CN203827255U - Solar cell panel installation apparatus used for annular cross section power transmission steel pipe tower - Google Patents
Solar cell panel installation apparatus used for annular cross section power transmission steel pipe tower Download PDFInfo
- Publication number
- CN203827255U CN203827255U CN201420261840.9U CN201420261840U CN203827255U CN 203827255 U CN203827255 U CN 203827255U CN 201420261840 U CN201420261840 U CN 201420261840U CN 203827255 U CN203827255 U CN 203827255U
- Authority
- CN
- China
- Prior art keywords
- clamping plate
- solar cell
- fixed
- steel pipe
- power transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 33
- 239000010959 steel Substances 0.000 title claims abstract description 33
- 230000005540 biological transmission Effects 0.000 title claims abstract description 27
- 238000009434 installation Methods 0.000 title claims abstract description 25
- 230000001012 protector Effects 0.000 claims description 15
- 229910001220 stainless steel Inorganic materials 0.000 claims description 6
- 239000010935 stainless steel Substances 0.000 claims description 6
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 238000012856 packing Methods 0.000 claims description 3
- 230000013011 mating Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000012544 monitoring process Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 230000001154 acute effect Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000004519 grease Substances 0.000 description 2
- 230000001050 lubricating effect Effects 0.000 description 2
- 239000007858 starting material Substances 0.000 description 2
- 238000003916 acid precipitation Methods 0.000 description 1
- 210000001367 artery Anatomy 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003749 cleanliness Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Photovoltaic Devices (AREA)
Abstract
A solar cell panel installation apparatus used for an annular cross section power transmission steel pipe tower relates to the solar cell panel installation technology field. The installation apparatus is provided. The apparatus is convenient and fast, can firmly install the solar cell panel on the power transmission steel pipe tower and can adjust an inclination angle of the solar cell panel. The solar cell panel installation apparatus used for the annular cross section power transmission steel pipe tower is fixed to the steel pipe tower through a semicircular first clamping plate and a semicircular second clamping plate. The first clamping plate and the second clamping plate are connected through a bolt so that the first clamping plate and the second clamping plate are convenient for dismounting and installation. A support is fixed to the first clamping plate. The support is provided with a driving device which drives a fixing plate to swing. The solar cell panel is installed on the fixing plate so that swing of the solar cell panel is further realized. According to seasons changing, the inclination angle of the solar cell panel is adjusted so that the cell panel can receive more solar energy. The installation apparatus is convenient to dismount and install, can be fixed firmly and is convenient for popularization and application.
Description
Technical field
The utility model relates to solar panel mounting technique field, specifically a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower.
Background technology
Aerial high-voltage power transmission line is the artery of electric power system, and its running status directly determines safety and the benefit of electric power system, just must bring huge loss once break down.Transmission line status parameter is carried out to on-line monitoring, and the supply of its power supply is one of key issue.Because monitoring sensor is on shaft tower or overhead wire, can not use normal power supplies.Solar powered cost is low, cleanliness without any pollution and technology maturation, therefore in transmission line status parameter monitoring, is widely used.
Adopt solar powered, need solar panel be installed at power transmission steel pipe tower, often require the construction of holing riveted joint or welding on the primary structure member of higher position certainly will bring certain influence to Transmission Tower intensity, and high-altitude construction operation difficulty is large, dismounting is inconvenient.Therefore design is a kind of convenient and swift, and the solar cell board mounting assembly power transmission tower tower body not being damaged is very necessary simultaneously.
Utility model content
The purpose of this utility model is to provide a kind of solar cell board mounting assembly that is applicable to ring section power transmission steel pipe tower, convenient and swift, firmly solar panel is arranged on power transmission steel pipe tower, for the on-line monitoring of ultra-high-tension power transmission line provides power supply, and can regulate the inclination angle of solar panel.
