CN203886034U - First-aid rubber pad - Google Patents
First-aid rubber pad Download PDFInfo
- Publication number
- CN203886034U CN203886034U CN201420195175.8U CN201420195175U CN203886034U CN 203886034 U CN203886034 U CN 203886034U CN 201420195175 U CN201420195175 U CN 201420195175U CN 203886034 U CN203886034 U CN 203886034U
- Authority
- CN
- China
- Prior art keywords
- fixed bolster
- hole
- rope
- clip
- fixing hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Air Bags (AREA)
Abstract
The utility model belongs to the field of rubber manufacture and particularly relates to a first-aid rubber pad which comprises a base paid, a fixed strip A, a fixed strip B, a strip-shaped air bag A, a strip-shaped air bag B, a round air bag, a triangular air bag A, a triangular air bag B, a pull ring A, a pull ring B, a pull ring C, a pull ring D, a fixed hole A, a fixed hole B, a fixed hole C, a fixed hole D, a fixed hole E, a fixed hole F, a fixed hole G, a fixed hole H, a fixed pad A, a fixed pad B, a fixed pad C, a fixed pad D, a fixed pad E, a fixed pad F, a fixed pad G, a fixed pad H, a fixed pad I, a fixed pad G, a fixed pad K, a fixed pad L, a rope hole A, a rope hole B, a rope hole C, a rope hole D, a rope hole E, a rope hole F, a rope hole G, a rope hole H, a rope hole I, a rope hole G, a rope hole K, a rope hole L, a main rope, a reinforcing rope A, a reinforcing rope B, a reinforcing rope C and a reinforcing rope D.
Description
Technical field
The utility model belongs to rubber and manufactures field, relates in particular to a kind of first aid rubber blanket.
[
background technology]
The production technology of rubber mainly comprise plasticate, mixing and shaping three phases.
[plasticating] plasticates is to make elasticity rubber change the machining process of plastic state into, thereby increases its plasticity, obtains suitable mobility, to meet technological requirement mixing and that be shaped.The two kinds of methods of having plasticated: machinery is plasticated and chemical plastication, the former is by mechanism, and the latter, by chemical action, makes the large molecular breakdown of rubber become relatively little molecule, thereby viscosity is declined, and plasticity increases.
[mixing] is mixing is that various compounding ingredients (vulcanizing agent, antiaging agent, filler etc.) are sneaked in rubber, make the process of uniform elastomeric compound, its basic task is to make the elastomeric compound (claiming again sizing material) that meets performance requirement, so that normally the carrying out of subsequent handling.
The forming technology of rubber mainly contains calendaring molding, extrudes shaping, injection moulding.
The calendaring molding of [calendaring molding] rubber is the technical process of utilizing rubber calender that material is extended.When material passes through two roller gaps of calender, extend and become the rubber with certain section configuration under pressure.This method is mainly used in compressing tablet, the die mould of sizing material; The rubberizing of yarn fabric and steel wire curtain etc., rubber; The laminating of film and film or film and kiss-coating fabric etc.
The extrusion technique of [extrusion technique] rubber is to utilize extruder, makes sizing material under the barrel wall of extruder and the top effect of screw rod, by the rotation of screw rod, sizing material is constantly advanced, and reaches the object of extruding preliminary moulding.Can extrude by means of die mould the semi-finished product of various complicated shapes, as the tread rubber of tire, inner-tube cylinder, electric wire crust etc.
The injection moulding of [injection technique] rubber is the production method that sizing material is directly vulcanized from machine barrel injection model, similar with the injection moulding of plastics.As shown be six mould rubber overshoes injector course of work schematic diagrames, the sizing material mixing is in advance sent into machine barrel through hopper, under the turning effort of screw rod, sizing material advances in process along screw channel, due to high degree of agitation and distortion, add machine barrel external heat, temperature raises very soon, and piston advances injecting glue, and sizing material injects die cavity pressurize a period of time through nozzle, in pressure maintaining period, sizing material at high temperature vulcanizes.That injection moulding has is with short production cycle, productivity ratio is high, labour intensity is low, high quality.
Summary of the invention
The utility model provides a kind of first aid rubber blanket, to solve the first aid rubber blanket problem that easily bounce-back is hurted sb.'s feelings proposing in above-mentioned background technology.
