CN203785438U - Improved smelter - Google Patents
Improved smelter Download PDFInfo
- Publication number
- CN203785438U CN203785438U CN201320321241.7U CN201320321241U CN203785438U CN 203785438 U CN203785438 U CN 203785438U CN 201320321241 U CN201320321241 U CN 201320321241U CN 203785438 U CN203785438 U CN 203785438U
- Authority
- CN
- China
- Prior art keywords
- smoke discharging
- heater
- pipe
- smelter
- smoke
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
The utility model discloses an improved smelter which comprises a smelter body. The improved smelter is characterized in that a cooling structure is arranged on the outer wall of the smelter body, a fume exhaust structure is arranged on the top of the smelter body, a turnover control structure for controlling the smelter body to turn over is further included, a mold conveying structure is arranged at the front end of the smelter body, a control chamber is arranged on one side of the smelter body, and the control chamber is connected with the cooling structure, the fume exhaust structure, the turnover control structure and the mold conveying structure. The improved smelter improves work efficiency and product quality, and lowers air pollution.
Description
Technical field
The utility model relates to a kind of improvement type smelting furnace.
Background technology
At present, our seen smelting furnace on market, because the metallic solution carrying out after transporting molten is wrapped in centre by transhipment, pour into again in mould, very dangerous of such operation, when especially defeated by transhipment contracted affreightment in centre, operate and is not easy very much, dangerous existence at any time, in transportation, solution can be lowered the temperature affects the quality of product, in addition simultaneously, also can produce air pollution, affect whole working environment.
Utility model content
The purpose of this utility model is in order a kind of improvement type smelting furnace to be provided, to increase work efficiency and product quality, reduce air pollution simultaneously.
For achieving the above object, the technical solution of the utility model is:
Improvement type smelting furnace, comprise body of heater, it is characterized in that: be provided with cooling structure, be provided with smoke discharging structure at body of heater top at the outer wall of body of heater, also comprise the upset control structure of controlling body of heater upset, be provided with mould transport structure at the front end of body of heater, be provided with control room in a side, described control room is connected setting with cooling structure, smoke discharging structure, upset control structure and mould transport structure respectively;
Described cooling structure, comprises that two side-by-side helixs are oppositely arranged on upper pipeline and the lower pipeline on furnace body outer wall;
Described smoke discharging structure, comprise the first smoke discharging structure and the second smoke discharging structure, described the first smoke discharging structure comprises the little petticoat pipe that is arranged on body of heater top end opening place, top at little petticoat pipe is provided with window, on window, be provided with the door body of flexible connection, also be provided with the smoke exhaust pipe being obliquely installed, also comprise the smoke discharging pipe being connected with smoke exhaust pipe, smoke discharging pipe end be provided with blower fan; Described the second smoke discharging structure is a large petticoat pipe, and described large petticoat pipe comprises cover body, the lower ending opening of cover body, and upper end forms dished cover, is provided with outlet on dished cover, is provided with 2 hooks at each edge of cover body, and described dished cover comprises that 4 plate bodys that are obliquely installed are spliced;
Described upset control structure, comprises 2 movable bearings that are mounted on body of heater both sides respectively, and one of them bearing is installed overturn structure, described overturn structure comprises support, on support, be provided with gear train, described gear train one end connection bearing, the other end connects motor and manual turntable;
Described mould transport structure comprises track, is provided with in orbit traveling table, on traveling table, is provided with workbench by elevating lever, is provided with control panel on traveling table, and the motor being connected with elevating lever.
The utility model is in practical work process, staff operates in operating room, control the running of whole smelting furnace, in the time that the metallic solution in smelting furnace is toppled over out, first by the mould on workbench track be transported to smelting furnace limit, then by upset control structure by tilting furnace, the metallic solution of the inside is poured in mould, after completing, body of heater is being reformed, completing whole process.Such operation, the process of transhipment bag in the middle of removing from, the danger coefficient of reduction work, the air pollution in the middle of also having reduced, makes whole working environment air clean simultaneously, is beneficial to environmental protection.