The technical scheme in the invention for solving the technical problem is: a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower, it is characterized in that, and comprise the first clamping plate, the second clamping plate, liner, support, fixed head, gear and tooth bar,
Described the first clamping plate and the second clamping plate are semicircular metallic plate, and the installation end of described the first clamping plate and the second clamping plate is rotationally connected by rotating shaft; Fixedly mount a first square fixed head at the free end of described the first clamping plate, at the free end fixed installation one of described the second clamping plate and the second square fixed head of the first fixed head mating reaction, described the first fixed head is fixedly connected with by some bolt assemblies with the second fixed head; On the inner arc surface of described the first clamping plate and the second clamping plate, be respectively equipped with a liner, the rubber parts that described liner is circular arc;
At the top of described the first clamping plate fixed installation two first fixed levers, fixedly mount the motion bar of a circle at the free end of the first fixed lever described in two, the upper end of one square fixed head and described motion bar are rotationally connected, and are provided with the second elongated slot of two symmetrically arranged T shapes on the bottom surface of described fixed head; Fixedly mount a L shaped support in the bottom of described the first clamping plate; At the free end of the described support tooth bar that is slidably installed, the tooth of described tooth bar arrange down and with the gear engagement fit that is positioned at frame bottom, described gear is fixedly connected with the motor output shaft that is positioned at frame bottom; One transverse arm is vertically fixedly mounted on the top of tooth bar, two ends at described transverse arm fixedly mount respectively a fixed block, described in each, on fixed block, fixedly mount respectively one second fixed lever, described in each, the free end of the second fixed lever extend in the second corresponding chute, described in each, the free end of the second fixed lever rotates respectively a roller is installed, and described in each, roller contacts cooperation with the inwall of corresponding the second elongated slot.
Further, on the inwall of described the first clamping plate and the second clamping plate, be respectively equipped with the first elongated slot of some tapers, in described in each, be lining with and be provided with some first projections corresponding with the first elongated slot, described liner was arranged on the first clamping plate and the second clamping plate by the first projection and coordinating of the first elongated slot.
Further, described bolt assembly comprises bolt, packing ring and nut, and the nut of described bolt contacts cooperation with the second clamping plate; On described the first clamping plate, be provided with a cannelure being looped around around nut, a head protector is threaded with described cannelure.
Further, be provided with two first projections at the installation end of described the first clamping plate, be provided with two breach that adapt with described the first projection at the installation end of described the second clamping plate, a rotating shaft couples together the first clamping plate and the second clamping plate through the first projection.
Further, be provided with an arc surface at the installation end of described support, described support contacts cooperation by arc surface with the outer wall of the first clamping plate.
Further, be provided with a strip hole at the free end of described support, described strip hole runs through the free-ended upper and lower surface of support, on the inwall of the left and right of described strip hole, is respectively equipped with a chute, and described chute is slidably matched with the 3rd projection that is positioned at tooth bar both sides.
Further, described chute and the 3rd projection are the T shape cooperatively interacting.
Further, described head protector is the cylindrical of one end uncovered one end shutoff, is provided with the external screw thread being threaded with cannelure at the opening end of described head protector.
Further, described in two, the first fixed lever be arranged in parallel, and described in each, the free end of the first fixed lever is inclined upwardly.
Further, described the first fixed lever and the second fixed lever are hollow stainless steel tube.
The beneficial effects of the utility model are: a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower that the utility model provides, be fixed on steel tube tower by semicircular the first clamping plate and the second clamping plate, the first clamping plate and the second clamping plate are bolted, easy for removal and installation; On the first clamping plate, be fixed with support, support is provided with the swing of drive unit driving fixed head, and solar panel is arranged on fixed head, and then realizes the swing of solar panel; According to the alternation of the seasons, regulate the inclination angle of solar panel, to make cell panel receive more solar energy.This erecting device, easy accessibility, fixed, is easy to be extended and applied.
Brief description of the drawings
Fig. 1 is front schematic view of the present utility model;
Fig. 2 is schematic top plan view of the present utility model;
Fig. 3 is that the first clamping plate and the second clamping plate coordinate schematic diagram;
Fig. 4 is the front view of Fig. 3;
Fig. 5 be in Fig. 1 A to partial view;
Fig. 6 be in Fig. 1 B to partial view;
Fig. 7 be in Fig. 1 C to partial view (omit mounting panel and solar panel);
Fig. 8 is the second clamping plate schematic three dimensional views;
Fig. 9 is the first clamping plate schematic three dimensional views;
Figure 10 is liner schematic diagram;
Figure 11 is the upward view of Fig. 9;
Figure 12 is head protector and the schematic diagram that coordinates of two clamping plate;
Figure 13 is the schematic three dimensional views of head protector;
Figure 14 is D-D cutaway view in Fig. 1;
Figure 15 is solar panel Inclination maneuver state one;
Figure 16 is solar panel Inclination maneuver state two;
In figure: 1 first clamping plate, 11 first fixed heads, 111 cannelures, 112 first screwed holes, 12 first projections, 13 first shaft holes, 2 second clamping plate, 21 second fixed heads, 211 second screwed holes, 22 first elongated slots, 23 breach, 24 second shaft holes, 3 liners, 31 second projections, 41 first rotating shafts, 42 second rotating shafts, 5 head protectors, 51 external screw threads, 6 bolt assemblies, 61 nuts, 7 supports, 71 first fixed levers, 72 motion bars, 73 strip holes, 8 mounting panels, 81 otic placodes, 82 second elongated slots, 83 square holes, 91 tooth bars, 911 the 3rd projections, 92 transverse arms, 93 fixed blocks, 94 gears, 95 motors, 96 second fixed levers, 97 rollers, 10 solar panels.
Embodiment
As shown in Fig. 1 to Figure 14, the utility model comprises the first clamping plate 1, the second clamping plate 2, liner 3, head protector 5, support 7, mounting panel 8, tooth bar 91, transverse arm 92, fixed block 93, gear 94, motor 95 and roller, below in conjunction with accompanying drawing, the utility model income is described.
As shown in Fig. 3, Fig. 9, Figure 11, the first clamping plate 1 are semicircular metallic plate, and the edge that is provided with two symmetrically arranged the first projection 12, two first projections in one end of the first clamping plate does fillet processing.In two first projections, be respectively equipped with the both ends of the surface that one first shaft hole 13, the first shaft holes run through projection.Fixing one first fixed head 11, the first fixed heads at the other end of the first clamping plate is square metallic plate, is provided with two symmetrically arranged the first screwed holes 112 on the first fixed head.On the inner arc surface of the first clamping plate, be provided with the first elongated slot 22 of some tapers, and the length direction of the first elongated slot is parallel to the center line of the first clamping plate.The large end of the first elongated slot is placed in the first clamping plate, and the small end of the first elongated slot overlaps with the inner arc surface of the first clamping plate.One end of containing the first projection on the first clamping plate is installation end, rotates one second clamping plate 2 are installed at the installation end of the first clamping plate, and as shown in Figure 8, the second clamping plate are a semicircular metallic plate.Be provided with two symmetrically arranged breach 23 in one end of the second clamping plate, two breach respectively with the corresponding setting of two first projections on the first clamping plate, on the second clamping plate, tool one end jaggy is installation end, also be provided with the second shaft hole 24, the second shaft holes and the corresponding setting of the first shaft hole at the installation end of the second clamping plate.When installation, two first projections are inserted in respectively in two breach and the first shaft hole is alignd with the second shaft hole, first rotating shaft 41 is through in the first shaft hole and the second shaft hole the first clamping plate and the second clamping plate are coupled together.Fixing one second fixed head 21, the second fixed heads at the other end of the second clamping plate is square metallic plate, on the second fixed head, be provided with two symmetrically arranged the second screwed hole 211, two second screwed holes respectively with the corresponding setting of two first screwed holes.On the inner arc surface of the second clamping plate, be also provided with the first elongated slot 22 of some tapers, and the first elongated slot is evenly arranged on the second clamping plate.The large end of the first elongated slot is placed in the second clamping plate, and the small end of the first elongated slot overlaps with the inner arc surface of the second clamping plate.
As shown in Figure 2 and Figure 3, on the inner arc surface of the first clamping plate and the second clamping plate, be respectively equipped with a liner 3, as shown in figure 10, liner is the rubber parts of circular arc, the second projection 31, the second projections that are provided with some tapers that are evenly arranged on the exterior arc surface of liner coordinate and realize the relative fixing of liner and the first clamping plate and the second clamping plate with the first elongated slot grafting.Rotate around the axis the second clamping plate until the second fixed head and the first fixed head be arranged in parallel, and now, two liners surround a circular space.