The technical problem that the utility model solves realizes by the following technical solutions: the utility model provides a kind of first aid rubber blanket, it is characterized in that: comprise heelpiece, fixed strip A, fixed strip B, strip air bag A, strip air bag B, round balloon, triangle air bag A, triangle air bag B, deep-slotted chip breaker A, deep-slotted chip breaker B, draw ring A, draw ring B, draw ring C, draw ring D, fixing hole A, fixing hole B, fixing hole C, fixing hole D, fixing hole E, fixing hole F, fixing hole G, fixing hole H, fixed bolster A, fixed bolster B, fixed bolster C, fixed bolster D, fixed bolster E, fixed bolster F, fixed bolster G, fixed bolster H, fixed bolster I, fixed bolster G, fixed bolster K, fixed bolster L, rope hole A, rope hole B, rope hole C, rope hole D, rope hole E, rope hole F, rope hole G, rope hole H, rope hole I, rope hole G, rope hole K, rope hole L, clip A, clip B, clip C, clip D, clip E, clip F, clip G, clip H, clip I, clip G, clip K, clip L, main rope, reinforcing cord A, reinforcing cord B, reinforcing cord C, reinforcing cord D, described draw ring A, draw ring B, draw ring C, draw ring D is on the side of heelpiece, described fixed strip A, fixed strip B, strip air bag A, strip air bag B, round balloon, triangle air bag A, triangle air bag B, fixing hole A, fixing hole B, fixing hole C, fixing hole D, fixing hole E, fixing hole F, fixing hole G, fixing hole H, fixed bolster A, fixed bolster B, fixed bolster C, fixed bolster D, fixed bolster E, fixed bolster F, fixed bolster G, fixed bolster H, fixed bolster I, fixed bolster G, fixed bolster K, fixed bolster L on described heelpiece, described strip air bag A, strip air bag B is at described fixed strip A, between fixed strip B point, described round balloon is at described strip air bag A, between strip air bag B, described triangle air bag A, triangle air bag B is at described strip air bag A, strip air bag B, the side of round balloon, described deep-slotted chip breaker A on described strip air bag A, described deep-slotted chip breaker B on described strip air bag B, described fixed bolster A, fixed bolster B, fixed bolster C is on one side of described heelpiece, fixed bolster D, fixed bolster E, fixed bolster F is at the another side of described heelpiece, described fixed bolster G, fixed bolster H, fixed bolster I is in a side of described heelpiece, described fixed bolster G, fixed bolster K, fixed bolster L is at the opposite side of described heelpiece, described fixing hole A, fixing hole B is at described fixed bolster A, between fixed bolster C, described fixed bolster B is at described fixing hole A, between fixing hole B, described fixing hole E, fixing hole F is at described fixed bolster D, between fixed bolster F, described fixed bolster E is at described fixing hole E, between fixing hole F, described fixing hole G, fixing hole H is at described fixed bolster G, between fixed bolster I, described fixed bolster H is at described fixing hole G, between fixing hole H, described fixing hole C, fixing hole D is at described fixed bolster G, between fixed bolster L, described fixed bolster K is at described fixing hole C, between fixing hole D, described draw ring A is at described fixed bolster C, between fixed bolster I, described draw ring B is at described fixed bolster D, between fixed bolster G, described draw ring C is at described fixed bolster F, between fixed bolster G, described draw ring D is at described fixed bolster A, between fixed bolster L, described rope hole D, clip I on described fixed bolster A, described rope hole E, clip H on described fixed bolster B, described rope hole D, clip I on described fixed bolster C, described rope hole L, clip A on described fixed bolster D, described rope hole K, clip B on described fixed bolster E, described rope hole G, clip C on described fixed bolster F, described rope hole G, clip F on described fixed bolster G, described rope hole H, clip E on described fixed bolster H, described rope hole I, clip D on described fixed bolster I, described rope hole C, clip G on described fixed bolster G, described rope hole B, clip K on described fixed bolster K, described rope hole A, clip L is on described fixed bolster L, and described reinforcing cord A runs through described rope hole D successively, fixing hole A, rope hole E, fixing hole B, rope hole F, clip E connects described main rope, and described reinforcing cord B runs through described fixed bolster L successively, fixing hole C, rope hole B, fixing hole D, rope hole C connects described main rope, and described reinforcing cord C passes through lacing hole G successively, fixing hole E, rope hole K, fixing hole F, rope hole L connects described main rope, and described reinforcing cord D runs through described rope hole G successively, fixing hole G, rope hole H, fixing hole H, rope hole I connects described main rope, and described main rope runs through described draw ring A successively, rope hole D, rope hole E, rope hole F, draw ring D, rope hole A, rope hole B, rope hole C, draw ring C, rope hole G, rope hole K, rope hole L, draw ring B, rope hole G, rope hole H, rope hole I.
The quantity of described strip air bag A, strip air bag B is more than bar, more than the quantity of described round balloon is, more than the quantity of described triangle air bag A, triangle air bag B be, the quantity of described deep-slotted chip breaker A, deep-slotted chip breaker B be individual more than.
Described fixed strip A, fixed strip B etc. are large, described strip air bag A, strip air bag B etc. are large, described triangle air bag A, triangle air bag B etc. are large, described deep-slotted chip breaker A, deep-slotted chip breaker B etc. are large, described draw ring A, draw ring B, draw ring C, draw ring D etc. are large, described fixing hole A, fixing hole B, fixing hole C, fixing hole D, fixing hole E, fixing hole F, fixing hole G, fixing hole H etc. are large, described fixed bolster A, fixed bolster B, fixed bolster C, fixed bolster D, fixed bolster E, fixed bolster F etc. are large, described fixed bolster G, fixed bolster H, fixed bolster I, fixed bolster G, fixed bolster K, fixed bolster L etc. are large, described rope hole A, rope hole B, rope hole C, rope hole D, rope hole E, rope hole F, rope hole G, rope hole H, rope hole I, rope hole G, rope hole K, rope hole L etc. are large, described clip A, clip B, clip C, clip D, clip E, clip F, clip G, clip H, clip I, clip G, clip K, clip L etc. are large, described reinforcing cord A, reinforcing cord B, reinforcing cord C, reinforcing cord D is isometric.
The beneficial effects of the utility model are:
The use of 1 deep-slotted chip breaker, triangle air bag, can make strip air bag to inner inclination, in use procedure, not because the bounce-back of strip air bag causes collision or gets injured by a fall, uses safer.
2 round balloons are filled up the space forming between triangle air bag, make the elasticity of heelpiece more average.
On 3 each fixed bolsters, there is clip, can on ground or other object, use and fix, also can use with multiple rubber blankets stack amalgamations, more have security.
4, the use of draw ring, reinforcing cord, can assist the use of main rope, makes the use of rubber blanket more stable.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further:
In figure: 1-heelpiece, 2-fixed strip A, 3-fixed strip B, 4-strip air bag A, 5-strip air bag B, 6-round balloon, 7-triangle air bag A, 8-triangle air bag B, 9-deep-slotted chip breaker A, 10-deep-slotted chip breaker B, 11-draw ring A, 12-draw ring B, 13-draw ring C, 14-draw ring D, 15-fixing hole A, 16-fixing hole B, 17-fixing hole C, 18-fixing hole D, 19-fixing hole E, 20-fixing hole F, 21-fixing hole G, 22-fixing hole H, 23-fixed bolster A, 24-fixed bolster B, 25-fixed bolster C, 26-fixed bolster D, 27-fixed bolster E, 28-fixed bolster F, 29-fixed bolster G, 30-fixed bolster H, 31-fixed bolster I, 32-fixed bolster G, 33-fixed bolster K, 34-fixed bolster L, the 35-hole A that restricts, the 36-hole B that restricts, the 37-hole C that restricts, the 38-hole D that restricts, the 39-hole E that restricts, the 40-hole F that restricts, the 41-hole G that restricts, the 42-hole H that restricts, the 43-hole I that restricts, the 44-hole G that restricts, the 45-hole K that restricts, the 46-hole L that restricts, 47-clip A, 48-clip B, 49-clip C, 50-clip D, 51-clip E, 52-clip F, 53-clip G, 54-clip H, 55-clip I, 56-clip G, 57-clip K, 58-clip L, the main rope of 59-, 60-reinforcing cord A, 61-reinforcing cord B, 62-reinforcing cord C, 63-reinforcing cord D.
Embodiment:
The present embodiment comprises heelpiece 1, fixed strip A2, fixed strip B3, strip air bag A4, strip air bag B5, round balloon 6, triangle air bag A7, triangle air bag B8, deep-slotted chip breaker A9, deep-slotted chip breaker B10, draw ring A11, draw ring B12, draw ring C13, draw ring D14, fixing hole A15, fixing hole B16, fixing hole C17, fixing hole D18, fixing hole E19, fixing hole F20, fixing hole G21, fixing hole H22, fixed bolster A23, fixed bolster B24, fixed bolster C25, fixed bolster D26, fixed bolster E27, fixed bolster F28, fixed bolster G29, fixed bolster H30, fixed bolster I31, fixed bolster G32, fixed bolster K33, fixed bolster L34, rope hole A35, rope hole B36, rope hole C37, rope hole D38, rope hole E39, rope hole F40, rope hole G41, rope hole H42, rope hole I43, rope hole G44, rope hole K45, rope hole L46, clip A47, clip B48, clip C49, clip D50, clip E51, clip F52, clip G53, clip H54, clip I55, clip G56, clip K57, clip L58, main rope 59, reinforcing cord A60, reinforcing cord B61, reinforcing cord C62, reinforcing cord D63, draw ring A11, draw ring B12, draw ring C13, draw ring D14 is on the side of heelpiece 1, fixed strip A2, fixed strip B3, strip air bag A4, strip air bag B5, round balloon 6, triangle air bag A7, triangle air bag B8, fixing hole A15, fixing hole B16, fixing hole C17, fixing hole D18, fixing hole E19, fixing hole F20, fixing hole G21, fixing hole H22, fixed bolster A23, fixed bolster B24, fixed bolster C25, fixed bolster D26, fixed bolster E27, fixed bolster F28, fixed bolster G29, fixed bolster H30, fixed bolster I31, fixed bolster G32, fixed bolster K33, fixed bolster L34 on heelpiece 1, strip air bag A4, strip air bag B5 is at fixed strip A2, between fixed strip B3 point, round balloon 6 is at strip air bag A4, between strip air bag B5, triangle air bag A7, triangle air bag B8 is at strip air bag A4, strip air bag B5, the side of round balloon 6, deep-slotted chip breaker A9 on strip air bag A4, deep-slotted chip breaker B10 on strip air bag B5, fixed bolster A23, fixed bolster B24, fixed bolster C25 is on one side of heelpiece 1, fixed bolster D26, fixed bolster E27, fixed bolster F28 is at the another side of heelpiece 1, fixed bolster G29, fixed bolster H30, fixed bolster I31 is at a side of heelpiece 1, fixed bolster G32, fixed bolster K33, fixed bolster L34 is at the opposite side of heelpiece 1, fixing hole A15, fixing hole B16 is at fixed bolster A23, between fixed bolster C25, fixed bolster B24 is at fixing hole A15, between fixing hole B16, fixing hole E19, fixing hole F20 is at fixed bolster D26, between fixed bolster F28, fixed bolster E27 is at fixing hole E19, between fixing hole F20, fixing hole G21, fixing hole H22 is at fixed bolster G29, between fixed bolster I31, fixed bolster H30 is at fixing hole G21, between fixing hole H22, fixing hole C17, fixing hole D18 is at fixed bolster G32, between fixed bolster L34, fixed bolster K33 is at fixing hole C17, between fixing hole D18, draw ring A11 is at fixed bolster C25, between fixed bolster I31, draw ring B12 is at fixed bolster D26, between fixed bolster G29, draw ring C13 is at fixed bolster F28, between fixed bolster G32, draw ring D14 is at fixed bolster A23, between fixed bolster L34, rope hole D38, clip I55 is on fixed bolster A23, and hole E39 restricts, clip H54 is on fixed bolster B24, and hole D38 restricts, clip I55 is on fixed bolster C25, and hole L46 restricts, clip A47 is on fixed bolster D26, and hole K45 restricts, clip B48 is on fixed bolster E27, and hole G44 restricts, clip C49 is on fixed bolster F28, and hole G41 restricts, clip F52 is on fixed bolster G29, and hole H42 restricts, clip E51 is on fixed bolster H30, and hole I 43 restricts, clip D50 is on fixed bolster I31, and hole C37 restricts, clip G56 is on fixed bolster G32, and hole B36 restricts, clip K57 is on fixed bolster K33, and hole A35 restricts, clip L58 is on fixed bolster L34, and reinforcing cord A60 passes through lacing hole D38 successively, fixing hole A15, rope hole E39, fixing hole B16, rope hole F40, clip E51 connects main rope 59, and reinforcing cord B61 runs through fixed bolster L34 successively, fixing hole C17, rope hole B36, fixing hole D18, rope hole C37 connects main rope 59, and reinforcing cord C62 passes through lacing hole G44 successively, fixing hole E19, rope hole K45, fixing hole F20, rope hole L46 connects main rope 59, and reinforcing cord D63 passes through lacing hole G 41 successively, fixing hole G21, rope hole H42, fixing hole H22, rope hole I43 connects main rope 59, and main rope 59 runs through draw ring A11 successively, rope hole D38, rope hole E39, rope hole F40, draw ring D14, rope hole A35, rope hole B36, rope hole C37, draw ring C13, rope hole G44, rope hole K45, rope hole L46, draw ring B12, rope hole G41, rope hole H42, rope hole I43.
The quantity of strip air bag A4, strip air bag B5 is more than 4, and the quantity of round balloon 6 is more than 28, and the quantity of triangle air bag A7, triangle air bag B8 is more than 40, and the quantity of deep-slotted chip breaker A9, deep-slotted chip breaker B10 is more than 40.
Fixed strip A2, fixed strip B3 etc. are large, strip air bag A4, strip air bag B5 etc. are large, triangle air bag A7, triangle air bag B8 etc. are large, deep-slotted chip breaker A9, deep-slotted chip breaker B10 etc. are large, draw ring A11, draw ring B12, draw ring C13, draw ring D14 etc. are large, fixing hole A15, fixing hole B16, fixing hole C17, fixing hole D18, fixing hole E19, fixing hole F20, fixing hole G21, fixing hole H22 etc. are large, fixed bolster A23, fixed bolster B24, fixed bolster C25, fixed bolster D26, fixed bolster E27, fixed bolster F28 etc. are large, fixed bolster G29, fixed bolster H30, fixed bolster I31, fixed bolster G32, fixed bolster K33, fixed bolster L34 etc. are large, rope hole A35, rope hole B36, rope hole C37, rope hole D38, rope hole E39, rope hole F40, rope hole G41, rope hole H42, rope hole I43, rope hole G44, rope hole K45, rope hole L46 etc. are large, clip A47, clip B48, clip C49, clip D50, clip E51, clip F52, clip G53, clip H54, clip I55, clip G56, clip K57, clip L58 etc. are large, reinforcing cord A60, reinforcing cord B61, reinforcing cord C62, reinforcing cord D63 is isometric.
Utilize technical scheme described in the utility model, or those skilled in the art being under the inspiration of technical solutions of the utility model, designs similar technical scheme, and reaching above-mentioned technique effect, is all to fall into protection domain of the present utility model.
Claims (3)
1. a first aid rubber blanket, is characterized in that: comprise heelpiece, fixed strip A, fixed strip B, strip air bag A, strip air bag B, round balloon, triangle air bag A, triangle air bag B, deep-slotted chip breaker A, deep-slotted chip breaker B, draw ring A, draw ring B, draw ring C, draw ring D, fixing hole A, fixing hole B, fixing hole C, fixing hole D, fixing hole E, fixing hole F, fixing hole G, fixing hole H, fixed bolster A, fixed bolster B, fixed bolster C, fixed bolster D, fixed bolster E, fixed bolster F, fixed bolster G, fixed bolster H, fixed bolster I, fixed bolster G, fixed bolster K, fixed bolster L, rope hole A, rope hole B, rope hole C, rope hole D, rope hole E, rope hole F, rope hole G, rope hole H, rope hole I, rope hole G, rope hole K, rope hole L, clip A, clip B, clip C, clip D, clip E, clip F, clip G, clip H, clip I, clip G, clip K, clip L, main rope, reinforcing cord A, reinforcing cord B, reinforcing cord C, reinforcing cord D, described draw ring A, draw ring B, draw ring C, draw ring D is on the side of heelpiece, described fixed strip A, fixed strip B, strip air bag A, strip air bag B, round balloon, triangle air bag A, triangle air bag B, fixing hole A, fixing hole B, fixing hole C, fixing hole D, fixing hole E, fixing hole F, fixing hole G, fixing hole H, fixed bolster A, fixed bolster B, fixed bolster C, fixed bolster D, fixed bolster E, fixed bolster F, fixed bolster G, fixed bolster H, fixed bolster I, fixed bolster G, fixed bolster K, fixed bolster L on described heelpiece, described strip air bag A, strip air bag B is at described fixed strip A, between fixed strip B point, described round balloon is at described strip air bag A, between strip air bag B, described triangle air bag A, triangle air bag B is at described strip air bag A, strip air bag B, the side of round balloon, described deep-slotted chip breaker A on described strip air bag A, described deep-slotted chip breaker B on described strip air bag B, described fixed bolster A, fixed bolster B, fixed bolster C is on one side of described heelpiece, fixed bolster D, fixed bolster E, fixed bolster F is at the another side of described heelpiece, described fixed bolster G, fixed bolster H, fixed bolster I is in a side of described heelpiece, described fixed bolster G, fixed bolster K, fixed bolster L is at the opposite side of described heelpiece, described fixing hole A, fixing hole B is at described fixed bolster A, between fixed bolster C, described fixed bolster B is at described fixing hole A, between fixing hole B, described fixing hole E, fixing hole F is at described fixed bolster D, between fixed bolster F, described fixed bolster E is at described fixing hole E, between fixing hole F, described fixing hole G, fixing hole H is at described fixed bolster G, between fixed bolster I, described fixed bolster H is at described fixing hole G, between fixing hole H, described fixing hole C, fixing hole D is at described fixed bolster G, between fixed bolster L, described fixed bolster K is at described fixing hole C, between fixing hole D, described draw ring A is at described fixed bolster C, between fixed bolster I, described draw ring B is at described fixed bolster D, between fixed bolster G, described draw ring C is at described fixed bolster F, between fixed bolster G, described draw ring D is at described fixed bolster A, between fixed bolster L, described rope hole D, clip I on described fixed bolster A, described rope hole E, clip H on described fixed bolster B, described rope hole D, clip I on described fixed bolster C, described rope hole L, clip A on described fixed bolster D, described rope hole K, clip B on described fixed bolster E, described rope hole G, clip C on described fixed bolster F, described rope hole G, clip F on described fixed bolster G, described rope hole H, clip E on described fixed bolster H, described rope hole I, clip D on described fixed bolster I, described rope hole C, clip G on described fixed bolster G, described rope hole B, clip K on described fixed bolster K, described rope hole A, clip L is on described fixed bolster L, and described reinforcing cord A runs through described rope hole D successively, fixing hole A, rope hole E, fixing hole B, rope hole F, clip E connects described main rope, and described reinforcing cord B runs through described fixed bolster L successively, fixing hole C, rope hole B, fixing hole D, rope hole C connects described main rope, and described reinforcing cord C passes through lacing hole G successively, fixing hole E, rope hole K, fixing hole F, rope hole L connects described main rope, and described reinforcing cord D runs through described rope hole G successively, fixing hole G, rope hole H, fixing hole H, rope hole I connects described main rope, and described main rope runs through described draw ring A successively, rope hole D, rope hole E, rope hole F, draw ring D, rope hole A, rope hole B, rope hole C, draw ring C, rope hole G, rope hole K, rope hole L, draw ring B, rope hole G, rope hole H, rope hole I.
2. a kind of first aid rubber blanket according to claim 1, it is characterized in that: the quantity of described strip air bag A, strip air bag B is more than bar, more than the quantity of described round balloon is, more than the quantity of described triangle air bag A, triangle air bag B is, the quantity of described deep-slotted chip breaker A, deep-slotted chip breaker B be individual more than.
3. a kind of first aid rubber blanket according to claim 1, is characterized in that: described fixed strip A, fixed strip B etc. are large, described strip air bag A, strip air bag B etc. are large, described triangle air bag A, triangle air bag B etc. are large, described deep-slotted chip breaker A, deep-slotted chip breaker B etc. are large, described draw ring A, draw ring B, draw ring C, draw ring D etc. are large, described fixing hole A, fixing hole B, fixing hole C, fixing hole D, fixing hole E, fixing hole F, fixing hole G, fixing hole H etc. are large, described fixed bolster A, fixed bolster B, fixed bolster C, fixed bolster D, fixed bolster E, fixed bolster F etc. are large, described fixed bolster G, fixed bolster H, fixed bolster I, fixed bolster G, fixed bolster K, fixed bolster L etc. are large, described rope hole A, rope hole B, rope hole C, rope hole D, rope hole E, rope hole F, rope hole G, rope hole H, rope hole I, rope hole G, rope hole K, rope hole L etc. are large, described clip A, clip B, clip C, clip D, clip E, clip F, clip G, clip H, clip I, clip G, clip K, clip L etc. are large, described reinforcing cord A, reinforcing cord B, reinforcing cord C, reinforcing cord D is isometric.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420195175.8U CN203886034U (en) | 2014-04-22 | 2014-04-22 | First-aid rubber pad |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420195175.8U CN203886034U (en) | 2014-04-22 | 2014-04-22 | First-aid rubber pad |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203886034U true CN203886034U (en) | 2014-10-22 |
Family
ID=51712489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420195175.8U Expired - Fee Related CN203886034U (en) | 2014-04-22 | 2014-04-22 | First-aid rubber pad |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203886034U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111202919A (en) * | 2019-01-14 | 2020-05-29 | 上海轱辘轩工业设计有限公司 | High-altitude falling rescue air cushion |
-
2014
- 2014-04-22 CN CN201420195175.8U patent/CN203886034U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111202919A (en) * | 2019-01-14 | 2020-05-29 | 上海轱辘轩工业设计有限公司 | High-altitude falling rescue air cushion |
CN111202919B (en) * | 2019-01-14 | 2023-05-23 | 上海轱辘轩工业设计有限公司 | High-altitude falling rescue air cushion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2015258536A1 (en) | Plasticizing delivery method and device using eccentric rotor and having pulsed volume deformation | |
CN106956406B (en) | Dynamic rubber injection molding device and method | |
CN203886034U (en) | First-aid rubber pad | |
CN103395268A (en) | Three-layer co-extruded plastic film as well as preparation technology and blow moulding system thereof | |
CN105111543A (en) | Spiral rubber extruding frictional piece and production method therefor | |
CN104786458A (en) | Production technology method and equipment for molding three-dimensional hollow product in continuous extruding manner | |
CN100560335C (en) | A kind of one-step method wood-plastic composite material extrusion equipment of extruding based on single screw rod | |
CN102376403B (en) | Compound insulator processing technology for extruding irregular sheath | |
CN104046050A (en) | Wood-plastic composite material and profile manufacturing process | |
CN1718412A (en) | Manufacturing method of rubber injection moulding hand shaged gloves | |
CN102558671B (en) | Plastic foam sheet material prepared by waste polypropylene and polyurethane and its production method | |
CN201471706U (en) | Five-color surrounding bar extruder | |
CN101913226A (en) | Injection moulding method of rubber and plastic electric insulation hand gloves and rubber boots | |
CN209987363U (en) | Film extruder screw | |
CN102152588B (en) | Production line for full-core inflaming retarding conveyor belt of double-layer extruding veneering | |
CN204354441U (en) | A kind of two cylinders extruding compounding machine control roller structure separately | |
CN203527849U (en) | Blow-molding system for three-layer coextruded plastic film | |
CN206357612U (en) | A kind of double screw extruder of inner wall belt ridge | |
CN108058360A (en) | A kind of reducing, Variable pitch screw | |
CN206254464U (en) | A kind of thrust brake of TPUE Rubber Extruder | |
CN206317261U (en) | A kind of rubber system of processing | |
CN110802819A (en) | Injection molding machine screw rod barrel assembly | |
CN202213185U (en) | Screw head of extruder | |
CN204109318U (en) | A kind of wood plastic composite Side fascia section bar mold | |
CN107932928A (en) | A kind of rubber system of processing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Zhao village on the south side of Jixian County Hanlin Sangzi town of Tianjin city in 300203 Patentee after: Tianjin run rubber products Limited by Share Ltd Address before: Zhao village on the south side of Jixian County Hanlin Sangzi town of Tianjin city in 300203 Patentee before: Tianjin Xiang Runcheng rubber Co., Ltd |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141022 Termination date: 20200422 |
|
CF01 | Termination of patent right due to non-payment of annual fee |