CN203867235U - Coke oven winter masonry heat insulation greenhouse - Google Patents
Coke oven winter masonry heat insulation greenhouse Download PDFInfo
- Publication number
- CN203867235U CN203867235U CN201420133377.XU CN201420133377U CN203867235U CN 203867235 U CN203867235 U CN 203867235U CN 201420133377 U CN201420133377 U CN 201420133377U CN 203867235 U CN203867235 U CN 203867235U
- Authority
- CN
- China
- Prior art keywords
- coke oven
- hot channel
- heat insulation
- winter
- canopy body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Coke Industry (AREA)
Abstract
The utility model belongs to a device used in coking engineering construction and particularly relates to a coke oven winter masonry heat insulation greenhouse used in masonry in the coking engineering construction. The coke oven winter masonry heat insulation greenhouse comprises a greenhouse body made of color steel polystyrene compound plates, and the greenhouse body is provided with a feeding port and a constructor entrance and exit. A first heat dissipation pipeline, a second heat dissipation pipeline and a third heat dissipation pipeline are installed in the greenhouse body. The first heat dissipation pipeline is installed on the coke side, the second heat dissipation pipeline is installed on the machine side, and the third heat dissipation pipeline is installed on a basement. The coke oven winter masonry heat insulation greenhouse is simple in structure and convenient to build and can guarantee that coke oven masonry can be normally performed in winter.
Description
Technical field
The utility model belongs to equipment used in the construction of a kind of coking engineering projects, is specifically related to coke oven building heat insulation in the winter booth using while building by laying bricks or stones in a kind of coking engineering projects construction.
Background technology
As everyone knows, region, NORTHWEST CHINA area is wide, and weather conditions are poor, and winter temperature is lower, through the subzero of being everlasting, sometimes may reach subzero more than 20 degree.When coke furnace building environment temperature reaches subzero temperature, the refractory wass of building use by laying bricks or stones is about to freeze, and causes subsequently that mud volume swells, mortar thickness and the slurry blank porosity increase, and strength decreased, causes the deterioration of whole masonry.When baker or temperature turn that the mud freezing after warm starts to dissolve and the impact that is subject to masonry gravity pressure is flowed out in brickwork joint, be that mortar joint shrinks and produces the differential settlement of masonry.Dimension, point out that in the winter time under execution conditions, temperature is not less than 5 ℃, and refractory brick and mud is not less than 3 ℃, otherwise should stops the work of building by laying bricks or stones in coke oven rules.During the Northwest November-April, minimum temperature is all below 0 ℃, and coke furnace building should not be constructed during this period.In coke oven process of construction, the coke furnace building duration selects to be subject to region restriction larger, makes to affect coke oven and delays to go into operation, and causes huge economic loss.And general protective shed does not reach the insulation requirement of construction at all.
Utility model content
The purpose of this utility model is to provide a kind of heat preservation greenhouse that is applicable to the Northwest's coke furnace building in winter.
To achieve these goals, the technical solution adopted in the utility model is:
Coke oven building heat insulation in a winter booth, comprises the canopy body of being built by color steel polrvinyl benzene composite board, and this canopy body is provided with feeding port and constructor access; The first hot channel, the second hot channel and the 3rd hot channel are installed in described canopy body; The first hot channel is arranged on coke side, and the second hot channel is arranged on pusher side, and the 3rd hot channel is arranged on basement.
Described the first hot channel, the second hot channel and the setting parallel with one another of the 3rd hot channel, described in each, hot channel comprises a plurality of radiating tubes that are arranged in parallel, and the entrance point of described radiating tube is equipped with valve.
The port of export of described radiating tube is equipped with drain valve.
Described radiating tube supports by being located at ground sliding support.
In described canopy body, be provided with thermometer.
In coke side, pusher side and basement in described canopy body, be evenly equipped with coal stove.
On described feeding port, heat holding curtain is installed.
The beneficial effects of the utility model are:
1, the utility model adopts color steel polrvinyl benzene composite board, and color steel polrvinyl benzene composite board quality is light, and intensity is high, and high insulating effect is built conveniently, detachably repeatedly utilize, and cheap, cost is low; Described canopy body is provided with feeding port, transportation that can convenient construction material; At coke side, pusher side and basement, be respectively equipped with hot channel, guarantee that winter, coke oven was reasonably constructed at temperature.
2, three groups of hot channels are set up in parallel, and the entrance point of radiating tube is equipped with valve, can guarantee when one of them radiating tube breaks down, and do not affect the normal use of other radiating tube.
3, the port of export of each radiating tube is equipped with drain valve, improves the effective rate of utilization of steam, reduces for thermal energy consumption, cost-saving.
4, the bottom of described radiating tube is provided with sliding support, and assurance pipeline can be done trace by sliding support owing to expanding and slide after passing into steam, prevents that pipe expansion from damaging steel pipe.
