CN203784632U - Filling device of overwater natural gas filling station - Google Patents

Filling device of overwater natural gas filling station Download PDF

Info

Publication number
CN203784632U
CN203784632U CN201420053057.3U CN201420053057U CN203784632U CN 203784632 U CN203784632 U CN 203784632U CN 201420053057 U CN201420053057 U CN 201420053057U CN 203784632 U CN203784632 U CN 203784632U
Authority
CN
China
Prior art keywords
filling
storage tank
lng
ship
ships
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420053057.3U
Other languages
Chinese (zh)
Inventor
张梅梅
许爱峰
李宁
林敏�
杨晓明
李明
龚坚
陶春辉
刘志仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hai Qi Gang Hua Gas Development Co Ltd
Original Assignee
Jiangsu Hai Qi Gang Hua Gas Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hai Qi Gang Hua Gas Development Co Ltd filed Critical Jiangsu Hai Qi Gang Hua Gas Development Co Ltd
Priority to CN201420053057.3U priority Critical patent/CN203784632U/en
Application granted granted Critical
Publication of CN203784632U publication Critical patent/CN203784632U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model relates to a filling device of an overwater natural gas filling station. The filling device is characterized by comprising a filling barge storage tank, a power vessel storage tank and a submerged pump, wherein a heat exchanger (PBC) is arranged between the filling barge storage tank and the power vessel storage tank which are connected with each other through a hose; the submerged pump conveys LNG (liquefied natural gas) into the power vessel storage tank through a filling hose; emergency shutdown valves (ESDs) with remote control and manual operation are arranged at two ends of the hose; an emergency release device (ERC) is arranged on the hose, and is often an emergency break valve; dry type quick connectors (DDC) are arranged at two ends of the filling hose so as to prevent leakage caused by breakage.

