CN203888232U - Shaping drum pressure control device of all-steel giant tyre radial forming machine - Google Patents
Shaping drum pressure control device of all-steel giant tyre radial forming machine Download PDFInfo
- Publication number
- CN203888232U CN203888232U CN201420322506.XU CN201420322506U CN203888232U CN 203888232 U CN203888232 U CN 203888232U CN 201420322506 U CN201420322506 U CN 201420322506U CN 203888232 U CN203888232 U CN 203888232U
- Authority
- CN
- China
- Prior art keywords
- control device
- plate valve
- pressure
- air inlet
- forming machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 15
- 239000010959 steel Substances 0.000 title claims abstract description 15
- 238000007493 shaping process Methods 0.000 title claims abstract description 7
- 239000012528 membrane Substances 0.000 claims abstract description 23
- 210000001161 mammalian embryo Anatomy 0.000 claims description 13
- 230000003028 elevating effect Effects 0.000 claims description 10
- 238000001514 detection method Methods 0.000 claims description 7
- 238000003754 machining Methods 0.000 abstract 2
- 239000000463 material Substances 0.000 abstract 1
- 238000004513 sizing Methods 0.000 description 5
- 238000005273 aeration Methods 0.000 description 3
- 238000007664 blowing Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 206010020852 Hypertonia Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000002688 persistence Effects 0.000 description 1
Landscapes
- Tyre Moulding (AREA)
Abstract
The utility model discloses a shaping drum pressure control device of an all-steel giant tyre radial forming machine. The shaping drum pressure control device comprises a valve control element which is arranged relative to an inflation air circuit, wherein the inflation air circuit is communicated with an air source and a tyre shaped on a shaping drum; the valve control element comprises an air inlet membrane valve and an air outlet membrane valve; the air inlet membrane valve and the air outlet membrane valve are connected with a PLC (Programmable Logic Controller) through pipelines; the PLC is connected with a pressure switch for detecting the size of air pressure in the tyre through a pipeline. The shaping drum pressure control device adopts the two membrane valves and one pressure switch to detect; the PLC is used for controlling the two membrane valves, so that the aims that the machining difficulty is reduced, the requirements for materials are low, the machining cost is reduced, the inflation and deflation are rapid, the pressure is accurately controlled and the pressure is kept during power failure and gas supply stop are realized.
Description
(1) technical field:
The utility model relates to tire building machine equipment control technology, is specially a kind of all steel giant embryo meridian forming machine setting drum pressure control device.
(2) background technology:
What traditional all steel giant embryo meridian forming machine (calling tyre building machine in the following text) setting drum the blowing pressure adopted is pneumatic proportional valve, carries out aeration settling.
But the setting drum of tyre building machine inflation needs moment aeration quantity very large (being greater than 14M3), terminal pressure requires again very little (more than 0.0 Mpa); And some tire plant can have a power failure suddenly, blowing-out, causes the pressure of setting drum to guarantee (have a power failure, after blowing-out, fall to press very fast), and the tire half an hour after sizing will be crushed by deadweight, be out of shape, on tire quality, affects very large.
(3) utility model content:
For this reason, the utility model proposes a kind of all steel giant embryo meridian forming machine setting drum pressure control device, its object is accurately to control the blowing pressure, and when having a power failure, stopping the supple of gas or steam at vulcanizer, guarantees that tyre inner pressure does not leak.
Can realize the technical scheme of all steel giant embryo meridian forming machine setting drum pressure control device of above-mentioned purpose, comprise the valve control elements arranging corresponding to inflation gas circuit, described inflation gas circuit is communicated with source of the gas and the tire of shaping on setting drum, difference is, described valve control elements comprises air inlet film plate valve and exhaust membrane plate valve, described air inlet film plate valve and exhaust membrane plate valve are by connection PLC Programmable Logic Controller, and described PLC Programmable Logic Controller detects the pressure switch of tire internal gas pressure size by connection.
Operation principle of the present utility model:
The conducting of PLC Controlled by Programmable Controller air inlet film plate valve is inflated tire on setting drum, the internal pressure that pressure switch detects tire reaches after setting pressure, detection signal is fed back to PLC Programmable Logic Controller, PLC control air inlet film able to programme plate valve stops inflation, if inside tires pressure surpasses setting pressure, PLC Controlled by Programmable Controller air inlet film plate valve stops inflation, and control exhaust membrane plate valve is opened and carried out exhaust; If after being detected by pressure switch when inside tires pressure leakage or other reasons cause pressure, detection signal feeds back to PLC Programmable Logic Controller, PLC Controlled by Programmable Controller air inlet film plate valve is inflated, until the pressure balance of tire.
A kind of set-up mode of described air inlet film plate valve and exhaust membrane plate valve, air inlet film plate valve is directly connected in inflation gas circuit, and exhaust membrane plate valve is by the inflation gas circuit after exhaust branch road access air inlet film plate valve.
Further be designed to, described inflation gas circuit is communicated with tire by the air inlet air flue of (central authority) elevating lever inside on setting drum.
