CN203771996U - Smelting chamber for vacuum smelting system - Google Patents
Smelting chamber for vacuum smelting system Download PDFInfo
- Publication number
- CN203771996U CN203771996U CN201420149291.6U CN201420149291U CN203771996U CN 203771996 U CN203771996 U CN 203771996U CN 201420149291 U CN201420149291 U CN 201420149291U CN 203771996 U CN203771996 U CN 203771996U
- Authority
- CN
- China
- Prior art keywords
- bell
- heater
- telescopic mechanism
- vertical rack
- elastic telescopic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Furnace Details (AREA)
Abstract
The utility model discloses a smelting chamber for a vacuum smelting system. The smelting chamber comprises a furnace body and a furnace cover which are fastened. A vertical support is disposed on the outer side wall of the furnace body. One end of the vertical support is fixedly connected with the outer wall of the furnace body, and the other end thereof protrudes out of a furnace body opening and is provided with an elastic telescoping mechanism. The furnace cover, corresponding to the side wall of the vertical support, sleeves the elastic telescoping mechanism. When the elastic telescoping mechanism is in a compression state, the furnace body is fastened with the furnace cover. When the elastic telescoping mechanism is in a loosened state, the furnace body is separated from the furnace cover. The smelting chamber has the advantages that the furnace cover can be opened automatically by the compression force of a pressure spring, troublesome manual pulling of the furnace cover is avoided, and manpower and material resources are saved.
Description
Technical field
The utility model relates to the preparation system of a kind of metallurgy and material, and more particularly, it relates to a kind of working chamber of vacuum melting system.
Background technology
Vacuum melting system mainly comprises working chamber, crucible, die cavity, mechanical pump, lobe pump, protective gas source, heating power supply and the valve linking with each pump.Wherein lobe pump and mechanical pump are as the pump of mainly sobbing.Conventionally working chamber comprises body of heater and bell, and bell arranges a hinged bar, and the other end and the body of heater of the relative bell of hinge bar are hinged, when needs are opened or closed working chamber, directly open bell.Also have plenty of bell and body of heater are fixed up with bolt and nut, the dismounting bolt and nut that need to bother in the time of need to opening is lost time and manpower very much.
Utility model content
The deficiency existing for prior art, the purpose of this utility model is to provide a kind of vacuum melting working chamber for system, Gai Zhong working chamber can utilize the compression stress of stage clip automatically bell to be opened when opening bell, does not need the bell of pulling of manpower trouble, has more saved man power and material.
For achieving the above object, the utility model provides following technical scheme:
A kind of vacuum melting working chamber for system, comprise body of heater and bell, described body of heater and bell are buckled into melting chamber, described body of heater lateral wall is provided with vertical rack, described vertical rack one end is fixedly connected with furnace body outer wall, the other end protrudes from body of heater opening part and is provided with elastic telescopic mechanism, and the sidewall sheath of the corresponding vertical rack of described bell is located in elastic telescopic mechanism; Described elastic telescopic mechanism is when compressive state, and body of heater and bell fasten; When relaxation state, body of heater and bell be separately in described elastic telescopic mechanism.
By adopting technique scheme, vertical rack is set and is used for installing and supports bell, bell is set in elastic telescopic mechanism, bell can be around the fixedly vertical rack rotation of elastic telescopic mechanism like this, the setting of elastic telescopic mechanism can allow bell fasten or open with body of heater because of the rising of elastic telescopic mechanism or decline, when opening working chamber, do not need like this bell of pulling that staff bothers, manpower and materials have effectively been saved, closed melting is opened the vavuum pump in vacuum melting system behind chamber again, this can make to fasten fast and get up to be not easy separately between bell and body of heater, after melting, discharge vacuum, elastic telescopic mechanism stretches, bell is separated with body of heater, elastic telescopic mechanism is arranged so that the connection between body of heater and bell is more reliable, elastic telescopic mechanism is set to stage clip and can when opening bell, utilizes the compression stress of stage clip automatically bell to be opened, the bell of pulling that does not need manpower trouble, more saved man power and material.
Further improvement as technique scheme: the outward flange of the corresponding vertical rack of described bell is provided with link slot, the other end of the relative body of heater of described vertical rack is arranged in link slot, the end that described vertical rack is located at link slot offers elastic groove, described elastic telescopic mechanism is stage clip, described stage clip one end is fixedly connected with elastic groove bottom, and the other end is fixedly connected with the bottom of link slot.
Described body of heater lateral wall fixed-link has locking block, and described locking block is provided with sealed groove, and described bell lateral wall convexes with for clamping and enters the locking pole in sealed groove, and when body of heater and bell fasten, locking pole is arranged in sealed groove.
Between described furnace body outer wall and inwall, be provided with the water-cooled chamber for water flowing, described water-cooled chamber is provided with water inlet and delivery port.
