CN203782202U - Pellet raw material preparing and dosing system - Google Patents

Pellet raw material preparing and dosing system Download PDF

Info

Publication number
CN203782202U
CN203782202U CN201420176751.4U CN201420176751U CN203782202U CN 203782202 U CN203782202 U CN 203782202U CN 201420176751 U CN201420176751 U CN 201420176751U CN 203782202 U CN203782202 U CN 203782202U
Authority
CN
China
Prior art keywords
concentrate
conveyor drive
group
conveyor
pressure roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420176751.4U
Other languages
Chinese (zh)
Inventor
朱占军
邓利
王明侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC North Dalian Engineering Technology Co Ltd
Northern Engineering and Technology Corp MCC
Original Assignee
MCC North Dalian Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC North Dalian Engineering Technology Co Ltd filed Critical MCC North Dalian Engineering Technology Co Ltd
Priority to CN201420176751.4U priority Critical patent/CN203782202U/en
Application granted granted Critical
Publication of CN203782202U publication Critical patent/CN203782202U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

The utility model belongs to the technical field of raw material preparing and dosing in the metallurgical industry and in particular relates to a pellet raw material preparing and dosing system. The system is characterized by comprising a concentrate warehouse, a concentrate preparation chamber, a concentrate drying chamber connected with the concentrate warehouse and the concentrate preparation chamber through an adhesive tape machine passage I, a high-pressure roll milling chamber connected with the concentrate drying chamber through an adhesive tape machine passage II, and a dosing chamber connected with the high-pressure roll milling chamber through an adhesive tape machine passage III. The system is simple in process layout, easy to operate, low in manufacturing cost, convenient to mount and overhaul, low in energy consumption and high in practicality; meanwhile, the occupied area is reduced, the control is easy, the situation of numerous iron ore concentrate varieties is adapted, the production adaptability is improved, and the freezing problem of materials in winter is effectively solved.

