CN203765502U - Pipeline installation support frame - Google Patents

Pipeline installation support frame Download PDF

Info

Publication number
CN203765502U
CN203765502U CN201420126714.2U CN201420126714U CN203765502U CN 203765502 U CN203765502 U CN 203765502U CN 201420126714 U CN201420126714 U CN 201420126714U CN 203765502 U CN203765502 U CN 203765502U
Authority
CN
China
Prior art keywords
pipeline
bracing
strutting arrangement
bracing frame
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420126714.2U
Other languages
Chinese (zh)
Inventor
张于
祝海健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU HANGKAI NEW ENERGY TECHNOLOGY CO LTD
Original Assignee
HANGZHOU HANGKAI NEW ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HANGKAI NEW ENERGY TECHNOLOGY Co Ltd filed Critical HANGZHOU HANGKAI NEW ENERGY TECHNOLOGY Co Ltd
Priority to CN201420126714.2U priority Critical patent/CN203765502U/en
Application granted granted Critical
Publication of CN203765502U publication Critical patent/CN203765502U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the field of mechanical tools and discloses a pipeline installation support frame. The support frame is used for achieving a supporting effect during installation of a pipeline with connection flanges arranged at two ends of the pipeline. The support frame comprises two groups of support parts. Each support part is connected with a flange at one end of the pipeline. Each support part comprises two or more than two support legs to achieve a supporting effect. A connection device capable of being fixed with the corresponding flange is arranged on each support part, and connection between the support parts and the flanges is achieved through the connection devices. The pipeline installation support frame has the advantages of being simple in structure, convenient to use, capable of clamping and locating the pipeline at any position to facilitate installation and reducing labor intensity of installation workers during pipeline installation and having good application value.

