CN203922430U - Band iron lifting special frame - Google Patents

Band iron lifting special frame Download PDF

Info

Publication number
CN203922430U
CN203922430U CN201420367491.9U CN201420367491U CN203922430U CN 203922430 U CN203922430 U CN 203922430U CN 201420367491 U CN201420367491 U CN 201420367491U CN 203922430 U CN203922430 U CN 203922430U
Authority
CN
China
Prior art keywords
band iron
girder
special frame
utility
lifting special
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420367491.9U
Other languages
Chinese (zh)
Inventor
杜祥迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIZHOU HUANGYAN GUANGHUAN INDUSTRIAL & TRADING Co Ltd
Original Assignee
TAIZHOU HUANGYAN GUANGHUAN INDUSTRIAL & TRADING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIZHOU HUANGYAN GUANGHUAN INDUSTRIAL & TRADING Co Ltd filed Critical TAIZHOU HUANGYAN GUANGHUAN INDUSTRIAL & TRADING Co Ltd
Priority to CN201420367491.9U priority Critical patent/CN203922430U/en
Application granted granted Critical
Publication of CN203922430U publication Critical patent/CN203922430U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a kind of band iron lifting special frame, and it comprises: girder, is shaft-like; Multiple hooks, are J-shaped, and lower end is welded in respectively the bottom of described girder two sides symmetrically, make the frame type space that is formed for holding band iron between described hook and girder; Suspension ring, are welded in the upper surface at described girder middle part, for being connected with the suspension hook of driving.The utility model both sides hooks is uniformly distributed, and can make band iron steady uniform stressed in the time of lifting, can be not sagging because conducting oneself with dignity, and transportation safety and improved production efficiency.

Description

Band iron lifting special frame
Technical field
The utility model relates to a kind of steel lifting appliance, particularly a kind of band iron lifting special frame.
Background technology
Band iron is quite wide in field of industrial production application, and its specification is 6000mm × 6mm × 2mm, and its length is large as seen, sectional area is less, totally comparatively elongated.While movement after band iron raw material enters warehouse or in workshop, in the middle of band iron, lift by crane, band iron two ends are sagging obvious owing to conducting oneself with dignity, not only inconvenience transport, and comparatively danger of transportation.
Summary of the invention
The purpose of this utility model is to provide a kind of band iron lifting special frame, to solve the problem such as inconvenience transport, risk height existing in existing band iron transportation.
In order to address the above problem, the technical solution of the utility model is as follows:
A kind of band iron lifting special frame, it comprises: girder, is shaft-like; Multiple hooks, are J-shaped, and lower end is welded in respectively the bottom of described girder two sides symmetrically, make the frame type space that is formed for holding band iron between described hook and girder; Suspension ring, are welded in the upper surface at described girder middle part, for being connected with the suspension hook of driving.
Preferably, in above-mentioned band iron lifting special frame, also comprise: connecting rod, two ends are connected to the upper surface at described girder both ends, and middle part is connected in described suspension ring.
Preferably, in above-mentioned band iron lifting special frame, described suspension ring entirety semicircular in shape.
Preferably, in above-mentioned band iron lifting special frame, described girder is rectangular steel pipe.
Analyze knownly, the utility model both sides hooks is uniformly distributed, and can make band iron steady uniform stressed in the time of lifting, can be not sagging because conducting oneself with dignity, and transportation safety and improved production efficiency.
Brief description of the drawings
Fig. 1 is the main TV structure schematic diagram of the utility model preferred embodiment;
Fig. 2 is the plan structure schematic diagram of the utility model preferred embodiment;
Fig. 3 is the left TV structure schematic diagram of the utility model preferred embodiment.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further details.
As shown in Figure 1, Figure 2 and Figure 3, the utility model preferred embodiment comprises girder 1, multiple hook 2, connecting rod 3, suspension ring 4.
Particularly, girder 1 is shaft-like, and the length of its length and band iron is substantially suitable.Multiple hooks 2 are all J-shaped, and as Fig. 3, each hook lower end of 2 is welded in respectively the bottom of girder 1 two sides symmetrically, make to link up with 2 and girder 1 between be formed for holding band iron frame type space.Suspension ring 4 are welded in the upper surface at girder 1 middle part, and it has a through hole 41, and this through hole 41 is for being connected with the suspension hook of driving.
Preferably, in order to improve the intensity of this preferred embodiment, this preferred embodiment also comprises connecting rod 3.The two ends of connecting rod 3 are connected to the upper surface at girder 1 both ends, and middle part is crossed over suspension ring 4 and is welded in suspension ring 4, and more preferably, connecting rod 3 is reinforcing bar.
In this preferred embodiment, the overall semicircular in shape of suspension ring 4, also, the outer circumferential profile of suspension ring 4 is similar to a semicircle substantially.
Further, the girder 1 of this preferred embodiment is rectangular steel pipe, links up with 2 and makes for reinforcing bar.
In when application, can be by band iron the length direction along girder 1, be balancedly positioned in the hook 2 of girder 1 both sides, the suspension hook of driving hangs in the through hole 41 of suspension ring 4, like this, driving, in the time of mobile band iron, can prevent that band iron is sagging.
In sum, the utility model can prevent that the band iron in movement from the sagging distortion in end occurring, and be easy to transport, and without greater risk, safety is higher.Meanwhile, conveying efficiency is also able to obvious raising.
As known by the technical knowledge, the utility model can be realized by other the embodiment that does not depart from its Spirit Essence or essential feature.Therefore, above-mentioned disclosed embodiment, with regard to each side, is all casehistory, is not only.Allly within the scope of the utility model or in the change being equal in scope of the present utility model, be all included in the utility model.

