CN203895864U - Underground cable laying device - Google Patents
Underground cable laying device Download PDFInfo
- Publication number
- CN203895864U CN203895864U CN201420174043.7U CN201420174043U CN203895864U CN 203895864 U CN203895864 U CN 203895864U CN 201420174043 U CN201420174043 U CN 201420174043U CN 203895864 U CN203895864 U CN 203895864U
- Authority
- CN
- China
- Prior art keywords
- cable
- steel pipe
- guide wheel
- wellhead
- governor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
本实用新型涉及一种井下电缆敷设装置,属于电力设备领域。所述的井下电缆敷设装置,包括电缆架,电缆架下部设置支撑底座,电缆架一侧设置井口支架,井口支架上设置导向轮,导向轮上缠绕钢丝绳,导向轮与调速器相连,钢丝绳与电缆在导向轮下方通过卡具连接在一起,井口支架下部的地面上设置电缆井,电缆井内部增设钢管,钢管高于地面1.1-1.5m,钢管周围采用混凝土密封,钢管上部设置井盖。本实用新型导向轮加装了调速器,速度控制均匀,方便了操作,本实用新型结构简单,节约了电缆的长度,雨水及外物不会进入电缆井中,增加了电缆的使用寿命。
The utility model relates to an underground cable laying device, which belongs to the field of electric equipment. The downhole cable laying device includes a cable rack, a support base is set at the bottom of the cable rack, a wellhead bracket is set on one side of the cable rack, a guide wheel is arranged on the wellhead bracket, a steel wire rope is wound on the guide wheel, the guide wheel is connected with the governor, and the steel wire rope is connected with the governor. The cables are connected together by fixtures under the guide wheels. A cable shaft is installed on the ground below the wellhead support. A steel pipe is added inside the cable shaft. The steel pipe is 1.1-1.5m above the ground. The surrounding of the steel pipe is sealed with concrete, and the upper part of the steel pipe is covered. The guide wheel of the utility model is equipped with a governor, the speed is controlled evenly, and the operation is convenient. The utility model has a simple structure, saves the length of the cable, prevents rainwater and foreign objects from entering the cable well, and increases the service life of the cable.
Description
技术领域technical field
本实用新型涉及一种井下电缆敷设装置,属于电力设备领域。The utility model relates to an underground cable laying device, which belongs to the field of electric equipment.
背景技术Background technique
现有技术中向井下敷设电缆时,一般采用人工直接将电缆向井下放置,这样操作导致电缆不能够准确地落到井底,不利于节约电缆的长度,而且将电缆直接放入井中长时间使用,容易受到雨水及外物的侵蚀。井口周围采用混凝土密封,一般高度都比较低,这样也容易导致电缆井中进水。另外,导向轮的速度需要控制,如果控制不好,钢丝绳放得太慢,则会影响工作效率,钢丝绳放得太快,则会导致操作人员来不及将钢丝绳和电缆通过卡具连接在一起,以致影响工作的进度。In the prior art, when laying cables downhole, the cables are usually placed manually down the well. This operation causes the cables to fail to fall accurately to the bottom of the well, which is not conducive to saving the length of the cables, and the cables are directly put into the well for long-term use. , susceptible to erosion by rain and foreign objects. Concrete is used to seal around the wellhead, and the height is generally relatively low, which can easily lead to water ingress in the cable well. In addition, the speed of the guide wheel needs to be controlled. If the control is not good, the wire rope is placed too slowly, which will affect the work efficiency. affect the progress of work.
实用新型内容Utility model content
根据以上现有技术中的不足,本实用新型要解决的技术问题是:提供一种节约电缆长度、增加电缆使用寿命、操作方便的井下电缆敷设装置。According to the deficiencies in the prior art above, the technical problem to be solved by the utility model is: to provide an underground cable laying device which saves the cable length, increases the service life of the cable and is easy to operate.
本实用新型解决其技术问题所采用的技术方案是:The technical scheme that the utility model solves its technical problem adopts is:
所述的井下电缆敷设装置,包括电缆架,电缆架下部设置支撑底座,电缆架一侧设置井口支架,井口支架上设置导向轮,导向轮上缠绕钢丝绳,导向轮与调速器相连,钢丝绳与电缆在导向轮下方通过卡具连接在一起,井口支架下部的地面上设置电缆井,电缆井内部增设钢管,钢管高于地面1.1-1.5m,钢管周围采用混凝土密封,钢管上部设置井盖。The downhole cable laying device includes a cable rack, a support base is set at the bottom of the cable rack, a wellhead bracket is set on one side of the cable rack, a guide wheel is arranged on the wellhead bracket, a steel wire rope is wound on the guide wheel, the guide wheel is connected with the governor, and the steel wire rope is connected with the governor. The cables are connected together by clamps under the guide wheels. A cable well is installed on the ground below the wellhead support. Steel pipes are added inside the cable wells. The steel pipes are 1.1-1.5m above the ground. The surroundings of the steel pipes are sealed with concrete and the upper part of the steel pipes is covered.