The scheme that described pressure switch detects tire internal gas pressure size is that pressure switch is communicated with tire by detecting gas circuit.
Further be designed to, described detection gas circuit is opened in the inside of (central authority) elevating lever on setting drum.
The beneficial effects of the utility model:
1, the utility model all steel giant embryo meridian forming machine setting drum pressure control device is simple in structure, and dismounting is easy to maintenance, and cost is low.
2, the utility model reduces difficulty of processing, and pressure controling precision is high, and inflation is fast.
3, the utility model is when stopping the supple of gas or steam, having a power failure, and the persistence of pressurize is higher than traditional proportioning valve.
4, the utility model is particularly suitable for the inflation requirements of large capacity tire.
(4) accompanying drawing explanation:
Figure 1 shows that the structural representation of a kind of embodiment of the utility model.
Figure number sign: 1, air inlet film plate valve; 2, exhaust membrane plate valve; 3, pressure switch; 4, PLC Programmable Logic Controller; 5, upper clamp ring; 6, tire; 7, source of the gas; 8, inflation gas circuit; 9, exhaust branch road; 10, elevating lever; 11, air inlet air flue; 12, detect gas circuit; 13, lower clamping.
(5) specific embodiment:
Below in conjunction with accompanying drawing illustrated embodiment, the technical solution of the utility model is described further.
All steel giant embryo meridian forming machine setting drum comprise clamp ring 5, lower clamping 13 or and (central authority) elevating lever 10, described upper clamp ring 5 is installed on elevating lever 10 tops, described lower clamping 13 is slidably installed on elevating lever 10, need the upper and lower tire mouth of the tire 6 of sizing to be located at respectively on clamp ring 5 and lower clamping 13, source of the gas 7 gives tire 6 inflations by inflation gas circuit 8, described inflation gas circuit 8 communicates with tire 6 by being opened in the air inlet air flue 11 of elevating lever 10 inside, as shown in Figure 1.
The utility model all steel giant embryo meridian forming machine setting drum pressure control device is directed to described inflation gas circuit 8 and arranges, comprise air inlet film plate valve 1, exhaust membrane plate valve 2, pressure switch 3 and PLC Programmable Logic Controller 4, described PLC Programmable Logic Controller 4 can be controlled respectively leading to, closing of air inlet film plate valve 1 and exhaust membrane plate valve 2 according to the detection signal feedback of pressure switch 3.
Described air inlet film plate valve 1 directly accesses in inflation gas circuit 8, in inflation gas circuit 8 after air inlet film plate valve 1, pick out an exhaust branch road 9 and connect exhaust membrane plate valve 2, described elevating lever 10 inside are offered a detection gas circuit 12 with tire 6 internal communication again, and described pressure switch 3 detects gas circuit 12 by pipeline communication; Described PLC Programmable Logic Controller 4 connects respectively air inlet film plate valve 1 and exhaust membrane plate valve 2 by circuit, and described PLC Programmable Logic Controller 4 is also by connection pressure switch 3, as shown in Figure 1.
Running of the present utility model:
1, sizing starts, and by PLC Programmable Logic Controller 4, sends instruction to air inlet film plate valve 1, and the tire 6 on 8 pairs of setting drums of conducting inflation gas circuit carries out aeration settling.
2, on setting drum, the 6 internal pressure feedbacks of the tire after sizing are detected by pressure switch 3, and pressure switch 3 sends to PLC Programmable Logic Controller 4 to process detection signal, after PLC Programmable Logic Controller 4 processing signals complete, judges.
If 3 hypertonia, close air inlet film plate valve 1 and open exhaust membrane plate valve 2, until the ready exhaust membrane plate valve 2 of turning off again of pressure; If pressure is suitable, stop air inlet film plate valve 1 and exhaust membrane plate valve 2; If pressure is inadequate, PLC control 4 devices able to programme are automatically opened air inlet film plate valve 1 and are inflated ftercompction, and then carry out aforementioned judgement, and inflation, exhaust back and forth continue, and guarantee all the time the sizing pressure in tire 6.
4, shaped while preparing pressure release, PLC Programmable Logic Controller 4 sends instruction supply and exhaust diaphragm valve 2, and exhaust pressure relief is carried out in 2 conductings of exhaust membrane plate valve.
If 5, in type-approval process, equipment has a power failure or stops the supple of gas or steam midway, due to the operating characteristic (energising is opened, and power-off is closed) of air inlet film plate valve 1, automatically close inflation gas circuit 8, reach pressure maintaining effect.
Claims (5)
1. all steel giant embryo meridian forming machine setting drum pressure control device, comprise the valve control elements arranging corresponding to inflation gas circuit (8), described inflation gas circuit (8) is communicated with source of the gas (7) and the tire (6) of shaping on setting drum, it is characterized in that: described valve control elements comprises air inlet film plate valve (1) and exhaust membrane plate valve (2), described air inlet film plate valve (1) and exhaust membrane plate valve (2) are by connection PLC Programmable Logic Controller (4), and described PLC Programmable Logic Controller (4) detects the pressure switch (3) of tire (6) internal gas pressure size by connection.