During the course, wherein smoke discharging structure can absorb the metal gas that body of heater port evaporates, and then avoids evaporateing into other places, makes the air pollution in whole working environment be reduced and improve, and this also contributes to, and staff's is healthy.In order to improve the efficiency of smoke evacuation, large petticoat pipe absorbs smelting furnace being poured into the metal gas evaporating in mould process, little petticoat pipe absorbs the gas that evaporates of smelting furnace in the time of deposite metal, the air blowing to smoke discharging pipe by blower fan simultaneously, accelerates flue gas velocity and the efficiency of the smoke exhaust pipe on little petticoat pipe.
Upset control structure, can control by motor upset and the playback of smelting furnace, but still can work in the time having a power failure in order to make provision against emergencies, and is provided with manual turntable, can continue upset work.
The setting of cooling structure, is beneficial to cooling rapidly, wherein goes up pipeline and is connected same water source with lower pipeline, oppositely arranges, and upper pipeline and lower pipeline are lowered the temperature from upper and lower both direction respectively simultaneously, greatly improves cooling efficiency.
The beneficial effects of the utility model: the utility model is increased work efficiency and product quality reduce air pollution simultaneously.
In order further to explain the technical solution of the utility model, below by specific embodiment, the utility model is elaborated.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the schematic diagram of control structure of overturning in the utility model.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
With reference to accompanying drawing 1, the present embodiment discloses a kind of improvement type smelting furnace, comprise body of heater 1, it is characterized in that: be provided with cooling structure 10, be provided with smoke discharging structure at body of heater top at the outer wall of body of heater 1, also comprise the upset control structure of controlling body of heater upset, be provided with mould transport structure at the front end of body of heater, be provided with control room in a side, described control room is connected setting with cooling structure, smoke discharging structure, upset control structure and mould transport structure respectively;
Described cooling structure, comprises that two side-by-side helixs are oppositely arranged on upper pipeline 11 and the lower pipeline 12 on body of heater 1 outer wall;
Described smoke discharging structure, comprise the first smoke discharging structure and the second smoke discharging structure, described the first smoke discharging structure comprises the little petticoat pipe 21 that is arranged on body of heater 1 top end opening place, be provided with window 22 at the top of little petticoat pipe 21, on window 22, be provided with the door body 23 of flexible connection, also be provided with the smoke exhaust pipe 24 being obliquely installed, also comprise the smoke discharging pipe 25 being connected with smoke exhaust pipe 24, smoke discharging pipe 25 end be provided with blower fan 26; Described the second smoke discharging structure is a large petticoat pipe 27, described large petticoat pipe 27 comprises cover body 28, the lower ending opening of cover body 28, upper end forms dished cover 29, on dished cover 29, be provided with outlet 221, be provided with 2 hooks 222 at each edge of cover body 28, described dished cover 29 comprises that 4 plate bodys that are obliquely installed are spliced;
As shown in Figure 2, described upset control structure, comprise 2 movable bearings 31 that are mounted on body of heater both sides respectively, one of them bearing 31 is installed overturn structure, described overturn structure comprises support 32, on support 32, be provided with gear train 33, described gear train 33 one end connection bearings 31, the other end connects motor 34 and manual turntable 35;
Described mould transport structure comprises track 41, is provided with traveling table 42 on track 41, on traveling table 42, is provided with workbench 44 by elevating lever 43, on traveling table 42, is provided with control panel, and the motor 34 being connected with elevating lever 43.
The foregoing is only an embodiment of the present utility model, the not restriction to this case design, all equivalent variations of doing according to the design key of this case, all fall into the protection domain of this case.