Description

Pipeline is installed bracing frame
Technical field
The utility model relates to mechanical frock field, and particularly a kind of pipeline is installed bracing frame.
Background technology
Mechanical frock refers to in machining, workpiece being clamped or located, to reach special equipment or the instrument of certain technological requirement.Being of wide application of mechanical frock, frock generally can be divided into cutter class, fixture class, measurer class, accessory class, cubing class, working position apparatus class, special plane class.Generally be used in various processing, for example, machining, location of pipeline, parts machining etc.Just because of that mechanical frock makes to produce is convenient, make all to have obtained application more and more widely in every profession and trade.
Fixture class frock refers to that nipper class frock is widely used in processing and assembling field in order to the device of clamping workpiece or guiding cutter.But in existing pipeline installation process, because workpiece (is pipeline, here indication pipeline is generally for by the fluid line of fluid, a large amount of as transfer oil, natural gas, coal gas, water or other fluid, and some solid material) profile is cylindrical shape, easily roll, and infield is conventionally in the factory floor environment of standard, lacks a kind of device that can the above-mentioned pipeline of fixed clamp.In installation process, the Simple support frame that installer often builds by means of some temporarily clamps pipeline, such makeshift device often cannot be realized being connected between pipeline and makeshift device quickly and easily, pipeline to be connected to securely on makeshift device and particularly require great effort, thereby stability is not high, location inconvenience, easily drops, and uses inconvenience completely.In addition, the two ends of pipeline are also provided with connecting flange conventionally, while using existing Simple support frame to clamp, often can bump against flange, affect the sealing effectiveness of joint face.
Thus, be necessary can make operating personnel can load and unload rapidly pipeline for above-mentioned defect development is a kind of, can play the device of temporary supporting effect.
Summary of the invention
The utility model lacks and can to pipeline, carry out quickly and easily the shortcoming of temporary fixed device for prior art, provides a kind of pipeline that bracing frame is installed, and can realize fixing pipeline.
For achieving the above object, the utility model can be taked following technical proposals:
Pipeline is installed bracing frame, and the support when pipeline that is provided with adpting flange for two ends is installed, comprises 2 groups of bracing or strutting arrangements; Described bracing or strutting arrangement is connected with the flange of pipeline one end respectively; Thereby bracing or strutting arrangement comprises more than 2 or 2 feets and plays the effect of support; On bracing or strutting arrangement, be provided with the jockey that can fix with flange, jockey is realized being connected between bracing or strutting arrangement and flange.
In embodiment of the present utility model, described jockey comprises a plurality of installing holes that are arranged on bracing or strutting arrangement.
In embodiment of the present utility model, described installing hole is distributed in the length direction both sides of pipeline.
In embodiment of the present utility model, described installing hole is rectangular.
In embodiment of the present utility model, described jockey is arranged at the top of bracing or strutting arrangement.
In embodiment of the present utility model, in installing hole, be provided with bolt, be bolted bracing or strutting arrangement and flange.
In embodiment of the present utility model, bracing or strutting arrangement also comprises bar shaped body, and feet is fixedly connected with body, and installing hole is arranged on body.
In embodiment of the present utility model, the bottom of described feet is respectively arranged with Steady base, and the length direction of Steady base is parallel to each other, and described Steady base is used for preventing that bracing or strutting arrangement is to sideways.
In embodiment of the present utility model, described feet is positioned at the middle part of Steady base.
In embodiment of the present utility model, described bracing or strutting arrangement and Steady base are made by angle steel respectively.
The utlity model has significant technique effect:
Can carry out pipeline temporary fixedly, easy installation and removal is quick.Bracing frame is supporting pipeline firmly, make it unsettled at certain position, installation personnel is fixed on bracing frame by pipe ends, in being connected and installed the process of pipeline, the pipeline being temporarily fixed is difficult for mobile, and order installation butterfly valve or the process being flexible coupling are more convenient.Reduce the working strength of installation personnel, improved the operating efficiency while installing, further, can also prevent from the accident of the flange of pipeline or pipe ends to collide with, there is good using value.
Accompanying drawing explanation
Fig. 1 is that pipe ends is provided with the structural representation that pipeline is installed bracing frame.
Fig. 2 is the structural representation that pipeline is installed bracing frame.
Fig. 3 is the structural representation that the length direction along pipeline of Fig. 1 is observed.
The specific embodiment
Below in conjunction with embodiment, the utility model is described in further detail.
Embodiment 1
Pipeline is installed bracing frame, as Figure 1-3, the support when pipeline that is provided with adpting flange for two ends is installed, related pipeline is the fluid line by fluid here, comprises 2 groups of bracing or strutting arrangements 100; Described bracing or strutting arrangement 100 is connected with the flange 201 of pipeline 200 one end respectively; Thereby bracing or strutting arrangement 100 comprises more than 2 or 2 feets 102 and plays the effect of support; On bracing or strutting arrangement 100, be provided with the jockey 101 that can fix with flange 201, jockey 101 is realized being connected between bracing or strutting arrangement 100 and flange 201.
Described jockey 101 comprises a plurality of installing holes 1011 that are arranged on bracing or strutting arrangement 100, installing hole 1011 rectangular or with the similar strip of rectangle, be generally through hole, the length direction of installing hole 1011 is parallel to the length direction of bracing or strutting arrangement 100 conventionally, installing hole 1011 is for adpting flange 201, typically use the devices such as bolt or latch and realize connection, so that pipeline 200 and whole bracing frame is stuck.
Described installing hole 1011 is distributed in the length direction both sides of pipeline 200.Especially, described installing hole 1011 is symmetrical centered by the length direction of pipeline 200.So that keep the left and right balance of bracing or strutting arrangement 100 and pipeline 200.
Conventionally, when using bracing frame, need present ground to place bracing frame, then utilize lowering or hoisting gear that flange 201 is aimed at the installing hole 1011 on jockey 101, normally by lowering or hoisting gear, then pipeline 200 is lifted and put down, pipeline 200 aligns mutually with the position of bracing frame, and described jockey 101 is arranged at the top of bracing or strutting arrangement 100.Being convenient to jockey 101 is connected with flange 201.
In installing hole 1011, be provided with bolt, be bolted bracing or strutting arrangement 100 and flange 201.Be convenient to clamp flange 201, the position of fixed-piping 200.
Bracing or strutting arrangement 100 comprises body 103 and feet 102, and body 103 is all bar shaped with feet 102, and feet 102 is fixedly connected with body 103, is conventionally fixed on body 103 both sides, and installing hole 1011 is arranged on body 103.
Feet 102 bottoms of described bracing or strutting arrangement 100 are respectively arranged with the Steady base 104 that length direction is parallel to each other, and in the present embodiment, feet 102 is fixedly connected with Steady base 104; Described Steady base 104 is for preventing that bracing or strutting arrangement 100 is to sideways.
Described feet 102 is positioned at the middle part of Steady base 104, can play better supporting role like this.
Described bracing or strutting arrangement 100 and Steady base 104 are made by angle steel respectively.
A kind of bracing frame that No. 5 GB angle steel make as material of take is below provided.
At above-mentioned pipeline, install in bracing frame, body 103 is No. 5 GB angle steel sections, is positioned at the top, should open two long 150mm on body 103, and the rectangle of wide 22mm or 18mm, as installing hole 1011, is fixed to facilitate to install.Feet 102 is for being fixed on body 103 two ends, and 2 No. 5 GB angle steel that vertically arrange, No. 2 GB angle steel that Steady base 104 is horizontal positioned, the junction of feet 102 and Steady base 104 is positioned at the middle part of Steady base 104, can play better support effect like this.
In a word, the foregoing is only preferred embodiment of the present utility model, all equalizations of doing according to the utility model claim change and modify, and all should belong to the covering scope of the utility model patent.

