CN203767832U - Rapid aluminum alloy flat ingot crystallizer replacement tool - Google Patents

Rapid aluminum alloy flat ingot crystallizer replacement tool Download PDF

Info

Publication number
CN203767832U
CN203767832U CN201420170953.8U CN201420170953U CN203767832U CN 203767832 U CN203767832 U CN 203767832U CN 201420170953 U CN201420170953 U CN 201420170953U CN 203767832 U CN203767832 U CN 203767832U
Authority
CN
China
Prior art keywords
lifting
dummy ingot
water frame
ingot platform
positioning pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420170953.8U
Other languages
Chinese (zh)
Inventor
迟人廷
田芳溪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian China Australia Heavy Industry Device Fabrication Co Ltd
Original Assignee
Dalian China Australia Heavy Industry Device Fabrication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian China Australia Heavy Industry Device Fabrication Co Ltd filed Critical Dalian China Australia Heavy Industry Device Fabrication Co Ltd
Priority to CN201420170953.8U priority Critical patent/CN203767832U/en
Application granted granted Critical
Publication of CN203767832U publication Critical patent/CN203767832U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a rapid aluminum alloy flat ingot crystallizer replacement tool which comprises a dummy ingot platform, a transition water frame, a lifting bolt and a lifting rack, wherein a positioning pin column is arranged on an upper end face of the dummy ingot platform; the transition water frame is arranged on the dummy ingot platform; a positioning pin hole used for inserting and positioning the positioning pin column on the dummy ingot platform is formed in the transition water frame; a threaded hole used for fixedly assembling the lower end of the lifting bolt is formed in the end of the positioning pin column assembled on the dummy ingot platform; a D-shaped shackle matched with a lifting hole in the top of the lifting bolt is formed in a lower end face of the lifting rack; a lifting ring used for lifting is arranged at the upper end of the lifting rack. By adoption of the technical scheme, the transition water frame is arranged on the dummy ingot platform, the lifting bolt is assembled, and the lifting rack is fastened and assembled with the lifting hole in the top of the lifting bolt through the D-shaped shackle and can be lifted through the lifting ring by the upper end of the lifting rack, so that a crystallizer holding tool which is flexible in assembly and convenient to lift is formed, the danger coefficient of an operator is greatly reduced, and the assembling convenience in improved.

