CN203827063U - Control system of intelligent electrical network - Google Patents

Control system of intelligent electrical network Download PDF

Info

Publication number
CN203827063U
CN203827063U CN201420048022.0U CN201420048022U CN203827063U CN 203827063 U CN203827063 U CN 203827063U CN 201420048022 U CN201420048022 U CN 201420048022U CN 203827063 U CN203827063 U CN 203827063U
Authority
CN
China
Prior art keywords
intelligent
intelligent electric
control system
controller
control unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420048022.0U
Other languages
Chinese (zh)
Inventor
王胜利
余秋芳
刘小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Universtar Science and Technology Shenzhen Co Ltd
Original Assignee
Universtar Science and Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Universtar Science and Technology Shenzhen Co Ltd filed Critical Universtar Science and Technology Shenzhen Co Ltd
Priority to CN201420048022.0U priority Critical patent/CN203827063U/en
Application granted granted Critical
Publication of CN203827063U publication Critical patent/CN203827063U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to a control system of an intelligent electrical network. The control system comprises an electrical network, a transformer, a master control unit and a power utilization unit. The control system also comprises an intelligent power supply manager. The power utilization unit is provided with an intelligent electric meter. A first controller is connected with a power switch of a power utilization apparatus in the power utilization unit. The intelligent power supply manager is respectively connected with the master control unit and the first controller. The intelligent electric meter is connected with the master control unit. The intelligent electric meter carries out information interaction with the master control unit and reports electric energy operation parameters consumed by a user unit to the master control unit. The master control unit realizes remote control on the power utilization apparatus through the first controller during power utilization peak hours depending on the intelligent power supply manager, so as to reduce power consumption and prevent overload of an electric power system.

Description

The control system of intelligent grid
Technical field
The utility model relates to electric power network technique field, relates in particular to a kind of control system of intelligent grid.
Background technology
Improve energy utilization rate and be the effective way that reduces resource consumption, protection of the environment; the important content that Ye Shi China takes a new road to industrialization; this is for improving Business Economic Benefit, and the energy and environmental constraints that alleviation socio-economic development faces have very important meaning.Along with the raising of expanding economy, resident living level and the continuous appearance of Novel electric equipment, increasing power consumption equipment has been installed in resident and business premises, the thing followed is power load rapid growth, power consumption is more and more, and the requirement of this and China's economic development runs in the opposite direction.
Utility model content
The purpose of this utility model is the defect for overcoming prior art, and a kind of control system of intelligent grid is provided.
For achieving the above object, the utility model is by the following technical solutions: a kind of control system of intelligent grid, comprise electrical network, transformer and main control unit, power unit, also comprise intelligent electric power management device, described power unit installing intelligent electric meter, in power unit, the mains switch of power consumption equipment is connected with the first controller, intelligent electric power management device respectively with main control unit, the first controller connects, and intelligent electric meter is connected with main control unit.
Described intelligent electric power management device is connected by GRSP wireless communication networks with the first controller.
Described intelligent electric meter is connected by GRSP wireless communication networks with main control unit.
The mains switch place installing second controller of registering one's residence of described power unit, described second controller is connected with intelligent electric power management device.
Described second controller is connected by GRSP wireless communication networks with intelligent electric power management device.
Also comprise energy storage device, energy storage device is connected with mains switch, the intelligent electric power management device of power unit respectively.
Described power unit comprises business premises user and resident.
Described intelligent electric meter is bidirectional measuring ammeter.
The utility model beneficial effect is compared with prior art: the utility model is realized the detection of energy consumption and the peak load shifting of electric load by space-time entirety control measures, improves power supply quality and power supply reliability.
Brief description of the drawings
Fig. 1 is the theory diagram of the utility model preferred embodiment.
Embodiment
In order to more fully understand technology contents of the present utility model, below in conjunction with specific embodiment, the technical solution of the utility model is further introduced and explanation.
As shown in Figure 1, for the theory diagram of the utility model preferred embodiment, a kind of control system of intelligent grid, comprise electrical network, transformer and main control unit, power unit 1, also comprise intelligent electric power management device, power unit installing intelligent electric meter, in power unit, the mains switch of power consumption equipment is connected with the first controller, intelligent electric power management device respectively with main control unit, first controller connect, intelligent electric meter is connected with main control unit.Intelligent electric meter and main control unit carry out information interaction, and the electric energy operational factor consuming to main control unit report of user unit 1, main control unit relies on intelligent electric power management device, in the time of peak times of power consumption, power consumption equipment is realized to Long-distance Control by the first controller, prevents electric power system overload to reduce power consumption.
Concrete, intelligent electric power management device is connected to realize by GRSP wireless communication networks with the first controller to be controlled.
Concrete, intelligent electric meter is connected and is carried out information interaction by GRSP wireless communication networks with main control unit.
Concrete, the mains switch place installing second controller of registering one's residence of power unit 1, second controller is connected with intelligent electric power management device, intelligent electric meter and main control unit carry out information interaction, and the electric energy operational factor consuming to main control unit report of user unit 1, main control unit relies on intelligent electric power management device, in the time of peak times of power consumption, power consumption equipment is realized to Long-distance Control by second controller, prevents electric power system overload to reduce power consumption.
Concrete, second controller is connected to realize by GRSP wireless communication networks with intelligent electric power management device to be controlled.
Concrete, also comprising energy storage device, energy storage device is connected with mains switch, the intelligent electric power management device of power unit 1 respectively.Carry out electric power storage by energy storage device in power supply ebb have dump energy in the situation that, during in order to peak of power consumption, use when power consumption equipment power shortage.
Concrete, power unit 1 comprises business premises user and resident.
Concrete, intelligent electric meter is bidirectional measuring ammeter.
The above only further illustrates technology contents of the present utility model with embodiment; so that reader is easier to understand; but do not represent that execution mode of the present utility model only limits to this, any technology of doing according to the utility model is extended or recreation, is all subject to protection of the present utility model.

