CN203878997U - Shear wall opening structure and shear wall opening structure formwork adjusting mechanism - Google Patents

Shear wall opening structure and shear wall opening structure formwork adjusting mechanism Download PDF

Info

Publication number
CN203878997U
CN203878997U CN201420289234.8U CN201420289234U CN203878997U CN 203878997 U CN203878997 U CN 203878997U CN 201420289234 U CN201420289234 U CN 201420289234U CN 203878997 U CN203878997 U CN 203878997U
Authority
CN
China
Prior art keywords
connector
shear wall
template
adjusting rod
wall opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420289234.8U
Other languages
Chinese (zh)
Inventor
陈俊杰
曹海良
刘洋洋
潘长河
李杨
赵亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201420289234.8U priority Critical patent/CN203878997U/en
Application granted granted Critical
Publication of CN203878997U publication Critical patent/CN203878997U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a shear wall opening structure and a shear wall opening structure formwork adjusting mechanism. The shear wall opening structure comprises a first formwork, a second formwork, a first connecting part, a second connecting part and a turn buckle, wherein the first formwork and the second formwork are supported on the left side and the right side of a shear wall opening, the first formwork and the second formwork are arranged on the wall body surface of a shear wall on the same side, the first connecting part is fixedly connected to the first formwork, the second connecting part is fixedly connected to the second formwork, and the turn buckle is connected between the first connecting part and the second connecting part. Steel tubes are fixedly connected to the formworks on the two opposite sides of the shear wall opening, turn buckles are connected between the steel tubes respectively connected with the two formworks, and the positions between the two formworks can be adjusted by adjusting the turn buckles. Thus, the problems of sideway and mould expansion of the formworks are solved. By means of the turn buckles, the labor is saved.

Description

Shear wall hole structure and this shear wall opening mould plate governor motion
Technical field
The utility model relates to construction engineering technical field, relates in particular to a kind of shear wall hole structure and this shear wall opening mould plate governor motion.
Background technology
In Building Construction, when traditional shear wall is used large steel moulding plate construction, the template position adjustment of both sides, shear wall hole pulls by artificial, reinforce and only rely on Screw arbor with nut at both-ends, adjustment expends more manpower, and because two side template lower ends, shear wall hole are fixed without horizontal drawknot, often there is sidesway in template herein, the problems such as mould rise.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of shear wall hole structure and this shear wall opening mould plate governor motion, for preventing shear wall hole two side template generation sidesways, mould rises.
For realizing above-mentioned technique effect, the utility model discloses a kind of shear wall hole structure, comprising: prop up the first template and the second template of being located at the left and right sides, shear wall hole, described the first template and described the second template are positioned at the same side body of wall face of shear wall;
Be fixedly connected on first connector and the second connector that is fixedly connected on described the second template of described the first template;
Be connected in the flower basket bolt between described the first connector free end and described the second connector free end.
As further improvement of the utility model, described the first connector, the second connector and described flower basket bolt are arranged at the latter half at described shear wall hole.
As further improvement of the utility model, described flower basket bolt comprises the first adjusting rod and the second adjusting rod, and described the first adjusting rod welding or hook joint are in described the first connector, and described the second adjusting rod welding or hook joint are in described the second connector.
As further improvement of the utility model, described the first connector and described the second connector are fixedly connected on respectively at least two back cords of template corresponding thereto.
As further improvement of the utility model, described the first template and described the second template can be large steel moulding plate or aluminium frame wooden form or steel framework bamboo offset plate.
As further improvement of the utility model, described the first connector and the second connector can be steel pipe or channel-section steel or i iron.
For realizing above-mentioned technique effect, the invention also discloses a kind of shear wall opening mould plate governor motion, described shear wall hole comprises the first template and the second template that is positioned at relative both sides, shear wall hole, and described the first template and described the second template are positioned at the same side body of wall face of described shear wall;
It is characterized in that, described shear wall opening mould plate governor motion comprises: the first connector and the second connector that is fixedly connected on described the second template that are fixedly connected on described the first template; And
Be connected in described the first connector free end and the free-ended flower basket bolt of described the second connector.
As further improvement of the utility model, described the first connector, the second connector and described flower basket bolt are arranged at the latter half at described shear wall hole.
As further improvement of the utility model, described flower basket bolt comprises the first adjusting rod and the second adjusting rod, and described the first adjusting rod welding or hook joint are in described the first connector, and described the second adjusting rod welding or hook joint are in described the second connector.
As further improvement of the utility model, described the first connector and described the second connector are fixedly connected at least two back cords of template corresponding thereto.
The beneficial effects of the utility model are, by being fixedly connected with steel pipe in the template in relative both sides, shear wall hole, and be connected with flower basket bolt between the steel pipe connecting in template both sides, by regulating flower basket bolt to regulate the position between two side templates, thereby avoid template sidesway, the problem of the mould that rises, use flower basket bolt to save labour.
Accompanying drawing explanation
Fig. 1 is the structural representation of shear wall hole structure of the present utility model and this shear wall opening mould plate governor motion;
Fig. 2 is shear wall of the present utility model hole wall segment sectional view.
The specific embodiment
Below in conjunction with accompanying drawing and the specific embodiment, the utility model is described in further detail.
Please refer to Fig. 1 and Fig. 2, Fig. 1 is the structural representation of a kind of shear wall hole structure of the present utility model and this shear wall opening mould plate adjusting device, Fig. 2 is shear wall of the present utility model hole wall segment sectional view, this device comprises: prop up the first template 2 and the second template 3 of being located at 11 left and right sides, shear wall hole, the second connector 5 that is fixedly connected on the first connector 4 of the first template 2 and is fixedly connected on the second template 3, and be connected in the flower basket bolt 6 between the first connector 4 free ends and the second connector 5 free ends.Particularly, this first template 2 and the second template 3 are positioned at the body of wall face of the same side shear wall 1.One end of the first connector 4 is fixedly connected in the first template 2, and the other end is connected on flower basket bolt 6 relatively; One end of the second connector 5 is fixedly connected in the second template 3, and the other end is connected on flower basket bolt 6 relatively, by regulating the relative position between adjustable the first template 2 of flower basket bolt 6 and the second template 3.
At length, this flower basket bolt 6 comprises the first adjusting rod 62, the second adjusting rod 63 and bolt body 61, and wherein, the first adjusting rod 62 and the second adjusting rod 63 are oppositely arranged.This first adjusting rod 62 and the second adjusting rod 63 are provided with screw thread, in the present embodiment, by swivel bolt body 61, can or screw out bolt body 61 by the first adjusting rod 62 and the second adjusting rod 63 precessions simultaneously.In addition, it should be noted that extreme length or the shortest length of flower basket bolt 6 in use not reaching all the time axially.Because flower basket bolt 6 comprises OO type flower basket bolt, CC type flower basket bolt and OC type flower basket bolt, so in the present embodiment, flower basket bolt 6 can be connected in the first connector 4 and the second connector 5 according to various types of flower basket bolts.Particularly, the first adjusting rod 62 welding or hook joint are in the first connector 4, the second adjusting rods 63 welding or hook joint in the second connector 5.Preferably, between the first adjusting rod 62 and the first connector 4, be set to mutual hook joint between the second adjusting rod 63 and the second connector 5, so setting can make this shear wall opening mould plate governor motion be convenient to dismounting, to realize repeatedly, uses.
In the utility model, the first template 2 and the second template 3 can be in large steel moulding plate or aluminium frame wooden form or steel framework bamboo offset plate any.The first connector 4 and the second connector 5 can be any of steel pipe or steel tank or i iron.Preferably, the first connector 4 and the second connector 5 are fixedly connected at least two back cords of template corresponding thereto, so arrange so that the bed knife of the first connector 4 and the first template 2, the second connector 5 and the second template 3 is stronger.In addition, in order to make the first template 2 and the horizontal drawknot fixed effect of the second template 3 better, the first connector 4, the second connector 5 and flower basket bolt 6 are arranged to the latter half at shear wall hole 11.As preferred forms of the present utility model, the first connector 4, flower basket bolt 6 and the formed integrated connection of the second connector 5, between the first template 2 and the second template 3, and are positioned at the lower end at the first template 2 and the relative shear wall of the second template 3 hole 11.
Specific implementation of the present utility model is, below for convenience of description, the first template 2 and the second template 3 be take large steel moulding plate and are illustrated as example, the first connector 4 and the second connector 5 be take steel pipe and are illustrated as example.In construction work process of construction, before shear-wall big steel-moulds plate matched moulds, according to shear wall hole 11 sizes, determine the length with the steel pipe of shear wall hole 11 left and right sides large steel moulding plates, one end of determining two steel pipes (i.e. the first connector 4 and the second connector 5) of length is welded respectively or hook joint at the left-right rotary threaded adjusting bar (i.e. the first adjusting rod 62 and the second adjusting rod 63) of flower basket bolt, the back cord of the other end and large steel moulding plate welds or fixedly holds, preferably, be at least welded on two back cords of large steel moulding plate.Then shear-wall big steel-moulds plate is lifted into large steel moulding plate to pre-fix position by tower crane or hydraulic climbing formwork, by tightening flower basket bolt 6, regulates both sides large steel moulding plate to accurate location and plays laterally fixing effect.In present embodiment, only with shear wall one side, illustrate, in practical operation, the both sides of body of wall are provided with shear wall opening mould plate governor motion, in thickness of wall body direction, by the fixing large steel moulding plate of both sides of Screw arbor with nut at both-ends 7, be so equipped with to guarantee that large steel moulding plate is in length and breadth to all reinforcing and put in place.Especially, shear wall opening mould plate governor motion of the present utility model is in mixed earth casting process, if large steel moulding plate is shifted, rises when mould, adjustable flower basket bolt is further strained location, by the adjusting of flower basket bolt, not only can simplify working process, and can save labour.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thereby some details in embodiment should not form restriction of the present utility model, the utility model will be usingd scope that appended claims defines as protection domain of the present utility model.

Claims (10)

1. a shear wall hole structure, is characterized in that, comprising:
Prop up the first template and the second template of being located at the left and right sides, shear wall hole, described the first template and described the second template are positioned at the same side body of wall face of described shear wall;
Be fixedly connected on first connector and the second connector that is fixedly connected on described the second template of described the first template; And
Be connected in described the first connector free end and the free-ended flower basket bolt of described the second connector.
2. shear wall hole structure according to claim 1, is characterized in that, described the first connector, described the second connector and described flower basket bolt are arranged at the latter half at described shear wall hole.
3. shear wall hole structure according to claim 1, it is characterized in that, described flower basket bolt comprises the first adjusting rod and the second adjusting rod, and described the first adjusting rod welding or hook joint are in described the first connector, and described the second adjusting rod welding or hook joint are in described the second connector.
4. shear wall hole structure according to claim 1 and 2, is characterized in that, described the first connector and described the second connector are fixedly connected on respectively at least two back cords of corresponding described the first template and described the second template.
5. shear wall hole structure according to claim 1, is characterized in that, described the first template and described the second template are large steel moulding plate, aluminium frame wooden form or steel framework bamboo offset plate.
6. shear wall hole structure according to claim 1, is characterized in that, described the first connector and the second connector are steel pipe, channel-section steel or i iron.
7. a shear wall opening mould plate governor motion, described shear wall opening mould plate comprises the first template and the second template that is positioned at relative both sides, shear wall hole, described the first template and described the second template are positioned at the same side body of wall face of described shear wall; It is characterized in that, described shear wall opening mould plate governor motion comprises:
Be fixedly connected on first connector and the second connector that is fixedly connected on described the second template of described the first template; And
Be connected in described the first connector free end and the free-ended flower basket bolt of described the second connector.
8. shear wall opening mould plate governor motion according to claim 7, is characterized in that, described the first connector, described the second connector and described flower basket bolt are arranged at the latter half at described shear wall hole.
9. shear wall opening mould plate governor motion according to claim 7, it is characterized in that, described flower basket bolt comprises the first adjusting rod and the second adjusting rod, and described the first adjusting rod welding or hook joint are in described the first connector, and described the second adjusting rod welding or hook joint are in described the second connector.
10. according to the shear wall opening mould plate governor motion described in claim 7 or 9, it is characterized in that, described the first connector and described the second connector are fixedly connected at least two back cords of corresponding described the first template and described the second template.
CN201420289234.8U 2014-05-30 2014-05-30 Shear wall opening structure and shear wall opening structure formwork adjusting mechanism Expired - Fee Related CN203878997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420289234.8U CN203878997U (en) 2014-05-30 2014-05-30 Shear wall opening structure and shear wall opening structure formwork adjusting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420289234.8U CN203878997U (en) 2014-05-30 2014-05-30 Shear wall opening structure and shear wall opening structure formwork adjusting mechanism

Publications (1)

Publication Number Publication Date
CN203878997U true CN203878997U (en) 2014-10-15

Family

ID=51679512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420289234.8U Expired - Fee Related CN203878997U (en) 2014-05-30 2014-05-30 Shear wall opening structure and shear wall opening structure formwork adjusting mechanism

Country Status (1)

Country Link
CN (1) CN203878997U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162379A (en) * 2018-10-17 2019-01-08 苏州昆仑绿建木结构科技股份有限公司 A kind of connection structure of the high-strength wooden shear wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162379A (en) * 2018-10-17 2019-01-08 苏州昆仑绿建木结构科技股份有限公司 A kind of connection structure of the high-strength wooden shear wall
CN109162379B (en) * 2018-10-17 2024-02-13 苏州昆仑绿建木结构科技股份有限公司 Connection structure of high-strength wood shear wall

Similar Documents

Publication Publication Date Title
CN207633756U (en) A kind of angle and the adjustable building internal corner template of length
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN204059957U (en) A kind of formwork reinforcement structure
CN203924705U (en) Rectangular beam die clamper
CN205444456U (en) Precast concrete lotus root roof beam rebar positioning board
CN203878997U (en) Shear wall opening structure and shear wall opening structure formwork adjusting mechanism
CN207348459U (en) A kind of concrete blinding piece regulating device
CN206428565U (en) A kind of concrete set shaped steel formwork support system
CN206091264U (en) Outer wall scaffold frame is wall spare even
CN203904785U (en) Multifunctional pressing rod of track slab of CRTS III plate type ballastless track
CN204081475U (en) A kind of adjustable floor one-piece keel structure
CN205134291U (en) Large -scale steel form with adjustable
CN202706526U (en) Concrete structure construction template fixing and reinforcing device
CN201972396U (en) Steel pipe template support frame
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN204174910U (en) A kind of wall-connecting device of scaffold
CN204552111U (en) Material distributing machine
CN203905493U (en) Template reinforcing fixture structure
CN203034796U (en) Reinforced device of shear wall end formwork
CN208220203U (en) A kind of masonry ring beam template bracing means
CN207647181U (en) A kind of wall hangs mould template reinforcing device
CN207295716U (en) A kind of cantilever combined steel template
CN205637590U (en) Template fixed knot of wrong platform constructs between anti -shear power wall floor
CN204023859U (en) Plain type NZ Built-in pipe mould anti-floating lifting hook device
CN204715752U (en) Side form block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141015

Termination date: 20200530

CF01 Termination of patent right due to non-payment of annual fee