CN203859762U - Hardware architecture of ERP system - Google Patents
Hardware architecture of ERP system Download PDFInfo
- Publication number
- CN203859762U CN203859762U CN201320808816.8U CN201320808816U CN203859762U CN 203859762 U CN203859762 U CN 203859762U CN 201320808816 U CN201320808816 U CN 201320808816U CN 203859762 U CN203859762 U CN 203859762U
- Authority
- CN
- China
- Prior art keywords
- server
- switch
- fpdp
- core
- data link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a hardware architecture of an ERP system. The hardware architecture comprises an instance server, a kernel database server, a first core switch, a second core switch, a virtual local area network switch, a first fiber switch, a second fiber switch, a log server, a first storage server, a second storage servers and a magnetic tape unit. The kernel database server establishes data links with different network segments of the virtual local area network switch; a redundant data link is established between the instance server and the first core switch; and data links are established between a second group of electric data ports of the instance server and different network segments of the virtual local area network switch. According to the technical scheme, a link network is established among the kernel database server, the instance server, and the storage servers through switch data ports, so that the core production system obtains the most reliable operation and maintenance environment and is effectively separated from project systems like debugging and training and the like at the physical infrastructure; and thus no direct interference on the core production system can be caused by changing of any project system.
Description
Technical field
The utility model relates to a kind of computer system, particularly relates to a kind of computer hardware system for SAP software systems.
Background technology
In the traditional ERP of enterprise application, the formation of software systems adopts SAP system more, and in SAP theoretical method, traditional ERP system forms by developing (DEV), test (QAS) and production system (PRD), i.e. three system architectures.Along with the needs that in scope of the enterprise fast development process, various resource height are integrated, production system is often subject to the impact of other operation system burst service requests.ERP system, in normal operation maintenance, also needs to bear the implementation of new projects or new business system.Therefore, production system is often received interference, is also unfavorable for the efficiency of the SAP project implementation.Conflict mutually with O&M line for fear of project line, in ERP system framework, need newly-increased professional system for distinguishing the test of O&M process and the test of implementation process.
By adopting five system models of ERP system, DEV system provides the original environment that customization (customizing) configures and ABAP develops; O&M/enforcement QAS system, for user provides the environment of integration testing (SIT) and final integration testing (FIT); Mock system provides the environment of regression test (Regression Test) and digital simulation trial run (Rehearsal); Training system provides the freestanding environment of user training, avoids the impact of large-scale concurrent user training on test macro; Production system provides the environment of user's actual services operation.Five system models are deferred to the Life Circle of software development, for each stage of project provides independently system data environment, have ensured carrying out smoothly of project development, test, production phase.
But existing hardware framework is all to set up around three system architectures of original software systems, cannot distinguish pointed test and a large amount of user trainings, normal O&M production process is often interfered, and system data has and suffers the potential possibility of obscuring and losing.
Utility model content
The purpose of this utility model is to provide a kind of ERP system hardware structure, solves existing ERP system framework and cannot adapt to the technical problem that SAP systems soft ware is dynamically adjusted.
ERP system hardware structure of the present utility model, comprise that instance server and core database server also comprise the first core switch, the second core switch, virtual local area network switch, the first optical fiber switch and the second optical fiber switch, also comprise log server, the first storage server, the second storage server and magnetic tape station, the first electric FPDP and first core switch of core database server are set up redundant data link, the second electric FPDP and second core switch of core database server are set up redundant data link, the 3rd electric FPDP of core database server and the different segment of virtual local area network switch are set up data link, first group of instance server electricity FPDP and the first core switch are set up redundant data link, the different segment of second group of instance server electricity FPDP and virtual local area network switch is set up data link, the first smooth FPDP and first optical fiber switch of core database server are set up data link, and the second smooth FPDP and second optical fiber switch of core database server are set up data link, the first optical fiber switch and the second optical fiber switch by light FPDP respectively with log server, the first storage server, the second storage server and magnetic tape station are set up data link, log server, magnetic tape station, the first storage server and optical fiber switch are at local disposition, and the second storage server is disposed in strange land.
Between the different segment between described the second core switch, virtual local area network switch, the first optical fiber switch and the second optical fiber switch, configure some hardware server groups, form the hardware structure of corresponding stand alone software system.