Description

A kind of rock gas filling station filling apparatus waterborne
Technical field
The utility model relates to a kind of rock gas filling station, the specifically technological process of a kind of rock gas filling station waterborne and filling apparatus.
Background technique
LNG applies in China's inland navigation craft as clean energy resource replacement for heavy/diesel oil progressively and launches, and uses gaseous propellant engine can effectively reduce the pollution to atmosphere environment such as NOx, SOx and PM, is regarded as adapting to the best marine fuel of following environmental requirement.In inland navigation craft " oil changes gas " pilot process, oneself has more than 14 successful boats and ships of transformation, realize the LNG repacking test of the ship types such as tugboat, Bulk carrier, pleasure-boat, fisheries administration ship, boats and ships are by using LNG-Diesel Dual-Fuel Engine, to industry, show that LNG is as the good Economy of marine fuel and the feature of environmental protection, these for LNG be applied to inland navigation craft as an alternative fuel strong support is provided.At present domestic also have many boats and ships carrying out in the transformation of LNG-diesel dual-fuel or planning, and each province is particularly positive to this along the Yangtze River for Jiangsu, Anhui, Jiangxi etc.According to measuring and calculating, use LNG clean energy resource can be saved 30% to 55% expense than use diesel oil, can significantly reduce the operation cost of Shipping enterprise.
Along with maritime Ju He National Energy Board carries out pilot and the application of LNG fuels and energy ship in inland river, the LNG of take is more and more as clean fuel power ship, and incident power ship fuel make up problem in operation process is very urgent.At present, LNG fuels and energy ship dosing method is broadly divided into four classes: the filling of bank base, landing stage filling, tank car filling, ship-to-ship filling.These four kinds of form Main Differences are that LNG storage mode is different, but the differences such as its dosing method, filling operation, filing provision, safety event are little.Consider the factors such as operating benefit and disaster risk, at present both at home and abroad for the major way of LNG fuels and energy ship supply is tank car transportation, but there is inconvenience part in this mode in actual motion, as: line-haul cost is large, tank car finite capacity, harbour be without problems such as tank car reserved places.In Europe, some countries apply LNG earlier as marine fuel, and set up harbour filling bank station and filling ship, and Sweden has built in the world first LNG filling ship No. SEAGAS, and this ship adopts single C type part tank 180m3.For advancing the vertical use of LNG navigating ship on He Jinghang canal, the Changjiang river, domestic a lot of energy unit actively drop into inland river LNG filling station along the line construction.Compare with the filling of bank base, the uncertain factor of filling waterborne landing stage filling operation has increased operating risk.Shore facilities is for relatively maintaining static, and filling operation the died young uncontrollable factor of the ectocine safety such as gas, wave, ocean current in landing stage increases greatly, and contingency occurrence probability is corresponding increase also.
Summary of the invention
The utility model is just for the technical problem existing in prior art, the technological process of a kind of rock gas filling station waterborne and dispensing device are provided, the function on LNG filling landing stage be by storage tank approximately 0.2-0.3MPa liquid natural gas by being transported to power ship storage tank from pressurization system or immersed pump, this technological scheme environmental protection, greatly reduce energy consumption, reduced fuel cost.
To achieve these goals, the technical solution adopted in the utility model is that a kind of rock gas filling station filling technique waterborne, is characterized in that, described filling technique comprises the following steps, 1) arrive at front preparation; 2) alongside operation; 3) filling operation; 4) from pool operation, wherein step 1 specific operation are as follows, and boats and ships are compatible to be detected; Gas phase condition and illumination; Interjob communication and communication failure; Navigational warning and warning mark; Deathtrap and safety zone; Operational instruction and personnel protective equipment; Emergency plan and fire-protection equipment two ship exchange messages; Check storage tank system; Check alongside and mooring arrangement; Check filing provision and water curtain; The specific operation of described step 2 are as follows, safety communication and mooring plan; Manoeuvre approaching; Fender arranges and alongside operation; Mooring operation; Connecting communication and ground connection; Connecting hose; The specific operation of described step 3 are as follows, checking table before filling; Adding amount and filling speed; Precooling internal duct and dispenser pump; Inerting and displacement; Open manual and remote-controlled valve; To two ships, send ready signal; Start dispenser pump program; Top and bottom liquid inlet be filling alternately; Stop dispenser pump program; Purging and inerting etc.;
The specific operation of described step 4 are as follows, checking table after filling; Close manual and remote-controlled valve; Remove flexible pipe; Remove communication line; Transmit filling file; Untie the mooring rope and weigh anchor; Manoeuvre sails out of.
As a kind of improvement of the present utility model, operation concrete in described step 1 is as follows, and the compatible detection of described boats and ships refers to LNG filling landing stage and noted ship and is set up compatible at equipment and cloth; Various calculated suggestions can be implemented/be observed to boats and ships; Alongside, mooring, hose operation and communicate by letter and can carry out safely and effectively; Good for guaranteeing the compatibility of two ships, conventionally should before alongside, to following items, confirm: by the house steward of use, be flexible pipe/handling arm/flexible pipe bracket size and number; In LNG filling operation, expection dried up minimum and maximum height of flexible pipe and freeboard are poor; Whether handling arm, crane and flexible pipe bracket be all right and meet safe working load; Hose support is on the quarter enough to prevent that flexible pipe is because of fricative damage; Flexible hose for loading should meet the regulation of the recommendation > > of OCIMF < < oil tanker house steward and accessory thereof; Handling arm should meet the regulation of OCIMF < < arm design code peculiar to vessel > > and the Ministry of Chemical Industry's standard HG/T21608-2012 < < liquid handling arm engineering requirement > >; Filing provision should meet transmission LNG low temperature combustable liquid medium, and flexible hose for loading/handling arm should be furnished with urgent Pull breaking ualve/emergency separating device and the insulation quarantine measures of head mutually.
As a kind of improvement of the present utility model, operation concrete in described step 2 is as follows: safety communication and mooring plan refer to that two ships are conversed and confirmed state separately by high frequency, according to the work procedure of appointment and emergency plan, carry out one by one, radio installation should be essential safe type; Fender setting and alongside operation refer to that alongside mobile operation is selected in to be carried out daytime, after receiving and berthing and agree to, can start of evolution approaching, should continue to monitor weather condition, wave and tidal regime, navigable condition around in the process of approaching simultaneously; Two main fenders are at least set and are fixed on filling landing stage topside, the setting of inferior fender guarantee to annotate landing stage and noted between ship and have direct touching to occur without any a place; Mooring operation refers to when being noted ship safely and smoothly after alongside, in the situation that stormy waves and current are permitted, could start according to original mooring plan operation at sea;
Connecting communication and ground fault protection refer to after completing alongside and mooring, for convenience of exchanging and safety control, may need the wired connection of two ships under some clear condition; Connecting hose/handling arm refers to that dry type rapid pipe joint is that manual flange or hydraulicefficiency telecontrol operation connect, and is also furnished with urgent Pull breaking ualve on flexible pipe simultaneously.
As a kind of improvement of the present utility model, operation concrete in described step 3 is as follows: checking table before filling, after the firmly mooring of two boats and ships and before LNG filling starts, should guarantee to set up good communication between the filling Line Leader of each boats and ships, and successfully complete the inspection before filling; Before formal filling, for LNG pipeline and the prominent domestic animal effect of stress that is subject to such as dispenser pump and flowmeter on the landing stage that prevents from annotating, and produce a large amount of boil-off gas, need to carry out pre-cooled to LNG tank inside system, open the valve member of instrument such as leading to dispenser pump, flowmeter, and open tank bottom valve member and make LNG be full of all delivery lines, also can open if desired from supercharging series connection valve member, in order to improve tank inner pressure, accelerate transporting velocity; Inerting pipeline, after two plumbous flexible pipes connect, in flexible pipe, may contain a certain amount of air, on filling house steward, open the ESD valve member of two ships and close valve member subsequently, nitrogen enters LNG liquid and gas house steward by arm, and flexible pipe is carried out to 15min, and the oxygen content that needs after purging to detect in house steward confirms to be no more than prescribed limits, otherwise should carry out 2 inertings operation, until up to specification; Displacement pipeline, because house steward and flexible pipe contain a large amount of nitrogen, need to it, replace by NG, on LNG filling landing stage, is conventionally furnished with compression NG gas cylinder, on filling house steward, open the ESD valve member of two ships and close valve member subsequently, NG enters LNG liquid and gas house steward and flexible pipe by arm, and nitrogen is replaced.
A kind of rock gas filling station filling apparatus waterborne, it is characterized in that, described filling apparatus comprises filling landing stage storage tank, power ship storage tank, between described filling landing stage storage tank and power ship storage tank, be provided with heat exchanger (being called for short PBC), by flexible pipe, connect each other, described filling apparatus also comprises immersed pump, described immersed pump is transported to LNG in power ship storage tank by flexible hose for loading, remote control is all housed at the two ends of flexible pipe and holds concurrently manually grasp emergency shut-in valve how (being called for short ESD), if occurred, leak or operation exception, ESD can close by automatic or manual, for response time of preventing overvoltage ESD is about 30 seconds.For preventing annotating landing stage and noted relative movement excessive between ship, emergency separating device (being called for short ERC) is housed on described flexible pipe, described emergency separating device is set to urgent Pull breaking ualve; Described flexible hose for loading two ends adopt dry type rapid pipe joint (being called for short DDC) to prevent from breaking rear leakage.
As a kind of improvement of the present utility model, described filling landing stage LNG storage tank is also provided with self-supercharging device.For increasing engine fuel system on transporting velocity shortening filling time and filling landing stage, need, the landing stage LNG storage tank of generally annotating is also furnished with self-supercharging device.
