CN203880698U - Fluidized bed boiler deslagging pipe capable of realizing dredging without shutdown - Google Patents
Fluidized bed boiler deslagging pipe capable of realizing dredging without shutdown Download PDFInfo
- Publication number
- CN203880698U CN203880698U CN201420218300.2U CN201420218300U CN203880698U CN 203880698 U CN203880698 U CN 203880698U CN 201420218300 U CN201420218300 U CN 201420218300U CN 203880698 U CN203880698 U CN 203880698U
- Authority
- CN
- China
- Prior art keywords
- dredging
- slag
- discharge pipe
- deslagging pipe
- fluidized bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Fluidized-Bed Combustion And Resonant Combustion (AREA)
Abstract
The utility model relates to a fluidized bed boiler deslagging pipe capable of realizing dredging without shutdown, which belongs to the technical field of fluidized bed boiler deslagging pipe equipment and is used for dredging the fluidized bed boiler deslagging pipe. The technical scheme is as follows: the fluidized bed boiler deslagging pipe comprises a deslagging pipe, a dredging rod, a cross rod and an operating handle, wherein the dredging rod is arranged in the deslagging pipe along the axial direction of the deslagging pipe; the side wall of the deslagging pipe is provided with a slotted hole along the axial direction of the deslagging pipe; one end of the cross rod is vertically connected with the dredging rod, and the other end of the cross rod extends out of the slotted hole; and the operating handle is connected to the outer end of the cross rod. According to the utility model, the dredging rod is arranged in the deslagging pipe, so that operating personnel can control the dredging rod to move up and down through the slotted hole in the side wall of the deslagging pipe, thereby ensuring that slag blocks in the deslagging pipe can be displaced and loosened, and further dredging the deslagging pipe. The fluidized bed boiler deslagging pipe provided by the utility model is simple in structure, convenient to use and favorable in dredging effect, can realize dredging of the deslagging pipe without shutdown, avoids the problem that a boiler can not operate normally due to blockage of the deslagging pipe, and has obvious economic benefits.
Description
Technical field
The utility model relates to a kind of fluidized-bed combustion boiler slag-discharge pipe that can dredge under not blowing out state, belongs to fluidized-bed combustion boiler slag-discharge pipe equipment technical field.
Background technology
Fluid-bed boiler slagging mode mostly is bottom slagging at present, join two barrel slag coolers, each slag-discharge pipe that is 159mm * 5mm rare-earth and high chromium nickel nitrogen heat resisting cast steel by a diameter passes air compartment and is connected with air distribution plate, during normal operation, one time wind enters air distribution plate fluid bed from air compartment, unnecessary bed material enters barrel slag cooler by 159mm * 5mm rare-earth and high chromium nickel nitrogen heat resisting cast steel slag-discharge pipe, is progressively cooled and solidifies, and falling into slag-draining device.In fluidized-bed combustion boiler slag-discharge pipe in service, slagging scorification obstruction is comparatively common multiple accident, when there is slag-discharge pipe obstruction, if can not drain increasing gradually after-flame lime-ash on fluid bed bed surface in time, will cause boiler can not normally move even blowing out.
Utility model content
Technical problem to be solved in the utility model be to provide a kind of can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, this slag-discharge pipe can be dredged the in the situation that of not blowing out, prevents to stop up because of slag-discharge pipe the problem that the boiler cause can not normally move.
The technical scheme solving the problems of the technologies described above is:
A kind of can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, it comprises slag-discharge pipe, dredging bar, cross bar, operating grip, dredging bar is stock, dredging bar being axially placed in slag-discharge pipe along slag-discharge pipe, on the sidewall of slag-discharge pipe, have along the axial slotted eye of slag-discharge pipe, bar is vertical is connected with dredging in one end of cross bar, and the other end of cross bar stretches out the slotted eye on slag-discharge pipe sidewall, and operating grip is connected to the outer end of cross bar.
Above-mentioned can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, the front end of described dredging bar is provided with sharp-pointed rifle head, rifle head is relative with blast cap direction.
