CN203809927U - Precast cement inspection well used for plastic pipeline connection - Google Patents

Precast cement inspection well used for plastic pipeline connection Download PDF

Info

Publication number
CN203809927U
CN203809927U CN201420086943.6U CN201420086943U CN203809927U CN 203809927 U CN203809927 U CN 203809927U CN 201420086943 U CN201420086943 U CN 201420086943U CN 203809927 U CN203809927 U CN 203809927U
Authority
CN
China
Prior art keywords
plastic
circle
inspection well
inspection shaft
mutually
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420086943.6U
Other languages
Chinese (zh)
Inventor
王泽生
唐琪舍
田家骝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Is Along Expanding Cement Tube Products Co Ltd
Original Assignee
Kunming Is Along Expanding Cement Tube Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Is Along Expanding Cement Tube Products Co Ltd filed Critical Kunming Is Along Expanding Cement Tube Products Co Ltd
Priority to CN201420086943.6U priority Critical patent/CN203809927U/en
Application granted granted Critical
Publication of CN203809927U publication Critical patent/CN203809927U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to the technical field of urban construction, and particularly comprises a precast cement inspection well used for plastic pipeline connection. The inspection well comprises an inspection well body, wherein a connecting hole is formed in a shaft of the inspection well body, an edge of the connecting hole is provided with an embedded plastic intersection circle, an expansion adhesive tape is arranged between the inspection wheel and the embedded plastic intersection circle and the embedded plastic intersection circle is connected with an external connecting pipe through a plastic welding strip. According to the technical scheme provided by the utility model, a traditional plastic inspection well is changed into the concrete inspection well, therefore, the concrete inspection wheel is firmer and more durable in the process of installing and using; furthermore, the expansion adhesive tape is arranged between the inspection wheel and the embedded plastic intersection circle, therefore, the airtightness of a joint between the embedded plastic intersection circle and the concrete inspection wheel can be effectively guaranteed, and the leakage phenomenon of the joint can be prevented; in addition, a joint between the embedded plastic intersection circle and the connecting pipe is more convenient and quick to connect by the welding of the inside and outside plastic welding rods. The precast cement inspection well provided by the utility model has the characteristics of being simple in structure, convenient to install and firm and durable to use.

Description

The Prefabricated Concrete inspection shaft connecting for plastic pipe
Technical field
The utility model relates to urban construction facility technology field, is a kind of Prefabricated Concrete inspection shaft connecting for plastic pipe specifically.
Background technique
When plastic pipe is installed, certain distance need to arrange an inspection shaft, in pipeline using process for the inspection to pipeline, remove contamination etc.Although the plastic inspection well connecting due to existing plastic pipe is that same material connects with pipeline, quick, strick precaution seepage when pipeline connects with well are met, but because plastic inspection well belongs to plastic material, in construction and using process, be subject to the extruding of lateral earth pressure to cause well body deformability, the problem of breaking even.
Model utility content
The purpose of this utility model is the problem existing for above-mentioned technology, and a kind of Prefabricated Concrete inspection shaft connecting for plastic pipe is provided, and has feature sturdy and durable, easy to connect, good airproof performance.
For achieving the above object, the technical solution adopted in the utility model is: a kind of Prefabricated Concrete inspection shaft connecting for plastic pipe, comprise inspection shaft, described manhole shaft is provided with attachment hole, described attachment hole edge is provided with pre-buried plastics and passes through mutually circle, described inspection shaft and pre-buried plastics pass through mutually between circle and are provided with expansion adhesive tape, and described pre-buried plastics pass through mutually circle and are connected with external connecting tube by Plastic Welding bar.
Further, described pre-buried plastics pass through circle and inspection shaft joint is provided with plastics embedded part mutually.
Further, described Plastic Welding bar is welded on the interior outside that pre-buried plastics pass through circle and external connecting tube connecting sewing mutually.
Further, described pre-buried plastics pass through circle and external connecting tube all adopts the plastics of identical material to make mutually.
Useful technique effect of the present utility model is: in the technical solution of the utility model, change the inspection shaft of conventional plastic into concrete inspection shaft, more sturdy and durable in the time installing and using, concrete inspection shaft is provided with expansion adhesive tape with the joint that pre-buried plastics pass through circle mutually, effectively ensure that pre-buried plastics pass through the sealing of circle and concrete inspection shaft joint mutually, avoid joint water leakage phenomenon; In addition it is more convenient when, pre-buried plastics pass through mutually joint between circle and connecting tube and are connected by being welded on of interior outside Plastic Welding bar.The utlity model has simple in structure, easy for installation, robust feature.
Brief description of the drawings
In order to be illustrated more clearly in the utility model embodiment or technological scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the utility model structural representation.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technological scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment who obtains under creative work prerequisite, all belong to the scope of the utility model protection.
As shown in Figure 1, a kind of Prefabricated Concrete inspection shaft connecting for plastic pipe, comprise inspection shaft 1, inspection shaft 1 pit shaft is provided with attachment hole, attachment hole edge is provided with pre-buried plastics and passes through mutually circle 2, inspection shaft 1 and pre-buried plastics pass through mutually between circle 2 and are provided with expansion adhesive tape 5, and pre-buried plastics pass through mutually circle 2 and are connected with external connecting tube 3 by Plastic Welding bar 4.
Wherein, pre-buried plastics pass through mutually circle 2 and are provided with plastics embedded part 6 with inspection shaft 1 junction surface, and the effect of plastics embedded part 6 is mainly pre-buried plastics to be passed through to circle 2 mutually be well fixed on the attachment hole edge that detects well.
Wherein, Plastic Welding bar 4 is welded on the interior outside that pre-buried plastics pass through circle 2 and external connecting tube 3 connecting sewings mutually, utilize the welding of Plastic Welding bar can ensure the sealing of joint in the interior outside of connecting sewing, there is good resistance to pressure simultaneously, obviously also Plastic Welding bar 4 can be welded between connecting sewing, but welding difficulty is large, if poor sealing does not with great difficulty appear in welding, cause water leakage phenomenon.
Wherein, pre-buried plastics pass through mutually circle 2 and external connecting tube 3 all adopts the plastics of identical material to make, and adopt the material of identical material to make between the two, ensure there is identical expansion coefficient, prevent plastics embedded part 6 come off and seam crossing leak.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (4)