所述的钢管优选高于地面1.2m,再加上混凝土的密封,雨水及外物不会进入电缆井中,增加了电缆的使用寿命。The steel pipe is preferably 1.2m higher than the ground, coupled with the concrete seal, rainwater and foreign objects will not enter the cable shaft, which increases the service life of the cable.
工作时,先确定好电缆井的深度,从而确定钢丝绳长度,再将钢丝绳缠绕在导向轮上进行敷设,将电缆用卡具与钢丝绳固定在一起,调整调速器,慢慢向下放电缆,一边放电缆一边加装卡具,直至将电缆放入井底为止。When working, first determine the depth of the cable well, so as to determine the length of the wire rope, then wind the wire rope on the guide wheel for laying, fix the cable with the wire rope with a clamp, adjust the governor, and slowly lower the cable, while Put the cable on one side and install the fixture until the cable is put into the bottom of the well.
本实用新型所具有的有益效果是:The beneficial effects that the utility model has are:
本实用新型的导向轮加装了调速器,速度控制均匀,方便了操作;本实用新型结构简单,节约了电缆的长度,雨水及外物不会进入电缆井中,增加了电缆的使用寿命。The guide wheel of the utility model is equipped with a governor, and the speed is controlled evenly, which is convenient for operation; the utility model has a simple structure, saves the length of the cable, prevents rainwater and foreign objects from entering the cable well, and increases the service life of the cable.
附图说明Description of drawings
图1是本实用新型结构示意图;Fig. 1 is a structural representation of the utility model;
图中:1、电缆架;2、支撑底座;3、电缆井;4、卡具;5、钢管;6、混凝土;7、井盖;8、井口支架;9、调速器;10、导向轮;11、电缆;12、钢丝绳。In the figure: 1. Cable rack; 2. Support base; 3. Cable well; 4. Fixture; 5. Steel pipe; 6. Concrete; 7. Well cover; 8. Wellhead bracket; 9. Governor; 10. Guide wheel ; 11, cable; 12, wire rope.
具体实施方式Detailed ways
下面结合附图对本实用新型的实施例做进一步描述:Embodiments of the utility model are further described below in conjunction with the accompanying drawings:
如图1所示,所述的井下电缆敷设装置,包括电缆架1,电缆架1下部设置支撑底座2,电缆架1一侧设置井口支架8,井口支架8上设置导向轮10,导向轮10上缠绕钢丝绳12,导向轮10与调速器9相连,钢丝绳12与电缆11在导向轮10下方通过卡具4连接在一起,井口支架8下部的地面上设置电缆井3,电缆井3内部增设钢管5,钢管5高于地面1.1-1.5m,钢管5周围采用混凝土6密封,钢管5上部设置井盖7。As shown in Figure 1, the underground cable laying device includes a cable rack 1, a support base 2 is arranged at the bottom of the cable rack 1, a wellhead bracket 8 is arranged on one side of the cable rack 1, and a guide wheel 10 is arranged on the wellhead bracket 8, and the guide wheel 10 The steel wire rope 12 is wound on the top, the guide wheel 10 is connected with the governor 9, the steel wire rope 12 and the cable 11 are connected together by the fixture 4 under the guide wheel 10, and the cable well 3 is set on the ground at the lower part of the wellhead support 8, and the inside of the cable well 3 is added. The steel pipe 5 is 1.1-1.5m higher than the ground, the surroundings of the steel pipe 5 are sealed with concrete 6 , and the upper part of the steel pipe 5 is provided with a manhole cover 7 .
所述的钢管5优选高于地面1.2m,再加上混凝土6的密封,雨水及外物不会进入电缆井3中,增加了电缆11的使用寿命。The steel pipe 5 is preferably 1.2m higher than the ground, and with the sealing of the concrete 6, rainwater and foreign objects will not enter the cable shaft 3, which increases the service life of the cable 11.