Claims (4)

1. a band iron lifting special frame, is characterized in that, comprising:
Girder, is shaft-like;
Multiple hooks, are J-shaped, and lower end is welded in respectively the bottom of described girder two sides symmetrically, make the frame type space that is formed for holding band iron between described hook and girder;
Suspension ring, are welded in the upper surface at described girder middle part, for being connected with the suspension hook of driving.
2. band iron lifting special frame according to claim 1, is characterized in that, also comprises:
Connecting rod, two ends are connected to the upper surface at described girder both ends, and middle part is connected in described suspension ring.
3. band iron lifting special frame according to claim 1, is characterized in that, described suspension ring entirety semicircular in shape.
4. band iron lifting special frame according to claim 1, is characterized in that, described girder is rectangular steel pipe.
CN201420367491.9U 2014-07-04 2014-07-04 Band iron lifting special frame Expired - Fee Related CN203922430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420367491.9U CN203922430U (en) 2014-07-04 2014-07-04 Band iron lifting special frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420367491.9U CN203922430U (en) 2014-07-04 2014-07-04 Band iron lifting special frame

Publications (1)

Publication Number Publication Date
CN203922430U true CN203922430U (en) 2014-11-05

Family

ID=51818286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420367491.9U Expired - Fee Related CN203922430U (en) 2014-07-04 2014-07-04 Band iron lifting special frame

Country Status (1)

Country Link
CN (1) CN203922430U (en)

Similar Documents

Publication Publication Date Title
CN203922430U (en) Band iron lifting special frame
CN202193536U (en) Lifting appliance for long steel plates
CN203295033U (en) Lifting frame
CN201746222U (en) Installation lifting device of cooling wall of furnace shell
CN204569141U (en) Steel plate overhead hoist
CN203545436U (en) Multipurpose lifting tool
CN204490332U (en) A kind of waterproof blanket fast hoisting pincers
CN203754232U (en) Simple steel rail lifting tool
CN203234509U (en) Household automatically telescopic clothes rack
CN202808157U (en) Novel tubular product lifting appliance
CN202379580U (en) Pipeline horizontal lifting appliance with automatic hook
CN204173754U (en) A kind of irregular lump material hanging apparatus
CN204980831U (en) Special continuous casting roller hoist of fork truck
CN205243038U (en) Simple and easy building block hoisting accessory
CN204847756U (en) Special lifting device of box transformer
CN204138145U (en) A kind of lifting hoisting clamp
CN205187645U (en) Hoist for prestress wire
CN204588563U (en) For the hanging apparatus that pipe stiffener ring is assembled
CN203624810U (en) Special lifting tool for steel material with a huge section
CN203602215U (en) Coil stock carrying hanger
CN202944980U (en) Logistics container lifting appliance
CN203193157U (en) Box-type transformer substation hanger
CN203497921U (en) Sling special for lifting slender rod piece
CN203582276U (en) Lifting bracket
CN202245683U (en) Furnace mantle lifting tool for blast furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Special-purpose rack for hoisting flat iron

Effective date of registration: 20171228

Granted publication date: 20141105

Pledgee: Industrial Commercial Bank of China Ltd Taizhou Huangyan branch

Pledgor: TAIZHOU HUANGYAN GUANGHUAN INDUSTRIAL & TRADING CO., LTD.

Registration number: 2017330000340

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20190704