CN203783109U - Building construction operation facility and personnel material transport equipment system - Google Patents

Building construction operation facility and personnel material transport equipment system Download PDF

Info

Publication number
CN203783109U
CN203783109U CN201420139893.3U CN201420139893U CN203783109U CN 203783109 U CN203783109 U CN 203783109U CN 201420139893 U CN201420139893 U CN 201420139893U CN 203783109 U CN203783109 U CN 203783109U
Authority
CN
China
Prior art keywords
transporting equipment
platform
personnel
equipment system
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420139893.3U
Other languages
Chinese (zh)
Inventor
王乔
冯功斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Academy of Building Research
Original Assignee
Shandong Provincial Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Academy of Building Research filed Critical Shandong Provincial Academy of Building Research
Priority to CN201420139893.3U priority Critical patent/CN203783109U/en
Application granted granted Critical
Publication of CN203783109U publication Critical patent/CN203783109U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a building main body and external decorative construction operation facility and personnel material transport equipment system which can not only provide an operation platform for constructers but also transport constructers and materials, and also can improve the construction efficiency, relieve the labor intensity of workers and eliminate potential safety hazards. The building construction operation facility and personnel material transport equipment system comprises an operation platform and transport equipment, wherein the operation platform comprises an upright post fixedly connected with a building through a wall-adhered framework 4, a frame capable of moving up and down along the upright post, a platform connected to the frame and a butting platform mounted on the platform and used for being butted with the transport equipment; the transport equipment comprises a suspension cage and a driving mechanism, and the suspension cage can be driven by the driving mechanism to move up and down along the upright post and is provided with an anti-falling device used for preventing the transport equipment from falling down.