Description

Pellet feed is prepared and feed proportioning system
Technical field
The utility model belongs to metallurgy industry raw material to be prepared and ingredients technical field, especially relates to a kind of pellet feed and prepares and feed proportioning system.
Background technology
In metallurgical briquetting field, owing to requiring strict to the water content of iron ore concentrate and specific surface area.Iron ore concentrate is after wet-milling is filtered, and water content is generally 10% left and right or more.This water content cannot reach the requirement of pelletizing batching, because enter the iron ore concentrate water content of pellet batching system, need be controlled in 8%, and iron ore concentrate specific surface area need be controlled at 2000cm simultaneously 2more than/g, just can there is good wetting ability and balling-up, to meet the demand of pelletizing operation.
Therefore, generalized case, arranges respectively wet feed storehouse and siccative storehouse conventionally in pelletizing proportioning room.Iron ore concentrate is had bad luck to proportioning room by stock ground, and according to the difference of water content and specific surface area, qualified iron ore concentrate leaves in siccative storehouse, and underproof iron ore concentrate leaves in wet feed storehouse.The iron ore concentrate in wet feed storehouse need enter concentrate drying operation, by after unnecessary moisture removal, then enters high pressure roller mill equipment, improves granularity and specific surface area.To reach the demand of pelletizing batching and pelletizing operation.Through the iron ore concentrate to after the processing of moisture, granularity and specific surface area, enter in the dry ore storage bin in proportioning room and prepare burden, then be transported to subsequent processing by conveyor drive.
The decoration form of this pellet batching system, comparatively loaded down with trivial details in technical process, material need to repeatedly be had bad luck between dosing device, drying plant and high pressure roller mill equipment.In floor plan, between above-mentioned three workshops, need to arrange many conveyor gallery, to guarantee repeatedly having bad luck of material.So not only increased the initial cost of civil engineering and equipment, expense and the labour intensity of also increased maintenance after going into operation simultaneously, safeguarding.
Summary of the invention
The purpose of this utility model is to provide a kind of floor space that can reduce feed proportioning system, can reduce again the initial cost of civil engineering and equipment, can also realize the pellet feed that raw material is prepared and batching operates smoothly simultaneously and prepare and feed proportioning system.
The purpose of this utility model realizes by following technical proposals:
Pellet feed of the present utility model is prepared and feed proportioning system, it is characterized in that comprising concentrate warehouse and concentrate preparation room, the concentrate drying chamber that concentrate warehouse and concentrate preparation room are connected by conveyor gallery I therewith, the high pressure roller mill chamber that concentrate drying chamber is connected by conveyor gallery II therewith, the proportioning room that high pressure roller mill chamber is connected by conveyor gallery III therewith
Described concentrate warehouse and concentrate preparation room comprise the mobile mine car that leaks, grab crane, one group of ore deposit groove, correspondence is arranged on one group of disk feeder I of this groove below, one group of ore deposit, be arranged on the conveyor drive I of this group of disk feeder I below, this conveyor drive I is arranged in described conveyor gallery I, and the exhaust end of described conveyor drive I is arranged in the entrance of described concentrate drying chamber
Described concentrate drying chamber comprises whizzer, be arranged on the conveyor drive II of this whizzer outlet below, be arranged on the belt plow of described conveyor drive I exhaust end, be arranged on the conveyor drive III of this belt plow below, described conveyor drive II and described conveyor drive III are all arranged in described conveyor gallery II and are connected with described high pressure roller mill chamber respectively
Described high pressure roller mill chamber comprises the constant feeder that is arranged on described conveyor drive II and conveyor drive III exhaust end bottom, be arranged on the buffer bin of this constant feeder below, be arranged on the high-pressure roller mill of this buffer bin below, be arranged on the conveyor drive IV of this high-pressure roller mill below, this conveyor drive IV is arranged in described conveyor gallery III and is connected with described proportioning room
Described proportioning room comprises one group of ore storage bin I and the one group of ore storage bin II that is arranged on described conveyor drive IV exhaust end below, correspondence is arranged on one group of disk feeder II of described one group of ore storage bin I below, correspondence is arranged on one group of star-shaped feeding machine of described one group of ore storage bin II below, be arranged on the belt electronic scale of each disk feeder II and each star-shaped feeding machine below, what be arranged on described belt electronic scale below removes to expect conveyor drive.
Advantage of the present utility model:
The utility model process layout is simple, easy handling, and reasonably raw material is prepared and feed proportioning system process layout, has solved the pelletizing producer supplied materials problem that is unfavorable for batching various in style.Than traditional technology, once investment and the follow-up maintenance expense of feed proportioning system floor space, civil engineering cost, equipment have been reduced, and can be according to the length of practical situation adjustment transhipment vestibule, between workshop, also can arrange relevant public off-set facility, be easy to control, be applicable to iron ore concentrate situation various in style, increased production adaptative ability, the number of times of having bad luck that reduces iron ore concentrate, has reduced bulk cargo loss.In addition, for northern China for winter, the effective solution that arrange of concentrate warehouse and concentrate preparation room freezed the impact for feed proportioning system because of material.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A-A view of the utility model Fig. 1.
Fig. 3 is the B-B view of the utility model Fig. 1.
Fig. 4 is the C-C view of the utility model Fig. 1.
Fig. 5 is the D-D view of the utility model Fig. 1.
Fig. 6 is the E-E view of the utility model Fig. 1.
Embodiment
Below in conjunction with accompanying drawing, further illustrate embodiment of the present utility model.
As shown in Fig. 1,2,3,4,5 and 6, pellet feed of the present utility model is prepared and feed proportioning system, it is characterized in that comprising concentrate warehouse and concentrate preparation room 1, the concentrate drying chamber 4 that concentrate warehouse and concentrate preparation room 1 are connected by conveyor gallery I 3 therewith, the high pressure roller mill chamber 8 that concentrate drying chamber 4 is connected by conveyor gallery II 7 therewith, the proportioning room 11 that high pressure roller mill chamber 8 is connected by conveyor gallery III 10 therewith
