CN203783570U - Comprehensive logging integrated formation pressure detecting device in process of drilling - Google Patents

Comprehensive logging integrated formation pressure detecting device in process of drilling Download PDF

Info

Publication number
CN203783570U
CN203783570U CN201320753976.7U CN201320753976U CN203783570U CN 203783570 U CN203783570 U CN 203783570U CN 201320753976 U CN201320753976 U CN 201320753976U CN 203783570 U CN203783570 U CN 203783570U
Authority
CN
China
Prior art keywords
logging
well
pressure
formation pressure
comprehensive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320753976.7U
Other languages
Chinese (zh)
Inventor
刘德伦
吴大奎
李立
魏建强
何葵
熊驰原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201320753976.7U priority Critical patent/CN203783570U/en
Application granted granted Critical
Publication of CN203783570U publication Critical patent/CN203783570U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a comprehensive logging integrated formation pressure detecting device in the process of drilling. The device comprises a remote transmission system, a well site end and a remote logging information formation pressure monitoring device, wherein the well site end is used for obtaining real-time logging data of a site comprehensive logging instrument and the remote logging information formation pressure monitoring device is used for comprehensively analyzing the remote transmission logging data in real time. The well site end is connected with the remote transmission system. The remote transmission system is connected with the remote logging information formation pressure monitoring device. According to the comprehensive logging integrated formation pressure detecting device, the real-time logging data of various work conditions of the site comprehensive logging instrument are obtained and intelligently and comprehensively analyzed and judged, an abnormal formation pressure alarm is made, the frequency of underground accidents is reduced, and the purpose of safe drilling production is achieved.

Description

Compound logging is detecting device integrated with boring strata pressure
Technical field
It is detecting device integrated with boring strata pressure that the utility model relates to a kind of compound logging, belongs to the drilling prospection development technique fields such as oil, natural gas.
Background technology
High-pressure gas well drilling well is countries in the world oil for many years always, the difficult point of natural gas exploration and development and focus, no matter China is on land or in marine drilling completion practice, all ubiquity the problem of abnormal high temperature and high pressure, and have and distribute extensively, the feature that pressure range is large, oil company is in order to find new opportunity, need to wellbore construction under rugged environment more both at home and abroad in drilling engineering detecting formation pressure conventionally adopt with the way of boring pressure detecting, and mainly contain Dc index method with the method for boring pressure detecting, Sigma's method, standard drilling speed method, the methods such as rock strength, all need intermediate parameters more, computational process is complicated, causing engineering site to use has difficulties, need the prediction of a set of collection strata pressure, monitor and be evaluated as a kind of compound logging of one with boring strata pressure integrated detection system.
Publication number is CN101025084, and the Chinese patent literature that open day is on August 29th, 2007 discloses a kind of method of predetecting formation pore pressure under drill-bit while drilling.It treats drilling well and drilling well for the block that exists together, extracts respectively the other some roads of each artesian well seismographic record, does weighting and processes to obtain and treat drilling well and the seismographic record of drilling well; Utilize log data and the seismographic record on the different series of strata of drilling well stratum, set up the hierarchical mode of seismographic record prediction stratum acoustic travel time logging curve; The acoustic travel time logging curve on the beneath stratum of drilling bit is treated in prediction; Utilize formation density log data, acoustic travel time logging data and the gamma ray log data of drilling well to set up overlying formation pressure computation model, degree of porosity and the shale content computation model of this geology block and the formation pore pressure computation model of minute interval; In conjunction with the overlying formation pressure computation model of this block of having set up, the degree of porosity of this block and shale content computation model and formation pore pressure computation model are predicted the pore pressure of current drilling strata.But these are all for static state, single analysis, lack integrated, dynamically with boring well logging pressure detecting.
Publication number is CN1966934, and the Chinese patent literature that open day is on May 23rd, 2007 discloses a kind of method of prediction while drilling stratum under drill bit caving pressure and fracture pressure.Its extract one treat drilling well and one with this other some roads of drilling well seismographic record for the treatment of well drilling neighbouring, do weighting and process acquisition this treats drilling well and the seismographic record of drilling well; Drilling well is carried out to interval transit time and density log, obtain this log data on the different intervals stratum of drilling well; Utilize this log data and seismographic record, set up the hierarchical mode that utilizes seismographic record prediction stratum SVEL, wave impedance; Predict the log that this treats the beneath stratum of drilling bit; In conjunction with stability of wellbore by mechanics log interpretation model, predict caving pressure and the fracture pressure that this treats stratum under drilling bit.The drilling well section well logging result of foundation by finding out different series of strata stratum in same well is associated with seismographic record, and according to geology layering prediction while drilling caving pressure and fracture pressure, like this, effective generation that stops cave-in, prevents down hole problem, but only there is the associated prediction of earthquake and well logging, there is no fully application with boring desirable compound logging information, the monitoring of strata pressure and evaluation are lacked to promptness and authenticity.
Summary of the invention
The purpose of this utility model is to overcome the problems referred to above that existing well logging formation pressure monitoring exists, and provides a kind of compound logging detecting device integrated with boring strata pressure.The utility model obtains the real-time logging data of the various working of field integrated logging, and these data are carried out to intelligent comprehensive analysis judgement, makes strata pressure abnormity early warning, reduces the generation of down-hole accident, meets the object of safety drilling Production requirement.
For achieving the above object, the technical solution adopted in the utility model is as follows:
A kind of compound logging is detecting device integrated with boring strata pressure, it is characterized in that: comprise remote transmitting system, for obtaining the well site end of the real-time logging data of field integrated logging and the long-range well logging information formation pressure monitoring device that teletransmission logging data is carried out to real time comprehensive analysis, well site end is connected with remote transmitting system, and remote transmitting system is connected with long-range well logging information formation pressure monitoring device.
Described well site end comprises that comprehensive logging instrument harvester and well logging are with boring strata pressure harvester, and well logging is connected with comprehensive logging instrument harvester with boring strata pressure harvester, and comprehensive logging instrument harvester is connected with remote transmitting system by interface.
Described long-range well logging information formation pressure monitoring device comprises network distribution platform and the customer account management device being connected with network distribution platform respectively, archive management device and with boring strata pressure information analysis apparatus, remote transmitting system is connected with the network publisher server of network distribution platform.
Employing the utility model has the advantage of:
One, the real-time logging data of the various working of the utility model collection site comprehensive logging instrument, these data are carried out to real-time Analyze Form ation Pressure and abnormity early warning, in base, obtain remote transmission data simultaneously, synchronously carry out remote auto monitoring and early warning, reduce the generation of down-hole accident, meet the object of safety drilling Production requirement.
Two, the utility model realized first well logging scene and base collection geology, well logging, well logging, earthquake integrated with boring pressure detecting.
Three, in the utility model, base, well site is synchronous, and round Realization well site, base be stressor layer monitoring alarm synchronously, improves the disposing capacity of base to emergency.
To sum up, the utility model associating well logging scene and base, collection geology, well logging, well logging, earthquake integrated with the pressure of the drill force checking device, realize automatic monitoring and early warning, meet safety drilling Production requirement.
Accompanying drawing explanation
Fig. 1 is the utility model structural principle schematic diagram
In figure, be labeled as: 1, comprehensive logging instrument harvester, 2, well logging is with boring strata pressure harvester, 3, remote transmitting system, 4, customer account management device, 5, network distribution platform, 6, archive management device, 7, with boring strata pressure information analysis apparatus.
The specific embodiment
A kind of compound logging is detecting device integrated with boring strata pressure, comprise remote transmitting system 3, for obtaining the well site end of the real-time logging data of field integrated logging and the long-range well logging information formation pressure monitoring device that teletransmission logging data is carried out to real time comprehensive analysis, well site end is connected with remote transmitting system 3, and remote transmitting system 3 is connected with long-range well logging information formation pressure monitoring device.The mode of remote transmitting system comprises satellite communication, moves through net or fixed-line telephone network etc.
In the utility model, described well site end comprises that comprehensive logging instrument harvester 1 and well logging are with boring strata pressure harvester 2, and well logging is connected with comprehensive logging instrument harvester 1 with boring strata pressure harvester 2, and comprehensive logging instrument harvester 1 is connected with remote transmitting system 3 by interface.
In the utility model, described long-range well logging information formation pressure monitoring device comprises network distribution platform 5 and the customer account management device 4 being connected with network distribution platform 5 respectively, archive management device 6 and with boring strata pressure information analysis apparatus 7, remote transmitting system 3 is connected with the network publisher server of network distribution platform 5.
In the utility model, compound logging comprises seven major functions such as database interface, data base administration, pressure prediction, real-time pressure detection, strata pressure evaluation, achievement Report and long-range well logging information monitoring with the main functional modules of boring the integrated detection of strata pressure.The realization of each functional module, major way is:
Database interface: with extraneous Interface design the interface between software and hardware, and each support software between interface.Well logging adopts the information of the network IP real-time Transmission of obtaining comprehensive logging system FPDP with brill strata pressure harvester; Base long-range well logging information formation pressure monitoring device obtains the real-time well logging information of well site remote transmission information platform by network IP, user according to authority login native system, select to need the well analyzed, complete and the docking of remote data base.
Data base administration: collect offset well data, by new shaft building, data importing, data query and modification and pressure detecting storehouse shift function, the essential information of well, strata division, casing programme, the whole rice of well logging data, late data, log data and lithology data, formation testing data are carried out to classified finishing, set up formation pressure data storehouse.
Pressure prediction: data information in database is calculated and prediction of formation pressure by compacting trend analysis, three calculation of pressure, nearly well pressure distribution map and nearly well pressure data and this well forecast function.
As the Trendline model in somewhere, set up, while collecting well depth, stratum, lithology, the brill of 1 to 2 mouthful of well of positive drilling well, the comprehensive logging parameters such as the pressure of the drill, rotating speed, moment of torsion, formation water density, bit diameter, drilling fluid density.Choose certain well section, just can obtain the Trendline model in corresponding area.
Real-time pressure detects: according to data-interface, obtain, select the data-interface specified data source of different comprehensive logging instruments, setting-up time or and the curve of Depth display form gathers and display format, then enter examinations or exit real-time detection, aligning drilling well and carry out real-time formation pressure detection and early warning.
Strata pressure is evaluated: selected strata pressure overall merit, and to selecting well logging information, well logging information and the formation testing information etc. of well comprehensively to analyze.Meanwhile, regional stratum pressure distribution is carried out to the output of planar layer spread, then export three-dimensional zonal pressure spread figure in conjunction with elevation of well.
Achievement Report: according to above-mentioned analysis, according to selecting well, with the compound logging strata pressure achievement Report of word file output individual well.
Long-range well logging information monitoring: obtain the real-time well logging information of well site remote transmission information platform by network IP according to base long-range well logging information formation pressure monitoring device, user according to authority login native system, select to need the well of analysis, complete and the docking of remote data base, utilize a kind of compound logging to realize remote monitoring with boring strata pressure integrated detection system.

