CN203909269U - Debugging inspection bench of intelligent electricity meter - Google Patents

Debugging inspection bench of intelligent electricity meter Download PDF

Info

Publication number
CN203909269U
CN203909269U CN201420192542.9U CN201420192542U CN203909269U CN 203909269 U CN203909269 U CN 203909269U CN 201420192542 U CN201420192542 U CN 201420192542U CN 203909269 U CN203909269 U CN 203909269U
Authority
CN
China
Prior art keywords
debugging
check
panel
inspection
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420192542.9U
Other languages
Chinese (zh)
Inventor
马永武
易鑫
孙敬国
郑凯
杨晶晶
张运山
单鲜堂
陈淼
刘志宏
陈银凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuji Group Co Ltd
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Henan Xuji Instrument Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuji Group Co Ltd
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Henan Xuji Instrument Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuji Group Co Ltd, Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd, Henan Xuji Instrument Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420192542.9U priority Critical patent/CN203909269U/en
Application granted granted Critical
Publication of CN203909269U publication Critical patent/CN203909269U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Debugging And Monitoring (AREA)

Abstract

The utility model relates to a debugging inspection bench of an intelligent electricity meter. The debugging inspection bench comprises a debugging line, an inspection line and a panel used for connecting a tooling plate, and the panel is connected with the debugging line and the inspection line via a switching device inside the debugging inspection bench. The debugging inspection bench of the utility model integrates a debugging bench and an inspection bench as one, integrates the internal lines together, is still a whole panel seen from the appearance, and realizes the debugging and inspection functions on the panel by matching the switching of the internal lines.

Description

A kind of bug check platform of intelligent electric meter
Technical field
The utility model relates to a kind of bug check platform of intelligent electric meter.
Background technology
Intelligent electric energy meter, when dispatching from the factory, need to carry out error debugging and check, and error debugging and check complete respectively on different stage bodies, guarantees because stage body fault causes substandard product, not flow out.If Fig. 1 is existing debugger and check-out console.
The step of error debugging: first working plate automatic flow is to debugger.Working plate refers to a plate, and a plurality of intelligent electric meters are installed on it.
Then compression bonding apparatus is docked and is powered on by cylinder, compression bonding apparatus makes electric energy meter, the splicing ear on panel, the corresponding debug circuit that is connected to form of the debug lines in debugger on working plate, after powering on successfully, under the control on backstage, intelligent electric meter is carried out to error debugging.
After debugging finishes, docking facilities is withdrawn, and working plate circulates forward, enters subsequent processing, tests.Step and the above-mentioned debugging apparatus of check are similar: first working plate circulates on check-out console and carry out, and then compression bonding apparatus is docked and powered on by cylinder, after powering on successfully, carry out ammeter error-tested and other associative operations.After test ending, docking facilities is withdrawn, and working plate circulates forward, enters next process.
In above-mentioned debugging and checkout procedure, take a working plate as unit circulation, if the working plate of take circulates as unit, suppose to advance left, first working plate needs after completing debugging to wait for that 7 debugging cycle just can reach check-out console, and 7 cycles, all waiting for, have wasted the time, cause whole process length consuming time, efficiency is low.
Utility model content
The purpose of this utility model is to provide a kind of bug check platform of intelligent electric meter, in order to existing bug check length consuming time, the inefficient problem solving.
For achieving the above object, scheme of the present utility model comprises:
A bug check platform for intelligent electric meter, comprises debug lines, check circuit and a panel for being connected with working plate, and panel connects described debug lines and check circuit by the switching device shifter of bug check platform inside.
Described switching device shifter is switchgear, and panel connects respectively described debug lines and check circuit by described switchgear.
By described switching device shifter, each station on panel connects debug lines or check circuit simultaneously; Or the different station on panel connects respectively corresponding debug lines and check circuit simultaneously.
Debugging test platform of the present utility model, debugger and check-out console is two-in-one, and internal wiring combines, and is externally still a panel.Coordinate the switching of internal wiring, on this panel, realize debugging and checking function.
The utility model also provides a kind of debugging test method, coordinate above-mentioned bug check platform, and a plurality of stations once circulate, debugging and two operations of check closely not only can be connected, the time Holding Problem that in the middle of avoiding, circulation causes, and ammeter circulation dislocation secondary use tune checking device and compression bonding apparatus, when guaranteeing to show meter debugging and checking, use different frock positions, avoid showing to count the problems such as overproof because equipment failure causes.
Accompanying drawing explanation
Fig. 1 is debugger and the check-out console of prior art;
Fig. 2 is a kind of bug check platform of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in more detail.
By comparison diagram 1 and Fig. 2, can find out that basic scheme of the present utility model is: debugger and check-out console is two-in-one, and internal wiring combines, be externally still a panel.Be that bug check platform comprises debug lines, check circuit and a panel for being connected with working plate, panel connects described debug lines and check circuit by the switching device shifter of bug check platform inside.
Panel is provided with n station, the corresponding working plate of each station.In the time of on working plate circulates panel, can make different stations corresponding debug lines and check circuit respectively by switching device shifter, even if different stations can be debugged respectively and check at one time.In this case, still adopt the pattern of a station of an existing working plate circulation each time, while circulating first, first working plate can be debugged, while circulating, first working plate can be tested and next piece working plate is debugged, thereby can raise the efficiency next time.The related hardware circuit of this working method only need increase corresponding switching device shifter on available circuit basis, as switchgear, different in the situation that, as required the splicing ear of panel inside is connected on corresponding circuit, at this, no longer too much narrates.
The utility model also provides a kind of mode of operation, under this mode of operation, less to the improvement of the hardware circuit of debugging check-out console, need to make all n stations all be connected to debug lines by switching device shifter, or be connected to check circuit simultaneously simultaneously.Under this mode of operation: when debugging, a first disposable circulation n-m working plate is to rear n-m station of panel, and bug check platform is switched to debug lines, n-m working plate is debugged simultaneously; Then n-m working plate integral body m the station that circulate forward, bug check platform is switched to check circuit, n-m working plate is tested simultaneously.N=8, m=1,7 working plates that circulate are first to rear 7 stations, 1 station that circulates for the second time, thus completed the bug check of 7 working plates; Then rear 7 stations that lower 7 working plates circulated, then 1 station that circulates, complete again the bug check of 7 working plates, the like.Debugging and two operations of check closely not only can be connected like this, the time Holding Problem that in the middle of avoiding, circulation causes, and ammeter circulation dislocation secondary is used tune checking device and compression bonding apparatus, while guaranteeing to show meter debugging and check, use different frock positions, avoid counting the problems such as overproof because equipment failure causes table.
More than provided concrete embodiment, but the utility model is not limited to described embodiment.Basic ideas of the present utility model are above-mentioned basic scheme, and for those of ordinary skills, according to instruction of the present utility model, the various distortion of designing do not need to spend creative work.The variation of in the situation that not departing from principle of the present utility model and spirit, embodiment being carried out, modification, replacement and modification still fall in protection domain of the present utility model.