Description

A kind of aluminium alloy flat bloom crystallizer quick-replaceable frock
Technical field
The utility model relates to a kind of aluminium alloy flat bloom crystallizer quick-replaceable frock.
Background technology
On the fixedly water frame of the rotation of can fascinating that original crystallizer is installed, every complete equipment is supporting one group of water frame only.Necessary single dismounting when changing crystallizer or dummy bar head, cannot realize crystallizer assembling water frame and the handling simultaneously of dummy ingot platform, all replacing must complete on equipment, and equipment crystallizer erecting frame bottom is 10 meters of dark casting wells, have potential safety hazard, the time of simultaneously changing is longer.
Summary of the invention
The utility model, for above-mentioned technical matters, proposes a kind of crystallizer quick-replaceable frock.
For reaching above object, be achieved through the following technical solutions:
An aluminium alloy flat bloom crystallizer quick-replaceable frock, comprising: dummy ingot platform, transitional water frame, ringbolt and suspension bracket;
Dummy ingot platform upper surface is provided with positioning pin column;
Transitional water frame is arranged at dummy ingot platform top;
Transitional water frame is provided with the dowel hole that inserts location for dummy ingot platform alignment pin;
The positioning pin column end of assembling on dummy ingot platform is processed with the tapped bore being mounted with for ringbolt lower end, and ringbolt is directly assemblied in upper end;
Suspension bracket lower surface is provided with the D type shackle for coordinating with ringbolt top hole for hoist;
Suspension bracket upper end is provided with the suspension ring for lifting;
Adopt the utility model of technique scheme, on original rotating water frame that fascinates, increase a transitional water frame, and according to the supporting corresponding transitional water frame of the crystallizer of different specification size, in carrying out Renewal process, first dummy ingot platform is for lying against on ground, then transitional water frame is lifted on to dummy ingot platform side, by the positioning pin column on dummy ingot platform (generally adopt 4 and realize stable position), locate, be that transitional water frame is positioned over dummy ingot platform upper end, then by assembling ringbolt, be that ringbolt screws in the tapped bore of dummy ingot platform positioning pin column upper end, then carry out contraposition and the installation of crystallizer and dummy bar head, finally suspension bracket is fastened to assembling by the shackle of D type and ringbolt top hole for hoist, operating personal can lift by the suspension ring of suspension bracket upper end, possess after the ability of Integral lifting, between operating personal reparation on the ground, complete more changing jobs of crystallizer and dummy bar head, and do not affect the normal use of equipment, can be ready to complete in advance, change rapidly,
The relative prior art of the utility model has following remarkable advantage:
1. reduced site operation personnel's work capacity.
2. the risk while reducing maintain and replace frock.
3. improve site operation personnel's working environment.
4. increase work efficiency.
To sum up the utility model provides a kind of flexible assembling to lift crystallizer easily and has controlled frock, greatly reduces the danger coefficient of operating personal, has promoted assembling convenience.
Above-mentioned explanation is only the general introduction of technical solutions of the utility model, in order to better understand technological means of the present utility model, and can be implemented according to the content of specification sheets, and for above and other object of the present utility model, feature and advantage can be become apparent, below especially exemplified by preferred embodiment, and coordinate accompanying drawing, be described in detail as follows.
Accompanying drawing explanation
The utility model is totally 1 width accompanying drawing, wherein:
Fig. 1 is side-looking structural representation of the present utility model.
Fig. 2 is dummy ingot platform side TV structure schematic diagram of the present utility model.
Fig. 3 is dummy ingot platform plan structure schematic diagram of the present utility model.
Fig. 4 is transitional water frame plan structure schematic diagram of the present utility model.
Fig. 5 is transitional water frame cross-sectional view of the present utility model.
In figure: 1, dummy ingot platform, 2, transitional water frame, 3, ringbolt, 4, suspension bracket, 5, positioning pin column, 6, dowel hole, 7, the shackle of D type, 8, suspension ring.
The specific embodiment
A kind of aluminium alloy flat bloom crystallizer quick-replaceable frock as shown in Figure 1, comprising: dummy ingot platform 1, transitional water frame 2, ringbolt 3 and suspension bracket 4;
Dummy ingot platform 1 upper surface is provided with positioning pin column 5, as shown in Figures 2 and 3;
Transitional water frame 2 is arranged at dummy ingot platform 1 top;
Transitional water frame 2 is provided with for dummy ingot platform 1 positioning pin column 5 and inserts the dowel hole 6 of location, as shown in Figure 4 and Figure 5;
On dummy ingot platform 1, positioning pin column 5 ends of assembling are processed with the tapped bore being mounted with for ringbolt 3 lower ends, and ringbolt 3 is directly assemblied in positioning pin column 5 upper ends, as shown in Figure 1, Figure 2 and Figure 3;
Suspension bracket 4 lower surfaces are provided with the D type shackle 7(JB/T8112 for coordinating with ringbolt 3 top holes for hoist);
Suspension bracket 4 upper ends are provided with the suspension ring 8 for lifting;
Adopt the utility model of technique scheme, on original rotating water frame that fascinates, increase a transitional water frame 2, and according to the supporting corresponding transitional water frame 2 of the crystallizer of different specification size, in carrying out Renewal process, first dummy ingot platform 1 is for lying against on ground, then transitional water frame 2 is lifted on to dummy ingot platform 1 top, by 4 of the general employings of the positioning pin column 5(on dummy ingot platform 1, realize stable position) location, be that transitional water frame 2 is positioned over dummy ingot platform 1 upper end, then by assembling ringbolt 3, be that ringbolt 3 screws in the tapped bore of dummy ingot platform 1 positioning pin column 5 upper ends, then carry out contraposition and the installation of crystallizer and dummy bar head, finally suspension bracket is fastened to assembling by D type shackle 7 and ringbolt 3 top holes for hoist, operating personal can lift by the suspension ring of suspension bracket upper end, possess after the ability of Integral lifting, between operating personal reparation on the ground, complete more changing jobs of crystallizer and dummy bar head, and do not affect the normal use of equipment, can be ready to complete in advance, change rapidly.
To sum up the utility model provides a kind of flexible assembling to lift crystallizer easily and has controlled frock, greatly reduces the danger coefficient of operating personal, has promoted assembling convenience.
The above, it is only preferred embodiment of the present utility model, not the utility model is done to any pro forma restriction, although the utility model discloses as above with preferred embodiment, yet not in order to limit the utility model, any those skilled in the art are not departing within the scope of technical solutions of the utility model, when utilizing, appeal the equivalent embodiment that the technology contents disclosing is made a little change or is modified to equivalent variations, in every case be the content that does not depart from technical solutions of the utility model, foundation technical spirit of the present utility model is to any simple modification made for any of the above embodiments, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (1)