Description

CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system
Technical field
The utility model relates to a kind of building operations operating platform, be specifically related to a kind of CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, this system both can provide constructor's operating platform, can transport again constructor and required material to assigned address.
Background technology
Building operations is divided into main body construction and internal and external ornament two stages of construction, the facility operating for constructor in domestic construction work progress is at present comparatively backward, still there is no a kind of safe and reliable operation facility or equipment that can be applicable to main body construction, can be applied to again building external decoration construction simultaneously, caused the increase of manpower, waste of time and use cost.
Building operations discrepancy in elevation adjustable double-layer operating platform as shown in Figure 1, 2 can be applied to main body construction and outer decoration construction simultaneously, but because the operating platform speed of service is very slow, be mainly used in mobile platform position, and can not be as vehicle, still the problem of transporting of unresolved personnel and material.
At present in building operations, operating personnel and required material transport main employing construction elevator and tower machine.In the main body construction stage, personnel and material need to first be transported in building or the scope of operation, then by rehandling, have bad luck on scaffold or operating platform; Decoration stage outside, general tower machine is removed, transporting of personnel and material can only be leaned on construction elevator, especially outside, decorate material used, need to be introduced into interior of building, rehandling is to scaffold or operating platform again, had a strong impact on efficiency of construction, increased workman labour intensity, there is potential safety hazard.
Utility model content
In order to overcome above-mentioned technical deficiency, the utility model provides a kind of building body and outer decoration constructing operation facility and personnel's material Transporting equipment system, this system not only can provide constructor's operating platform, and can transport constructor and material, can also improve efficiency of construction, alleviate labor strength, eliminate safe hidden trouble.
The utility model adopts following measures to realize:
A kind of CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, comprise operating platform and Transporting equipment, operating platform comprises the column, the stock that can move up and down along column that adopt wall-attached frame 4 to be connected and fixed with building, is connected to the platform on stock and is arranged on the docking platform for docking with Transporting equipment on platform; Transporting equipment comprises cage and driving mechanism, and cage drives and can move up and down along column through driving mechanism, and cage is provided with the falling proof device for preventing that Transporting equipment from falling.
In above-mentioned CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, cage has the working platform for installing/dismounting wall-attached frame 4 near building one side.
In above-mentioned CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, cage adopts a plurality of rollers to contact with 2 main limbs of column away from building one side.
In above-mentioned CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, in cage, be provided with the transfer carriage for material lifting.
In above-mentioned CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, motorized winch batten is installed on stock.
In above-mentioned CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, the guide peg cat ladder assembly stretching out is downwards installed on platform, and guide peg cat ladder assembly comprises the leading truck with chute that is arranged on transfer carriage and is connected the guide peg that can move up and down along leading truck with cat ladder.
In above-mentioned CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, operating platform is provided with the first limit switch and limit switch assembly, and the first collision block stretching out is downwards installed on operating platform; The second limit switch and limit switch assembly are installed on Transporting equipment, the second collision block protruding upward is installed on Transporting equipment.
The utility model mainly contains following characteristics:
1) the utility model CONSTRUCTION OPERATIONS facility and Transporting equipment system adopt and are independent of Transporting equipment operating platform, can high-speed cruising.Except providing constructor's operating platform, can utilize Transporting equipment to complete efficiently the transhipment of constructor and material simultaneously, solved and utilized other construction equipment to transport in the past, need a difficult problem for secondary transhipment.
2) the utility model CONSTRUCTION OPERATIONS facility and Transporting equipment system possess and improve reliable safety monitoring system.When Transporting equipment and operating platform approach, first stop the operation of Transporting equipment, then utilize the feature that the operating platform speed of service is low, start platform and decline, possess ramp to stop, prevent the function of collision, and make it to reach transhipment state.
3) while transporting personnel, when different, transport material, in cage, do not lay transfer carriage.Reach after transhipment state, the utility model Transporting equipment system possesses the escape way of a kind of personnel from Transporting equipment to operating platform.
4) while transporting material, reach after transhipment state, this system is utilized a kind of transfer carriage and motorized winch batten, and material is transferred to operating platform from Transporting equipment.
5) the utility model is particularly used in super highrise building at highrise building, can increase substantially the efficiency of construction of CONSTRUCTION OPERATIONS platform, has strengthened the feasibility that CONSTRUCTION OPERATIONS platform is promoted the use of.
Accompanying drawing explanation
Fig. 1 is that the master of building operations discrepancy in elevation adjustable double-layer operating platform looks schematic diagram.
Fig. 2 is the schematic top plan view of building operations discrepancy in elevation adjustable double-layer operating platform.
Fig. 3 is that the utility model master looks schematic diagram.
Fig. 4 is the local schematic top plan view of the utility model operating platform.
Fig. 5 is the utility model Transporting equipment schematic top plan view.
Fig. 6 is the enlarged diagram of A in Fig. 5.
Fig. 7 is that the utility model transports process schematic diagram.
In figure, 1-column, 2-stock, 3-platform, 4-wall-attached frame, 5-building, 6-left and right platform connect walk on stage, 7-motorized winch batten, 8-guide peg cat ladder assembly, 9-Transporting equipment, 10-docking platform, 11-working platform, 12-transfer carriage, 13-roller, 14-driving mechanism, 15-the first limit switch and limit switch assembly, 16-the first collision block, 17-the second limit switch and limit switch assembly, 18-falling proof device, 19-the second collision block.
the specific embodiment:
Below in conjunction with the drawings and specific embodiments, the utility model is described further.
With reference to accompanying drawing 3, accompanying drawing 4, a kind of CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, comprise operating platform and Transporting equipment 9, operating platform comprises the column 1 that adopts wall-attached frame 4 and building 5 to be connected and fixed, the stock 2 that can move up and down along column 1, be connected to the platform 3 on stock 2 and be arranged on the docking platform 10 for docking with Transporting equipment 9 on platform 3, Transporting equipment 9 comprises cage and driving mechanism 14, cage drives and can move up and down along column 1 through driving mechanism 14, cage is provided with the falling proof device 18 for preventing that Transporting equipment 9 from falling.
With reference to accompanying drawing 5, accompanying drawing 6, cage adopts a plurality of rollers 13 to contact with 2 main limbs of column 1 away from building 5 one sides, can avoid in service and interfere with the wall-attached frame 4 of column 1, guarantees that Transporting equipment 9 operates steadily reliably between ground and operating platform.Cage has the working platform 11 for installing/dismounting wall-attached frame 4 near building 5 one sides.In cage, be provided with the transfer carriage 12 for material lifting, the leading truck with chute is installed on transfer carriage.
With reference to accompanying drawing 3, motorized winch batten 7 is installed on stock 2, can lift goods.
With reference to accompanying drawing 5, the guide peg cat ladder assembly 8 stretching out is downwards installed on docking platform 10, guide peg cat ladder assembly 8 comprises guide peg 8-2 and the cat ladder 8-1 being connected with guide peg.
With reference to figure 7, consider safety, operating platform is provided with the first limit switch and limit switch assembly 15, and the second collision block 19 stretching out is downwards installed on operating platform; The second limit switch and limit switch assembly 17 are installed on Transporting equipment 9, the first collision block 16 protruding upward is installed on Transporting equipment 9.
With reference to figure 7, a kind of method of utilizing CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system to transport, comprises the following steps:
1), while normally working, column 1 is often connected with building 5 across a certain distance by wall-attached frame 4; Stock 2 and platform 3 slowly move along column 1, for constructor, on platform 3, operate, and complete the construction of building body and outer decoration stage;
2) Transporting equipment 9 high-speed cruising between ground and operating platform, during transit staff, guide peg cat ladder assembly 8 can arrive in the cage of Transporting equipment 9, and constructor can shift by cat ladder 8 between operating platform 3 and Transporting equipment 9.
3) in the time of need to transporting material state, operating personnel arrive in Transporting equipment 9 cages by guide peg cat ladder assembly 8, then utilize and be arranged on the motorized winch batten 7 on platform 3, the transfer carriage 12 of slinging in Transporting equipment 9, transfer carriage 12 is along upwards operation of guide peg 8, constructor can expect on platform 3 by load, construct on the docking platform 10 on lower floor or upper strata.
The method that described CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system are transported, also include following steps: when Transporting equipment 9 runs to while approaching with operating platform, the second collision block 19 on operating platform first contacts with the limit switch in the second limit switch on Transporting equipment 9 and limit switch assembly 17, rupturing operation platform power, when electrical system breaks down cannot realize time, the second collision block 19 again with in the second limit switch and limit switch assembly 17 limit switch contact, the general supply of force disconnect Transporting equipment 9, make Transporting equipment 9 out of service, prevent from colliding with operating platform, after Transporting equipment 9 stops, utilize the feature that the operating platform speed of service is low, step-down operation platform makes itself and Transporting equipment 9 close, when platform 3 declines, the first collision block 16 on Transporting equipment 9, first contact with the limit switch in the first limit switch on operating platform and limit switch assembly 15, cut off its operating mechanism's power supply, when electrical system breaks down cannot realize time, the first collision block contacts with the limit switch in the first limit switch and limit switch assembly 15 again, the general supply of force disconnect operating platform, prevent and Transporting equipment 9 collisions, so far reach the transhipment state of operating platform and Transporting equipment 9.Above-mentioned steps can prevent that operating platform and Transporting equipment 9 from bumping.

Claims (7)

1. a CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system, it is characterized in that: comprise operating platform and Transporting equipment, operating platform comprises the column, the stock that can move up and down along column that adopt wall-attached frame to be connected and fixed with building, is connected to the platform on stock and is arranged on the docking platform for docking with Transporting equipment on platform, Transporting equipment comprises cage and driving mechanism, cage drives and can move up and down along column through driving mechanism, and cage is provided with the falling proof device for preventing that Transporting equipment from falling.
2. CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system according to claim 1, is characterized in that: cage has the working platform for installing/dismounting wall-attached frame near building one side.
3. CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system according to claim 1, is characterized in that: cage adopts a plurality of rollers to contact with 2 main limbs of column away from building one side.
4. CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system according to claim 1, is characterized in that: in cage, be provided with the transfer carriage for material lifting.
5. CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system according to claim 1, is characterized in that: motorized winch batten is installed on stock.
6. CONSTRUCTION OPERATIONS facility and personnel's material Transporting equipment system according to claim 4, it is characterized in that: the guide peg cat ladder assembly stretching out is downwards installed on platform, and guide peg cat ladder assembly comprises the leading truck with chute that is arranged on transfer carriage and is connected the guide peg that can move up and down along leading truck with cat ladder.
7. according to CONSTRUCTION OPERATIONS facility described in claim 1 to 6 any one and personnel's material Transporting equipment system, it is characterized in that: operating platform is provided with the first limit switch and limit switch assembly, the second collision block stretching out is downwards installed on operating platform; The second limit switch and limit switch assembly are installed on Transporting equipment, the first collision block protruding upward is installed on Transporting equipment.
CN201420139893.3U 2014-03-26 2014-03-26 Building construction operation facility and personnel material transport equipment system Expired - Fee Related CN203783109U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420139893.3U CN203783109U (en) 2014-03-26 2014-03-26 Building construction operation facility and personnel material transport equipment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420139893.3U CN203783109U (en) 2014-03-26 2014-03-26 Building construction operation facility and personnel material transport equipment system

Publications (1)

Publication Number Publication Date
CN203783109U true CN203783109U (en) 2014-08-20

Family

ID=51319310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420139893.3U Expired - Fee Related CN203783109U (en) 2014-03-26 2014-03-26 Building construction operation facility and personnel material transport equipment system

Country Status (1)

Country Link
CN (1) CN203783109U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103850423A (en) * 2014-03-26 2014-06-11 山东省建筑科学研究院 Conveying equipment system and conveying method for operation facilities, personnel and materials in building construction
CN104863371A (en) * 2015-04-22 2015-08-26 中国十七冶集团有限公司 Construction method of cage front door reconstruction and material-receiving platform erection combined transportation
CN106144983A (en) * 2016-09-28 2016-11-23 苏州市汉诺威升降台有限公司 A kind of have the lifting platform climbing miscellaneous function

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103850423A (en) * 2014-03-26 2014-06-11 山东省建筑科学研究院 Conveying equipment system and conveying method for operation facilities, personnel and materials in building construction
CN103850423B (en) * 2014-03-26 2016-01-20 山东省建筑科学研究院 A kind of method utilizing Transporting equipment system to transport CONSTRUCTION OPERATIONS facility and personnel's material
CN104863371A (en) * 2015-04-22 2015-08-26 中国十七冶集团有限公司 Construction method of cage front door reconstruction and material-receiving platform erection combined transportation
CN106144983A (en) * 2016-09-28 2016-11-23 苏州市汉诺威升降台有限公司 A kind of have the lifting platform climbing miscellaneous function

Similar Documents

Publication Publication Date Title
CN103979383A (en) Multi-layer lifting platform for building construction
CN104140037B (en) Wallboard Lift-on/Lift-off System
CN105437603B (en) Forcing press full-automatic wireless changes the mold car and system
CN203783109U (en) Building construction operation facility and personnel material transport equipment system
CN103935925B (en) Container unloading device
CN105083902A (en) Ground-type roller conveying mechanism suitable for floor slab arrangement
CN204896637U (en) It constructs to paste ground formula roller conveyors suitable for floor is arranged
CN204823593U (en) Perpendicular conveying system of high -rise electromechanical material
CN103381954A (en) Automatic full-loading conveying system
CN203820331U (en) Material hoist with built-in steel wire rope
CN209778027U (en) Lifting machine with follow-up type door opening and closing function
CN205187568U (en) Dual -purpose explosion -proof diagonal lift of people's goods
CN103850423B (en) A kind of method utilizing Transporting equipment system to transport CONSTRUCTION OPERATIONS facility and personnel's material
CN102963715A (en) Automatic vehicle loading device for steel drums
CN204057758U (en) A kind of hoisting device for overhaul of the equipments in large height industrial building
CN212122267U (en) Counterweight assembly special machine matched with loader ground drag chain assembly line
MX2012004722A (en) Method of operating a flow line, an assembly trailer, a tow bar, and a heavy machine installed on an assembly trailer and a flow line.
CN206091457U (en) Heap parking stall
CN104925671A (en) Telescopic manipulator installation and maintenance trolley
CN205275061U (en) Semi -portal crane
CN205973360U (en) Chimney hanging flower basket
CN103144992B (en) Cut-to-length two-layer drum splicing car
CN205706959U (en) A kind of abandoned car disassembling flow line
CN104444183A (en) Conveying and lifting all-in-one machine
CN205531262U (en) Steel construction construction platform can rise automatically

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20160326

CF01 Termination of patent right due to non-payment of annual fee