Described hardware server group comprises 8 hardware servers, as the first exploitation server, the second exploitation server, the first testing server, first produces server, second produces server, Training Server, the first test environment server and the second test environment server, each server all comprises the first electric FPDP, the second electric FPDP, the first smooth FPDP and the second smooth FPDP, the first electric FPDP and second core switch of hardware server are set up data link, the second electric FPDP and the virtual local area network switch of hardware server are set up data link, the first smooth FPDP and first optical fiber switch of hardware server are set up data link, the second smooth FPDP and second optical fiber switch of hardware server are set up data link.
ERP system hardware structure of the present utility model is especially applicable to the Data Transmission Controlling between ERP system.The ERP system five system model frameworks of setting up in this hardware foundation, make each SAP systems team member set up transmission and management system TMS in conjunction with the management of the each system of ERP, the each Client of system and user right (User Authorizatoin), can on this hardware structure basis, realize the configuration of transmission path (Transport Route) and domain transmission (Transport domains) between certain group (SAP is referred to as Client) based on different system.Be applicable to each system and carry out strict rights management, limited subscriber and the consultant access rights to system.Can ruly parallel support ERP system O&M and the carrying out of project work.
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model ERP system hardware structure;
Fig. 2 is operation system hardware configuration schematic diagram in the utility model ERP system hardware structure;
Fig. 3 is unitem system and the integrated hardware configuration schematic diagram of heterogeneous system in the utility model ERP system hardware structure.
Embodiment
As shown in Figure 1, the present embodiment comprises the first core switch 11, the second core switch 12, virtual local area network switch 15, the first optical fiber switch 13 and the second optical fiber switch 14, also comprise log server 10, the first storage server 16, the second storage server 17 and magnetic tape station 18, the first electric FPDP and first core switch 11 of core database server 52 are set up redundant data link, the second electric FPDP and second core switch 12 of core database server 52 are set up redundant data link, the 3rd electric FPDP of core database server 52 and the different segment of virtual local area network switch 15 are set up data link, first group of instance server 51 electricity FPDP and the first core switch 11 are set up redundant data link, the different segment of second group of instance server 51 electricity FPDP and virtual local area network switch 15 is set up data link.The first smooth FPDP and first optical fiber switch 13 of core database server 52 are set up data link, and the second smooth FPDP and second optical fiber switch 14 of core database server 52 are set up data link.The first optical fiber switch 13 and the second optical fiber switch 14 are set up data link with log server 10, the first storage servers 16, the second storage server 17 and magnetic tape station 18 respectively by light FPDP.Log server 10, magnetic tape station 18, the first storage server 16 are with optical fiber switch at local disposition, and the second storage server 17 is disposed in strange land.
Above hardware structure, during core database server 52, instance server 51 and stores service, set up link network by exchange data port, make core production system obtain the most reliable O&M environment, effectively separate on physical structure with the project system such as debugging, training, the change of any one project system can directly not produce interference to core production system.
As shown in Figure 2, according to project needs, can, between the second core switch 12, virtual local area network switch 15, the first optical fiber switch 13 and the second optical fiber switch 14, between the different network segments, build the ERP system hardware server group 53 of noncontinuous item.
For example by virtual local area network switch 15,8 hardware servers are divided in to the same network segment, deployment software system respectively, as the first exploitation server DEV1, the second exploitation server DEV2, the first testing server QAS1, first produces server PRD1, second produces server PRD2, Training Server TRN1, the first test environment server MOCK1 and the second test environment server MOCK2, each server all comprises the first electric FPDP, the second electric FPDP, the first smooth FPDP and the second smooth FPDP, the first electric FPDP and second core switch 12 of hardware server are set up data link, the second electric FPDP and the virtual local area network switch 15 of hardware server are set up data link, the first smooth FPDP and first optical fiber switch 13 of hardware server are set up data link, the second smooth FPDP and second optical fiber switch 14 of hardware server are set up data link.The ERP system and the core production system that form are isolated completely in data processing aspect, and the debugging, training and the virtual operation that newly form ERP system can not cause interference to other ERP system of mature and stable operation.Once new ERP system maturity can put into operation, by exploitation server more than needed, production server, testing server, test environment server are marked off to this network segment, just can discharge respective resources, realize the flexible configuration of hardware resource.
