CN203878159U - Novel main body structure of gas furnace - Google Patents

Novel main body structure of gas furnace Download PDF

Info

Publication number
CN203878159U
CN203878159U CN201420223998.7U CN201420223998U CN203878159U CN 203878159 U CN203878159 U CN 203878159U CN 201420223998 U CN201420223998 U CN 201420223998U CN 203878159 U CN203878159 U CN 203878159U
Authority
CN
China
Prior art keywords
combustion chamber
main body
gas furnace
wall
preheating zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420223998.7U
Other languages
Chinese (zh)
Inventor
石永涛
焦辉广
王振江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Zhong Bei Environmental Protection Technology Co Ltd
Original Assignee
Hebei Zhong Bei Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Zhong Bei Environmental Protection Technology Co Ltd filed Critical Hebei Zhong Bei Environmental Protection Technology Co Ltd
Priority to CN201420223998.7U priority Critical patent/CN203878159U/en
Application granted granted Critical
Publication of CN203878159U publication Critical patent/CN203878159U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Gas Burners (AREA)

Abstract

The utility model relates to a novel main body structure of a gas furnace. The novel main body structure comprises a gas furnace main body, a preheating zone, a melting chamber and a combustion chamber, wherein the gas furnace main body is a cylindrical structure with an upper part and a lower part which are communicated, the upper part of the gas furnace main body is a charging preheating zone, the lower part of the gas furnace main body is a heating-melting zone, the diameter of the heating-melting zone is greater than that of the charging preheating zone, the interior of the charging preheating zone is in up-down communication with that of the heating-melting zone, the heating-melting zone comprises the melting chamber and the combustion chamber, the combustion chamber coaxially surrounds the melting chamber, the upper end of the melting chamber is communicated with the preheating zone and a support structure is located between the melting chamber and the combustion chamber. Since the scientific and reasonable main body structure is adopted by the utility model, a water cooling grill and ceramic balls are omitted and thus the potential hazard of melting explosion caused by water leakage is completely avoided; meanwhile, since higher-price ceramic balls are no longer consumed, the cost of producing iron per ton is reduced.