Claims (1)
1. improvement type smelting furnace, comprise body of heater, it is characterized in that: be provided with cooling structure, be provided with smoke discharging structure at body of heater top at the outer wall of body of heater, also comprise the upset control structure of controlling body of heater upset, be provided with mould transport structure at the front end of body of heater, be provided with control room in a side, described control room is connected setting with cooling structure, smoke discharging structure, upset control structure and mould transport structure respectively;
Described cooling structure, comprises that two side-by-side helixs are oppositely arranged on upper pipeline and the lower pipeline on furnace body outer wall;
Described smoke discharging structure, comprise the first smoke discharging structure and the second smoke discharging structure, described the first smoke discharging structure comprises the little petticoat pipe that is arranged on body of heater top end opening place, top at little petticoat pipe is provided with window, on window, be provided with the door body of flexible connection, also be provided with the smoke exhaust pipe being obliquely installed, also comprise the smoke discharging pipe being connected with smoke exhaust pipe, smoke discharging pipe end be provided with blower fan; Described the second smoke discharging structure is a large petticoat pipe, and described large petticoat pipe comprises cover body, the lower ending opening of cover body, and upper end forms dished cover, is provided with outlet on dished cover, is provided with 2 hooks at each edge of cover body, and described dished cover comprises that 4 plate bodys that are obliquely installed are spliced;
Described upset control structure, comprises 2 movable bearings that are mounted on body of heater both sides respectively, and one of them bearing is installed overturn structure, described overturn structure comprises support, on support, be provided with gear train, described gear train one end connection bearing, the other end connects motor and manual turntable;
Described mould transport structure comprises track, is provided with in orbit traveling table, on traveling table, is provided with workbench by elevating lever, is provided with control panel on traveling table, and the motor being connected with elevating lever.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320321241.7U CN203785438U (en) | 2013-06-05 | 2013-06-05 | Improved smelter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320321241.7U CN203785438U (en) | 2013-06-05 | 2013-06-05 | Improved smelter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203785438U true CN203785438U (en) | 2014-08-20 |
Family
ID=51321616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320321241.7U Expired - Fee Related CN203785438U (en) | 2013-06-05 | 2013-06-05 | Improved smelter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203785438U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103344111A (en) * | 2013-06-05 | 2013-10-09 | 浙江永成机械有限公司 | Improved smelter |
-
2013
- 2013-06-05 CN CN201320321241.7U patent/CN203785438U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103344111A (en) * | 2013-06-05 | 2013-10-09 | 浙江永成机械有限公司 | Improved smelter |
CN103344111B (en) * | 2013-06-05 | 2018-11-27 | 浙江永成机械有限公司 | Improvement type smelting furnace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103695690B (en) | A kind of suite of equipment producing foamed metal | |
CN103776270A (en) | Calcium carbide sensible heat recovery equipment and method for calcium carbide furnace | |
CN203785438U (en) | Improved smelter | |
CN105617943A (en) | Large-volume vacuum cracking furnace | |
CN203561195U (en) | Movable-type gas holding furnace with turnover mechanism | |
CN103344111A (en) | Improved smelter | |
CN105953592B (en) | A kind of offline heat smoke preheating device of material and its pre-heating mean | |
CN203833963U (en) | Novel mobile closed dust collection hood for ladle-to-ladle position in steel smelting workshop | |
CN203798180U (en) | Calcium carbide furnace calcium carbide sensible heat recovery device | |
CN102134623B (en) | Blast furnace swing spout dust collecting cover | |
CN105666669A (en) | Steam curing pool gas exhauster | |
CN205505727U (en) | A response intermediate frequency furnace for melting motor housing substandard product | |
CN203373389U (en) | Multilayer box-type heating furnace | |
CN201250258Y (en) | Copper strip on-line continuous annealing system | |
CN203672123U (en) | Overturning control structure of smelting furnace | |
CN202934219U (en) | Plasma cutting platform | |
CN202984247U (en) | Integrated movable smoke collection system | |
CN104858117A (en) | Double-layer high-temperature drying channel of coating line | |
CN206045982U (en) | Big volume vacuum cracking stove | |
CN205037744U (en) | Induction heating furnace feeding device that discharges fume | |
CN204690021U (en) | To fetch water extraction hood car device | |
CN204052308U (en) | Drying sludge motor spindle deashing device | |
CN210367765U (en) | Iron adding device for electric furnace | |
CN204396844U (en) | Vertical coal gas is baked packaging and is put | |
CN203975750U (en) | Circulating steel ball mechanical transport device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140820 |