For the ECC(enterprise key assembly of SAP) data fusion of system and other heterogeneous systems, often relate to the technical problem that data cannot be mated, need to carry out data transaction by a software intermediate layer, make data type and state between system, keep continuity, due to the heterogeneous system complexity relating to, need to complete by middleware system is flexibly PI system.And PI system and the each heterogeneous system interface model when integrated need to be adjusted at any time, utilize original three system architectures, the tune-up data of PI system and the unexpected state of test tend to cause production system and O&M system to occur response time delay, cause decrease in efficiency.
As shown in Figure 3, ECC system in ERP system will be divided in 5 hardware servers in a network segment for deployment software system by virtual local area network switch 15, form the 3rd exploitation server EDEV, the 3rd testing server EQAS, the 3rd test environment server EMOCK, the 3rd Training Server ETRN and the 3rd produces server EPRD, in the same network segment, also divide and be useful on 3 hardware servers disposing PI software systems by virtual local area network switch 15, form the 4th exploitation server PDEV for deployment software system, the 4th testing server PQAS, the 4th produces server PPRD.Each server all comprises the first electric FPDP, the second electric FPDP, the first smooth FPDP and the second smooth FPDP, the first electric FPDP and second core switch 12 of hardware server are set up data link, the second electric FPDP and the virtual local area network switch 15 of hardware server are set up data link, the first smooth FPDP and first optical fiber switch 13 of hardware server are set up data link, and the second smooth FPDP and second optical fiber switch 14 of hardware server are set up data link.
The 4th exploitation server PDEV, the 4th testing server PQAS, the 4th produce server PPRD and also comprise separately the 3rd electric FPDP, set up data link respectively with peripheral switch 19, and peripheral switch 19 forms data link with heterogeneous system.Main heterogeneous system comprises project management system, the office automation system, equipment maintenance system, buying production system and marketing system, and each heterogeneous system is connected in peripheral switch 19 by corresponding FPDP.
In the independent network segment of existing ERP ECC system, configured the hardware server of a new system by this ERP system hardware structure, make ECC system to set up data link by the hardware structure of PI system and heterogeneous system, complete the configuration of ERP data transfer path (Transport Route) and domain transmission (Transport domains), can set up corresponding software service by the hardware structure of PI system again, the interference of isolation heterogeneous system to the each system service of ERP ECC system.This ERP system hardware structure can make different ERP system carry out the fusion of hardware-level, for upgrading and the optimization of mature system provide hardware foundation.This ERP system hardware structure is in ensureing that the calculating of core production system, load, storage organization ensure reliability, can increase flexibly new ERP project and system, even if also can ensure to complete with the data of heterogeneous system and dock in existing control and management authority from bottom architecture for existing mature system, and can not impact other system.
Consider the reliability of communication link, arbitrary FPDP of each hardware server can be configured to one group, realizes the redundancy link of same communication link.
Above-described embodiment is described preferred implementation of the present utility model; not scope of the present utility model is limited; do not departing under the prerequisite of the utility model design spirit; various distortion and improvement that those of ordinary skill in the art make the technical solution of the utility model, all should fall in the definite protection range of the utility model claims.
Claims (3)
1. an ERP system hardware structure, comprise instance server (51) and core database server (52), also comprise the first core switch (11), the second core switch (12), virtual local area network switch (15), the first optical fiber switch (13) and the second optical fiber switch (14), also comprise log server (10), the first storage server (16), the second storage server (17) and magnetic tape station (18), it is characterized in that: the first electric FPDP and first core switch (11) of core database server (52) are set up redundant data link, the second electric FPDP and second core switch (12) of core database server (52) are set up redundant data link, the 3rd electric FPDP of core database server (52) and the different segment of virtual local area network switch (15) are set up data link, first group of instance server (51) electricity FPDP and the first core switch (11) are set up redundant data link, the different segment of second group of instance server (51) electricity FPDP and virtual local area network switch (15) is set up data link, the first smooth FPDP and first optical fiber switch (13) of core database server (52) are set up data link, and the second smooth FPDP and second optical fiber switch (14) of core database server (52) are set up data link, the first optical fiber switch (13) and the second optical fiber switch (14) are set up data link with log server (10), the first storage server (16), the second storage server (17) and magnetic tape station (18) respectively by light FPDP, log server (10), magnetic tape station (18), the first storage server (16) are with optical fiber switch at local disposition, and the second storage server (17) is disposed in strange land.