Claims (3)

1. a compound logging is detecting device integrated with boring strata pressure, it is characterized in that: comprise remote transmitting system (3), for obtaining the well site end of the real-time logging data of field integrated logging and the long-range well logging information formation pressure monitoring device that teletransmission logging data is carried out to real time comprehensive analysis, well site end is connected with remote transmitting system (3), and remote transmitting system (3) is connected with long-range well logging information formation pressure monitoring device.
2. compound logging according to claim 1 is detecting device integrated with boring strata pressure, it is characterized in that: described well site end comprises that comprehensive logging instrument harvester (1) and well logging are with boring strata pressure harvester (2), well logging is connected with comprehensive logging instrument harvester (1) with boring strata pressure harvester (2), and comprehensive logging instrument harvester (1) is connected with remote transmitting system (3) by interface.
3. compound logging according to claim 1 and 2 is detecting device integrated with boring strata pressure, it is characterized in that: described long-range well logging information formation pressure monitoring device comprises network distribution platform (5) and the customer account management device (4) being connected with network distribution platform (5) respectively, archive management device (6) and with boring strata pressure information analysis apparatus (7), remote transmitting system (3) is connected with the network publisher server of network distribution platform (4).
CN201320753976.7U 2013-11-26 2013-11-26 Comprehensive logging integrated formation pressure detecting device in process of drilling Expired - Fee Related CN203783570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320753976.7U CN203783570U (en) 2013-11-26 2013-11-26 Comprehensive logging integrated formation pressure detecting device in process of drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320753976.7U CN203783570U (en) 2013-11-26 2013-11-26 Comprehensive logging integrated formation pressure detecting device in process of drilling

Publications (1)

Publication Number Publication Date
CN203783570U true CN203783570U (en) 2014-08-20

Family

ID=51319770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320753976.7U Expired - Fee Related CN203783570U (en) 2013-11-26 2013-11-26 Comprehensive logging integrated formation pressure detecting device in process of drilling

Country Status (1)

Country Link
CN (1) CN203783570U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533394A (en) * 2014-12-18 2015-04-22 中国航天科技集团公司烽火机械厂 Formation pressure while drilling measuring device
CN105064983A (en) * 2015-06-04 2015-11-18 中国石油化工股份有限公司 Underground wireless pressure measurement system, pressure measurement electric switchgear thereof and data collection transceiver
CN105484724A (en) * 2014-09-18 2016-04-13 中国石油化工股份有限公司 Drilling downhole anomaly monitoring method
CN105484725A (en) * 2014-09-18 2016-04-13 中国石油化工股份有限公司 Drilling downhole anomaly monitoring device
CN106897839A (en) * 2017-03-08 2017-06-27 武汉盛华伟业科技有限公司 A kind of data integrated collaboration platform in well site
CN109766396A (en) * 2018-12-12 2019-05-17 武汉盛华伟业科技股份有限公司 A kind of long-range logging method and system
CN110939435A (en) * 2019-10-09 2020-03-31 中国海洋石油集团有限公司 Implementation method of formation pressure while-drilling automatic early warning system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484724A (en) * 2014-09-18 2016-04-13 中国石油化工股份有限公司 Drilling downhole anomaly monitoring method
CN105484725A (en) * 2014-09-18 2016-04-13 中国石油化工股份有限公司 Drilling downhole anomaly monitoring device
CN104533394A (en) * 2014-12-18 2015-04-22 中国航天科技集团公司烽火机械厂 Formation pressure while drilling measuring device
CN104533394B (en) * 2014-12-18 2019-03-12 四川航天烽火伺服控制技术有限公司 One kind is with brill formation pressure testing device
CN105064983A (en) * 2015-06-04 2015-11-18 中国石油化工股份有限公司 Underground wireless pressure measurement system, pressure measurement electric switchgear thereof and data collection transceiver
CN106897839A (en) * 2017-03-08 2017-06-27 武汉盛华伟业科技有限公司 A kind of data integrated collaboration platform in well site
CN106897839B (en) * 2017-03-08 2020-07-07 武汉盛华伟业科技有限公司 Well site data integration collaborative work platform
CN109766396A (en) * 2018-12-12 2019-05-17 武汉盛华伟业科技股份有限公司 A kind of long-range logging method and system
CN110939435A (en) * 2019-10-09 2020-03-31 中国海洋石油集团有限公司 Implementation method of formation pressure while-drilling automatic early warning system
CN110939435B (en) * 2019-10-09 2022-11-22 中国海洋石油集团有限公司 Implementation method of formation pressure automatic early warning system while drilling

Similar Documents

Publication Publication Date Title
CN203783570U (en) Comprehensive logging integrated formation pressure detecting device in process of drilling
CN102373923B (en) Reservoir stratum identification method
CN101949973B (en) Method for measuring ground potential
CN103615236A (en) Method for real-time monitoring of formation pressure by means of remote mud logging information
NO336838B1 (en) Monitoring of a reservoir by observation and analysis of microseismic events
CN103308946B (en) A kind of geological extra-forecast method entering information based on blasthole drilling
CN113655542B (en) Geophysical-based dry-hot rock development stage reservoir information acquisition method
CN106646591B (en) A kind of monitoring method using oil reservoir fireflood leading edge Microseismic monitoring system
CN106194262A (en) Mine floor Austria limestone gushing water on-line monitoring intelligent early-warning system
CN101295026A (en) Levee intelligent detecting early-warning method based on wireless sensing net
CN107842394B (en) The Dynamic Elastic Module detection method of Large Span Underground chamber exploitation roof stability
CN103616731A (en) Altered volcano rock effective reservoir determination method ad device in oil-gas exploration
CN201386558Y (en) Seismic while drilling quality monitoring device
CN113818929A (en) Mine underground water dynamic monitoring system, control method and application
CN104632186B (en) Secondary kill-job parameter detecting processing method and processing device after kill-job failure
CN106484925A (en) Shale gas fractured horizontal well selections system and selections method
Cladouhos et al. The role of stress modeling in stimulation planning at the Newberry Volcano EGS Demonstration Project
CN103473894A (en) Earthquake monitoring and early warning system and working method thereof
CN102562049A (en) Method for predicting change of strata while drilling
Rahimi Zeynal et al. Correlation of stimulated rock volume from microseismic pointsets to production data-a horn river case study
Hasting et al. Real-time induced seismicity monitoring during wellbore stimulation at Paralana-2 South Australia
CN103390108A (en) Well type design method and device based on compressibility of fractured geologic body
CN205400721U (en) Long -range survey device of well head gas
CN104932006A (en) Mechanical energy automatic lossless excitation apparatus of artificial seismic waves in tunnel geological advanced forecast
Moran Interpretation of long-term Grande Ronde aquifer testing in the Palouse Basin of Idaho and Washington

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200928

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING Co.

Address before: The 1 section of No. 3 company Chuanqing Drilling Technology Information Office Chenghua District Green Road 610051 Chengdu City, Sichuan Province

Patentee before: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING Co.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820