1. the Prefabricated Concrete inspection shaft connecting for plastic pipe, it is characterized in that, comprise inspection shaft (1), described inspection shaft (1) pit shaft is provided with attachment hole, described attachment hole edge is provided with pre-buried plastics and passes through mutually circle (2), described inspection shaft (1) and pre-buried plastics pass through mutually between circle (2) and are provided with expansion adhesive tape (5), and described pre-buried plastics pass through mutually circle (2) and are connected with external connecting tube (3) by Plastic Welding bar (4).
2. the Prefabricated Concrete inspection shaft connecting for plastic pipe according to claim 1, is characterized in that: described pre-buried plastics pass through mutually circle (2) and are provided with plastics embedded part (6) with inspection shaft (1) joint.
3. the Prefabricated Concrete inspection shaft connecting for plastic pipe according to claim 1, is characterized in that: described Plastic Welding bar (4) is welded on the interior outside that pre-buried plastics pass through circle (2) and external connecting tube (3) connecting sewing mutually.
4. according to the Prefabricated Concrete inspection shaft connecting for plastic pipe described in claim 1-3 any one, it is characterized in that: described pre-buried plastics pass through mutually circle (2) and external connecting tube (3) all adopts the plastics of identical material to make.
CN201420086943.6U 2014-02-27 2014-02-27 Precast cement inspection well used for plastic pipeline connection Expired - Fee Related CN203809927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420086943.6U CN203809927U (en) 2014-02-27 2014-02-27 Precast cement inspection well used for plastic pipeline connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420086943.6U CN203809927U (en) 2014-02-27 2014-02-27 Precast cement inspection well used for plastic pipeline connection

Publications (1)

Publication Number Publication Date
CN203809927U true CN203809927U (en) 2014-09-03

Family

ID=51448676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420086943.6U Expired - Fee Related CN203809927U (en) 2014-02-27 2014-02-27 Precast cement inspection well used for plastic pipeline connection

Country Status (1)

Country Link
CN (1) CN203809927U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975129A (en) * 2017-11-28 2018-05-01 中国二十冶集团有限公司 A kind of prefabricated rain sewage inspection well and pipe connecting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975129A (en) * 2017-11-28 2018-05-01 中国二十冶集团有限公司 A kind of prefabricated rain sewage inspection well and pipe connecting method

Similar Documents

Publication Publication Date Title
CN103363203A (en) Lining glass fiber reinforced plastic concrete compound pipeline
CN201502826U (en) Spigot-and-socket type fusing plastic pipeline
CN203878712U (en) Municipal drain pipe
CN203514482U (en) Novel sealing plastic inspection well
CN203809927U (en) Precast cement inspection well used for plastic pipeline connection
CN203384508U (en) Compound pipeline lined with glass fiber reinforced plastic concrete
CN100540970C (en) The plastic winding structure wall bell-and-spigot pipe
CN204570884U (en) A kind of novel municipal drain
CN201943090U (en) Plastic inspection well
CN202466792U (en) Inspection well with connection short pipe
CN204691791U (en) The waterproof construction of rectangular top pipe
CN214541019U (en) Inspection well shaft seepage-proofing alarm device
CN205653873U (en) Plastic check well convenient to installation
CN210462146U (en) Circular pipeline repairing structure
CN204185933U (en) Manhole rubber pipeline sealing device
CN202580319U (en) Hexagonal sealing ring
CN203546725U (en) Backfilling grouting device capable of being recycled
CN207298135U (en) Steel plastic composite structure bellows
CN203856051U (en) Repairing device of local water leakage mouth of large-diameter pipe
CN203880283U (en) Double-taper-type connector for connecting drainage pipelines
CN205171554U (en) Chute inspection shaft is inlayed to socket joint formula
CN204942820U (en) Sewer SEALING FITTING
CN202660069U (en) Leakage-proof component and pipeline system for buildings
CN203393749U (en) Ball sealer
CN204080865U (en) A kind of fiber glass reinforced plastics inspection well parts

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140903

Termination date: 20200227