Above-mentioned can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, on described cross bar, be connected with baffle plate, baffle plate is along the length direction of slag-discharge pipe, baffle plate covers on the slotted eye of slag-discharge pipe sidewall.
Above-mentioned can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, the slotted eye upper end anomaly platform 1.3m to 1.5m on described slag-discharge pipe sidewall.
The beneficial effects of the utility model are:
The utility model is placed dredging bar in slag-discharge pipe, and operating personnel can handle dredging bar by the slotted eye on slag-discharge pipe sidewall and move up and down, and dredging bar can be subjected to displacement looseningly by being blocked in clinker in slag-discharge pipe, and slag-discharge pipe is dredged.The utility model is simple in structure, easy to use, it is respond well to dredge, and can the in the situation that of not blowing out, to slag-discharge pipe, dredge, and prevents, because slag-discharge pipe stops up the problem that the boiler that causes can not normally move, to have significant economic benefit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure, each label is: blast cap 1, air distribution plate 2, rifle head 3, dredging bar 4, cross bar 5, operating grip 6, slotted eye 7, slag-discharge pipe 8, slag cooler 9, baffle plate 10, clinker 11, air compartment 12.
The specific embodiment
The utility model is comprised of slag-discharge pipe 8, dredging bar 4, cross bar 5, operating grip 6, baffle plate 10.
In figure, show, blast cap 1 is welded on air distribution plate 2, and slag-discharge pipe 8 passes at air distribution plate 2, and slag-discharge pipe 8 lower ends are connected with slag cooler 9, has along the axial slotted eye 7 of slag-discharge pipe 8 slotted eye 7 upper end anomaly platform 1.3m to 1.5m on the sidewall of slag-discharge pipe 8.
In figure, show, dredging bar 4 is long tube, dredging bar 4 being axially placed in slag-discharge pipe 8 along slag-discharge pipe 8, bar 4 is vertical is connected with dredging in one end of cross bar 5, the other end of cross bar 5 stretches out the slotted eye 7 on slag-discharge pipe 8 sidewalls, operating grip 6 is connected to the outer end of cross bar 5, and the front end of dredging bar 4 is provided with sharp-pointed rifle head 3, and rifle head 3 is relative with blast cap 1 direction.Operating personnel hold operating grip 6 outside slag-discharge pipe 8 can make cross bar 5 move forward and backward along slotted eye 7, thereby has movement before driving dredging bar 4.
In figure, show, be connected with baffle plate 10 on cross bar 5, baffle plate 10 is along the length direction of slag-discharge pipe 8, and baffle plate 10 covers on the slotted eye 7 of slag-discharge pipe 8 sidewalls, and baffle plate 10 can prevent that lime-ash in slag-discharge pipe 8 is from slotted eye 7 to outward leakage.
Specific implementation process of the present utility model is:
In boiler operatiopn, when slag-discharge pipe 8 generation congestion affects boilers normally move, operating personnel hold operating grip 6 outside slag-discharge pipe 8 can make cross bar 5 move forward and backward along slotted eye 7, thereby there is movement before driving dredging bar 4, make to be blocked in clinker 11 in slag-discharge pipe 8 and be subjected to displacement looseningly, slag-discharge pipe 8 is dredged.
Claims (4)
- One kind can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, it is characterized in that: it comprises slag-discharge pipe (8), dredging bar (4), cross bar (5), operating grip (6), dredging bar (4) is stock, dredging bar (4) being axially placed in slag-discharge pipe (8) along slag-discharge pipe (8), on the sidewall of slag-discharge pipe (8), have along the axial slotted eye (7) of slag-discharge pipe (8), one end of cross bar (5) and dredging vertical connection of bar (4), the other end of cross bar (5) stretches out the slotted eye (7) on slag-discharge pipe (8) sidewall, operating grip (6) is connected to the outer end of cross bar (5).
- According to claim 1 can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, it is characterized in that: the front end of described dredging bar (4) is provided with sharp-pointed rifle head (3), rifle head (3) is relative with blast cap (1) direction.
- According to claim 2 can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, it is characterized in that: on described cross bar (5), be connected with baffle plate (10), baffle plate (10) is along the length direction of slag-discharge pipe (8), and baffle plate (10) covers on the slotted eye (7) of slag-discharge pipe (8) sidewall.