2. ERP system hardware structure according to claim 1, it is characterized in that: between the different segment between described the second core switch (12), virtual local area network switch (15), the first optical fiber switch (13) and the second optical fiber switch (14), configure some hardware server groups (53), form the hardware structure of corresponding stand alone software system.
3. ERP system hardware structure according to claim 2, it is characterized in that: described hardware server group (53) comprises 8 hardware servers, as the first exploitation server (DEV1), the second exploitation server (DEV2), the first testing server (QAS1), first produces server (PRD1), second produces server (PRD2), Training Server (TRN1), the first test environment server (MOCK1) and the second test environment server (MOCK2), each server all comprises the first electric FPDP, the second electric FPDP, the first smooth FPDP and the second smooth FPDP, the first electric FPDP and second core switch (12) of hardware server are set up data link, the second electric FPDP and the virtual local area network switch (15) of hardware server are set up data link, the first smooth FPDP and first optical fiber switch (13) of hardware server are set up data link, the second smooth FPDP and second optical fiber switch (14) of hardware server are set up data link.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320808816.8U CN203859762U (en) | 2013-12-10 | 2013-12-10 | Hardware architecture of ERP system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320808816.8U CN203859762U (en) | 2013-12-10 | 2013-12-10 | Hardware architecture of ERP system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203859762U true CN203859762U (en) | 2014-10-01 |
Family
ID=51609606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320808816.8U Expired - Fee Related CN203859762U (en) | 2013-12-10 | 2013-12-10 | Hardware architecture of ERP system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203859762U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106027515A (en) * | 2016-05-13 | 2016-10-12 | 中船黄埔文冲船舶有限公司 | Security integration method and system for heterogeneous network |
CN107995106A (en) * | 2017-12-04 | 2018-05-04 | 山东超越数控电子股份有限公司 | A kind of interchanger redundant system of data storing platform |
-
2013
- 2013-12-10 CN CN201320808816.8U patent/CN203859762U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106027515A (en) * | 2016-05-13 | 2016-10-12 | 中船黄埔文冲船舶有限公司 | Security integration method and system for heterogeneous network |
CN107995106A (en) * | 2017-12-04 | 2018-05-04 | 山东超越数控电子股份有限公司 | A kind of interchanger redundant system of data storing platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112866333B (en) | Cloud-native-based micro-service scene optimization method, system, device and medium | |
CN107193546A (en) | A kind of micro services business application system | |
CN107203376A (en) | A kind of enterprise-level information system | |
CN114329920B (en) | Virtual-real system combined large-scale satellite network simulation evaluation and test system | |
US20150215376A1 (en) | Systems and methods for deploying legacy software in the cloud | |
CN102799962A (en) | Configuration type business flow system and realization method thereof | |
CN102508437B (en) | Multifunctional electromechanical system simulation method for simulation of airplane power supply control management system | |
CN105138339A (en) | Distributed communication midware developing method based on DDS standard | |
CN103685572B (en) | Method and system for building data center management platform based on SOA (service-oriented architecture) | |
CN109871384A (en) | Method, system, equipment and the storage medium of container migration are carried out based on PaaS platform | |
CN110427182A (en) | A kind of template type construction APP method and device | |
CN105094961A (en) | Task scheduling management system based on quartz frame and method thereof | |
CN104517181A (en) | Enterprise content management system and enterprise content management method for nuclear power plants | |
CN103984814A (en) | Modeling method of complex equipment system | |
CN110858356A (en) | Manufacturing execution system based on micro-service architecture | |
CN110780856A (en) | Electricity consumption data publishing platform based on micro-service | |
CN106961440B (en) | Cloud platform based on the operation monitoring management of enterprise-level resource | |
CN203859762U (en) | Hardware architecture of ERP system | |
CN203859763U (en) | Hardware architecture with integration of ERP system and heterogeneous system | |
CN204833253U (en) | A USB server for cloud calculates | |
CN102779034A (en) | Client side of railway ticketing system and implementation method of client side | |
CN110392053A (en) | Container access control method, device, client and server | |
CN103281202A (en) | System of browser/server architecture and front-end presentation method of system | |
CN104468829A (en) | Enterprise IT system structure implementation method based on virtualization environment | |
CN105488229A (en) | Data exchange and integration method applied to heterogeneous data environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |