CN203821666U - Anti-leakage floor slab - Google Patents
Anti-leakage floor slab Download PDFInfo
- Publication number
- CN203821666U CN203821666U CN201420072569.4U CN201420072569U CN203821666U CN 203821666 U CN203821666 U CN 203821666U CN 201420072569 U CN201420072569 U CN 201420072569U CN 203821666 U CN203821666 U CN 203821666U
- Authority
- CN
- China
- Prior art keywords
- leakage
- floor
- plate body
- floor slab
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
The utility model provides an anti-leakage floor slab which comprises a floor slab body and a waterproof connecting piece pre-buried in the floor slab body, wherein the waterproof connecting piece comprises an anti-leakage cylinder and a connecting pipe which is arranged at the bottom end of the anti-leakage cylinder, the top part and the side wall of the anti-leakage cylinder are pre-buried in the floor slab body, and the lower end of the connecting pipe extends out of the lower surface of the floor slab body. Compared with the prior art, the anti-leakage floor slab has substantial characteristics and progress, the structure of the anti-leakage floor slab basically prevents the leakage occurrence, the installing requirement and the installing difficulty are reduced, the use is convenient, the structure is simple, the waterproof materials are saved, and the cost is low.
Description
Technical field
The utility model relates to a kind of Pipeline Crossing Program floor, specifically, has related to the leakage-proof floor for Pipeline Crossing Program floor.
Background technology
Along with the industrialized mode propelling of building, integrated the becoming of prefabrication and assembly construction mode and pipeline must.Pipeline field Installation Modes mainly contains two kinds at present: the first is first box out on floor, then prop up and hang mould, installing pipe sleeve pipe, then in the upper and lower of pipe sleeve, waterproof construction is all set, this waterproof construction comprises waterproofing course, cement mortar water blocking ring etc., waterproofing course upwards turns down and is close on pipe sleeve, finally uses the concrete cementation of fissures; The second is the modular drainage water-saving mechanism that passing through floors is set on floor, but integral waterproofing layer must be added in module below, and integral waterproofing layer must be along turning under headwall to the bucket end.The first Installation Modes working procedure is loaded down with trivial details, and along with easily forming crack between passage of time waterproofing course and duct wall, causes infiltration, and waterproof is unreliable; The second Installation Modes must be done an integral waterproofing layer above floor, needs site operation in the time of installation, and inconvenience is installed, bothersome effort, and cost compare is high.Therefore, above two kinds of Installation Modes cannot meet the requirement of industrialization construction and waterproof safety.
In order to solve the problem of above existence, people are seeking a kind of desirable technical solution always.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, thereby a kind of simple in structure, design science, easy to use, better anti-leakage property, making leakage-proof floor simple, with low cost are provided.
To achieve these goals, the technical scheme that the utility model adopts is: a kind of leakage-proof floor, it comprises floor plate body and is embedded in the waterproof connector in described floor plate body, described waterproof connector comprises antiseep cylinder and is located at the tube connector of this antiseep cylinder bottom, the top of described antiseep cylinder and sidewall are embedded in described floor plate body, and the soffit of described floor plate body is stretched out in the lower end of described tube connector.
Based on above-mentioned, described floor plate body comprises layer of concrete and be located at the cage of reinforcement in described layer of concrete, and described antiseep cylinder is between the upper steel bar layer and lower steel bar layer of described cage of reinforcement.
Based on above-mentioned, the top of described antiseep cylinder is concordant with the upper steel bar layer bottom of described cage of reinforcement, and the base plate of described antiseep cylinder is arranged in the lower steel bar layer of described cage of reinforcement.
Based on above-mentioned, described layer of concrete is mainly mixed to build by concrete and impervious agent to be made.
The relative prior art of the utility model has substantive distinguishing features and progress, specifically, leakage-proof floor, due in waterproof connector, the top of antiseep cylinder and sidewall are embedded in floor plate body, therefore, the top of antiseep cylinder and sidewall are wrapped up by floor plate body completely, fundamentally stopped the ponding on floor by the possibility of the downward seepage in gap between waterproof connector and floor plate body, the soffit of floor plate body is stretched out in the lower end of tube connector, when being installed, below pipeline can adopt the gutter with birdsmouth, tube connector inserts in the birdsmouth of below gutter, like this, even between pipeline up and spliced eye owing to expanding with heat and contract with cold and using for a long time the reason such as aging to occur gap, ponding also can flow in the gutter of below along gap, therefore, the structure of this leakage-proof floor has fundamentally been stopped the generation of seepage, when installing, upper and lower pipeline only need to peg graft and caulking joint where necessary, requirement and the difficulty of installing have been reduced, easy construction, should and leakage-proof floor simple in structure, prefabricated, standardization level is high, greatly save waterproofing materials, quality easily guarantees, convenient construction management, be conducive to reduce on-the-spot coordinative construction operation, save site operation cost, be convenient to housing industrialization.