When use, open the free end of the first clamping plate and the second clamping plate, steel pipe is nested with in the region between two liners, then rotating the second clamping plate makes the second fixed head draw close to a side at the first fixed head place, realize being fixedly connected with of the first fixed head and the second fixed head by the bolt assembly 6 coordinating with the second screwed hole with the first screwed hole, and then realize the relative fixing of the first clamping plate and the second clamping plate.Now, between the first fixed head and the second fixed head, there is certain gap.Bolt assembly comprises bolt, packing ring and nut 61, and the position by adjusting nut on bolt changes the normal pressure size between two clamping plate and steel pipe.Meanwhile, the squeezing action lower compression distortion of liner between steel pipe and clamping plate, one side can adapt to the steel pipe of different size, increases on the other hand the frictional force between steel pipe and clamping plate, prevents clamping plate slippage from steel pipe.For further increasing the frictional force between liner and steel pipe, on the inner arc surface of liner, be provided with anti-skid design or projection.In addition, two nuts are set on screw rod, to prevent the loosening of nut.Because this erecting device is positioned on steel tower, long term exposure is in the environment such as strong wind, sleet, acid rain, bolt assembly is easy to get rusty, after particularly bolt assembly gets rusty, the destruction of screw thread can make this erecting device on steel pipe, produce loosening and slippage on the one hand, and in the time needing repairing, dismounting is relatively required great effort on the other hand.For this reason, on the second fixed head, be provided with two cannelure 111, two cannelures respectively with two first screwed hole is concentric arranges.Bolt assembly and two clamping plate as shown in figure 12, screw in cannelure head protector 5 by nut seal after installing.As shown in figure 13, head protector is the cylindrical metal part of one end uncovered one end sealing, is provided with external screw thread 51 at the opening end of head protector, and head protector is threaded with cannelure by external screw thread.In head protector, be filled with lubricating grease, so that nut is embedded in lubricating grease and prevents from getting rusty.
Being welded with two the first fixed lever 71, the first fixed levers that be arranged in parallel on the top of the first clamping plate is circular stainless steel part, each first fixed lever all with the bus angle in an acute angle of the first clamping plate.As shown in Figure 5, be welded and fixed a motion bar 72 at the free end of two first fixed levers, motion bar is circular stainless steel, two first fixed levers and motion bar form " ∏ " shape, the two ends of motion bar and a mounting panel 8 are rotationally connected, be specially: mounting panel is a square stainless steel metal plate, be fixed with two symmetrically arranged otic placodes 81 on the bottom surface of mounting panel, the two ends of motion bar are rotatably installed in respectively in two otic placodes.Be welded and fixed a support 7 in the bottom of the first clamping plate, support is a L shaped corrosion resistant plate, is provided with an arc surface on the side on support top, and this arc surface contacts cooperation with the first clamping plate outer wall, so that being welded and fixed of the first clamping plate and support.As shown in Figure 6, be provided with a square strip hole 73 in the bottom of support, the tooth bar 91 that is slidably installed in strip hole, is specially: the 3rd projection 911 that is provided with two T shapes in the side of tooth bar, be respectively equipped with the chute of a T shape in the both sides of strip hole, two the 3rd projections are slidably matched with two chutes respectively.As shown in Figure 7, the tooth of tooth bar arranges down, the top of tooth bar and the coplanar setting of the upper surface of support, and the top of tooth bar also can exceed the upper surface of support.Be bolted at the top of tooth bar a transverse arm 92 is installed, the metallic plate that transverse arm is strip, and transverse arm is vertical with tooth bar arranges.Be welded and fixed respectively a fixed block 93 at the two ends of transverse arm upper surface, fixed block is square metal derby, be welded and fixed one second fixed lever 96 at the upper surface of each fixed block, the second fixed lever is circular stainless steel, the upper surface angle in an acute angle of each second fixed lever and corresponding fixed block, is rotated rollers 97 is installed by the second rotating shaft 42 at the free end of each the second fixed lever.As shown in figure 14, the second elongated slot 82, two second elongated slots that are provided with two T shapes in the bottom of mounting panel are symmetrical arranged.The free end of each the second fixed lever extend in the second corresponding elongated slot, and each roller coordinates with the second corresponding elongated slot inwall contact.