Description

A kind of new kind of gas burners agent structure
Technical field
The utility model belongs to casting iron field, especially a kind of new kind of gas burners agent structure.
Background technology
Existing gas furnace all needs to use water-cooled grid and ceramic heat-storing sphere, wherein, on water-cooled grid, in use have unavoidably the weldering of iron drop attached to it, and reach certain degree or grate steel pipe and use and there will be perforation when iron liquid weldering is attached to, thereby the use of water-cooled grid and ceramic heat-storing sphere exists to leak and causes the potentially dangerous of melting blast.While improving iron liquid temp as needs, need to increase the packing height of ceramic heat-storing sphere, ton iron liquid consumes 8 to 10 kilograms of ceramic heat-storing spheres, causes ton iron cost higher.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art part, and the new kind of gas burners agent structure of a kind of design science, simple in structure, high-quality and efficient, energy-conserving and environment-protective is provided.
The utility model solves its technical problem and takes following technical scheme to realize:
A kind of new kind of gas burners agent structure, comprise gas furnace main body, preheating zone, melting chamber and combustion chamber, gas furnace main body adopts refractory materials to construct and be surrounded by high temperature steel outward, gas furnace main body is a cylinder barrel shaped structure being communicated with up and down, the top of gas furnace main body is reinforced preheating zone, the bottom of gas furnace main body is heat fused district, the diameter in heat fused district is greater than reinforced preheating zone, reinforced preheating zone is communicated with up and down with inside, heat fused district, it is characterized in that: the gas furnace main body upper end of reinforced preheating zone is material inlet, and gas furnace main body top is preheating zone; Heat fused district comprises melting chamber and combustion chamber, combustion chamber coaxial surrounding melting chamber, and melting chamber upper end is communicated with preheating zone, between melting chamber and combustion chamber, is shaped with supporting structure.
And, described supporting structure comprises wall of the outer-rotor and inner tube wall, in the wall of the outer-rotor of gas furnace lower body part, be coaxially arranged with inner tube wall, inner tube wall internal space is melting chamber, melting chamber is communicated with the preheating zone one of top, on inner tube wall, spaced radial is uniform is shaped with a plurality of notches, annular space between inner tube wall and wall of the outer-rotor is combustion chamber, on the wall of the outer-rotor of this combustion chamber periphery, be shaped with uniformly at intervals a plurality of burners hole and in burner hole, burner be installed, the plurality of burner is along same tangent to periphery setting, the flame of burner ejection forms annular eddy flow in combustion chamber, lower end, the combustion chamber radially wall of the outer-rotor of a side is shaped with an iron notch.
And, described supporting structure comprises wall of the outer-rotor and brace table, the interior brace table that is coaxially fixed with of the wall of the outer-rotor of gas furnace lower body part, this brace table builds up with refractory materials, brace table upper end is shaped with many diversion trenchs radially, and these many diversion trenchs are the made iron notch in brace table lower end, middle part in the same way; Annular space between brace table periphery and wall of the outer-rotor is combustion chamber, on the wall of the outer-rotor of this combustion chamber periphery, be shaped with uniformly at intervals a plurality of burners hole and in burner hole, burner be installed, the plurality of burner is along same tangent to periphery setting, and the flame of burner ejection forms annular eddy flow in combustion chamber.
Advantage of the present utility model and positively effect are:
The utility model, owing to having adopted scientific and reasonable agent structure, has saved water-cooled grid and Ceramic Balls, thereby avoided leaking completely, causes the potentially dangerous of melting blast, simultaneously owing to no longer consuming the Ceramic Balls that price is higher, has reduced ton iron cost.
Accompanying drawing explanation
Fig. 1 is embodiment 1 structural representation of the present utility model;
Fig. 2 is that the A-A of Fig. 1 is to structure sectional view;
Fig. 3 be Fig. 1 in cut open right view;
Fig. 4 is the structural representation of the utility model embodiment 2;
Fig. 5 is that the E-E of Fig. 3 is to structure sectional view;
Fig. 6 is the surface structure schematic diagram of Fig. 3.
Mark in accompanying drawing: 1 preheating zone; 2 gas furnace main bodys; 3 combustion chambers; 4 wall of the outer-rotor; 5 inner tube walls; 6 melting chambers; 7 iron notchs; 8 burner holes; 9 brace tables.
Embodiment
Below in conjunction with accompanying drawing and by specific embodiment, the utility model is described in further detail, and following examples are descriptive, are not determinate, can not limit protection domain of the present utility model with this.
Embodiment 1
A kind of new kind of gas burners agent structure, comprise gas furnace main body 2, preheating zone 1, melting chamber 6 and combustion chamber 3, gas furnace main body adopts refractory materials to construct and be surrounded by high temperature steel outward, gas furnace main body is a cylinder barrel shaped structure being communicated with up and down, the top of gas furnace main body is reinforced preheating zone, the bottom of gas furnace main body is heat fused district, and the diameter in heat fused district is greater than reinforced preheating zone, and reinforced preheating zone is communicated with up and down with inside, heat fused district;
The gas furnace main body upper end of reinforced preheating zone is material inlet (in figure not label), and gas furnace main body top is preheating zone, and raw material is entered and in stove and in preheating zone, carried out preheating by material inlet;
Heat fused district comprises melting chamber and combustion chamber, combustion chamber coaxial surrounding melting chamber, and melting chamber upper end is communicated with preheating zone, between melting chamber and combustion chamber, is shaped with supporting structure, and the position of the raw material that restriction is not melted in stove, guarantees that there are enough spaces combustion chamber.
The heat fused district concrete structure of the present embodiment is: described supporting structure comprises wall of the outer-rotor 4 and inner tube wall 5, in the wall of the outer-rotor of gas furnace lower body part, be coaxially arranged with inner tube wall, inner tube wall internal space is melting chamber, melting chamber is communicated with the preheating zone one of top, on inner tube wall, spaced radial is uniform is shaped with a plurality of notches, annular space between inner tube wall and wall of the outer-rotor is combustion chamber, on the wall of the outer-rotor of this combustion chamber periphery, be shaped with uniformly at intervals a plurality of burners hole and in burner hole, burner be installed, the present embodiment accompanying drawing is depicted as four burner holes, the plurality of burner is along same tangent to periphery setting, make the flame of burner ejection in combustion chamber, form annular eddy flow, lower end, the combustion chamber radially wall of the outer-rotor of a side is shaped with an iron notch 7.
Raw material is subject to inner tube wall constraint after falling in melting chamber, even if soft state can too much not overflow melting chamber yet, thereby guarantee that there are enough spaces combustion chamber, during burner combustion, refractory materials around Hot-blast Heating also enters melting area heating raw from notch, and the molten iron of fusing flows out to combustion chamber and continued heating until from iron notch outflow combustion chamber from the notch of inner tube wall.
Embodiment 2
A new kind of gas burners agent structure, structure to accompanying drawing 6, is heat fused district concrete structure with the difference of embodiment 1 referring to accompanying drawing 4:
Described supporting structure comprises wall of the outer-rotor and brace table 9, in the wall of the outer-rotor of gas furnace lower body part, be coaxially fixed with a brace table, this brace table builds up with refractory materials, height and the radial dimension of brace table are set according to physical size, brace table upper end is shaped with many diversion trenchs radially, and these many diversion trenchs are the made iron notch 7 in brace table lower end, middle part in the same way; Annular space between brace table periphery and wall of the outer-rotor is combustion chamber, on the wall of the outer-rotor of this combustion chamber periphery, be shaped with uniformly at intervals a plurality of burners hole and in burner hole, burner be installed, the present embodiment accompanying drawing is depicted as three burner holes, the plurality of burner, along same tangent to periphery setting, makes the flame of burner ejection in combustion chamber, form annular eddy flow.
When filler and melting, due to stopping of brace table, even also can spacingly rest on brace table after softening raw material falls, thereby keep combustion chamber to have enough spaces, for increasing raw material and hot blast contact area, make heat exchange more abundant, on brace table, have a plurality of communicating apertures, the iron liquid of fusing falls along brace table, after absorption heat, further heats up, and finally from iron notch, flows out.
Molten iron aftertreatment (as intensification, adjusting component) can realize in other parts of same smelting furnace, also can realize by being mated other smelting furnace of use; The gas of burning use can be Sweet natural gas, liquefied petroleum gas (LPG) (propane), acetylene etc., can be that air blast is combustion-supporting simultaneously, can be also even pure oxygen combustion-supporting of oxygen enrichment; Using interchanger to carry out waste heat recovery is also known mature technology.
Although disclose for the purpose of illustration embodiment of the present utility model and accompanying drawing, but it will be appreciated by those skilled in the art that: within not departing from the spirit and scope of the utility model and claims, various replacements, variation and modification are all possible, therefore, scope of the present utility model is not limited to embodiment and the disclosed content of accompanying drawing.

