CN203820277U - Specific turnover rack for equalizing beam rack of bulldozer - Google Patents
Specific turnover rack for equalizing beam rack of bulldozer Download PDFInfo
- Publication number
- CN203820277U CN203820277U CN201420212566.6U CN201420212566U CN203820277U CN 203820277 U CN203820277 U CN 203820277U CN 201420212566 U CN201420212566 U CN 201420212566U CN 203820277 U CN203820277 U CN 203820277U
- Authority
- CN
- China
- Prior art keywords
- bulldozer
- supporting leg
- roof beam
- beam structure
- rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to processing equipment of an equalizing beam rack of a bulldozer, and particularly relates to a specific turnover rack for the equalizing beam rack of the bulldozer. The turnover rack comprises a square rack body, wherein the rack body comprises four cross beams which are connected end to end; a supporting rod is horizontally arranged in the middle of the rack body, and is parallel to the cross beams; two parallel lifting rings are vertically fixed in the middle of the supporting rod; a supporting leg is respectively vertically fixed at four corners of the rack body, a tray is arranged at the top end of each supporting leg, and a baffle is vertically arranged on each tray; a clamping ring is arranged at the outer side, close to the rack body, of each baffle; a hook corresponding to each clamping ring is arranged on the lower part of each supporting leg; two stay bars are fixed at the outer side of each supporting leg, and are tilted upward at 10 degrees; bumps are arranged on the stay bars; rib plates are arranged at joints between the stay bars and the supporting legs; the cross section of each baffle is a half-circle with an outward opening. According to the turnover rack, four equalizing beam racks can be painted at the same time, and twelve equalizing beam racks can be subjected to shot blasting or run at the same time, so that the efficiency of painting, shot blasting and running of the equalizing beam racks can be improved.
Description
Technical field
The utility model relates to a kind of Fabricating machinery of bulldozer balance roof beam structure, relates in particular to a kind of bulldozer balance roof beam structure special transfer rack.
Background technology
Spraying paint with ball blast is the necessary operation in the bulldozer balance roof beam structure course of processing, in the process of bulldozer balance roof beam structure spraying ball blast, need balance roof beam structure to sling, when ball blast, traditional suspender once can only hang 3-4 part balance roof beam structure, while spraying paint, can only hang 1 balance roof beam structure at every turn, and when turnover each fork truck transport at most 3-4 part balance roof beam structure, seriously affected production efficiency.Therefore need to improve out a kind of for bulldozer balance roof beam structure the special processing accessory equipment in the time spraying paint ball blast, improve the ball blast efficiency of spraying paint of balance roof beam structure.
Utility model content
The purpose of this utility model is: a kind of bulldozer balance roof beam structure special transfer rack is provided, can realizes that more balance roof beam structure sprays paint, ball blast or fork truck transhipment simultaneously, improve the ball blast efficiency of spraying paint of balance roof beam structure.
For achieving the above object, the technical solution adopted in the utility model is:
This bulldozer balance roof beam structure special transfer rack comprises square support body, support body comprises four end to end crossbeams, support body by-level arranges strut bar, strut bar is parallel with crossbeam, in the middle of strut bar, be vertically fixedly installed two parallel suspension ring, when ball blast with the special suspender suspension ring of slinging, four jiaos of places of support body are vertically fixedly installed respectively a supporting leg, supporting leg top arranges pallet, baffle plate is vertically set on pallet, baffle plate is near the arranged outside lock ring of support body, and supporting leg bottom arranges the hook adapting with lock ring.
Each leg outer side is fixedly installed two struts of 10 ° of being inclined upwardly, between two parallel struts on adjacent two supporting legs, place balance roof beam structure, projection is set above strut, the junction of strut and supporting leg arranges gusset, gusset is used for connecting strut and supporting leg, balance roof beam structure is placed between the projection and gusset on strut, because strut is inclined upwardly, bossed existence again, so balance roof beam structure can not drop, and have gusset between balance roof beam structure and supporting leg, and make to keep certain spacing between balance roof beam structure and supporting leg, be conducive to spray paint evenly.
Crossbeam and supporting leg are all cylinder.
The cross-sectional plane of baffle plate is opening semicircle outwardly, baffle plate be shaped as the hemicycle cylinder sectioning along cylindrical bus, and opening is outwardly.