Further, in solidifying soil layer, establish cage of reinforcement, strengthened structural strength, and provide support for the installation of antiseep cylinder.
Further, the top of antiseep cylinder is concordant with the bottom of described upper steel bar layer, and the base plate of antiseep cylinder is arranged in described lower steel bar layer, has like this clamping of upper steel bar layer and lower steel bar layer, more firm to fixing of waterproof connector, improves the quality of products.
Further, layer of concrete is mainly mixed to build by concrete and impervious agent to be made, and this layer of concrete impermeability is good, has strengthened waterproof effect.
Accompanying drawing explanation
Fig. 1 is the structural representation of leakage-proof floor in embodiment of the present utility model.
Fig. 2 is a kind of use state diagram of leakage-proof floor in embodiment of the present utility model.
Fig. 3 is that the another kind of leakage-proof floor in embodiment of the present utility model is used state diagram.
The specific embodiment
Below by the specific embodiment, the technical solution of the utility model is described in further detail.
As shown in Figure 1, a kind of leakage-proof floor, it comprises floor plate body 1 and is embedded in the waterproof connector of described floor plate body 1, waterproof connector comprises antiseep cylinder and is located at the tube connector 4 of this antiseep cylinder bottom, in the pre-buried floor plate body 1 of the top of described antiseep cylinder and sidewall 2, the lower end of tube connector 4 is stretched out the soffit of floor plate body 1 downwards, and waterproof connector and floor plate body 1 form funnelform spliced eye 14.
Leakage-proof floor in the present embodiment, when same-floor drainage pipeline is installed, as shown in Figure 2, inserts the bottom of threeway standpipe pipe nipple 11 in tube connector, then uses concrete 13 caulking joints, is socketed in the lower end of tube connector 4 with the gutter 10 of bell and spigot.
Leakage-proof floor in the present embodiment, when co-layer draining module is installed, as shown in Figure 3, the charge for remittance bucket of modular drainage device 8 bottoms 9 is inserted in tube connector 4, then with the gutter 10 of bell and spigot, be socketed in the lower end of tube connector 4, can complete installation.
The leakage-proof floor of the present embodiment, in funnelform waterproof connector, the top of its antiseep cylinder and sidewall are imbedded in floor plate body, the top of antiseep cylinder and sidewall are wrapped up by floor plate body completely, therefore, fundamentally stopped the ponding on floor by the possibility of the downward seepage in gap between waterproof connector and floor plate body, the tube connector of waterproof connector stretches out the soffit of floor plate body, when being installed, below pipeline can adopt the gutter with birdsmouth, tube connector inserts in the birdsmouth of below pipeline, even like this between the standpipe pipe nipple in the insertion spliced eye of top or charge for remittance bucket and spliced eye owing to expanding with heat and contract with cold and using for a long time the reason such as aging to occur gap, ponding also can flow in the pipeline of below along gap, therefore, the structure of this leakage-proof floor has fundamentally been stopped the generation of seepage, requirement and the difficulty of installing have been reduced, very easy to use, and simple in structure, with low cost.
In order to strengthen the structural strength of leakage-proof floor, and for the installation of antiseep cylinder provides support, floor plate body 1 comprises layer of concrete 5 and is located at reinforcement in concrete skeleton, now, antiseep cylinder is between the upper steel bar layer 6 and lower steel bar layer 7 of cage of reinforcement, further, in order to make the fixing more firm of waterproof connector, improve the quality of products, the wallboard of antiseep cylinder 2 tops are concordant with the bottom of upper steel bar layer 6, and the base plate 3 of antiseep cylinder is arranged in lower steel bar layer 7.
Layer of concrete 5 is mainly mixed to build by concrete and impervious agent to be made, and this layer of concrete impermeability is good, has strengthened waterproof effect.
In other embodiment of leakage-proof floor, floor plate body also can adopt other water-proof building materials to make, as long as the wallboard of antiseep cylinder is imbedded in floor plate body, wallboard laminating parcel is met the demands; In other embodiment of leakage-proof floor, floor plate body, when meeting designing requirement or due to the needs of replacement and the construction of material, also can not add steel bar layer or add the substitutable layer of steel bar layer.