Claims (10)

1. pipeline is installed a bracing frame, and the support when pipeline that is provided with adpting flange for two ends is installed, is characterized in that, comprises 2 groups of bracing or strutting arrangements (100); Described bracing or strutting arrangement (100) is connected with the flange (201) of pipeline (200) one end respectively; Thereby bracing or strutting arrangement (100) comprises the feets (102) that 2 or 2 are above plays the effect of support; On bracing or strutting arrangement (100), be provided with the jockey (101) that can fix with flange (201), jockey (101) is realized being connected between bracing or strutting arrangement (100) and flange (201).
2. pipeline according to claim 1 is installed bracing frame, it is characterized in that, described jockey (101) comprises a plurality of installing holes (1011) that are arranged on bracing or strutting arrangement (100).
3. pipeline according to claim 2 is installed bracing frame, it is characterized in that, described installing hole (1011) is distributed in the length direction both sides of pipeline (200).
4. pipeline according to claim 3 is installed bracing frame, it is characterized in that, described installing hole (1011) is rectangular.
5. pipeline according to claim 1 is installed bracing frame, it is characterized in that, described jockey (101) is arranged at the top of bracing or strutting arrangement (100).
6. according to the arbitrary described pipeline of claim 2-4, bracing frame is installed, is it is characterized in that, installing hole is provided with bolt in (1011), is bolted bracing or strutting arrangement (100) and flange (201).
7. pipeline according to claim 1 is installed bracing frame, it is characterized in that, bracing or strutting arrangement (100) also comprises bar shaped body (103), and feet (102) is fixedly connected with body, and installing hole (1011) is arranged on body (103).
8. pipeline according to claim 1 is installed bracing frame, it is characterized in that, the bottom of described feet (102) is respectively arranged with Steady base (104), the length direction of Steady base (104) is parallel to each other, and described Steady base (104) is for preventing that bracing or strutting arrangement (100) is to sideways.
9. pipeline according to claim 8 is installed bracing frame, it is characterized in that, described feet (102) is positioned at the middle part of Steady base (104).
10. according to the arbitrary described pipeline of claim 7-9, bracing frame is installed, is it is characterized in that, described bracing or strutting arrangement (100) and Steady base (104) are made by angle steel respectively.
CN201420126714.2U 2014-03-20 2014-03-20 Pipeline installation support frame Expired - Fee Related CN203765502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420126714.2U CN203765502U (en) 2014-03-20 2014-03-20 Pipeline installation support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420126714.2U CN203765502U (en) 2014-03-20 2014-03-20 Pipeline installation support frame

Publications (1)

Publication Number Publication Date
CN203765502U true CN203765502U (en) 2014-08-13

Family

ID=51282744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420126714.2U Expired - Fee Related CN203765502U (en) 2014-03-20 2014-03-20 Pipeline installation support frame

Country Status (1)

Country Link
CN (1) CN203765502U (en)

Similar Documents

Publication Publication Date Title
CN205371829U (en) A multilayer pipeline gallows convenient to equipment
CN107882591B (en) Assembled hanging piece, rapid mounting device and mounting method
CN204676914U (en) A kind of rope support that slips safely
CN203900775U (en) Adjustable welding test piece fixing device
WO2017161931A1 (en) Structure for integrated installation of wireless communication device
KR101399964B1 (en) Duct alignment device
KR101834329B1 (en) Apparatus for supporting suspension scaffold pole
CN203765502U (en) Pipeline installation support frame
KR101236184B1 (en) Pendant assembling type prefabricated scaffolding system device for large heat power plant
CN104372928A (en) Cantilever type scaffold assembly
CN207178885U (en) A kind of concrete bell-and-spigot pipe installs underwater pipeline stabilizing support frame
CN206157907U (en) Antidetonation connecting piece
CN205571798U (en) Building carrier plate frame weldment work platform
KR20170127690A (en) Scaffold clamp for multiple support
CN103322325B (en) A kind of oil platform pipeline boundling pillar
KR20120000621A (en) Alignment jig of pipes and alignment method of pipes using the jig
CN205078927U (en) Nuclear power station assembled pipeline bracket
CN202559714U (en) Steel pipe butt-joint locating device
CN207233394U (en) A kind of non-rectilinear length of tube debugging apparatus
CN204675645U (en) The accessory appliances of vertical steel tube lifting in vertical shaft
CN213946369U (en) Pipeline installation equipment for building engineering
CN220727366U (en) Adjustable pipeline bracket
CN217256055U (en) Assembly fixture of manual-hydraulic flat valve with novel structure
CN210950213U (en) Supporting device for pipeline
CN216078622U (en) Device for hoisting rectangular ventilation pipe below I-shaped steel beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Hangzhou City, Zhejiang province 310015 Gongshu District Kang Road No. 18

Patentee after: HANGZHOU HANGKAI NEW ENERGY TECHNOLOGY Co.,Ltd.

Address before: Hangzhou City, Zhejiang province 310015 Gongshu District Kang Road No. 18

Patentee before: HANGZHOU HANGKAI NEW ENERGY TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 310015 Hangzhou City, Hangzhou, Zhejiang, Kang Jing Road, No. 18

Patentee after: HANGZHOU HANGKAI NEW ENERGY TECHNOLOGY CO.,LTD.

Address before: 310015 Hangzhou City, Hangzhou, Zhejiang, Kang Jing Road, No. 18

Patentee before: HANGZHOU HANGKAI NEW ENERGY TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140813