As a kind of improvement of the present utility model, described filling landing stage LNG storage tank is provided with self-circulation system, lowers the temperature and step-down.When ESD closes, for preventing pressure oscillation.
As a kind of improvement of the present utility model, described flexible pipe joint is provided with isolated insulation pad.The place that may occur rotation or friction to connecting two ends arranges isolated insulation pad, prevents the generation of static.
With respect to prior art, advantage of the present utility model is as follows, and 1) rock gas is as ship power fuel, and practice is good, and this technology there is no precedent at home at present, and this technological scheme reduces fuel cost greatly; Reduce logistics transportation cost.Rock gas is with the calorific value rate of exchange far below oil, so LNG boats and ships are than using petrol and diesel oil fuel saving expense to surpass 30%, have the stronger market competitiveness.According to statistics, approximately 203.08 yuan/hundred Wan Yingre of annual East China 0# diesel oil average price in 2011, and LNG price is only 113.24 yuan/hundred Wan Yingre, is equivalent to 55.76% of diesel-fuel price.If can calculate by loss-rate 3:7 according to diesel oil and LNG, the fuel cost of LNG mixed power boats and ships, is only that tradition is all used 69% of diesel ship fuel cost.2), significantly reduce energy consumption; Shipping enterprise all wishes that shiphoard machinery system has the energy use efficiency of good power, the best, to reduce vessel motion cost.Compare diesel oil and other alternative energy sources, the Ship Power Equipment that the rock gas of take is fuel has the power index substantially equal with diesel engine.Other alternative energy source power plant also cannot become the major impetus of boats and ships at present, can only be as a supplement and auxiliary power.The cost price of natural gas engine unit capacity is lower than diesel engine, and cost advantage is obvious.Diesel oil and the LNG Gas Prices of selling at present of take is example, and current LNG Gas Prices per ton is about 80% of diesel-fuel price per ton.According to the difference of substitute gas diesel oil usage ratio (50~100%), use rock gas than the fuel cost of using diesel oil saving (15~30%), and combustion of natural gas is thorough, is difficult for carbon distribution, can also reduce maintenance cost.Promote the application of LNG fuel on boats and ships, meet national industrial policies, to optimizing China's field of traffic energy resource structure, promote high efficiency of energy utilization, realize target for energy-saving and emission-reduction and there is important strategic importance and realistic meaning.3), reducing emission of carbon dioxide, oxygen sulfur compound, oxynitrides, and noise pollution, flue dust, waste oil water discharge etc. also can reduce greatly.The main component of rock gas is methane, is a kind of clean, efficient green energy resource.Development LNG fuels and energy ship, has good positive role to improving urban air-quality, river water quality and shore-environment protection.Adopt LNG fuel can reduce by 10%~20% CO2 discharge amount, 90% NOX discharge amount, 100% sulphide and granular material discharged, the carcinogens such as except conventional pollutant emission significantly reduces, LNG boats and ships are not leaded in discharging, benzene.And LNG fuel main frame does not need lubricant oil cleaning equipment is installed, internal environment is better.Therefore, formula LNG filling in landing stage waterborne is an environment-friendly engineering, along with constantly constructing and implementing of Natural Gas Projects, will reduce widely the discharge amount of flue dust, dust, sulfur dioxide, carbon dioxide, nitrogen oxide in this area's atmosphere, greatly improve local environment pollution situation, improve environmental quality, create good live and work environment, its environmental benefit will be considerable.
Accompanying drawing explanation
Fig. 1 rock gas filling station filling waterborne operating procedure;
Fig. 2 the utility model LNG filling mooring layout plan;
Fig. 3 the utility model flexible hose for loading Connecting format figure;
Fig. 4 the utility model LNG filling landing stage loading system schematic diagram waterborne;
Fig. 5 cooling LNG tank inside piping and dispenser pump;
Fig. 6 replaces flexible pipe and house steward's flow chart;
Fig. 7 top filling flow chart;
Fig. 8 bottom filling flow chart;
Fig. 9 scavenging pipeline flow chart.
In figure: 1, filling landing stage storage tank, 2, power ship storage tank, 3, heat exchanger, 4, dry type rapid pipe joint, 5, urgent Pull breaking ualve, 6, emergency shut-in valve, 7, stern fast, 8, quarter spring, 9, fore spring, 10, head line.
Embodiment
In order to deepen, to understanding and cognition of the present utility model, below in conjunction with accompanying drawing, the utility model to be further described and to be introduced.
embodiment 1:a rock gas filling station filling technique waterborne, described filling technique comprises the following steps, 1) arrive at front preparation; 2) alongside operation; 3) filling operation; 4) from pool operation,
Wherein step 1 specific operation are as follows, and boats and ships are compatible to be detected; Gas phase condition and illumination; Interjob communication and communication failure; Navigational warning and warning mark; Deathtrap and safety zone; Operational instruction and personnel protective equipment; Emergency plan and fire-protection equipment two ship exchange messages; Check storage tank system; Check alongside and mooring arrangement; Check filing provision and water curtain;
1, boats and ships are compatible detects, and is to guarantee LNG filling landing stage and noted ship to be set up compatible at equipment and cloth; Various calculated suggestions can be implemented/be observed to boats and ships; Alongside, mooring, hose operation and communicate by letter and can carry out safely and effectively.It is essential, captain should grasp data and the information of relevant principal dimensions, freeboard, house steward position, mooring and fender.
If operator cabin both wings stretch out the boats and ships of main beam, when alongside and filling operation, should be specifically noted that anticollision and supplementary measure, for operator cabin both wings, be no more than the boats and ships of ship side when filling, also should consider necessary precaution measure.Good for guaranteeing the compatibility of two ships, conventionally should before alongside, to following items, confirm: by house steward's (flexible pipe/handling arm/flexible pipe bracket) size and number of using; In LNG filling operation, expection dried up minimum and maximum height of flexible pipe and freeboard are poor; Whether handling arm, crane and flexible pipe bracket be all right and meet safe working load; Hose support is on the quarter enough to prevent that flexible pipe is because of fricative damage; Flexible hose for loading should meet the regulation of the recommendation > > of OCIMF < < oil tanker house steward and accessory thereof; Handling arm should meet the regulation of OCIMF < < arm design code peculiar to vessel > > and the Ministry of Chemical Industry's standard HG/T21608-2012 < < liquid handling arm engineering requirement > >; Filing provision should meet transmission LNG low temperature combustable liquid medium, and flexible hose for loading/handling arm should be furnished with urgent Pull breaking ualve/emergency separating device and the insulation isolation of head mutually and wait measure.
2, person in overall, landing stage filling operation should be responsible for by the person in overall of an appointment instructing and control.Person in overall is served as by LNG filling landing stage captain or senior filling expert, and conventionally selecting LNG filling landing stage captain is good as person in overall.But this does not show person in overall by releasing in any degree or alleviates obligation, requirement and the responsibility of being noted ship captain and other staff.Noted ship, the owner of cargo or ship operator and should be agreed to and specify person in overall, specified overall responsibility personnel should possess following qualification: have the Deck Drain management level certificate for officers who reaches accordingly authorized by state standard, and through up-to-date STCW pact and hazardous cargo operative knowledge, upgrade training, have the qualifications and record of service of being engaged in LNG filling operation; Participated in ship operation Course Training; Under analogue, commanded repeatedly alongside, the mooring of similar boats and ships and the operation of untying the mooring rope; There is LNG filling landing stage filling experience; Understand thoroughly filling operation area and geographical situation around; Understand thoroughly LNG leakage technique, comprise equipment and the resource be familiar with for landing stage filling emergency plan; Be proficient in filling plan.Person in overall should guarantee to carry out filling, the mooring of goods and the operation of untying the mooring rope according to the suggestion in the content of these chapters and sections in the requirement of filling plan, handbook and consideration industry publication < < LNG ship-to-ship oil filling guide > >; During filling, mooring and the key operation of untying the mooring rope, to being noted ship, give suggestion; When there is leakage or fire, guarantee the enforcement of emergency preplan; Guarantee that the report of all requirements reports higher level department or appropriate authorities; Guarantee the own responsibility understanding separately of crewman of Attended Operation links; Before examining LNG filling landing stage and being noted and set up between ship and suitably effectively to communicate by letter and complete appropriate inspection, guarantee not carry out approaching and mooring and operate; Guarantee the safety inspection before annotating according to the industry guide of approval very much, and guarantee to complete suitable inspection before untying the mooring rope.Person in overall should have the right to propose following suggestion simultaneously: end or finish filling to operate; For some concrete operation, revise filling plan.
3, weather conditions, weather conditions depends primarily on stormy waves to the restriction of filling operation and surges on the impact of fender or hawser and participate in the rolling that operation boats and ships cause, considers relevant freeboard and water displacement.Thereby filling operation should take into full account because meteorological and power flow changing make to be noted ship, rock and aggravate to cause the over-stressed of hawser and anchor chain.Comprise: the weather forecast before should obtaining filling and while annotating; In whole alongside operation, consider the requirement of navigation and collision prevention, should there is good visibility to realize safe manoeuvring; Thunderstorm situation will cause special attention.In a word when filling operation, should fully take into account the hydrometeorological conditions such as ocean current, tidal height, wave, temperature, wind speed, visibility, forecast interval, the environmental conditions such as waterborne, periphery landform, physical features, the depth of water, water surface area, peripheral obstacle, radius of gyration.
4, filling notice and navigational warning, generally, provided filling notice to noting ship in advance by LNG filling landing stage.Also can be the operation of ship people who carries out inside processing, or filling-up service provider.The content of filling notice mainly comprises: organizer's full name, person in overall's identification and contact number; Plan comprises the description of the operation area of annotating; Equipment details (confirming the integrity of fender, flexible pipe, handling arm etc.), logistic support and the personnel that need provide; The preparation requirement of alongside, mooring, flexible pipe and hoisting apparatus; The LNG filling landing stages such as location side or country filling regulation with noted ship before the operation of annotating starts and between operational period, should issue navigational warning to periphery boats and ships.Requirement is at the ship of filling district periphery navigation, keeps enough distance with filling operation ship, drives with caution.
5, interjob communication and fault, should set up contact by suitable VHF channel as early as possible.Before two ships are set up effective communication, should not attempt approaching, mooring and untie the mooring rope.Should determine that the portable radiotelephone on each boats and ships can work under identical frequency, or wherein boats and ships there are enough mancarried devices to come together to offer two boats and ships to use.The personnel that are responsible for tie-out on ship should be furnished with convenient nursing type radio telephone, should not use emergent portable V HF radio telephone when routine work.If there is communication failure in approaching manipulation process, should suitable and safe in the situation that, end to handle, and the measure that boats and ships are taked subsequently should represent with the suitable sound number of < < International Regulations for Preventing Collisions at Sea > > defined.If communication outage when LNG annotates, emergency signal should be sounded and the in the situation that of safety, be ended immediately all ongoing operations.Only have after having re-established good communication and just can resume operation.
6, personnel's dealing and illumination, the personnel's dealing between two ships should be reduced in LNG filling landing stage when filling operation as far as possible.The operation of annotating night should have enough conventional illumination of decks.Suggestion adapter place minimum illumination is that 5 candle lights (lumen), LNG filling operating area are 1 candle light (by 1 meter, deck above).The portable spotlight of explosion-proof type and the spotlight of bridge both wings can be used for the mooring of carrying out night and the operation of untying the mooring rope.
7, emergency plan and safety, formulate one and can cover the contingency plan (particularly being noted ship manipulation and LNG filling stage) of all contingent urgencies and be ready to comprehensive emergency reaction.In addition, emergency plan should take into full account the resource of filling operation area and hundred uses of follow-up assisting party.As applicable, the similar plan that contingency plan Ying Yu local authority formulate combines.Two ships and local competent authority before filling operation starts (as applicable) reply emergency plan is reached an agreement.
On annotate in whole process landing stage/noted ship generally in being equal to leading position of filling.Emergency plan, this ship captain Ying Sheng power is responsible for working out the overall emergency plan of being checked and ratifying.The thing that the processing that every boats and ships must specify crewman to be responsible for emergency episode occurs during LNG filling with reply is two, especially occurs to leak and during fire.
(l) emergency signal
The personnel of two ships all should be familiar with the signal that in case of emergency two ships use of oneself agreement very much.No matter which boats and ships generation urgency, all should sound immediately the internal alarm signal of this ship and sound (or more) short sound to report to the police to the other side's boats and ships with steam whistle.All personnel will be according to contingency plan action subsequently.
(2) urgency
In case of emergency, relevant captain tackles situation and assesses and take corresponding action.When there is urgency, should consider or take the lower action of level: end filling operation; Sound emergency signal; Notify the character of two boat crews about urgency; Personnel are promptly in place; Implement emergence program; Put residual and remove flexible hose for loading or load and unload arm; Mooring group is produced, and member is in place; Confirm that main frame is available at any time; Notify await orders working boat correlation circumstance and requirement.In addition, captains should discuss and decide jointly, and especially, in fire alarm situation, whether two ship alongside are suitable together.Above basic measures should be put into the contingency plan consistent with its security management system of annotating separately.
(3) emergent during manoeuvre
The captain of two ships and person in overall should carry out the preparation of ending where necessary alongside operation at any time.Two make decision can have the situation under control in the situation that still leaving the sufficient time, and two ship captains should notify mutually the other side to take approximately to take action immediately.
(4) emergency preparedness
Two ships should be carried out arrangement below: main frame and the steering wheel of being noted ship are available at any time; Before filling operation starts, dispenser pump and other transportation by lighter equipment cutting functions should be tested; Standby and the emptying flexible pipe remove at short notice of crewman; Have portable catch tray equipment available at any time; Mooring arrangement is available at any time, and back up cable can be changed at any time disrumpent feelings heaving pile fire-protection equipment and can come into operation immediately.
(5) safety
All LNG filling operations, each captain must at every moment be responsible for ship, crewman, LNG and equipment, and can not allow because of other people action, the safety guarantee of operation to be suffered damage.Each captain should guarantee observe the program of this filling operation plan recommendation and meet national associated safety convention.
Between filling operation for preventing that personnel are tired, person in overall and/or all relevant with filling operation take responsibility (people) should in accordance with the lounge relevant with international rule with ILO, IMO every requirement and the relevant chapters and sections of ISM.Should retain and have a rest and the disconnected record of working hours accordance.It is on duty that captain should consider that the activity duration of estimating guarantees to maintain from start to finish the crewman of safe and unlikely fatigue.
8, before manoeuvre, prepare, after arriving at, two ships that participate in filling operation should be set up radio traffic, and all programmed sequence of operations of having assessed are reached common understanding.Further the information of exchange two ships, also should check Major Systems and the equipment such as storage tank system, mooring arrangement and flexible hose for loading for LNG filling landing stage, to guarantee carrying out smoothly of LNG filling operation.Before starting, filling operation should check according to table for information about.
(l) prepare
LNG filling landing stage and noted boat crew and should know fully relevant program and danger, especially about mooring and the aspect of untying the mooring rope.Guarantee that Vessel's Description meets relevant regulations, top-up and have all requisite loading systems of suitable trim and oneself warp of safety installations to pass through to test, reach upstate at any time.Oneself is ready through pressing mooring plan for mooring facilities, and oneself correctly places fender and flexible hose for loading, connects and fixes.Oneself is ready to flexible hose for loading and operational facilities according to related request by warp.Obtain filling operating area in the weather forecast of expection fishing time, agreed when the boats and ships steam whistle matters such as action that emergency signal should take of sounding.
(2) exchange message
In two boats and ships that carry out LNG filling operation exchange message mutually, the item of the operation of annotating is confirmed.The quantity of LNG of will annotating and feature and order of operation are confirmed, wherein mainly comprise following information: mooring planimetric map; The quantity of LNG loading system, pump and the details of maximum allowble pressure; Filling speed (start, maximum and while filling in barn); Filling landing stage changes required time vexed normally stop and the emergent rest schedule of flow when filling operation starts, stops and filling it up with soon; Between operational period, expect freeboard and drinking water maximum value; The ventilation of suggestion or the details of inerting pipeline mode; The order of taking action when leakage and fire; The key operation step that oneself confirms; On duty or (in shifts) arranges to cause filling operation and ends, tears open pipe and untie the mooring rope about environment and performance constraint condition; Should observe locality or government about the rule of filling; The connection of flexible hose for loading, the plan coordination of monitoring, draining and tearing open pipe; The plan of untying the mooring rope etc.
(3) check storage tank system
Before filling, except customary visual examination storage tank appearance, whether have the phenomenon such as sweat, also should check the parameters such as liquid level, pressure, temperature of storage tank on LNG filling landing stage, confirm to meet the barium of the operation of annotate calmly.If pressure and temperature is in being unfavorable for the job state of annotating, should first carry out the measures such as pressure release or precooling, treat that storage tank carries out operation after level of security again.Before formal filling, should note the temperature of ship storage tank simultaneously, guarantee that the temperature of two storage tanks is suitable.Check that storage tank is to piping, valve member and control system between filling station, the outfit situation of the emergency power supply of monitor and alarm system.
(4) check alongside and mooring arrangement
Fender is the key equipment of ship-to-ship alongside operation fender, should confirm to touch base power validity.Conventionally fender has two kinds of tandem fender and fenders arranged in pairs.Age of the fender confirm to be about to using and take adequate measures to make them meet the requirement of intended service to fender.
When two ships are fixed together, moorings should arrange and be equipped with, and guarantees hawser pipeline safely and effectively.The manoeuvre ship that this point is generally used for mooring to hawser is very important, and chock and warping winch and running line equipment should regularly check.
(5) check filing provision and water curtain
Before filing provision is connected with house steward, tackle each filing provision and carry out visual examination, determined whether damage.The flexible pipe using should be made regular check on and deterioration situation.The relative recording of inspection or push type broach/vacuum monitor should be effectively available.If flexible pipe or flange are damaged, this flexible pipe should be withdrawn further and check, repairs or scrap.Should confirm to have reducer fitting and the pad of enough specifications aboard ship, required for the size of actual house steward and flexible pipe.Filling operation requirements flexible pipe/handling arm connection state is fine.As use flange or rapid pipe joint, should make it in order and suitably fix, to guarantee that closely connecting nothing leaks.Meanwhile, also should check the drenching installation of filling station house steward gunnel, guarantee in good condition.
The specific operation of described step 2 are as follows, safety communication and mooring plan; Manoeuvre approaching; Fender arranges and alongside operation; Mooring operation; Connecting communication and ground connection; Connecting hose; Alongside process comprises the manipulation of two ships and mooring, first needs secure communication and mooring plan to confirm, the facilities such as fender and operation tool are placed ready, carry out according to schedule alongside and mooring operation.For being noted ship manoeuvre, should formulate emergency plan and deal with any urgency.Before filling alongside mooring, should check according to table for information about.
1, safety communication and mooring plan
Two ships should be conversed and be confirmed state separately by very high frequency, according to the work procedure of appointment and emergency plan, carry out one by one, and radio installation should be essential safe type.Consider weather and navigation state, every single stepping all needs to obtain both sides' confirmation.As needs, being noted ship should be able to provide concise and to the point sketch demonstration deck to arrange clear condition, comprises the quantity of fairlead and bollard and the information such as distance of filling station.When preparing, mooring plan should consider following factor: the size of each boats and ships and difference thereof; Estimate freeboard and water displacement difference; Expection weather conditions and sea state; Provide effective mooring to lead cable etc.
2, fender setting and alongside operation,
Alongside mobile operation should be selected in as far as possible carries out daytime, except irrelevant personnel has special experience to the job manipulation of annotating night.After receiving and berthing and agree to, can start of evolution approaching.In the process of approaching, should continue to monitor weather condition, wave and tidal regime, navigable condition etc. around simultaneously.
Two main fenders at least should be set and be fixed on filling landing stage topside, the setting of inferior fender should be able to guarantee to annotate landing stage and noted between ship and have direct touching to occur without any a place.Recommend adoption diameter is about the pneumatic pattern fender of lm, and the type of inferior fender and size depend on the design on the landing stage of annotating.
3, mooring operation, referring to Fig. 2,
When being noted ship safely and smoothly after alongside, in the situation that stormy waves and current are permitted, could start according to original mooring plan operation at sea.If the LNG filling landing stage that does not configure special mooring arrangement is at the typical Mooring Arrangements of annotating barely, should comprise at least four head lines, two fore springs and two quarter springs and four stern fasts, refer to Fig. 2.
LNG filling landing stage ISP should be provided with the mooring plan of a standard, is applicable to specific place.While confirming mooring, considered that it is very important that the relative movement of boats and ships and the variation of freeboard avoid between operational period hawser to bear excessive tension force, but hawser cannot be oversize to such an extent as to relative movement that two ships are raw excessive.The mooring line of equidirectional should be used similar material.
4, connecting communication and ground fault protection
After completing alongside and mooring, for convenience of exchanging and safety control, under some clear condition, may need the wired connection of two ships.Mainly comprise warning connection, emergent stopping control box of communication connection, tank level and temperature and pressure monitoring, two ships etc.Two gears have identical connection and communication interface.Should locate to equip single Jie's insulated flange each house steward, or one section of electric discontinuous flexible pipe of every flexible pipe equipment, or special construction flexible pipe prevents current delivery between accumulation of static electricity or boats and ships.Between two ships, potential electromotive force should be down to minimum.All ship-to-ship mooring lines should insulate, or use the soft mooring rope of natural material or the every metal mooring line that soft stern fast is connected by eye thimble.Nonisulated Wire ladder between two ships or gangway ladder should be installed rubber at ladder end.Suspension rod or hoist steel wire and the operation of suspension hook care should be used to.Fender supports the standing grain in net or cage region to need high-quality to safeguard through bare wire and the chain of protection.
5, connecting hose/handling arm, referring to Fig. 3,
Before connecting hose/handling arm, should guaranteeing to shout LNG flexible hose for loading, to unload the state of arm intact, reaches expectation service condition.Arm or the employing flexible pipe bracket of by LNG, annotating on landing stage, also can install flexible pipe/handling arm by auxiliary docking facilities or the docking guide rail of advising, to reduce the impact of boats and ships being rocked due to stormy waves.The installation of flexible pipe should be considered suitable support or the problems such as friction fixing and that produce due to ship motion, selects the flexible pipe of appropriate length, and guarantee that the crooked radian of flexible pipe is up to specification according to the different height difference of the drinking water of two ships.Connecting hose is often referred to dry type rapid pipe joint (manually flange or hydraulicefficiency telecontrol operation) and connects, and is also furnished with urgent Pull breaking ualve on flexible pipe simultaneously.Ordinary circumstance bottom hose two ends are connected with ESD remote-controlled valve, mainly in case of emergency can fast shut-off charging line.After connecting hose, can carry out hot test to ESD valve member.On handling arm, are conventionally furnished with the critical components such as position monitoring system, quick connector, emergency separating device and swivel joint, landing stage, riverbank is arranged when U reads G handling arm, according to factors such as river low water water level, flood level, boats and ships range of drift, determine that the envelope vapour of liquid handling arm encloses.Position monitoring system should be reported to the police and perform an action according to handling arm swing and rotating minute two-stage.
The specific operation of described step 3 are as follows, checking table before filling; Adding amount and filling speed; Precooling internal duct and dispenser pump; Inerting and displacement; Open manual and remote-controlled valve; To two ships, send ready signal; Start dispenser pump program; Top and bottom liquid inlet be filling alternately; Stop dispenser pump program; Purging and inerting etc.
1, checking table before filling
After the firmly mooring of two boats and ships and before LNG filling starts, should guarantee to set up good communication between the filling Line Leader of each boats and ships, and successfully complete the inspection before filling.Checking table before particular content for details, see the appendix 5 filling, before formal filling, checking table should be by each ship Line Leader withdrawal of signing.Captain should guarantee to observe the security step of all recommendations in the works, and formulates emergency plan and deal with any urgency in filling process.
When preparing LNG filling plan, should consider to guarantee that boats and ships maintain enough stabilities, Structure stress maintains in design limit, and it is minimum that free surface effect remains.The plan that LNG filling operation should have two ships to agree in writing form, when feasible, before should comprising that LNG filling starts, filling landing stage should be known and noted ship at the flow of different phase.As the change of the speed of annotating is necessary, noted ship and should be informed the requirement in this respect of filling landing stage.Equally, filling is that ship should be informed and noted ship because operation and the variation of any flow of causing.Consult the filling speed of agreeing to, should not shout and unload the flow that arm manufacturer advises over flexible hose for loading.
2, landing stage filling principle
At present, the external dosing method of Marine vacuum heat insulation-type LNG storage tank mainly contains three kinds: auto-pressurizing; Dispenser pump formula; From supercharging and dispenser pump convolution.
Auto-pressurizing is that LNG in storage tank is vaporized by entering heat exchanger from supercharging concentrated phase pipe, and the gas after vaporization returns in storage tank, improves the gaseous pressure of storage tank, and oneself reaches the object of external filling.That is, the power source of auto-pressurizing storage tank is filling tank and the pressure difference of being noted tank.Advantage from supercharging dagger-axe storage tank is that technological process simply, does not need power consumption; Shortcoming is a main more emptying gas, filling time compared with two, noted tank needs continuous pressure release poor etc. to increase two pressure tanks.Dispenser pump formula is that two ear G annotate to being noted the gas-phase space of tank filling tank and the gas-phase space UNICOM of being noted tank via immersed pump supercharging, noted inflexible BOG in tank and got back to filling tank first by muffler, solved filling tank because liquid reduces the problem of pressure decreased, also solved simultaneously and noted tank and increase the problem that gaseous pressure raises because of liquid, whole filling process is without to being noted tank pressure release.The advantages such as comprehensive, good fortune note efficiency is high although dispenser pump formula has, the filling time is short, simple operation, also have line arrangement complexity, increase the rhymed formula points such as manufacture and maintenance cost.Particularly adopt deep-well pump form in tank, very high to the sealing of storage tank and pump housing joint and adiabatic requirement, the domestic ships moon storage tank not yet adopt this form, and generally adopt immersed pump outside tank.
Referring to Fig. 4, two kinds of situations should be avoided with being noted in ship power mouth main procedure in LNG filling landing stage: 1. forbid inflammable gas and air to appear at some place simultaneously; If 2. 1. there is no proud arriving, should guarantee that so this place does not have burning things which may cause a fire disaster to produce.Around this two principle, we realize LNG filling operation waterborne.The working principle of this system is: with immersed pump, LNG is transported to and is noted in ship storage tank by flexible hose for loading, for increasing engine fuel system on transporting velocity shortening filling time and filling landing stage, need, the landing stage LNG storage tank of generally annotating is also furnished with self-supercharging device.The remote control manually behaviour's emergency shut-in valve how (ESD) of holding concurrently is all housed at the two ends of flexible pipe, if occur to leak or operation exception, ESD can close by automatic or manual, for response time of preventing overvoltage ESD is about 30 seconds.When ESD closes, for preventing pressure oscillation, storage tank is equipped with self-circulation system to lower the temperature and step-down.For preventing annotating landing stage and noted relative movement excessive between ship, emergency separating device (ERC) is housed on flexible pipe, be generally urgent Pull breaking ualve.Flexible hose for loading two ends adopt dry type rapid pipe joint (Dry Discolmect Couplings, DDC) to prevent from breaking rear leakage.The place that may occur rotation or friction to connecting two ends also should arrange isolated insulation pad, prevents the generation of static.
3, inner precooling, referring to Fig. 5, before formal filling, for LNG pipeline on the landing stage that prevents from annotating with dispenser pump and flowmeter etc. are prominent is subject to domestic animal effect of stress, and produces a large amount of boil-off gas.Need to carry out LNG tank inside system pre-cooledly, open the valve member of instrument such as leading to dispenser pump, flowmeter, and open tank bottom valve member and make LNG be full of all delivery lines.Also can open if desired from supercharging series connection valve member, in order to improve tank inner pressure, accelerate transporting velocity.
4, inerting pipeline
After two plumbous flexible pipes connect, in flexible pipe, may contain a certain amount of air, according to above-mentioned filling principle, must exclude the air in charging line.In LNG filling, Nie is furnished with nitrogen storage gas cylinder or nitrogen gas generating device on ship conventionally, on filling house steward, open the ESD valve member of two ships and close valve member subsequently, nitrogen enters LNG liquid and gas house steward by arm, flexible pipe is carried out to 15min, the oxygen content that needs after purging to detect in house steward confirms to be no more than prescribed limits, otherwise should carry out 2 inertings operation, until up to specification.
5, displacement pipeline, referring to Fig. 6,
After inerting meets the demands, because house steward and flexible pipe contain a large amount of nitrogen, therefore need to it, replace by NG, on LNG filling landing stage, is conventionally furnished with compression NG gas cylinder, on filling house steward, open the ESD valve member of two ships and close valve member subsequently, NG enters LNG liquid and gas house steward and flexible pipe by arm, and nitrogen is replaced.
6, top filling, referring to Fig. 7,
After inerting and displacement all complete, just can open manually and remote-controlled valve, to two ships, send ready signal, record filling house steward is the initial reading of flowmeter above, and starts dispenser pump program.For the temperature that keeps two storage tanks quite and reduce boil-off gas, when initial filling, need to adopt small flow mode of movement to be carried out precooling cooling to noting ship storage tank.Filling landing stage LNG pass through flowmeter by immersed pump and is transported to and is noted ship tank top, is noted ship storage tank gas phase and turns back to the landing stage storage tank gas phase of annotating, the gaseous pressure balance of the amount of reaching storage tank.
7, bottom filling, referring to Fig. 8,
When the temperature of two ship storage tanks is suitable and the abundant precooling of pipeline after, the slow dosing method in top can be transformed into bottom dosing method fast, in transfer process, first slowly open and lead to valve member on the charging line of bottom, by abandoning, closing the cooling valve member of top spray.When slowly annotate in top, first open bottom filling valve member and close again bottom valve member, prevent the appearance of superpressure phenomenon.In the limited field of filling speed, start high-power dispenser pump and carry, as noted ship storage tank and occur the higher phenomenon of temperature and pressure.Can again be transformed into top dosing method and carry out precooling cooling, also can adopt bottom filling and bottom two kinds of modes of filling to hocket.
8, scavenging pipeline, referring to Fig. 9,
In filling, reach after the demand of being noted ship, that notes storage tank fills the limit (being generally 90%), according to program stopped dispenser pump work, reading after recording flowmeter filling, is also provided with flowmeter on gas phase return pipeline or conventionally according to the corresponding deduction of flat evaporator rate of operation side.Now in delivery line, be full of LNG liquid, therefore need to purge operation to liquid phase delivery line.The valve member of NG gas cylinder is opened, NG gas is purged the LNG in house steward and flexible pipe to storage tank, purge time is about 15min, and the pressure of gas cylinder should be no more than the working pressure of storage tank conventionally.
9, inerting pipeline
After two ship house stewards and flexible pipe purge, in flexible pipe, may contain a certain amount of NG, inflammable gas remains in pipeline may bring harm, therefore before removing flexible pipe, needs pipeline inerting disposal again.The operation and maintenance of system nitrogen storage gas cylinder or nitrogen gas generating device entered to LNG liquid and gas house steward by arm, its pipeline carried out to inerting disposal, so that can be dismantled flexible hose for loading after inerting.
10, filling is ended
In two ship filling operation process, there is some case of emergency, should prepare to interrupt immediately filling operation, if desired from pool.Mainly comprise following situations: alongside ship moves and reaches maximum permissible value, may cause hose strength loss or excessive deformation; Freakish weather and or sea situation; There is power failure in arbitrary ship; Main communication system between two ships goes out rose and puts barrier, and there is no suitable standby communication modes; Find that LNG leaks or breaking out of fire; There is agnogenic pressure drop in LNG system; Flexible pipe, deck, the Huo Chuan village, joint pipeline are found any leakage; Discovery may cause leaks fault or the report wound threatening; Unload output and be subject to fluence to have the notable difference of unknown cause; There is any fault in bumper system; The situation such as when any boatman rises.
While adopting the filling of handling arm, All Alerts signal should have demonstration on landing stage, and during filling, emergency stopping system can be carried out following action: 1., when 1 grade of generation is transfinited, dispenser pump stops, and emergency separating device ball valve is closed; 2. when 2 grades of generations are transfinited, dispenser pump stops, and emergency separating device ball valve is closed, and ejection escape mechanism action is realized ship ship separated.
The specific operation of described step 4 are as follows, checking table after filling; Close manual and remote-controlled valve; Remove flexible pipe; Remove communication line; Transmit filling file; Untie the mooring rope and weigh anchor; Manoeuvre sails out of.
1, the operation of untying the mooring rope
After filling operation, first to close manually and remote-controlled valve, all flexible pipes dismountings are educated and are vertically confirmed that oneself is through inerting, prevent that operation from producing static dangerous, as requested two ship wire communications are removed after by mutual consent.Two ships confirm that personnel have returned boats and ships separately, regain boarding ladder.Flexible pipe, handling knee-joint head, cable modem speech etc. are connected to dismounting rear and blind disconnected.Should notify management organization to complete LNG filling and expection is untied the mooring rope the time, confirm the relevant part again of filling, regain and file.The operation of untying the mooring rope suggestion is carried out by having the staffing of filling operating experience.
During morning and evening tides changes, muddy cable is not wanted in suggestion, according to person in overall, the judgement of weather and ocean current situation is determined.
Untie the mooring rope and should distribute sufficient crewman, and need to consider that following danger looks into: the cargo transfer side of boats and ships is answered rid, comprises suspension rod and hoist; Mooring line departs from and method for releasing should be through consulting agreement; Fender, comprise they tow rope and be solid rope, should check that it is in shape; The running line at all heaving piles station and upper cable device should be ready to; Sharp keen emergency axe or cutting equipment should be prepared appropriate at each heaving pile station; Bridge-to-bridge communication should be confirmed; Between mooring personnel, should set up communication; Mooring personnel only obtain just targeted release hawser of instruction; Should check navigation density; Before untying the mooring rope according to appendix 6 filling, checking table is filled in.
2, from pool operation
Conventionally the method adopting while untying the mooring rope is: then equipment the place ahead backspring of first dishing out throws first cable above, after the equipment stern fast quarter spring of then dishing out of first dishing out, manoeuvre ship drives towards extensive waters.While discharging last root hawser, demand special care, this needs safety and effectively completes; A method that can offer convenience is " noose pin technology ", and mooring rope order may change along with weather condition or mooring captain suggestion.Two ships of any change before untying the mooring rope should be notified.Should be noted that local condition or Ship Structure feature may cause that two ships depart from difficulty, should consider substitution plan.
Filling Line Leader and crewman can adopt diverse ways safety and effectively execute the task.The lasso trick pin that use is fixed on the quick release hook in bitt or is connected with running line, when mooring cable is thrown off from bitt, the load that can bear mooring line.After untying the mooring rope successfully, noted ship manoeuvre and sail out of, routine check should be carried out according to relevant regulations in filling landing stage.
Embodiment 2: referring to Fig. 4, a kind of rock gas filling station filling apparatus waterborne, described filling apparatus comprises filling landing stage storage tank 1, power ship storage tank 2, between described filling landing stage storage tank 1 and power ship storage tank 2, be provided with heat exchanger (being called for short PBC), by flexible pipe, connect each other, described filling apparatus also comprises immersed pump, described immersed pump is transported to LNG in power ship storage tank 1 by flexible hose for loading, the double manually behaviour of remote control emergency shut-in valve 6(how is all housed at the two ends of flexible pipe and is called for short ESD), if occurred, leak or operation exception, ESD can close by automatic or manual, for response time of preventing overvoltage ESD is about 30 seconds.For preventing annotating landing stage and noted relative movement excessive between ship, emergency separating device 5(is housed on described flexible pipe and is called for short ERC), be generally urgent Pull breaking ualve; Described flexible hose for loading two ends adopt dry type rapid pipe joint 4 (being called for short DDC) to prevent from breaking rear leakage.
Embodiment 3: referring to Fig. 4, as a kind of improvement of the present utility model, described filling landing stage LNG storage tank is also provided with self-supercharging device.For increasing engine fuel system on transporting velocity shortening filling time and filling landing stage, need, the landing stage LNG storage tank of generally annotating is also furnished with self-supercharging device.
Embodiment 4: referring to Fig. 4, as a kind of improvement of the present utility model, described filling landing stage LNG storage tank is provided with self-circulation system, lowers the temperature and step-down.When ESD closes, for preventing pressure oscillation.
Embodiment 5: referring to Fig. 4, as a kind of improvement of the present utility model, described flexible pipe joint is provided with isolated insulation pad.The place that may occur rotation or friction to connecting two ends arranges isolated insulation pad, prevents the generation of static.
Embodiment 6: referring to Fig. 4, as a kind of improvement of the present utility model, described filling apparatus is also provided with flowmeter, instrument, and the quantity of described flowmeter, instrument is at least one, and described flowmeter, instrument are arranged between filling landing stage storage tank and power ship storage tank.
The utility model can also, by least one and embodiment in technical characteristics described in embodiment 3,4,5,62 combinations, form new mode of execution.
It should be noted that above-described embodiment, be not used for limiting protection domain of the present utility model, the equivalents of having done on the basis of technique scheme or substitute and all to fall into the scope that the utility model claim is protected.