1. an aluminium alloy flat bloom crystallizer quick-replaceable frock, comprising: dummy ingot platform (1), transitional water frame (2), ringbolt (3) and suspension bracket (4);
Described dummy ingot platform (1) upper surface is provided with positioning pin column (5);
Described transitional water frame (2) is arranged at dummy ingot platform (1) top;
Described transitional water frame (2) is provided with the dowel hole (6) that inserts location for dummy ingot platform (1) positioning pin column (5);
Positioning pin column (5) end of the upper assembling of described dummy ingot platform (1) is processed with the tapped bore being mounted with for ringbolt (3) lower end;
Described suspension bracket (4) lower surface is provided with the D type shackle (7) for coordinating with ringbolt (3) top hole for hoist;
Described suspension bracket (4) upper end is provided with the suspension ring (8) for lifting.
CN201420170953.8U 2014-04-09 2014-04-09 Rapid aluminum alloy flat ingot crystallizer replacement tool Expired - Fee Related CN203767832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420170953.8U CN203767832U (en) 2014-04-09 2014-04-09 Rapid aluminum alloy flat ingot crystallizer replacement tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420170953.8U CN203767832U (en) 2014-04-09 2014-04-09 Rapid aluminum alloy flat ingot crystallizer replacement tool

Publications (1)

Publication Number Publication Date
CN203767832U true CN203767832U (en) 2014-08-13

Family

ID=51285046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420170953.8U Expired - Fee Related CN203767832U (en) 2014-04-09 2014-04-09 Rapid aluminum alloy flat ingot crystallizer replacement tool

Country Status (1)

Country Link
CN (1) CN203767832U (en)

Similar Documents

Publication Publication Date Title
CN103730231B (en) A kind of head cover of transformer lowering or hoisting gear
CN203728399U (en) Hook specially for transporting drying rolls in lifting way
CN203767832U (en) Rapid aluminum alloy flat ingot crystallizer replacement tool
CN103387200B (en) Turn-over method in large-scale box type component workshop
CN204752009U (en) Maintenance is with having rotated gallows
CN204297906U (en) Based on handling and the thin plate superstructure segmentation of standing up eye plate
CN203746609U (en) Transformer top cover lifting device
CN204980822U (en) Whole hoist of superimposed sheet
CN203740851U (en) Detachable lifting beam
CN207328748U (en) A kind of quick auxiliary device for realizing transverse bulkhead lifting positioning and construction safety
CN204549893U (en) A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing
CN107739008B (en) Frock of supplementary installation shackle
CN105921993B (en) A kind of tower kind equipment changes shim method
CN201573763U (en) Support tool for embarkation and connection of dock
CN211969536U (en) Aluminum ingot transport vehicle
CN205616428U (en) A hoist device for scraper engine
CN205555887U (en) Double -girder crane
CN204265244U (en) A kind of pedestal of fuel line hanger
CN104692238A (en) Large-diameter heavy pipe lifting device
CN204075164U (en) A kind of large-scale cake class Workpiece turnover tool
CN201620407U (en) Offshore petroleum drilling platform skid block
CN203582284U (en) Lifting appliance specially for large-size sand wheel
CN208776150U (en) A kind of elevator suspention quick release structure
CN203599234U (en) Pneumatic jacking part for winding and unwinding
CN202493302U (en) Assembling platform for vertically assembled rotor of turbine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140813

CF01 Termination of patent right due to non-payment of annual fee