By adopting technique scheme, locking block is set and coordinates locking pole, the fastening between bell and body of heater has played directed effect like this; Arrange when water-cooled chamber carries out melting work in working chamber body of heater is lowered the temperature, increased the operating efficiency of working chamber.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of working chamber for the utility model vacuum melting system;
Fig. 2 is the cutaway view of the embodiment of working chamber for the utility model vacuum melting system.
Reference numeral:
1, body of heater; 11, water inlet; 12, delivery port; 13, water-cooled chamber; 2, bell; 21, locking pole; 22, link slot; 3, vertical rack; 4, locking block; 41, sealed groove; 5, elastic telescopic mechanism.
The specific embodiment
Referring to figs. 1 through Fig. 2, the utility model vacuum melting system is described further with the embodiment of working chamber.
A kind of vacuum melting working chamber for system, comprise body of heater 1 and bell 2, described body of heater 1 and bell 2 are buckled into melting chamber, described body of heater 1 lateral wall is provided with vertical rack 3, described vertical rack 3 one end are fixedly connected with body of heater 1 outer wall, the other end protrudes from body of heater 1 opening part and is provided with elastic telescopic mechanism 5, and the sidewall sheath of the corresponding vertical rack 3 of described bell 2 is located in elastic telescopic mechanism 5; Described elastic telescopic mechanism 5 is when compressive state, and body of heater 1 and bell 2 fasten; When relaxation state, body of heater 1 and bell 2 be separately in described elastic telescopic mechanism 5.
By adopting technique scheme, vertical rack 3 is set and is used for installing and supports bell 2, bell 2 is set in elastic telescopic mechanism 5, bell 2 can be around fixedly vertical rack 3 rotations of elastic telescopic mechanism 5 like this, the setting of elastic telescopic mechanism 5 can allow bell 2 fasten or open with body of heater 1 because of the rising of elastic telescopic mechanism 5 or decline, what when opening working chamber, do not need like this that staff bothers pulls bell 2, manpower and materials have effectively been saved, closed melting is opened the vavuum pump in vacuum melting system behind chamber again, this can make to fasten fast and get up to be not easy separately between bell 2 and body of heater 1, after melting, discharge vacuum, elastic telescopic mechanism 5 stretches, bell 2 is separated with body of heater 1, elastic telescopic mechanism 5 is arranged so that the connection between body of heater 1 and bell 2 is more reliable, elastic telescopic mechanism 5 is set to stage clip and can when opening bell 2, utilizes the compression stress of stage clip automatically bell 2 to be opened, what do not need manpower trouble pulls bell 2, more saved man power and material.
The outward flange of the corresponding vertical rack 3 of described bell 2 is provided with link slot 22, the other end of described vertical rack 3 relative bodies of heater 1 is arranged in link slot 22, the end that described vertical rack 3 is located at link slot 22 offers elastic groove, described elastic telescopic mechanism 5 is stage clip, described stage clip one end is fixedly connected with elastic groove bottom, and the other end is fixedly connected with the bottom of link slot 22.Bell 2 arranges link slot 22 and is conveniently enclosed within on vertical rack 3, and vertical rack 3 arranges the convenient elastic telescopic mechanism 5 of placing of elastic groove.When fastening bell 2 and body of heater 1, thereby press down bell 2 compression press springs, bell 2 and body of heater 1 are fastened, then open mechanical pump and extract the air in melting chamber, make the pressure in melting chamber be less than atmospheric pressure, bell 2 and body of heater 1 closely fasten; Smelter completes in the time of will opening bell 2, and release vacuumizes melting chamber, makes to be returned to normal pressure in melting chamber, and the compression stress that stage clip is subject to is removed, and is returned to normal condition, drives bell 2 away from body of heater 1 simultaneously, separates between the two.
Described body of heater 1 lateral wall fixed-link has locking block 4, and described locking block 4 is provided with sealed groove 41, and described bell 2 lateral walls convex with for clamping and enter the locking pole 21 in sealed groove 41, and when body of heater 1 and bell 2 fasten, locking pole 21 is arranged in sealed groove 41.Locking block 4 is set and coordinates sealed groove 41 for the fastening between body of heater 1 and bell 2 provides directed, allow body of heater 1 and bell 2 fasten according to set track; While fastening body of heater 1 and bell 2, press down bell 2, locking pole 21 clampings are entered in sealed groove 41, location body of heater 1 and bell 2, more convenient and easy when further melting chamber is vacuumized.
Between described body of heater 1 outer wall and inwall, be provided with the water-cooled chamber 13 for water flowing, described water-cooled chamber 13 is provided with water inlet 11 and delivery port 12.Arrange when water-cooled chamber 13 working chamber carries out melting work body of heater 1 is lowered the temperature, increased the operating efficiency of working chamber.Water pipe can be accessed and is fixed on water inlet 11 places, and then fix a water pipe at delivery port 12 places, and water ceaselessly enters into water-cooled chamber 13 from water inlet 11, and then the high temperature of taking away body of heater 1 flow away from delivery port 12, effectively shorten the cool time of body of heater 1, accelerated operating efficiency.Certainly to the cooling liquid of body of heater 1, can be also cooling fluid or frozen water etc., preferred water be as cooling medium herein, makes smelting system environmental pollution not in fusion process, more friendly to environment.