Claims (3)

1. a rock gas filling station filling apparatus waterborne, it is characterized in that, described filling apparatus comprises filling landing stage storage tank, power ship storage tank, between described filling landing stage storage tank and power ship storage tank, be provided with heat exchanger, by flexible pipe, connect each other, described filling apparatus also comprises immersed pump, described immersed pump is transported to LNG in power ship storage tank by flexible hose for loading, the remote control manually operated emergency shut-in valve of holding concurrently is all housed at the two ends of flexible pipe, on described flexible pipe, emergency separating device is housed, described emergency separating device is set to urgent Pull breaking ualve; Described flexible hose for loading two ends adopt dry type rapid pipe joint to prevent from breaking rear leakage.
2. rock gas filling station filling apparatus waterborne according to claim 1, is characterized in that, described filling landing stage LNG storage tank is also provided with self-supercharging device.
3. rock gas filling station filling apparatus waterborne according to claim 1 and 2, is characterized in that, described flexible pipe joint is provided with isolated insulation pad.
CN201420053057.3U 2014-01-27 2014-01-27 Filling device of overwater natural gas filling station Expired - Lifetime CN203784632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420053057.3U CN203784632U (en) 2014-01-27 2014-01-27 Filling device of overwater natural gas filling station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420053057.3U CN203784632U (en) 2014-01-27 2014-01-27 Filling device of overwater natural gas filling station