Finally should be noted that: above embodiment is only in order to illustrate that the technical solution of the utility model is not intended to limit; Although the utility model is had been described in detail with reference to preferred embodiment, those of ordinary skill in the field are to be understood that: still can modify or part technical characterictic is equal to replacement the specific embodiment of the present utility model; And not departing from the spirit of technical solutions of the utility model, it all should be encompassed in the middle of the technical scheme scope that the utility model asks for protection.
Claims (4)
1. a leakage-proof floor, it is characterized in that: it comprises floor plate body and is embedded in the waterproof connector in described floor plate body, described waterproof connector comprises antiseep cylinder and is located at the tube connector of this antiseep cylinder bottom, the top of described antiseep cylinder and sidewall are embedded in described floor plate body, and the soffit of described floor plate body is stretched out in the lower end of described tube connector.
2. leakage-proof floor according to claim 1, is characterized in that: described floor plate body comprises layer of concrete and be located at the cage of reinforcement in described layer of concrete, and described antiseep cylinder is between the upper steel bar layer and lower steel bar layer of described cage of reinforcement.
3. leakage-proof floor according to claim 2, is characterized in that: the top of described antiseep cylinder is concordant with the upper steel bar layer bottom of described cage of reinforcement, and the base plate of described antiseep cylinder is arranged in the lower steel bar layer of described cage of reinforcement.
4. according to the leakage-proof floor described in claim 2 or 3, it is characterized in that: described layer of concrete is mainly mixed to build by concrete and impervious agent to be made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420072569.4U CN203821666U (en) | 2014-02-20 | 2014-02-20 | Anti-leakage floor slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420072569.4U CN203821666U (en) | 2014-02-20 | 2014-02-20 | Anti-leakage floor slab |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203821666U true CN203821666U (en) | 2014-09-10 |
Family
ID=51477180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420072569.4U Withdrawn - After Issue CN203821666U (en) | 2014-02-20 | 2014-02-20 | Anti-leakage floor slab |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203821666U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103835421A (en) * | 2014-02-20 | 2014-06-04 | 王凤蕊 | Anti-seepage floor slab and anti-seepage construction method |
-
2014
- 2014-02-20 CN CN201420072569.4U patent/CN203821666U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103835421A (en) * | 2014-02-20 | 2014-06-04 | 王凤蕊 | Anti-seepage floor slab and anti-seepage construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104032856B (en) | A kind of precast shear wall horizontal connecting node | |
CN205530344U (en) | Utility tunnel is pour to split type no mould | |
CN202660067U (en) | Waterproof sleeve preventing wall body leakage | |
CN103572808A (en) | Building toilet caisson waterproof device and construction method | |
CN106013471A (en) | Anti-seepage construction method for expansion joint | |
CN106704708B (en) | The supporting structure and its construction method of heat distribution pipeline in pipe gallery | |
CN201695529U (en) | Integral waterproofing structure of toilet | |
CN103835421A (en) | Anti-seepage floor slab and anti-seepage construction method | |
CN202227694U (en) | Embedded sleeve for concrete pouring construction of bathroom floor | |
CN203821666U (en) | Anti-leakage floor slab | |
CN204551694U (en) | A kind of pre-buried type balcony floor drain | |
CN104712105A (en) | Tile plate preventing rainwater leakage | |
CN201671178U (en) | Anti-seepage floor drain embedded part | |
CN102900144A (en) | Undermining floor drain automatic drainage structure capable of preventing leakage of toilet | |
CN205369917U (en) | Bathroom antiseep built -in fitting | |
CN110552378A (en) | Underground space roof subsides post-cast strip and seals structure in advance | |
CN114045880A (en) | Basement post-cast strip treatment process | |
CN206554180U (en) | A kind of integrated water-proof chassis of toilet pipeline | |
CN204531409U (en) | A kind of floor pre-buried type soil stack connector | |
CN206667445U (en) | Bathroom floor drain waterproof node | |
CN2814074Y (en) | Device for sealing up pipe in the wall | |
CN206385698U (en) | A kind of connecting node of roof boarding and wallboard | |
CN205171652U (en) | Heavy pond of formula that installs additional floor drain | |
CN207296028U (en) | Applied to the waterproof system in the interior space | |
CN103437408A (en) | Built-in impermeable floor drain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |