CN203784908U - Novel boiler for combustion of biomass pressing block - Google Patents

Novel boiler for combustion of biomass pressing block Download PDF

Info

Publication number
CN203784908U
CN203784908U CN201420121235.1U CN201420121235U CN203784908U CN 203784908 U CN203784908 U CN 203784908U CN 201420121235 U CN201420121235 U CN 201420121235U CN 203784908 U CN203784908 U CN 203784908U
Authority
CN
China
Prior art keywords
heater
boiler
deduster
boiler body
burner hearth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420121235.1U
Other languages
Chinese (zh)
Inventor
王伟
陈秀斋
李云广
李玉斌
丁木宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG YUNTIAN HEATING TECHNOLOGY Co Ltd
Original Assignee
SHANDONG YUNTIAN HEATING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG YUNTIAN HEATING TECHNOLOGY Co Ltd filed Critical SHANDONG YUNTIAN HEATING TECHNOLOGY Co Ltd
Priority to CN201420121235.1U priority Critical patent/CN203784908U/en
Application granted granted Critical
Publication of CN203784908U publication Critical patent/CN203784908U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Combustion Of Fluid Fuel (AREA)

Abstract

A novel boiler for the combustion of a biomass pressing block comprises a boiler body and a hearth located in the boiler body, wherein a feeding opening and a slag discharging opening are formed in the boiler body; a dust collector communicated with the hearth and an induced draft fan communicated with the dust collector are further arranged in the boiler body; a flue is connected with the dust collector and the induced draft fan and then extends to the outside from the upper end of the boiler body; a water-bearing layer formed by a water pipe is further arranged in the boiler body; and one end of the water pipe is a water inlet formed in the boiler body, while the other end is a water outlet formed in the boiler body. The novel boiler improves the thermal efficiency only by changing the connection relationship between the components without increasing the cost, thereby achieving good energy conservation and emission reduction effects.

Description

A kind of novel biomass briquetting burning boiler
Technical field
The utility model relates to fluid heater technical field, especially relate to a kind ofly make full use of fume afterheat, reach energy-efficient object, for biomass block burning boiler.
Background technology
In prior art, boiler is made up of boiler body and auxiliary equipment, and burning matter completes burning in boiler body, and the high-temperature flue gas producing after burning is discharged by the function auxiliary equipment of blower fan, deduster.This kind of a large amount of heat energy of boiler is discharged with flue gas, high fume temperature, and combustion thermal efficiency is low.
In order to improve heat utilization rate, publication number is that the utility application of CN101408308 discloses a kind of coal-burning boiler, this boiler comprises body of heater and the high-temperature surface being connected and low temperature heating surface, lower portion of furnace body is provided with fire grate, fire grate top is provided with burner hearth, fire grate bottom is provided with lower air blast, this lower air blast communicates with combustion chamber of furnace body, the flue gas of burner hearth enters the first deduster by high-temperature surface and low temperature heating surface, deduster downside is connected with the first flue gas recirculation pipeline, this the first flue gas recirculation install pipeline has recirculation blower, and be connected with lower air blast by appendix, flue gas and furnace bottom combustion air are mixed into furnace bottom combustion chamber.Downside due to deduster in this boiler connects flue gas recirculation pipeline, and flue gas is mixed into furnace bottom combustion chamber by recirculation blower and furnace bottom combustion air, thereby reduces the amount of carrying soot particle in flue gas, improves boiler combustion efficiency.In conjunction with its bright book accompanying drawing, deduster is independent of body of heater outside, in burner hearth, flue gas enters deduster after by high-temperature surface and low temperature heating surface, deduster is arranged the dust in flue by chimney is outer time, in deduster, remaining smoke heat energy again carries out heat energy utilization after gas transmission road enters burner hearth at lower air blast.Although this boiler is compared to conventional art, improve heat utilization rate, but high-temperature flue gas is transported to the process that deduster turns back to burner hearth again and still had hot loss of energy from burner hearth, and the heat energy containing in the dust put outward of deduster has also caused the direct losses of heat.
Summary of the invention
The purpose of this utility model is do not changing under existing boiler part prerequisite, further reduce the flue-gas temperature of discharging, thereby improve the biomass block burning boiler of heat utilization rate, the technical scheme adopting is: a kind of novel biomass briquetting burning boiler, comprise body of heater and the burner hearth that is arranged in body of heater, body of heater is provided with dog-house and removes cinder notch, it is characterized in that: in described body of heater, be also provided with the deduster being communicated with burner hearth and the air-introduced machine being communicated with deduster, flue extends body of heater from body of heater upper end after connecting deduster and air-introduced machine; In described body of heater, be also provided with the water-bearing layer that water pipe forms, described water pipe one end is the water inlet being located on body of heater, and the other end is the delivery port being located on body of heater.
Technical characterictic of the present utility model also has: described water-bearing layer is between burner hearth and deduster.
Technical characterictic of the present utility model also has: described water-bearing layer is also between deduster and the body of heater of burner hearth opposite side.
Technical characterictic of the present utility model also has: the lower end of described deduster connects the dedusting mouth on body of heater.
Technical characterictic of the present utility model also has: described dedusting mouth is 2.
Technical characterictic of the present utility model also has: on described body of heater, just burner hearth place is provided with to observation panel.
Technical characterictic of the present utility model also has: on described air-introduced machine, be also provided with blower motor.
Technical characterictic of the present utility model also has: on described body of heater, be also provided with limnimeter.
The beneficial effects of the utility model are: this boiler has changed the position relationship between body of heater, deduster and air-introduced machine in conventional boiler, flue is drawn high-temperature flue gas and is entered into deduster dedusting and discharge outside body of heater through flue from burner hearth, high-temperature flue gas its heat energy in flue course of conveying is directly absorbed by water-bearing layer, thereby make this boiler in heating exhaust steam, also can draw hot water; Heat energy make full use of the flue dust temperature that has reduced outer discharge boiler, outer smoke evacuation dirt is lowered into 90-100 degree Celsius of left and right above from 300 degrees Celsius, thereby greatly reduces hot loss of energy, reached the object of energy-saving and emission-reduction.The utility model, not increasing under the prerequisite of cost, has only changed the annexation between parts, has improved the thermal efficiency, has the effect of good energy-saving and emission-reduction.
Brief description of the drawings
Accompanying drawing 1 is the utility model structural representation, wherein, the 1st, body of heater, the 2nd, dog-house, the 3rd, observation panel, the 4th, except cinder notch, the 5th, dedusting mouth, the 6th, delivery port, the 7th, deduster, the 8th, flue, the 9th, air-introduced machine, the 10th, water inlet, the 11st, blower motor, the 12nd, water-bearing layer, the 13rd, limnimeter, the 14th, burner hearth.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described.The utility model discloses a kind of New-type boiler, this boiler comprises body of heater 1 and the burner hearth 14 that is arranged in body of heater 1, and body of heater 1 is provided with dog-house 2 and removes cinder notch 4.In body of heater 1, be also provided with the deduster 7 being communicated with via flue 8 with burner hearth 14 and the air-introduced machine 9 being communicated with via flue 8 with deduster 7, flue 8 extends body of heater 1 from body of heater 1 upper end after connecting deduster 7 and air-introduced machine 9.In body of heater 1, be also provided with the water-bearing layer 12 that water pipe forms, water pipe one end is the water inlet 10 being located on body of heater 1, and the other end is the delivery port 6 being located on body of heater 1.
Water-bearing layer 12 is between burner hearth 14 and deduster 7, and water-bearing layer is also between deduster 7 and opposite side body of heater.
The lower end of deduster 7 connects the dedusting mouth 5 on body of heater 1.
On body of heater 1, just burner hearth 14 places are provided with to observation panel 3.
When use, biomass block to be burnt is delivered burner hearth 14 from dog-house, the high-temperature flue gas producing after burning is drawn via flue 8 from burner hearth 14, after absorbing heat content for the first time, water-bearing layer 12 enters deduster 7, the flue gas of drawing from deduster 7 is drawn by air-introduced machine 9 after via flue 8, come out of the stove side by side external, flue gas from deduster 7 to still contact, further discharge its contained heat energy with water-bearing layer in row's process and reduce the temperature of discharged gas fume, thereby ensure making full use of of heat energy.
Certainly; above-mentioned explanation is not limitation of the utility model; the utility model is also not limited only to above-mentioned giving an example, and variation, remodeling, interpolation or replacement that those skilled in the art make in essential scope of the present utility model, also belong to protection domain of the present utility model.

Claims (8)

1. a novel biomass briquetting burning boiler, comprise body of heater and the burner hearth that is arranged in body of heater, body of heater is provided with dog-house and removes cinder notch, it is characterized in that: in described body of heater, be also provided with the deduster being communicated with burner hearth and the air-introduced machine being communicated with deduster, flue extends body of heater from body of heater upper end after connecting deduster and air-introduced machine; In described body of heater, be also provided with the water-bearing layer that water pipe forms, described water pipe one end is the water inlet being located on body of heater, and the other end is the delivery port being located on body of heater.
2. according to boiler claimed in claim 1, it is characterized in that: described water-bearing layer is between burner hearth and deduster.
3. according to boiler claimed in claim 2, it is characterized in that: described water-bearing layer is also between deduster and the body of heater of burner hearth opposite side.
4. according to boiler claimed in claim 1, it is characterized in that: the lower end of described deduster connects the dedusting mouth on body of heater.
5. according to boiler claimed in claim 4, it is characterized in that: described dedusting mouth is 2.
6. according to boiler claimed in claim 1, it is characterized in that: on described body of heater, just burner hearth place is provided with to observation panel.
7. according to boiler claimed in claim 1, it is characterized in that: on described air-introduced machine, be also provided with blower motor.
8. according to boiler claimed in claim 1, it is characterized in that: on described body of heater, be also provided with limnimeter.
CN201420121235.1U 2014-03-18 2014-03-18 Novel boiler for combustion of biomass pressing block Expired - Fee Related CN203784908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420121235.1U CN203784908U (en) 2014-03-18 2014-03-18 Novel boiler for combustion of biomass pressing block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420121235.1U CN203784908U (en) 2014-03-18 2014-03-18 Novel boiler for combustion of biomass pressing block

Publications (1)

Publication Number Publication Date
CN203784908U true CN203784908U (en) 2014-08-20

Family

ID=51321088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420121235.1U Expired - Fee Related CN203784908U (en) 2014-03-18 2014-03-18 Novel boiler for combustion of biomass pressing block

Country Status (1)

Country Link
CN (1) CN203784908U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104654277A (en) * 2015-02-03 2015-05-27 杨俊栋 Chain plate grate biomass particle combustion boiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104654277A (en) * 2015-02-03 2015-05-27 杨俊栋 Chain plate grate biomass particle combustion boiler

Similar Documents

Publication Publication Date Title
CN102618681A (en) Grate-free double-preheating top combustion type hot blast stove
CN203784908U (en) Novel boiler for combustion of biomass pressing block
CN203382777U (en) Hot-blast furnace
CN204880693U (en) Unload convenient energy -conserving boiler of sediment
CN204534546U (en) Biomass boiler environmental protection and energy saving control system
CN205227381U (en) Chain formula grate coal fired boiler prevents stifled air preheater control unit
CN201935384U (en) Energy-saving and environment-friendly hot blast stove
CN203771707U (en) Flue gas waste heat recycling system for boiler
CN207422654U (en) A kind of hot-blast stove for improving heat utilization efficiency
CN202074684U (en) Water heating furnace
CN103884006A (en) Novel boiler for biomass briquette combustion
CN205619553U (en) Biomass boiler
CN205504938U (en) Vertical complete energy -concerving and environment -protective type boiler of firetube
CN2926824Y (en) Smokeless secondary combustion environment-friendly energy-saving hot blast stove
CN204574463U (en) A kind of heating stove
CN204648207U (en) Multipurpose horizontal heating furnace
CN204757366U (en) Hot air stove
CN203810461U (en) Energy-saving burner
CN204460692U (en) Novel heat insulation hot-blast stove
CN208945091U (en) A kind of low energy consumption industry forge furnace
CN202485188U (en) Energy-saving boiler
CN102589129A (en) Energy saver of coal-fired boiler
CN202470430U (en) Economizer for coal burning boiler
CN201640095U (en) Sootless and coal-saving warm wind stove device for greenhouses
CN106949628A (en) A kind of environment friendly and pollution-free quick hot water boiler provided with the special-shaped flue of bending

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20170318