5, the local an ancient unit of weight of the difference of the utility model in booth is provided with thermometer, implements monitoring temperature, guarantees that coke oven construction is more than construction temperature, to prevent the too low frostbite coke oven of temperature or construction infection workmanship in the situation that temperature is lower.
6, in booth, be also provided with coal stove, at hot channel, break down can not normally dispel the heat time, can dispel the heat by coal stove, to reach the object of insulation.
7, on described feeding port, heat holding curtain is installed, when material loading not, puts down heat holding curtain, reduce entering of cold air, prevent that heat runs off.
Accompanying drawing explanation
Fig. 1 is plan view of the present utility model.
Fig. 2 is the structural representation of radiating tube.
Fig. 3 is lateral view of the present utility model.
Fig. 4 is canopy body structure schematic diagram.
The specific embodiment
As shown in the figure, the utility model comprises the canopy body 1 of being built by color steel polrvinyl benzene composite board, one side of this canopy body is provided with 4 feeding ports 2 and constructor access 3, on described feeding port 2, heat holding curtain 12 is installed, when construction material loading, rise, while stopping constructing material loading, fall, reduce entering of cold air, prevent that heat runs off; Described constructor is provided with wicket on access; This canopy body is enclosed in its inside completely by coke oven resistance wall and basement.
Building of described canopy body 1: first at coke oven resistance wall and basement outside welding canopy body support frame, and then color steel polrvinyl benzene composite board is welded on support, the color steel polrvinyl benzene composite board joint of canopy body 1 top and surrounding compresses with band steel, in case blow, color steel polrvinyl benzene composite board is come off; Described canopy body 1 lower end and ground contact portion are all filled up sealing with sandy soil, to prevent that cold air from entering.
In described canopy body 1, be provided with three groups of hot channels, and three groups of hot channels be take steam as thermal medium; The first hot channel 4 is arranged on coke side, and the second hot channel 5 is arranged on pusher side, and the 3rd hot channel 6 is arranged on basement; The first hot channel 4, the second hot channel 5 and the setting parallel with one another of the 3rd hot channel 6, every group of hot channel comprises 4 radiating tubes that are arranged in parallel 13, and the entrance point of described radiating tube 13 is provided with valve 7, the port of export of this radiating tube 13 is provided with drain valve 8; The entrance point of three groups of hot channels is connected with boiler by pipeline, and the port of export of three groups of hot channels is connected with water tank by pipeline.
The snakelike layout of described radiating tube 13, and 4 radiating tubes 13 are arranged side by side along flue direction, and described radiating tube 13 supports by being arranged on ground travel(l)ing rest 9; The lower end of described travel(l)ing rest 9 is provided with pulley, can slide on the ground.
On surroundings wall in described canopy body 1 and four jiaos be equipped with thermometer 10; On surrounding inwall in basement, be also provided with thermometer 10; So that the temperature of different location in canopy body is detected, guarantee that temperature reaches construction requirement.
In basement in described canopy body 1, be evenly provided with 10 coal stoves 11, at pusher side and coke side, be evenly provided with respectively 20 coal stoves 11, when if generation utmost point cold weather or steam interrupt suddenly, can put in time coal furnace, to prevent that the utmost point cold weather canopy temperature from not reaching to build by laying bricks or stones, require or steam interrupts suddenly waiting fortuitous event generation and causes that greenhouse temperature is out of control.
Take the Northwest is example in March December to next year construction, in these four middle of the month, by steam insulation, make the temperature in whole construction period booth remain at more than 7 ℃, meet and build the temperature requirement to coke furnace building in standard by laying bricks or stones, guaranteed the masonry quality of coke oven.After temperature improvements are stabilized to more than 10 ℃, heat insulation work finishes.
Claims (7)
1. coke oven building heat insulation in a winter booth, is characterized in that: comprise the canopy body (1) of being built by color steel polrvinyl benzene composite board, this canopy body (1) is provided with feeding port (2) and constructor access (3); The first hot channel (4), the second hot channel (5) and the 3rd hot channel (6) are installed in described canopy body (1); The first hot channel (4) is arranged on coke side, and the second hot channel (5) is arranged on pusher side, and the 3rd hot channel (6) is arranged on basement.
2. a kind of coke oven building heat insulation in winter booth according to claim 1, it is characterized in that: described the first hot channel (4), the second hot channel (5) and the setting parallel with one another of the 3rd hot channel (6), described in each, hot channel comprises a plurality of radiating tubes that are arranged in parallel (13), and the entrance point of described radiating tube (13) is equipped with valve (7).
3. a kind of coke oven building heat insulation in winter booth according to claim 2, is characterized in that: the port of export of described radiating tube (13) is equipped with drain valve (8).
4. a kind of coke oven building heat insulation in winter booth according to claim 2, is characterized in that: described radiating tube (13) supports by being located at ground sliding support (9).
5. a kind of coke oven building heat insulation in winter booth according to claim 1, is characterized in that: in described canopy body (1), be provided with thermometer (10).
6. a kind of coke oven building heat insulation in winter booth according to claim 1, is characterized in that: in coke side, pusher side and basement in described canopy body (1), be evenly equipped with coal stove (11).
7. a kind of coke oven building heat insulation in winter booth according to claim 1, is characterized in that: heat holding curtain (12) is installed on described feeding port (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420133377.XU CN203867235U (en) | 2014-03-24 | 2014-03-24 | Coke oven winter masonry heat insulation greenhouse |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420133377.XU CN203867235U (en) | 2014-03-24 | 2014-03-24 | Coke oven winter masonry heat insulation greenhouse |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203867235U true CN203867235U (en) | 2014-10-08 |
Family
ID=51648205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420133377.XU Expired - Fee Related CN203867235U (en) | 2014-03-24 | 2014-03-24 | Coke oven winter masonry heat insulation greenhouse |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203867235U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105986697A (en) * | 2015-02-17 | 2016-10-05 | 柏美迪康环境工程(上海)股份有限公司 | Ceiling structure capable of restraining dust and preventing influence of weather factors |
CN109356411A (en) * | 2018-12-04 | 2019-02-19 | 中冶焦耐(大连)工程技术有限公司 | A kind of closing coke oven coke side space greenhouse |
CN109488058A (en) * | 2018-12-27 | 2019-03-19 | 中冶焦耐(大连)工程技术有限公司 | A kind of coke oven integrally closed greenhouse |
CN113530272A (en) * | 2021-07-12 | 2021-10-22 | 五冶集团上海有限公司 | Winter concrete heat preservation method |
-
2014
- 2014-03-24 CN CN201420133377.XU patent/CN203867235U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105986697A (en) * | 2015-02-17 | 2016-10-05 | 柏美迪康环境工程(上海)股份有限公司 | Ceiling structure capable of restraining dust and preventing influence of weather factors |
CN109356411A (en) * | 2018-12-04 | 2019-02-19 | 中冶焦耐(大连)工程技术有限公司 | A kind of closing coke oven coke side space greenhouse |
CN109488058A (en) * | 2018-12-27 | 2019-03-19 | 中冶焦耐(大连)工程技术有限公司 | A kind of coke oven integrally closed greenhouse |
CN113530272A (en) * | 2021-07-12 | 2021-10-22 | 五冶集团上海有限公司 | Winter concrete heat preservation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203867235U (en) | Coke oven winter masonry heat insulation greenhouse | |
CN102322623B (en) | Coke oven top waste heat reclaiming system | |
CN203869493U (en) | Tunnel kiln | |
CN204894186U (en) | Solar energy curing kiln | |
CN103418781B (en) | Haul multi-modal steel ladle roasting furnace kiln | |
CN202630727U (en) | Direct-spraying-type residual steam processing device | |
CN104132554A (en) | Energy saving device for cyclic utilization of smoke of open smoke hood type silicon submerged arc furnace | |
CN202485194U (en) | Totally-enclosed safe energy-saving type biogas boiler | |
CN203385190U (en) | High-heat-efficiency energy-saving heating boiler | |
CN204214307U (en) | hot-blast stove flue heat exchanger | |
CN204869197U (en) | Energy -efficient curing kilns of section of jurisdiction production | |
CN206692682U (en) | A kind of anti-freeze type blast-furnace soft water expansion drum | |
CN206300364U (en) | The built-in heat collection type solar water heater of vacuum tube | |
CN204251639U (en) | Novel hot-blast furnace checker brick | |
CN201652454U (en) | Temperature-preserving and heat-insulating fire wall | |
CN203848663U (en) | Heat pipe heat exchanging system for tunnel kiln cooling zone | |
CN205002362U (en) | Energy -conserving vertical boiler suitable for many fuel | |
CN203785466U (en) | Recovery device for heat emitted from petroleum coke calcining furnaces and collected flues | |
CN103994656B (en) | Cooling Section of Tunnel Kiln heat pipe heat exchanging system and using method thereof | |
CN204251633U (en) | For preventing the change water speed cooling system of cooling stave scaling loss | |
CN104154653A (en) | High-efficiency energy-saving hot blast boiler | |
CN203797777U (en) | Solar greenhouse coupling heating device based on fire pit exhaust gas gradient utilization | |
CN204612184U (en) | A kind of Portable type outdoor solar water stove | |
CN203615732U (en) | Super internal combustion sintered brick tunnel kiln waste heat recovery boiler | |
CN202066194U (en) | Radiating pan type hot air boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141008 Termination date: 20150324 |
|
EXPY | Termination of patent right or utility model |