工作时,先确定好电缆井3的深度,从而确定钢丝绳12的长度,再将钢丝绳12缠绕在导向轮10上进行敷设,将电缆11用卡具4与钢丝绳12固定在一起,调整调速器9,慢慢向下放电缆11,一边放电缆11一边加装卡具4,直至将电缆11放入井底为止。When working, first determine the depth of the cable well 3, thereby determining the length of the steel wire rope 12, then wind the steel wire rope 12 on the guide wheel 10 for laying, fix the cable 11 with the clamp 4 and the steel wire rope 12, and adjust the governor 9. Lower the cable 11 slowly, and install the fixture 4 while putting the cable 11 down until the cable 11 is put into the bottom of the well.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420174043.7U CN203895864U (en) | 2014-04-11 | 2014-04-11 | Underground cable laying device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420174043.7U CN203895864U (en) | 2014-04-11 | 2014-04-11 | Underground cable laying device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203895864U true CN203895864U (en) | 2014-10-22 |
Family
ID=51722220
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420174043.7U Expired - Fee Related CN203895864U (en) | 2014-04-11 | 2014-04-11 | Underground cable laying device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203895864U (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105197670A (en) * | 2015-10-22 | 2015-12-30 | 国网山东莒南县供电公司 | Automatic pay-off rack for cable |
| CN108521098A (en) * | 2018-05-10 | 2018-09-11 | 中煤第三建设集团机电安装工程有限责任公司 | Device for simultaneously removing large-diameter cables of vertical shaft and construction method thereof |
| CN109256726A (en) * | 2018-11-22 | 2019-01-22 | 陕西陕煤铜川矿业有限公司 | A kind of cable laying method of vertical laying pipeline |
| CN110364966A (en) * | 2019-07-25 | 2019-10-22 | 铜陵有色金属集团铜冠矿山建设股份有限公司 | A kind of method of mine down-hole deep hole cabling |
| CN112531616A (en) * | 2020-11-19 | 2021-03-19 | 四川盐业地质钻井大队 | Anti-corrosion device and process for logging cable |
| CN112928702A (en) * | 2021-03-29 | 2021-06-08 | 杭州凯达电力建设有限公司 | Multi-machine linkage cable laying machine suitable for cable laying in cable well |
| CN113437701A (en) * | 2021-06-24 | 2021-09-24 | 高沛根 | Automatic angle frame of transferring of utility tunnel cable input |
-
2014
- 2014-04-11 CN CN201420174043.7U patent/CN203895864U/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105197670A (en) * | 2015-10-22 | 2015-12-30 | 国网山东莒南县供电公司 | Automatic pay-off rack for cable |
| CN105197670B (en) * | 2015-10-22 | 2019-04-05 | 日照朝力信息科技有限公司 | An automatic cable pay-off rack |
| CN108521098A (en) * | 2018-05-10 | 2018-09-11 | 中煤第三建设集团机电安装工程有限责任公司 | Device for simultaneously removing large-diameter cables of vertical shaft and construction method thereof |
| CN109256726A (en) * | 2018-11-22 | 2019-01-22 | 陕西陕煤铜川矿业有限公司 | A kind of cable laying method of vertical laying pipeline |
| CN110364966A (en) * | 2019-07-25 | 2019-10-22 | 铜陵有色金属集团铜冠矿山建设股份有限公司 | A kind of method of mine down-hole deep hole cabling |
| CN112531616A (en) * | 2020-11-19 | 2021-03-19 | 四川盐业地质钻井大队 | Anti-corrosion device and process for logging cable |
| CN112928702A (en) * | 2021-03-29 | 2021-06-08 | 杭州凯达电力建设有限公司 | Multi-machine linkage cable laying machine suitable for cable laying in cable well |
| CN113437701A (en) * | 2021-06-24 | 2021-09-24 | 高沛根 | Automatic angle frame of transferring of utility tunnel cable input |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203895864U (en) | Underground cable laying device | |
| CN204858424U (en) | Cable tunnel inspection shaft pulls cabling composite set | |
| CN203895865U (en) | Cable laying device | |
| CN215105435U (en) | Automatic control device for water level of dewatering pipe well | |
| CN203977326U (en) | A kind of multifunctional road pile of power integral type | |
| CN204474271U (en) | A kind of high wind resistance nacelle device | |
| CN107381397B (en) | Quick safe hoist device of cable in wind generating set tower section of thick bamboo | |
| CN103526799B (en) | Telescopic selective water taking device | |
| CN206471765U (en) | A kind of steel pipe pole cable upper boom structure | |
| CN205604824U (en) | Fastener that pole suitability is strong | |
| CN204434076U (en) | Lifting hook capable of adjusting attitude of shield machine component in underground hoisting process of shield machine | |
| CN204457532U (en) | Pipe device under profound inclinometer pipe | |
| CN207483092U (en) | A kind of cable unwinding device | |
| CN207090869U (en) | A kind of tower barrel of wind generating set inner cable fast and safely hanging apparatus | |
| CN205135475U (en) | Nonmetal cabling oil pipe in succession rises device of going into well | |
| CN206233673U (en) | A kind of herringbone holding pole standing device | |
| CN104018444B (en) | A kind of multifunctional road pile of power integral type | |
| CN204587292U (en) | A kind of liftable adhesion type seawater pump bracket | |
| CN204165547U (en) | A kind of tower mast sedimentation detecting system | |
| CN204125968U (en) | The anti-water collecting device of a kind of cable shaft | |
| CN203504068U (en) | Bird driving device installation tool | |
| CN204590740U (en) | With the line bar structural assembly of pull wire arrangement | |
| CN204703524U (en) | Multifunctional integrated prestress tensioning device | |
| CN201666967U (en) | Guide frame for laying underground pipeline optical cable | |
| CN105699679A (en) | Device for fixing seabed flow velocity measuring instrument |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141022 |