2. all steel giant embryo meridian forming machine setting drum pressure control device according to claim 1, it is characterized in that: in described air inlet film plate valve (1) access inflation gas circuit (8), described exhaust membrane plate valve (2) is by exhaust branch road (9) access air inlet film plate valve (1) inflation gas circuit (8) afterwards.
3. all steel giant embryo meridian forming machine setting drum pressure control device according to claim 1 and 2, is characterized in that: described inflation gas circuit (8) is communicated with tire (6) by the inner air inlet air flue (11) of elevating lever on setting drum (10).
4. all steel giant embryo meridian forming machine setting drum pressure control device according to claim 1 and 2, is characterized in that: described pressure switch (3) is communicated with tire (6) by detecting gas circuit (12).
5. all steel giant embryo meridian forming machine setting drum pressure control device according to claim 1 and 2, is characterized in that: described detection gas circuit (12) is opened in the inside of the upper elevating lever (10) of setting drum (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420322506.XU CN203888232U (en) | 2014-06-17 | 2014-06-17 | Shaping drum pressure control device of all-steel giant tyre radial forming machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420322506.XU CN203888232U (en) | 2014-06-17 | 2014-06-17 | Shaping drum pressure control device of all-steel giant tyre radial forming machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203888232U true CN203888232U (en) | 2014-10-22 |
Family
ID=51714678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420322506.XU Expired - Fee Related CN203888232U (en) | 2014-06-17 | 2014-06-17 | Shaping drum pressure control device of all-steel giant tyre radial forming machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203888232U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104057626A (en) * | 2014-06-17 | 2014-09-24 | 桂林橡胶机械厂 | Pressure control device of shaping drum of all-steel radial giant tire forming machine |
CN109732959A (en) * | 2019-01-07 | 2019-05-10 | 赛轮(沈阳)轮胎有限公司 | Drum Isobarically Control tire moulding method and system in a kind of molding machine |
-
2014
- 2014-06-17 CN CN201420322506.XU patent/CN203888232U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104057626A (en) * | 2014-06-17 | 2014-09-24 | 桂林橡胶机械厂 | Pressure control device of shaping drum of all-steel radial giant tire forming machine |
CN109732959A (en) * | 2019-01-07 | 2019-05-10 | 赛轮(沈阳)轮胎有限公司 | Drum Isobarically Control tire moulding method and system in a kind of molding machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203888232U (en) | Shaping drum pressure control device of all-steel giant tyre radial forming machine | |
CN104057626A (en) | Pressure control device of shaping drum of all-steel radial giant tire forming machine | |
CN103487219A (en) | Small general-purpose plane cockpit and fuel tank integrated gas tightness detecting system | |
CN205642763U (en) | Cylinder cap gas tightness detects machine | |
CN102519688B (en) | Production inspection table and inspection method for air passage control system assembly of clutch thruster | |
CN203809781U (en) | Air cylinder driving type high and low pressure valve | |
CN205254004U (en) | Press air cushion gas circuit controlling means | |
CN204448617U (en) | A kind of double electronics airtight test machine | |
CN209155873U (en) | Precision processing mixed bed is into acid-alkali regeneration system | |
CN207515977U (en) | A kind of big volume product fast aeration leakage detecting device | |
CN207564996U (en) | A kind of Raw material pail of reaction injection molding device and batch can air-pressure balancing device | |
CN207416085U (en) | A kind of wind pressure automatic control system | |
CN202614594U (en) | Double-station air pressure testing table | |
CN101797782B (en) | Preheating device for tire vulcanizing mold | |
CN102872757A (en) | Vacuum charging hopper applied to resin production | |
CN202471370U (en) | Production test stand for clutch thruster air passage control system assembly | |
CN204640630U (en) | The outer warm condensate drain device of steaming pan type vulcanizer | |
CN104441364A (en) | Automatic condensate drain device for hot plate and die sleeve of tyre vulcanizer | |
CN203365089U (en) | Filling machine wine valve ripple lining detector | |
CN201442329U (en) | Water draining unit for wheel tire vulcanizer steam thermal pipeline | |
CN104647245B (en) | Multistation pressurizer | |
CN202658512U (en) | Automatic inflation system for rubber-tyred rollers | |
CN207789492U (en) | Vulcanize the double mold vulcanizer of function with single mode | |
CN219867437U (en) | Hydrogen inlet valve adjusting pipeline system | |
CN204188342U (en) | The pick-up unit of valve seal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 541002 Guilin in the Guangxi Zhuang Autonomous Region City General Road No. 24 Patentee after: GUILIN RUBBER MACHINERY Co.,Ltd. Address before: 541002 Guilin in the Guangxi Zhuang Autonomous Region City General Road No. 24 Patentee before: Guilin Rubber Machinery Factory |
|
CF01 | Termination of patent right due to non-payment of annual fee |