Claims (3)

1. a new kind of gas burners agent structure, comprise gas furnace main body, preheating zone, melting chamber and combustion chamber, gas furnace main body adopts refractory materials to construct and be surrounded by high temperature steel outward, gas furnace main body is a cylinder barrel shaped structure being communicated with up and down, the top of gas furnace main body is reinforced preheating zone, the bottom of gas furnace main body is heat fused district, the diameter in heat fused district is greater than reinforced preheating zone, reinforced preheating zone is communicated with up and down with inside, heat fused district, it is characterized in that: the gas furnace main body upper end of reinforced preheating zone is material inlet, gas furnace main body top is preheating zone, heat fused district comprises melting chamber and combustion chamber, combustion chamber coaxial surrounding melting chamber, and melting chamber upper end is communicated with preheating zone, between melting chamber and combustion chamber, is shaped with supporting structure.
2. new kind of gas burners agent structure according to claim 1, it is characterized in that: described supporting structure comprises wall of the outer-rotor and inner tube wall, in the wall of the outer-rotor of gas furnace lower body part, be coaxially arranged with inner tube wall, inner tube wall internal space is melting chamber, melting chamber is communicated with the preheating zone one of top, on inner tube wall, spaced radial is uniform is shaped with a plurality of notches, annular space between inner tube wall and wall of the outer-rotor is combustion chamber, on the wall of the outer-rotor of this combustion chamber periphery, be shaped with uniformly at intervals a plurality of burners hole and in burner hole, burner be installed, the plurality of burner is along same tangent to periphery setting, the flame of burner ejection forms annular eddy flow in combustion chamber, lower end, the combustion chamber radially wall of the outer-rotor of a side is shaped with an iron notch.
3. new kind of gas burners agent structure according to claim 1, it is characterized in that: described supporting structure comprises wall of the outer-rotor and brace table, in the wall of the outer-rotor of gas furnace lower body part, be coaxially fixed with a brace table, this brace table builds up with refractory materials, brace table upper end is shaped with many diversion trenchs radially, and these many diversion trenchs are the made iron notch in brace table lower end, middle part in the same way; Annular space between brace table periphery and wall of the outer-rotor is combustion chamber, on the wall of the outer-rotor of this combustion chamber periphery, be shaped with uniformly at intervals a plurality of burners hole and in burner hole, burner be installed, the plurality of burner is along same tangent to periphery setting, and the flame of burner ejection forms annular eddy flow in combustion chamber.
CN201420223998.7U 2014-05-05 2014-05-05 Novel main body structure of gas furnace Expired - Fee Related CN203878159U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420223998.7U CN203878159U (en) 2014-05-05 2014-05-05 Novel main body structure of gas furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420223998.7U CN203878159U (en) 2014-05-05 2014-05-05 Novel main body structure of gas furnace

Publications (1)

Publication Number Publication Date
CN203878159U true CN203878159U (en) 2014-10-15

Family

ID=51678681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420223998.7U Expired - Fee Related CN203878159U (en) 2014-05-05 2014-05-05 Novel main body structure of gas furnace

Country Status (1)

Country Link
CN (1) CN203878159U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114383438A (en) * 2021-08-11 2022-04-22 西安东方能源工程有限公司 Sectional spiral type condensation heat exchanger

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114383438A (en) * 2021-08-11 2022-04-22 西安东方能源工程有限公司 Sectional spiral type condensation heat exchanger

Similar Documents

Publication Publication Date Title
JP3223816U (en) New top-fired hot air furnace
CN101619852A (en) Commercial high-efficiency energy-saving gas burner
CN101382286B (en) Air flow circle alternating and equalization injection combustor for stabilizing flame by pre-mixing
CN203878159U (en) Novel main body structure of gas furnace
CN203980868U (en) A kind of hot blast oxygen rich fuel gas energy-conserving and environment-protective melting shaft furnace
CN109593905A (en) Steel scrap baking method in a kind of Converter
CN208667463U (en) A kind of glass microballoon production equipment
CN203215674U (en) Combustor with built-in hot air pipe and combustion in nozzle orthogonal jet mixed heat accumulator
CN102304596B (en) Flow-equalizing and combustion-supporting hot blast furnace with multihole combustion-stabilizing nozzle and heat accumulators
CN103486871B (en) Melting furnace chimney with waste heat recovery structure
CN202246724U (en) Hot-blast stove with porous flame-stabilizing nozzle and flow equalization combustion support of heat accumulator
CN204007116U (en) Oxygen-enriched combusting natural gas cupola
CN101688665A (en) Burner apparatus
CN202808849U (en) Hot-blast stove using blast furnace gas as fuel
CN103913056B (en) Alloy baking method
CN202885494U (en) Perlite preheating expansion device
CN201522185U (en) Gas-fired cupola
CN207119789U (en) A kind of big bag roaster
CN205580193U (en) Dual compound smelting furnace
CN204478792U (en) A kind of natural gas cupola
CN205209266U (en) A open hearth is smelted to heat accumulation formula for reclaimed copper
CN204478793U (en) A kind of Multi-flue furnace cupola
CN204127534U (en) The flexible flexible link of heat sealing
CN204301146U (en) A kind of energy-efficient cracking burner
CN204285450U (en) Air single-preheating integral type sintering ignition furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141015

Termination date: 20210505