- According to claim 3 can not blowing out the fluidized-bed combustion boiler slag-discharge pipe of dredging, it is characterized in that: slotted eye (7) the upper end anomaly platform 1.3m to 1.5m on described slag-discharge pipe (8) sidewall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420218300.2U CN203880698U (en) | 2014-04-30 | 2014-04-30 | Fluidized bed boiler deslagging pipe capable of realizing dredging without shutdown |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420218300.2U CN203880698U (en) | 2014-04-30 | 2014-04-30 | Fluidized bed boiler deslagging pipe capable of realizing dredging without shutdown |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203880698U true CN203880698U (en) | 2014-10-15 |
Family
ID=51681189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420218300.2U Expired - Fee Related CN203880698U (en) | 2014-04-30 | 2014-04-30 | Fluidized bed boiler deslagging pipe capable of realizing dredging without shutdown |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203880698U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107543153A (en) * | 2017-10-25 | 2018-01-05 | 大唐鸡西第二热电有限公司 | Recirculating fluidized bed deslagging pipe device and dredging method |
CN117570449A (en) * | 2024-01-17 | 2024-02-20 | 大同富乔垃圾焚烧发电有限公司 | Slag outlet structure of incinerator |
-
2014
- 2014-04-30 CN CN201420218300.2U patent/CN203880698U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107543153A (en) * | 2017-10-25 | 2018-01-05 | 大唐鸡西第二热电有限公司 | Recirculating fluidized bed deslagging pipe device and dredging method |
CN117570449A (en) * | 2024-01-17 | 2024-02-20 | 大同富乔垃圾焚烧发电有限公司 | Slag outlet structure of incinerator |
CN117570449B (en) * | 2024-01-17 | 2024-03-15 | 大同富乔垃圾焚烧发电有限公司 | Slag outlet structure of incinerator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203880698U (en) | Fluidized bed boiler deslagging pipe capable of realizing dredging without shutdown | |
CN203744243U (en) | Slag discharge device for wear-resistant water-cooled circulating fluidized bed boiler | |
CN205443359U (en) | Ladle refining stove alloy mechanism of feeding in raw material | |
CN210242346U (en) | Electric arc furnace wall oxygen lance tied in a bundle adjusting device | |
CN102051438A (en) | Slag scraping and early warning protection system for oxygen lance | |
CN201014462Y (en) | Cooling residue extraction mechanism of high temperature furnace slag | |
CN204478130U (en) | A kind of double-drum boiler | |
CN103727529A (en) | Blockage processor for slag discharging pipe | |
CN203052650U (en) | Hood and air duct combined device | |
CN103361452A (en) | Granulating device for molten steel or iron slag | |
CN204874635U (en) | Intensive condenser tube structure of wind gap cooling wall | |
CN203307387U (en) | Billet locating baffle plate device on in-furnace roller table | |
CN207421618U (en) | A kind of four-way pipe | |
CN203159664U (en) | Oxygen lance channel protective device | |
CN209470540U (en) | A kind of heating furnace water cooling anticollision device, collision-prevention device | |
CN202143943U (en) | Blower for blowing iron oxide on surface of billet steel | |
CN201634753U (en) | Track rolling powder zinc impregnation equipment | |
CN203751326U (en) | Steel ladle sliding gate hydraulic cylinder installation structure | |
CN204007167U (en) | External air cooling system boom device in a kind of central cooler easy to maintenance | |
CN218453745U (en) | Steel pipe heat treatment production line unloader | |
CN203100453U (en) | Mobile multi-tube furnace cooling water tank | |
CN207746927U (en) | Boiler wear resistant watt attachment means | |
CN203715664U (en) | Inlet pipeline fire-retarding device of converter secondary-dust removal system | |
CN109611637A (en) | Evaporating air cooler bobbin carriage device for plugging and blocking method | |
CN109579552B (en) | Transition flue of waste heat boiler of smelting furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141015 |
|
CF01 | Termination of patent right due to non-payment of annual fee |