Claims (8)

1. the control system of an intelligent grid, comprise electrical network, transformer and main control unit, power unit, it is characterized in that, also comprise intelligent electric power management device, described power unit installing intelligent electric meter, in power unit, the mains switch of power consumption equipment is connected with the first controller, intelligent electric power management device respectively with main control unit, the first controller connects, and intelligent electric meter is connected with main control unit.
2. the control system of intelligent grid according to claim 1, is characterized in that, described intelligent electric power management device is connected by GRSP wireless communication networks with the first controller.
3. the control system of intelligent grid according to claim 2, is characterized in that, described intelligent electric meter is connected by GRSP wireless communication networks with main control unit.
4. the control system of intelligent grid according to claim 3, is characterized in that, the mains switch place installing second controller of registering one's residence of described power unit, and described second controller is connected with intelligent electric power management device.
5. the control system of intelligent grid according to claim 4, is characterized in that, described second controller is connected by GRSP wireless communication networks with intelligent electric power management device.
6. the control system of intelligent grid according to claim 1, is characterized in that, also comprise energy storage device, energy storage device is connected with mains switch, the intelligent electric power management device of power unit respectively.
7. the control system of intelligent grid according to claim 1, is characterized in that, described power unit comprises business premises user and resident.
8. the control system of intelligent grid according to claim 1, is characterized in that, described intelligent electric meter is bidirectional measuring ammeter.
CN201420048022.0U 2014-01-24 2014-01-24 Control system of intelligent electrical network Expired - Fee Related CN203827063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420048022.0U CN203827063U (en) 2014-01-24 2014-01-24 Control system of intelligent electrical network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420048022.0U CN203827063U (en) 2014-01-24 2014-01-24 Control system of intelligent electrical network

Publications (1)

Publication Number Publication Date
CN203827063U true CN203827063U (en) 2014-09-10

Family

ID=51482524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420048022.0U Expired - Fee Related CN203827063U (en) 2014-01-24 2014-01-24 Control system of intelligent electrical network

Country Status (1)

Country Link
CN (1) CN203827063U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104242469A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Comprehensive railway power monitoring device
CN105490381A (en) * 2014-10-03 2016-04-13 电联运通股份有限公司 Intelligent power grid management system and method
CN107666180A (en) * 2017-11-09 2018-02-06 成都优力德新能源有限公司 Internet of Things wisdom power-supply system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105490381A (en) * 2014-10-03 2016-04-13 电联运通股份有限公司 Intelligent power grid management system and method
CN105490381B (en) * 2014-10-03 2018-07-27 电联运通股份有限公司 Intelligent power grid management system and method
CN104242469A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Comprehensive railway power monitoring device
CN107666180A (en) * 2017-11-09 2018-02-06 成都优力德新能源有限公司 Internet of Things wisdom power-supply system

Similar Documents

Publication Publication Date Title
CN205080737U (en) Intelligence system of checking meter based on networking function is taken to LORA technique
CN203827063U (en) Control system of intelligent electrical network
CN203151218U (en) Energy efficiency management system based on intelligent station area
CN207319431U (en) A kind of intelligent meter data recording system based on NB-IoT
CN204044953U (en) A kind of door magnetic panalarm
CN203606940U (en) Electricity consumption information gathering system based on hybrid networking
CN202329629U (en) Wireless hydrological telegage
CN204205712U (en) A kind of transforming plant DC power supply is near, remote wireless monitoring system
CN204928366U (en) Power load monitoring system based on power load technique of decomposing
CN103777071A (en) High voltage DC electric energy meter
CN202584404U (en) Wireless water meter acquisition and control device
CN204347590U (en) A kind of transformer station's Distribution Management System based on ZigBee
CN204145078U (en) Based on the household electric appliances electric supply installation of ZigBee-network
CN202906934U (en) Intelligent management system for electric power distribution patrol inspection
CN203069698U (en) An integrated information acquiring device of electric energy in a transformer station
CN202816128U (en) Remote monitoring system of telecommunication machine room ammeter
CN202206191U (en) Intelligent distribution box system
CN202583858U (en) Device asset electrical intelligent monitoring device
CN203433345U (en) Cognitive electric energy measurement and management cloud system
CN202309233U (en) Electric power information monitoring system
CN204741279U (en) Wireless telemetering measurement remote control and GPRS data transmission's reactive compensation system
CN104155961A (en) Intelligent home monitoring system and method based on Internet of Things
CN203233237U (en) APF and SVG controller with 3G monitoring function
CN203243122U (en) Intelligent electricity consumption management system for strong current
CN203773324U (en) Agricultural cleaner production intelligent information monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140910

Termination date: 20220124

CF01 Termination of patent right due to non-payment of annual fee