Claims (3)

1. a bug check platform for intelligent electric meter, is characterized in that, comprises debug lines, check circuit and a panel for being connected with working plate, and panel connects described debug lines and check circuit by the switching device shifter of bug check platform inside.
2. the bug check platform of a kind of intelligent electric meter according to claim 1, is characterized in that, described switching device shifter is switchgear, and panel connects respectively described debug lines and check circuit by described switchgear.
3. the bug check platform of a kind of intelligent electric meter according to claim 1, is characterized in that, by described switching device shifter, each station on panel connects debug lines or check circuit simultaneously; Or the different station on panel connects respectively corresponding debug lines and check circuit simultaneously.
CN201420192542.9U 2014-04-18 2014-04-18 Debugging inspection bench of intelligent electricity meter Expired - Lifetime CN203909269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420192542.9U CN203909269U (en) 2014-04-18 2014-04-18 Debugging inspection bench of intelligent electricity meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420192542.9U CN203909269U (en) 2014-04-18 2014-04-18 Debugging inspection bench of intelligent electricity meter

Publications (1)

Publication Number Publication Date
CN203909269U true CN203909269U (en) 2014-10-29

Family

ID=51783531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420192542.9U Expired - Lifetime CN203909269U (en) 2014-04-18 2014-04-18 Debugging inspection bench of intelligent electricity meter

Country Status (1)

Country Link
CN (1) CN203909269U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104076318A (en) * 2014-04-18 2014-10-01 国家电网公司 Debugging inspection bench of smart electric meter and debugging inspection method
CN106383331A (en) * 2016-10-27 2017-02-08 宁波三星医疗电气股份有限公司 Single-phase watt-hour meter debugging and inspecting integrated device and method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104076318A (en) * 2014-04-18 2014-10-01 国家电网公司 Debugging inspection bench of smart electric meter and debugging inspection method
CN106383331A (en) * 2016-10-27 2017-02-08 宁波三星医疗电气股份有限公司 Single-phase watt-hour meter debugging and inspecting integrated device and method thereof

Similar Documents

Publication Publication Date Title
CN203178453U (en) Automatic test system for switch power supply module
CN203054186U (en) Universal board testing device
CN110442043B (en) Real-time-semi-physical flexible simulation test system for satellite GNC system
WO2018129893A1 (en) Hardware-in-the-loop equipment based testing system
CN103678062A (en) Comprehensive test system and test method
CN203909269U (en) Debugging inspection bench of intelligent electricity meter
CN104076318A (en) Debugging inspection bench of smart electric meter and debugging inspection method
CN103869189A (en) Passive device debugging system
CN203149382U (en) Virtual apparatus bus product calibration platform
CN203422426U (en) Universal comprehensive automatic test system of airborne computer of civilian airliner
CN110824338A (en) Method and system for automatically testing chip
CN203922037U (en) A kind of Novel PCB board test carrying platform
CN204116387U (en) A kind of LCD module short circuit test adapter
CN102759648A (en) Method and system for testing power panel
CN204316171U (en) A kind of debugging operations platform of automatic change-over controller
CN109490749A (en) A kind of eMMC FLASH class chip test system
CN211263672U (en) Universal automatic cable testing system based on CPCI bus
CN204405814U (en) A kind of electronic load tester with power meter function
CN104037779B (en) The compatible platform systems overlapping STATCOM and switching referee method thereof more
CN204302428U (en) A kind of cable detects adaptive device
CN203433363U (en) Detection apparatus for electrical control of generating set
CN209233850U (en) A kind of portable mono meshed network automatization test system
CN204230914U (en) A kind of convenience is to the complete SVG device of phase
CN204882817U (en) General if converting circuit test system
CN106054668A (en) RT-Lab-based modular switchable semi-physical debugging system and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141029

CX01 Expiry of patent term