Publications (1)

Publication Number Publication Date
CN203784632U true CN203784632U (en) 2014-08-20

Family

ID=51320819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420053057.3U Expired - Lifetime CN203784632U (en) 2014-01-27 2014-01-27 Filling device of overwater natural gas filling station

Country Status (1)

Country Link
CN (1) CN203784632U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104315335A (en) * 2014-10-22 2015-01-28 成都华气厚普机电设备股份有限公司 Pontoon-type gas station ship unloading system
CN104565806A (en) * 2014-12-08 2015-04-29 武汉三江航天远方科技有限公司 LNG (Liquefied Natural Gas) filling method for small ships
CN104197183B (en) * 2014-01-27 2016-05-11 江苏海企港华燃气发展有限公司 A kind of natural gas filling station waterborne technological process and filling apparatus
CN109140225A (en) * 2018-09-05 2019-01-04 中国海洋石油集团有限公司 A kind of LNG Distribution Center
CN110030488A (en) * 2019-04-30 2019-07-19 黄立亚 A kind of transfusion system between LNG ship oceangoing ship and LNG tank case (or tank car)
CN110360445A (en) * 2019-07-18 2019-10-22 江南造船(集团)有限责任公司 A kind of gas charging method and device
CN114104206A (en) * 2021-12-07 2022-03-01 连云港杰瑞自动化有限公司 LNG offshore side-leaning type conveying and transferring system
CN114166137A (en) * 2021-11-26 2022-03-11 沪东中华造船(集团)有限公司 Intelligent detection system and method for ship-to-ship filling interval
CN114427656A (en) * 2022-03-09 2022-05-03 重庆富江能源科技有限公司 LNG filling and BOG recovery system based on LNG wharf boat filling station

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104197183B (en) * 2014-01-27 2016-05-11 江苏海企港华燃气发展有限公司 A kind of natural gas filling station waterborne technological process and filling apparatus
CN104315335A (en) * 2014-10-22 2015-01-28 成都华气厚普机电设备股份有限公司 Pontoon-type gas station ship unloading system
CN104565806A (en) * 2014-12-08 2015-04-29 武汉三江航天远方科技有限公司 LNG (Liquefied Natural Gas) filling method for small ships
CN104565806B (en) * 2014-12-08 2016-08-10 武汉三江航天远方科技有限公司 Small-sized Marine LNG charging method
CN109140225A (en) * 2018-09-05 2019-01-04 中国海洋石油集团有限公司 A kind of LNG Distribution Center
CN110030488A (en) * 2019-04-30 2019-07-19 黄立亚 A kind of transfusion system between LNG ship oceangoing ship and LNG tank case (or tank car)
CN110360445A (en) * 2019-07-18 2019-10-22 江南造船(集团)有限责任公司 A kind of gas charging method and device
CN114166137A (en) * 2021-11-26 2022-03-11 沪东中华造船(集团)有限公司 Intelligent detection system and method for ship-to-ship filling interval
CN114104206A (en) * 2021-12-07 2022-03-01 连云港杰瑞自动化有限公司 LNG offshore side-leaning type conveying and transferring system
CN114427656A (en) * 2022-03-09 2022-05-03 重庆富江能源科技有限公司 LNG filling and BOG recovery system based on LNG wharf boat filling station
CN114427656B (en) * 2022-03-09 2023-12-08 重庆富江能源科技有限公司 LNG filling and BOG recovery system based on LNG wharf filling station

Similar Documents

Publication Publication Date Title
CN104197183B (en) A kind of natural gas filling station waterborne technological process and filling apparatus
CN203784632U (en) Filling device of overwater natural gas filling station
CN202546254U (en) Marine small LNG (liquefied natural gas) modular receiving terminal
Paik Ship-shaped offshore installations: design, construction, operation, healthcare and decommissioning
CN103879522B (en) A kind of natural fuels filling station landing stage waterborne
Fan et al. LNG bunkering pontoons on inland waters in China
Boulougouris et al. LNG Fueled Vessels Design Training
CN203740104U (en) Plane arrangement for overwater natural gas filling station wharf boat
CN209241260U (en) The filling distribution ship of LNG container
RINE AL REPORT
Tokić et al. Training Requirements for LNG Ship-to-Ship Transfer
Poldervaart et al. Offshore LNG transfer: a worldwide review of offloading availability
Sano et al. Design issues and trends for the new generation of offshore support vessels
Jafarzadeh et al. Electrification of the Coastal Fishing Fleet Using Hydrogen and Ammonia-Fed Fuel Cells
Chen Risk factors analysis and countermeasures of FPSO's lightering in Dongying sea area
CN108569380A (en) A kind of waters navigation channel service facility
Herdzik Remarks about the European ports’ regulations of natural gas bunkering
Aubault et al. Regulatory Framework for Design, Construction and Operation of Floating Wind Turbine Platforms
Xiao Analysis on the Development of Intelligent Shipping
Wang Risk analysis of fire/explosion to the LNG fuelled passenger ferries
Hongjun et al. LNG bunkering pontoons on inland waters in China
Hodgson et al. LNG as a fuel for offshore vessels-Bunkering technology
Andersen et al. The Floatel Superior Loose-Anchor Incident and its Significance for Design and Operation of Semi-Submersibles
Zhenfang et al. Emergency Response to a Heavy Damaged Giant Container Vessel
CLUB Carefully to Carry

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140820