The erecting device of this solar panel is fixed on whole device on steel tube tower by the first clamping plate and the second clamping plate, is arranged on solar panel on the first clamping plate and the support side towards sun place, absorbs solar energy and also saves as electric energy.Along with the replacement in season, too can direct projection angle be different, and in rainy season, rainy weather can continue some months sometimes.In the winter time, thick accumulated snow is deposited on solar panel, melts slowly.Absorb as much as possible more solar energy for ease of solar panel, and be convenient to the protection of solar panel, the inclination angle of solar panel is adjustable, be specially: as shown in figure 15, starter motor, rotates counterclockwise gear, this hour rack is moved to the left, and drives fixed block to be moved to the left; Due to the upper end of fixed head be fixed on the free-ended motion bar of the first fixed lever and be rotationally connected, the lower end activity of fixed head is nested with the free end at the second fixed lever, in the time that fixed block drives the second fixed lever to be moved to the left, the second fixed lever pulls fixed head to clockwise rotate around motion bar, and the inclination angle that is arranged on the solar panel on fixed head diminishes thereupon.As shown in figure 16, starter motor, clockwise rotates gear, and this hour rack moves right, and drives fixed block to move right; Due to the upper end of fixed head be fixed on the free-ended motion bar of the first fixed lever and be rotationally connected, the lower end activity of fixed head is nested with the free end at the second fixed lever, in the time that fixed block drives the second fixed lever to move right, the second fixed lever promotes fixed head and rotates counterclockwise around motion bar, and the inclination angle that is arranged on the solar panel on fixed head becomes large thereupon.According to the radiation situation of the sunlight in operational environment, suitably adjust the inclination angle of solar panel, to absorb more solar energy.When running in Heavy snow weather, can rotate by drive motors, solar panel is clockwise rotated, until solar panel is in vertical state, to avoid sleet to be deposited on solar panel.For alleviating the weight of fixed head, on the bottom surface of fixed head, be provided with some square holes 83, to alleviate the pressure to support and two clamping plate.
Claims (10)
1. for a solar cell board mounting assembly for ring section power transmission steel pipe tower, it is characterized in that, comprise the first clamping plate, the second clamping plate, liner, support, fixed head, gear and tooth bar,
Described the first clamping plate and the second clamping plate are semicircular metallic plate, and the installation end of described the first clamping plate and the second clamping plate is rotationally connected by rotating shaft; Fixedly mount a first square fixed head at the free end of described the first clamping plate, at the free end fixed installation one of described the second clamping plate and the second square fixed head of the first fixed head mating reaction, described the first fixed head is fixedly connected with by some bolt assemblies with the second fixed head; On the inner arc surface of described the first clamping plate and the second clamping plate, be respectively equipped with a liner, the rubber parts that described liner is circular arc;
At the top of described the first clamping plate fixed installation two first fixed levers, fixedly mount the motion bar of a circle at the free end of the first fixed lever described in two, the upper end of one square fixed head and described motion bar are rotationally connected, and are provided with the second elongated slot of two symmetrically arranged T shapes on the bottom surface of described fixed head; Fixedly mount a L shaped support in the bottom of described the first clamping plate; At the free end of the described support tooth bar that is slidably installed, the tooth of described tooth bar arrange down and with the gear engagement fit that is positioned at frame bottom, described gear is fixedly connected with the motor output shaft that is positioned at frame bottom; One transverse arm is vertically fixedly mounted on the top of tooth bar, two ends at described transverse arm fixedly mount respectively a fixed block, described in each, on fixed block, fixedly mount respectively one second fixed lever, described in each, the free end of the second fixed lever extend in the second corresponding chute, described in each, the free end of the second fixed lever rotates respectively a roller is installed, and described in each, roller contacts cooperation with the inwall of corresponding the second elongated slot.
2. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 1, it is characterized in that, on the inwall of described the first clamping plate and the second clamping plate, be respectively equipped with the first elongated slot of some tapers, in described in each, be lining with and be provided with some first projections corresponding with the first elongated slot, described liner was arranged on the first clamping plate and the second clamping plate by the first projection and coordinating of the first elongated slot.
3. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 1, is characterized in that, described bolt assembly comprises bolt, packing ring and nut, and the nut of described bolt contacts cooperation with the second clamping plate; On described the first clamping plate, be provided with a cannelure being looped around around nut, a head protector is threaded with described cannelure.
4. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 3, it is characterized in that, be provided with two first projections at the installation end of described the first clamping plate, be provided with two breach that adapt with described the first projection at the installation end of described the second clamping plate, a rotating shaft couples together the first clamping plate and the second clamping plate through the first projection.
5. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 1, is characterized in that, be provided with an arc surface at the installation end of described support, described support contacts cooperation by arc surface with the outer wall of the first clamping plate.
6. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 5, it is characterized in that, be provided with a strip hole at the free end of described support, described strip hole runs through the free-ended upper and lower surface of support, on the inwall of the left and right of described strip hole, be respectively equipped with a chute, described chute is slidably matched with the 3rd projection that is positioned at tooth bar both sides.
7. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 6, is characterized in that, described chute and the 3rd projection are the T shape cooperatively interacting.
8. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 3, it is characterized in that, described head protector is the cylindrical of one end uncovered one end shutoff, is provided with the external screw thread being threaded with cannelure at the opening end of described head protector.
9. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 1, is characterized in that, described in two, the first fixed lever be arranged in parallel, and described in each, the free end of the first fixed lever is inclined upwardly.
10. a kind of solar cell board mounting assembly for ring section power transmission steel pipe tower according to claim 1, is characterized in that, described the first fixed lever and the second fixed lever are hollow stainless steel tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420261840.9U CN203827255U (en) | 2014-05-21 | 2014-05-21 | Solar cell panel installation apparatus used for annular cross section power transmission steel pipe tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420261840.9U CN203827255U (en) | 2014-05-21 | 2014-05-21 | Solar cell panel installation apparatus used for annular cross section power transmission steel pipe tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203827255U true CN203827255U (en) | 2014-09-10 |
Family
ID=51482714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420261840.9U Expired - Lifetime CN203827255U (en) | 2014-05-21 | 2014-05-21 | Solar cell panel installation apparatus used for annular cross section power transmission steel pipe tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203827255U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108390452A (en) * | 2018-04-24 | 2018-08-10 | 王银 | A kind of annular solar energy power store device |
-
2014
- 2014-05-21 CN CN201420261840.9U patent/CN203827255U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108390452A (en) * | 2018-04-24 | 2018-08-10 | 王银 | A kind of annular solar energy power store device |
CN108390452B (en) * | 2018-04-24 | 2021-02-26 | 北京华顺德电力工程有限公司 | Annular solar energy power storage device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107834484A (en) | A kind of deicing robot control system for integrating mechanical deicing and heating power deicing | |
CN203827255U (en) | Solar cell panel installation apparatus used for annular cross section power transmission steel pipe tower | |
CN115288924A (en) | Wind power blade mounting structure for wind power generation | |
CN104320053A (en) | Section lifting type supporting device for solar receiving panel | |
CN204223556U (en) | Tank floating abhiseca earth system | |
CN202129306U (en) | Expansion device for plate member | |
CN209993995U (en) | Transmission line shaft tower operation horizontal ladder | |
CN111810362B (en) | Wind power generation set is used in new forms of energy development convenient to maintain | |
CN212744135U (en) | Automobile exhaust treatment device convenient to dismantle | |
CN219834227U (en) | Mobile video monitoring vehicle | |
CN109945972B (en) | Remote control's pointolite protection casing device | |
CN109282128B (en) | Traffic monitoring equipment support convenient to maintain and repair | |
CN219902165U (en) | Lifting rail for inspection robot | |
CN208358736U (en) | A kind of marine propeller mounting tool | |
CN205153668U (en) | Steel pipe tower cross arm pavement handrail support structure | |
CN203826896U (en) | Anemometer installation apparatus used for annular cross section power transmission steel pipe tower | |
CN102052932B (en) | Mounting frame of meteorological monitoring equipment | |
CN221034891U (en) | Fixing mechanism for monitoring mechanical properties of photovoltaic support | |
CN221054732U (en) | Road traffic monitoring device for road electromechanical engineering | |
CN204168213U (en) | The bracing or strutting arrangement of merogenesis elevation type solar panel | |
CN215399331U (en) | Unmanned aerial vehicle carries on formula bolt binding | |
CN216303075U (en) | Anchoring device of gantry crane | |
CN210780193U (en) | Solar power supply device of monitoring system | |
CN217206742U (en) | Sealing protection device for wind generating set | |
CN218539066U (en) | Auxiliary moving tool and system for clamping plates for assembling cross beam bracket |