Described concentrate warehouse and concentrate preparation room comprise the mobile mine car 1-4 that leaks, grab crane 1-1, one group of ore deposit groove 1-2, correspondence is arranged on one group of disk feeder I 1-3 of this group of ore deposit groove 1-2 below, be arranged on the conveyor drive I 2 of this group of disk feeder I 1-3 below, this conveyor drive I 2 is arranged in described conveyor gallery I 3, and the exhaust end of described conveyor drive I 2 is arranged in the entrance of described concentrate drying chamber 4
Described concentrate drying chamber 4 comprises whizzer 4-2, be arranged on the conveyor drive II 5 of this whizzer 4-2 outlet below, be arranged on the belt plow 4-1 of described conveyor drive I 2 exhaust ends, be arranged on the conveyor drive III 6 of this belt plow 4-1 below, described conveyor drive II 5 and described conveyor drive III 6 are all arranged in described conveyor gallery II 7 and are connected with described high pressure roller mill chamber 8 respectively
Described high pressure roller mill chamber 8 comprises the constant feeder 8-1 that is arranged on described conveyor drive II 5 and conveyor drive III 6 exhaust end bottoms, be arranged on the buffer bin 8-2 of this constant feeder 8-1 below, be arranged on the high-pressure roller mill 8-3 of this buffer bin 8-2 below, be arranged on the conveyor drive IV 9 of this high-pressure roller mill 8-3 below, this conveyor drive IV 9 is arranged in described conveyor gallery III 10 and is connected with described proportioning room 11
Described proportioning room 11 comprises one group of ore storage bin I 11-4 and the one group of ore storage bin II 11-1 that is arranged on described conveyor drive IV 9 exhaust end belows, correspondence is arranged on one group of disk feeder II 11-5 of described one group of ore storage bin I 11-4 below, correspondence is arranged on one group of star-shaped feeding machine 11-2 of described one group of ore storage bin II 11-1 below, be arranged on the belt electronic scale 11-3 of each disk feeder II 11-5 and each star-shaped feeding machine 11-2 below, what be arranged on described belt electronic scale 11-3 below removes to expect conveyor drive 12.
The utility model adopts and prepares burden in advance and prepare burden arranged apart, to different sorts and batch iron ore concentrate tentatively thaw (be mainly applicable to bulk and freeze thawing of material) and pre-batching, not only reduce the ore storage bin number in proportioning room 11, and adapted to current many producers iron ore concentrate supplied materials problem that is unfavorable for batching various in style.Separately process qualified concentrate containing and defective concentrate concentrate drying chamber, saves energy consumption, makes drying treatment more flexible.
Applying pellet feed preparation of the present utility model with the arrangement technology of feed proportioning system is:
(1) in concentrate warehouse and the interior iron ore concentrate to different sorts batch of concentrate preparation room 1 prepare burden in advance.The mobile mine car 1-4 that leaks sends to different types of iron ore concentrate to concentrate warehouse and concentrate preparation room 1 from concentrate stockyard, grab crane 1-1 makes heap and supplied materials is had bad luck to different ore deposit groove 1-2, and the disk feeder I 1-3 of ore deposit groove 1-2 below drops down onto in proportion in below conveyor drive I 2 by the material in different ore deposit groove 1-2 and is transported to concentrate drying chamber 4 according to presetting.
(2) iron ore concentrate of pre-batching carried out in concentrate drying chamber 4 to drying and dehydrating and further thaw.The iron ore concentrate of pre-batching comprises off-grade iron concentrate and qualified iron ore concentrate.Thawed and qualified iron ore concentrate that water content is suitable by belt plow 4-1 by material dumping to bottom conveyor drive III 6, and be directly transported to high pressure roller mill chamber 8; Off-grade iron concentrate enters whizzer 4-2 and thaws or remove moisture, and dried material is had bad luck to high pressure roller mill chamber 8 by the conveyor drive II 5 of whizzer 4-2 outlet below again.
(3) iron ore concentrate after drying and dehydrating is ground in high pressure roller mill chamber 8, make granularity and specific surface area reach the requirement of batching and pelletizing operation.Iron ore concentrate after drying and dehydrating is interior in high pressure roller mill chamber 8 enters high-pressure roller mill 8-3 grinding through constant feeder 8-1 and buffer bin 8-2, makes granularity and specific surface area reach the requirement of batching and pelletizing operation.Through the iron ore concentrate grinding, be transported to proportioning room 11 again by conveyor drive IV 9, the dust and the wilkinite that are delivered to proportioning room 11 with air-transport system are stored in the corresponding ore storage bin of proportioning room 11 jointly.
(4) iron ore concentrate that granularity and specific surface area is reached to the requirement of batching and pelletizing operation carries out weighing and burden.Behind high pressure roller mill chamber 8, the iron ore concentrate that granularity and specific surface area have reached the requirement of batching and pelletizing operation enters in the ore storage bin I 11-4 of proportioning room 11, the fine fraction dust of being carried by air-transport system and wilkinite flux enter in ore storage bin II 11-1, iron ore concentrate in ore storage bin I 11-4 enters belt electronic scale 11-3 via disk feeder II 11-5, fine fraction dust in ore storage bin II 11-1 and wilkinite flux enter belt electronic scale 11-3 via star-shaped feeding machine 11-2, by belt electronic scale 11-3 by material successively fall within proportion ore storage bin below go expect on conveyor drive 12, be transported to next procedure.
The utility model is compared with existing arrangement technology, and process layout is simple, easy handling, and reasonably raw material is prepared and feed proportioning system process layout, has solved the pelletizing producer supplied materials problem that is unfavorable for batching various in style.Than traditional technology, once investment and the follow-up maintenance expense of feed proportioning system floor space, civil engineering cost, equipment have been reduced, and can be according to the length of practical situation adjustment transhipment vestibule, between workshop, also can arrange relevant public off-set facility, be easy to control, be applicable to iron ore concentrate situation various in style, increased production adaptative ability, the number of times of having bad luck that reduces iron ore concentrate, has reduced bulk cargo loss.In addition, for northern China for winter, the effective solution that arrange of concentrate warehouse and concentrate preparation room freezed the impact for feed proportioning system because of material.

Claims (1)

1. a pellet feed is prepared and feed proportioning system, it is characterized in that comprising concentrate warehouse and concentrate preparation room, the concentrate drying chamber that concentrate warehouse and concentrate preparation room are connected by conveyor gallery I therewith, the high pressure roller mill chamber that concentrate drying chamber is connected by conveyor gallery II therewith, the proportioning room that high pressure roller mill chamber is connected by conveyor gallery III therewith
Described concentrate warehouse and concentrate preparation room comprise the mobile mine car that leaks, grab crane, one group of ore deposit groove, correspondence is arranged on one group of disk feeder I of this groove below, one group of ore deposit, be arranged on the conveyor drive I of this group of disk feeder I below, this conveyor drive I is arranged in described conveyor gallery I, and the exhaust end of described conveyor drive I is arranged in the entrance of described concentrate drying chamber
Described concentrate drying chamber comprises whizzer, be arranged on the conveyor drive II of this whizzer outlet below, be arranged on the belt plow of described conveyor drive I exhaust end, be arranged on the conveyor drive III of this belt plow below, described conveyor drive II and described conveyor drive III are all arranged in described conveyor gallery II and are connected with described high pressure roller mill chamber respectively
Described high pressure roller mill chamber comprises the constant feeder that is arranged on described conveyor drive II and conveyor drive III exhaust end bottom, be arranged on the buffer bin of this constant feeder below, be arranged on the high-pressure roller mill of this buffer bin below, be arranged on the conveyor drive IV of this high-pressure roller mill below, this conveyor drive IV is arranged in described conveyor gallery III and is connected with described proportioning room
Described proportioning room comprises one group of ore storage bin I and the one group of ore storage bin II that is arranged on described conveyor drive IV exhaust end below, correspondence is arranged on one group of disk feeder II of described one group of ore storage bin I below, correspondence is arranged on one group of star-shaped feeding machine of described one group of ore storage bin II below, be arranged on the belt electronic scale of each disk feeder II and each star-shaped feeding machine below, what be arranged on described belt electronic scale below removes to expect conveyor drive.
CN201420176751.4U 2014-04-11 2014-04-11 Pellet raw material preparing and dosing system Withdrawn - After Issue CN203782202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420176751.4U CN203782202U (en) 2014-04-11 2014-04-11 Pellet raw material preparing and dosing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420176751.4U CN203782202U (en) 2014-04-11 2014-04-11 Pellet raw material preparing and dosing system

Publications (1)

Publication Number Publication Date
CN203782202U true CN203782202U (en) 2014-08-20

Family

ID=51318408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420176751.4U Withdrawn - After Issue CN203782202U (en) 2014-04-11 2014-04-11 Pellet raw material preparing and dosing system

Country Status (1)

Country Link
CN (1) CN203782202U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924067A (en) * 2014-04-11 2014-07-16 中冶北方(大连)工程技术有限公司 Preparation and blending system of pellet raw materials and arrangement process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924067A (en) * 2014-04-11 2014-07-16 中冶北方(大连)工程技术有限公司 Preparation and blending system of pellet raw materials and arrangement process
CN103924067B (en) * 2014-04-11 2015-07-08 中冶北方(大连)工程技术有限公司 Preparation and blending system of pellet raw materials and arrangement process

Similar Documents

Publication Publication Date Title
CN107414642A (en) One kind automates two-sided deburring cleaning, drying production line
CN103924067B (en) Preparation and blending system of pellet raw materials and arrangement process
CN206152941U (en) Broken system of cement clinker
CN203782202U (en) Pellet raw material preparing and dosing system
CN102513202A (en) Novel process for producing superfine powder
CN210877560U (en) System for preparing copper powder by using SCR (Selective catalytic reduction) continuous casting and rolling shaft furnace
CN210022424U (en) Slag and cement combined grinding production line
CN110614377B (en) Production process for preparing copper powder by using SCR (Selective catalytic reduction) shaft furnace system
CN108176489B (en) Matte powder preparation and conveying equipment and factory building integrated configuration system
CN205932562U (en) Powder ore bin storehouse top dust pelletizing system
CN213727022U (en) High-efficient selection powder milling system of high-strength environmental protection gesso
CN107553713A (en) A kind of non-sintered haydite automated production equipment
CN208732161U (en) A kind of closed petroleum coke storage transportation system
CN108080123A (en) A kind of cement grinding mill machine washing mill method
CN203866209U (en) Drying system for ceramic roller slurry
CN208583088U (en) Molybdenum concentrate dewatering system
CN204841191U (en) Quick dewatering system of iron fine ore
CN205042558U (en) Automatic cement mill of material loading
CN112979196B (en) Steel slag sand production process and system
CN204898025U (en) System is decomposed in calcination of tombarthite powdered ore
CN105312150A (en) Configuration method of iron removal of mill
CN108714331A (en) Molybdenum concntrate dewatering
CN109954564B (en) Phosphorus concentrate powder feeding and size mixing system and method suitable for cold areas
CN210585306U (en) Iron ore crushing system
CN220277613U (en) Cement raw material roller press grinding system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140820

Effective date of abandoning: 20150708

RGAV Abandon patent right to avoid regrant