When to balance roof beam structure ball blast, two bulldozer balance roof beam structure special transfer racks are stacked together up and down, 4 supporting leg correspondences on bulldozer balance roof beam structure special transfer rack are above put on 4 pallets on bulldozer balance roof beam structure special transfer rack below, the baffle plate at tray edge place can limit the position of supporting leg, then 4 lock ring correspondences on bulldozer balance roof beam structure special transfer rack are below suspended on 4 hooks on bulldozer balance roof beam structure special transfer rack above, according to the method, 3 bulldozer balance roof beam structure special transfer racks are stacked together up and down, then on each bulldozer balance roof beam structure special transfer rack, place 4 balance roof beams structure, finally with special hanger, the suspension ring on the bulldozer balance roof beam structure special transfer rack of the superiors are sling and carried out ball blast.Need to turn round time, directly fork crossbeam with the pallet fork of fork truck.
In the time that balance roof beam structure is sprayed paint, lock ring is opened, four balance roof beams structure on single bulldozer balance roof beam structure special transfer rack are sprayed paint simultaneously.
The beneficial effect that the utility model compared with prior art had is:
Bulldozer balance roof beam structure special transfer rack can be realized 4 balance roof beams structure and be sprayed paint simultaneously, be stacked together up and down and can realize 12 of balance roof beam structure ball blast or whens running and carry out simultaneously by 3 bulldozer balance roof beam structure special transfer racks, the spraying paint of balance roof beam structure, ball blast and running efficiency are improved, and bulldozer balance roof beam structure special transfer rack is simple in structure, easy operating.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
The structural representation that Fig. 2 stacks while being two the utility model uses up and down.
In figure: 1, strut; 2, baffle plate; 3, lock ring; 4, crossbeam; 5, suspension ring; 6, strut bar; 7, pallet; 8, gusset; 9, projection; 10, supporting leg; 11, hook; 12, balance roof beam structure.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further:
As depicted in figs. 1 and 2, bulldozer balance roof beam structure special transfer rack comprises square support body, support body comprises four end to end crossbeams 4, crossbeam 4 is cylinder, support body by-level arranges strut bar 6, strut bar 6 is parallel with crossbeam 4, in the middle of strut bar 6, be vertically fixedly installed two parallel suspension ring 5, when ball blast with the special suspender suspension ring 5 of slinging, four jiaos of places of support body are vertically fixedly installed respectively one and are cylindrical supporting leg 10, supporting leg 10 tops arrange pallet 7, baffle plate 2 is vertically set on pallet 7, baffle plate 2 is near the arranged outside lock ring 3 of support body, supporting leg 10 bottoms arrange the hook 11 adapting with lock ring 3.
Each supporting leg 10 outsides are fixedly installed two struts 1 of 10 ° of being inclined upwardly, between two parallel struts 1 on adjacent two supporting legs 10, place balance roof beam structure 12, strut 1 arranges projection 9 above, strut 1 arranges gusset 8 with the junction of supporting leg 10, gusset 8 is used for connecting strut 1 and supporting leg 10, balance roof beam structure 12 is placed between the projection 9 and gusset 8 on strut 1, because strut 1 is inclined upwardly, there is again the existence of projection 9, so balance roof beam structure 12 can not drop, and there is gusset 8 between balance roof beam structure 12 and supporting leg 10, make to keep between balance roof beam structure 12 and supporting leg 10 certain spacing, be conducive to spray paint evenly.
The cross-sectional plane of baffle plate 2 is opening semicircle outwardly, baffle plate 2 be shaped as the hemicycle cylinder sectioning along cylindrical bus, and opening is outwardly.
When to balance roof beam structure 12 ball blast, two bulldozer balance roof beam structure special transfer racks are stacked together up and down, 4 supporting leg 10 correspondences on bulldozer balance roof beam structure special transfer rack are above put on 4 pallets 7 on bulldozer balance roof beam structure special transfer rack below, the position that the baffle plate 2 of pallet 7 edges can limit supporting leg 10, then 4 lock ring 3 correspondences on bulldozer balance roof beam structure special transfer rack are below suspended on 4 hooks 11 on bulldozer balance roof beam structure special transfer rack above, according to the method, 3 bulldozer balance roof beam structure special transfer racks are stacked together up and down, then on each bulldozer balance roof beam structure special transfer rack, place 4 balance roof beams structure 12, finally with special hanger, the suspension ring 5 on the bulldozer balance roof beam structure special transfer rack of the superiors are sling and carried out ball blast.Need to turn round time, directly fork crossbeam 4 with the pallet fork of fork truck.
