper plane layout of described building row's hedge (1) has anti-skidding ripple.
8. construction work aerial work platform according to claim 3, is characterized in that the upper plane layout of described building row's hedge (1) has anti-skidding ripple.
9. according to construction work aerial work platform described in claim 1 or 2, it is characterized in that described building row's hedge (1) includes glazing bar (12), described glazing bar below is provided with reinforcing rib (13), described reinforcing rib (13) and glazing bar (12) form T-shaped, and the height of reinforcing rib (13) is crisscross arranged.
10. construction work aerial work platform according to claim 3, it is characterized in that described building row's hedge (1) includes glazing bar (12), described glazing bar below is provided with reinforcing rib (13), described reinforcing rib (13) and glazing bar (12) form T-shaped, and the height of reinforcing rib (13) is crisscross arranged.
CN201420360141.XU 2014-06-30 2014-06-30 Construction work aerial work platform Withdrawn - After Issue CN203924675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420360141.XU CN203924675U (en) 2014-06-30 2014-06-30 Construction work aerial work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420360141.XU CN203924675U (en) 2014-06-30 2014-06-30 Construction work aerial work platform

Publications (1)

Publication Number Publication Date
CN203924675U true CN203924675U (en) 2014-11-05

Family

ID=51820525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420360141.XU Withdrawn - After Issue CN203924675U (en) 2014-06-30 2014-06-30 Construction work aerial work platform

Country Status (1)

Country Link
CN (1) CN203924675U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110126A (en) * 2014-06-30 2014-10-22 浙江学仕课桌椅制造有限公司 Architectural engineering aerial work platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104110126A (en) * 2014-06-30 2014-10-22 浙江学仕课桌椅制造有限公司 Architectural engineering aerial work platform
CN104110126B (en) * 2014-06-30 2016-06-22 浙江学仕课桌椅制造有限公司 Architectural engineering aerial work platform

Similar Documents

Publication Publication Date Title
CN204163606U (en) A kind of electric power work high above the ground multimode combined type maintenance step ladder
CN203924675U (en) Construction work aerial work platform
CN104110126A (en) Architectural engineering aerial work platform
CN204024430U (en) Adopt the bamboo ladder stand of contiguous block overlapping
CN201705193U (en) Dedicated flexible ladder used for replacing insulators
CN204470434U (en) A kind of riveting tool
CN206053545U (en) Simple construction protection hurdle
CN204024443U (en) Adopt the bamboo ladder stand of connector overlapping
CN203392657U (en) Machine maintenance platform
CN203782765U (en) Multifunctional shovel for electric power
CN203080988U (en) Umbrella-shaped standard processing shed
CN201924941U (en) Hoisting device for reinforced concrete pipe segment
CN202423898U (en) Maintenance workbench
CN201274392Y (en) Operating platform on portable adjustable bar
CN206034905U (en) Board combination design mould falls in bathroom
CN205666736U (en) Disassembling tool for motor rotor for forklift
CN203755623U (en) Load overhauling bent frame convenient to assemble and disassemble
CN203475927U (en) Plug-in power transmission line steel-pipe pole removal device
CN201406824Y (en) Maintenance workbench
CN204418797U (en) Photovoltaic place fence easy to assemble
CN203924901U (en) The combined enclosure of quick dismounting
CN204983681U (en) Novel reinforcing bar hopper
CN205400007U (en) Scaffold
CN205213586U (en) Plant big -arch shelter of strawberry
CN203129567U (en) Safety tread for operation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141105

Effective date of abandoning: 20160622

C25 Abandonment of patent right or utility model to avoid double patenting