The above is only preferred embodiment of the present utility model, and protection domain of the present utility model is also not only confined to above-described embodiment, and all technical schemes belonging under the utility model thinking all belong to protection domain of the present utility model.It should be pointed out that for those skilled in the art, in the some improvements and modifications that do not depart under the utility model principle prerequisite, these improvements and modifications also should be considered as protection domain of the present utility model.
Claims (4)
1. vacuum melting working chamber for system, comprise body of heater and bell, described body of heater and bell are buckled into melting chamber, it is characterized in that: described body of heater lateral wall is provided with vertical rack, described vertical rack one end is fixedly connected with furnace body outer wall, the other end protrudes from body of heater opening part and is provided with elastic telescopic mechanism, and the sidewall sheath of the corresponding vertical rack of described bell is located in elastic telescopic mechanism; Described elastic telescopic mechanism is when compressive state, and body of heater and bell fasten; When relaxation state, body of heater and bell be separately in described elastic telescopic mechanism.
2. vacuum melting according to claim 1 working chamber for system, it is characterized in that: the outward flange of the corresponding vertical rack of described bell is provided with link slot, the other end of the relative body of heater of described vertical rack is arranged in link slot, the end that described vertical rack is located at link slot offers elastic groove, described elastic telescopic mechanism is stage clip, described stage clip one end is fixedly connected with elastic groove bottom, and the other end is fixedly connected with the bottom of link slot.
3. vacuum melting according to claim 1 and 2 working chamber for system, it is characterized in that: described body of heater lateral wall fixed-link has locking block, described locking block is provided with sealed groove, described bell lateral wall convexes with for clamping and enters the locking pole in sealed groove, and when body of heater and bell fasten, locking pole is arranged in sealed groove.
4. vacuum melting according to claim 3 working chamber for system, is characterized in that: between described furnace body outer wall and inwall, be provided with the water-cooled chamber for water flowing, described water-cooled chamber is provided with water inlet and delivery port.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420149291.6U CN203771996U (en) | 2014-03-29 | 2014-03-29 | Smelting chamber for vacuum smelting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420149291.6U CN203771996U (en) | 2014-03-29 | 2014-03-29 | Smelting chamber for vacuum smelting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203771996U true CN203771996U (en) | 2014-08-13 |
Family
ID=51289181
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420149291.6U Expired - Fee Related CN203771996U (en) | 2014-03-29 | 2014-03-29 | Smelting chamber for vacuum smelting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203771996U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108267012A (en) * | 2018-01-11 | 2018-07-10 | 深圳市华星光电半导体显示技术有限公司 | storage device and heating component with sealing function |
-
2014
- 2014-03-29 CN CN201420149291.6U patent/CN203771996U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108267012A (en) * | 2018-01-11 | 2018-07-10 | 深圳市华星光电半导体显示技术有限公司 | storage device and heating component with sealing function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203771996U (en) | Smelting chamber for vacuum smelting system | |
CN106475365B (en) | A kind of carbon dust pipe dredging device | |
CN209052385U (en) | Filling apparatus is used in a kind of drip-proof anti-icing fluid production | |
CN203771991U (en) | Smelting chamber for vacuum smelting system | |
CN202898564U (en) | Housing air cooling device | |
CN206287505U (en) | Plastics sucking moulding device | |
CN209334705U (en) | Cooling device in a kind of cast member process | |
CN208236414U (en) | One population tube top is into hole pre-buried steel ring flat-plate and push-bench sealing and connecting device | |
CN207608627U (en) | A kind of cooling back installation of gaseous phase deposition stove | |
CN205832786U (en) | A kind of filter element sintering vibrating cleaning device | |
CN208671513U (en) | A kind of novel electric heat constant temperature drying box | |
CN204603280U (en) | A kind of water cooling equipment | |
CN204461052U (en) | One rises liquid melting furnace automatically | |
CN211500915U (en) | Waste heat recycling device for air compressor | |
CN206167992U (en) | Oil -gas separator | |
CN203582837U (en) | High-pressure water-cooled hydrolat extraction equipment | |
CN204741661U (en) | Machine charges with two cooling system | |
CN104534900A (en) | Water cooler | |
CN219797918U (en) | Energy-saving hardware casting roasting furnace | |
CN214096861U (en) | Residual wax recovery device of pathology embedding machine | |
CN204924809U (en) | High temperature vacuum pressure device | |
CN210485019U (en) | Electric tracing heat preservation box with good protection effect | |
CN211486626U (en) | Improved heating and cooling tank for bilirubin extraction | |
CN220982935U (en) | Hydraulic pressure resistance testing device for pipe | |
CN218388186U (en) | Meteorological observation device with protective structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140813 Termination date: 20160329 |
|
CF01 | Termination of patent right due to non-payment of annual fee |