In the time that balance roof beam structure 12 is sprayed paint, lock ring 3 is opened, four balance roof beams structure 12 on single bulldozer balance roof beam structure special transfer rack are sprayed paint simultaneously.
In sum, the utility model is simple in structure, and easy operating has advantages of and improves the spraying paint of balance roof beam structure 12, ball blast and running efficiency.
Claims (5)
1. a bulldozer balance roof beam structure special transfer rack, comprise square support body, support body comprises four end to end crossbeams (4), it is characterized in that: support body by-level arranges strut bar (6), strut bar (6) is parallel with crossbeam (4), in the middle of strut bar (6), be vertically fixedly installed two parallel suspension ring (5), four jiaos of places of support body are vertically fixedly installed respectively a supporting leg (10), supporting leg (10) top arranges pallet (7), baffle plate (2) is vertically set on pallet (7), baffle plate (2) is near the arranged outside lock ring (3) of support body, supporting leg (10) bottom arranges the hook (11) adapting with lock ring (3), each supporting leg (10) outside is fixedly installed two acclivitous struts (1), strut (1) arranges projection (9) above.
2. bulldozer balance roof beam structure special transfer rack according to claim 1, is characterized in that: described crossbeam (4) and supporting leg (10) are all cylinder.
3. bulldozer balance roof beam structure special transfer rack according to claim 1, is characterized in that: described strut (1) is inclined upwardly 10 °.
4. according to the bulldozer balance roof beam structure special transfer rack described in claim 1 or 2 or 3, it is characterized in that: described strut (1) arranges gusset (8) with the junction of supporting leg (10).
5. bulldozer balance roof beam structure special transfer rack according to claim 1, is characterized in that: the cross-sectional plane of described baffle plate (2) is opening semicircle outwardly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420212566.6U CN203820277U (en) | 2014-04-28 | 2014-04-28 | Specific turnover rack for equalizing beam rack of bulldozer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420212566.6U CN203820277U (en) | 2014-04-28 | 2014-04-28 | Specific turnover rack for equalizing beam rack of bulldozer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203820277U true CN203820277U (en) | 2014-09-10 |
Family
ID=51475797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420212566.6U Expired - Fee Related CN203820277U (en) | 2014-04-28 | 2014-04-28 | Specific turnover rack for equalizing beam rack of bulldozer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203820277U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105858447A (en) * | 2016-03-31 | 2016-08-17 | 中海阳能源集团股份有限公司 | Installation lifting device for heliostats and lifting method of heliostats |
-
2014
- 2014-04-28 CN CN201420212566.6U patent/CN203820277U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105858447A (en) * | 2016-03-31 | 2016-08-17 | 中海阳能源集团股份有限公司 | Installation lifting device for heliostats and lifting method of heliostats |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201553530U (en) | Hanging tool for processing surface | |
CN205269985U (en) | Railing sprays paint and removes frame | |
CN205442380U (en) | Guard gate hanging beam | |
CN203820277U (en) | Specific turnover rack for equalizing beam rack of bulldozer | |
CN203448220U (en) | Workpiece rotating hanging system | |
CN203254299U (en) | Support for rust removal and abrasive blasting of trench surface plate | |
CN205024346U (en) | Basket conversion frame is hung to heavy copper production line of printed circuit board | |
CN204957296U (en) | Wind -powered electricity generation base packing transportation frame | |
CN102847635B (en) | Steel rim coating hanger | |
CN206244350U (en) | A kind of oil drum sling | |
CN104326003A (en) | Cart | |
CN204661128U (en) | Spraying suspender | |
CN205114102U (en) | Frame is deposited, is transported in special use of prefabricated PCF board | |
CN207670437U (en) | Transport charka | |
CN105480282A (en) | Space-efficient firm drug carrier | |
CN205820688U (en) | A kind of goods shelf transfer carriage of flexibility | |
CN201217709Y (en) | Self-weight locking type chemical self-electrophoretic plating universal hanging rack | |
CN203545603U (en) | Hoisting device for forklift | |
CN203682866U (en) | Lifting balance beam structure | |
CN203664086U (en) | Passenger car rearview mirror tool | |
CN212832337U (en) | Disconnect-type railing hoist and mount frame | |
CN103662624A (en) | Workpiece conveying device for aluminum plate spraying room | |
CN203582276U (en) | Lifting bracket | |
CN207276024U (en) | Large-scale reactor special hanger | |
CN203794429U (en) | Spray tower bin lifting appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140910 Termination date: 20160428 |