CN203867065U - Integral casting ring beam for buildings - Google Patents

Integral casting ring beam for buildings Download PDF

Info

Publication number
CN203867065U
CN203867065U CN201420098885.9U CN201420098885U CN203867065U CN 203867065 U CN203867065 U CN 203867065U CN 201420098885 U CN201420098885 U CN 201420098885U CN 203867065 U CN203867065 U CN 203867065U
Authority
CN
China
Prior art keywords
cross rib
wall
brick
wall board
integral casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420098885.9U
Other languages
Chinese (zh)
Inventor
路强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420098885.9U priority Critical patent/CN203867065U/en
Application granted granted Critical
Publication of CN203867065U publication Critical patent/CN203867065U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses an integral casting ring beam for buildings. The integral casting ring beam comprises a brick wall and a concave brick die, wherein at least two shortened precast floor slabs are transversely arranged in the brick wall; the top end of the concave brick die is fixed on the brick wall; the bottom of the concave brick die penetrates through a cross rib and is fixed in a concrete layer; steel hoops are mounted in the positions close to two ends of the cross rib; an adjustable structure is adopted between each steel hoop and the cross rib; outer wall slabs are further arranged on the cross rib and vertically penetrate through the cross rib; a cross beam is arranged in the positions close to the bottoms of the outer wall slabs; two ends of the cross beam are connected with the outer wall slabs through internal steel nails; and a steel wire mesh penetrates through the cross beam. According to the integral casting ring beam for the buildings, the concave brick die is adopted to replace a template and is built once with the wall, so that procedures of setting up and dismounting the template are omitted, the workload is reduced, the construction time is saved, and simultaneously, the integral casting ring beam has good bearing cavity and anti-seismic performance.

Description

Build the whole collar tie beam that waters
Technical field
The utility model relates to a kind of collar tie beam, particularly the whole collar tie beam that waters of a kind of building.
Background technology
The collar tie beam of general building adopts reinforced concrete structure mostly, and its major defect is: one, building operations program is complicated, and the amount of labour is large, long in time limit, and produces a large amount of building wastes; Two, between collar tie beam and floor, there is no reliable drawknot, antidetonation, waterproof and heat insulation effect are difficult to the state that reaches desirable; Three, in building operations, need a large amount of templates, and install and dismounting trouble very all, greatly increased workload, extended the construction period.Simultaneously general collar tie beam design is also unstable on switching performance, and the phenomenon such as may occur subsiding, causes the generation of safe condition.Therefore, need better for these problems, make better design, just can better be for used in construction.
Utility model content
The technical problems to be solved in the utility model is: overcome the problems referred to above, a kind of workload that reduced is provided, saved the engineering time, have the whole collar tie beam that waters of building of good supporting capacity and anti-seismic performance simultaneously.
To achieve these goals, the technical solution adopted in the utility model is such: the whole collar tie beam that waters of building of the present utility model, comprise brick wall body, in brick wall body, be laterally provided with and subtract length precast floor slab, subtract length precast floor slab and be at least two, also comprise spill stock mould, concave brick die tip is fixed on brick wall body, spill stock mould bottom is fixed in layer of concrete through a cross rib, cross rib is provided with stirrup near place, both ends, between stirrup and cross rib, adopt adjustable structure, on cross rib, be also provided with outer wall board, outer wall board is vertically through cross rib setting, outer wall board is provided with crossbeam near place, bottom, crossbeam two ends are connected with outer wall board by built-in steel nail, in crossbeam, be equipped with gauze wire cloth.
Further, as a kind of concrete form of structure, between outer wall board described in the utility model and crossbeam, be provided with voussoir.
Further, as a kind of concrete form of structure, in outer wall board described in the utility model, be provided with adiabator layer.
Compared with prior art, the utility model has the advantage of: the whole collar tie beam that waters of this building is owing to adopting spill stock mould to replace template and be once built into body of wall, cancelled the operation of building and dismantle template, reduced workload, save the engineering time, there is good supporting capacity and anti-seismic performance simultaneously.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model;
In figure: 1. brick wall body; 2. subtract length precast floor slab; 3. spill stock mould; 4. cross rib; 5. stirrup; 6. layer of concrete; 7. outer wall board; 8. crossbeam; 9. gauze wire cloth.
The specific embodiment
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, basic structure of the present utility model is only described in a schematic way, so it only show the formation relevant with the utility model.
The whole preferred embodiment that waters collar tie beam of the utility model building as shown in Figure 1, comprise brick wall body 1, interior being laterally provided with of brick wall body 1 subtracts length precast floor slab 2, subtract length precast floor slab 2 and be at least two, also comprise spill stock mould 3, spill stock mould 3 tops are fixed on brick wall body 1, spill stock mould 3 bottoms are fixed in layer of concrete 6 through a cross rib 4, cross rib 4 is provided with stirrup 5 near place, both ends, between stirrup 5 and cross rib 4, adopt adjustable structure, on cross rib 4, be also provided with outer wall board 7, outer wall board 7 is vertical to be arranged through cross rib 4, outer wall board 7 is provided with crossbeam 8 near place, bottom, crossbeam 8 two ends are connected with outer wall board 7 by built-in steel nail, in crossbeam 8, be equipped with gauze wire cloth 9, between described outer wall board 7 and crossbeam 8, be provided with voussoir, in described outer wall board 7, be provided with adiabator layer.
The whole collar tie beam that waters of building of the present utility model, owing to adopting spill stock mould 3 to replace template and be once built into body of wall, has been cancelled the operation of building and dismantle template, has reduced workload, has saved the engineering time, has good supporting capacity and anti-seismic performance simultaneously.
The above-mentioned foundation desirable embodiment of the present utility model of take is enlightenment, and by above-mentioned description, relevant staff can, within not departing from the scope of this utility model technological thought, carry out various change and modification completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to claim scope.

Claims (3)

1. build the whole collar tie beam that waters for one kind, comprise brick wall body, it is characterized in that: in brick wall body, be laterally provided with and subtract length precast floor slab, subtract length precast floor slab and be at least two, also comprise spill stock mould, concave brick die tip is fixed on brick wall body, spill stock mould bottom is fixed in layer of concrete through a cross rib, cross rib is provided with stirrup near place, both ends, between stirrup and cross rib, adopt adjustable structure, on cross rib, be also provided with outer wall board, outer wall board is vertically through cross rib setting, outer wall board is provided with crossbeam near place, bottom, crossbeam two ends are connected with outer wall board by built-in steel nail, in crossbeam, be equipped with gauze wire cloth.
2. the whole collar tie beam that waters of building according to claim 1, is characterized in that: between described outer wall board and crossbeam, be provided with voussoir.
3. the whole collar tie beam that waters of building according to claim 1, is characterized in that: in described outer wall board, be provided with adiabator layer.
CN201420098885.9U 2014-03-06 2014-03-06 Integral casting ring beam for buildings Expired - Fee Related CN203867065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420098885.9U CN203867065U (en) 2014-03-06 2014-03-06 Integral casting ring beam for buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420098885.9U CN203867065U (en) 2014-03-06 2014-03-06 Integral casting ring beam for buildings

Publications (1)

Publication Number Publication Date
CN203867065U true CN203867065U (en) 2014-10-08

Family

ID=51648035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420098885.9U Expired - Fee Related CN203867065U (en) 2014-03-06 2014-03-06 Integral casting ring beam for buildings

Country Status (1)

Country Link
CN (1) CN203867065U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592866A (en) * 2016-12-20 2017-04-26 成都佰思汇信科技有限责任公司 Cast-in-place concrete surrounding ring beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592866A (en) * 2016-12-20 2017-04-26 成都佰思汇信科技有限责任公司 Cast-in-place concrete surrounding ring beam

Similar Documents

Publication Publication Date Title
CN203080705U (en) Concrete post-cast strip supporting top
CN204152207U (en) Hang the reinforcing construction of mould template
CN103938649B (en) A kind of construction method on high-rise building cavity basis
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN203022222U (en) Wholly-cast ring beam of brick-concrete building support
CN204475850U (en) Clear-water concrete balcony template
CN203867065U (en) Integral casting ring beam for buildings
CN103866866B (en) Super High Core Walls Structure and housing water node after setting a roof beam in place
CN204850078U (en) Short wall structure of leading of basement outer wall
CN205712565U (en) A kind of prefabricated two-sided wall
CN106836592A (en) Overlapped hollow floor system after partial precast assembled
CN204174820U (en) The building block of a kind of constructional column template
CN205935352U (en) Building carrier plate is from formwork
CN206174482U (en) Outsourcing concrete ring beam reinforcing bar integral erection device of no bracket steel -pipe column
CN202577382U (en) Reinforcing structure of bus supporting pier in electrolytic plant
CN205400050U (en) Hollow superstructure mandrel of thin wall square chest
CN104328793B (en) Raft plated construction
CN204001214U (en) High accuracy capital embedded board
CN104343129B (en) For manufacturing the reversion template of cast-in-situ prestressed concrete cylinder blower foundation
CN107254964B (en) Waterproof beam structure of steel die above flat-top
CN207027854U (en) The initial approach to become a Buddhist believer type that misplaces section assembled stainless steel beam making bench
CN205839789U (en) Photovoltaic plant box type transformer configurations constructing structure
CN204691304U (en) A kind of bracing frame for integral precast groined slab floor structure
CN204899034U (en) Prefabricated wall post

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141008

Termination date: 20150306

EXPY Termination of patent right or utility model