- CN203760993U CN203760993U CN201420086313.9U CN201420086313U CN203760993U CN 203760993 U CN203760993 U CN 203760993U CN 201420086313 U CN201420086313 U CN 201420086313U CN 203760993 U CN203760993 U CN 203760993U
- Authority
- CN
- China
- Prior art keywords
- rod
- deicing
- connecting rod
- insulation body
- power equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to an electric power equipment deicing tool which is characterized in that the front side of a deicing head (2) is provided with a front opening (22), the rear side of the deicing head (2) is provided with two rear openings (26) that are positioned at two sides of a connecting rod (21), and all of the front opening and the rear openings (26) are provided with conic thorns (23). The connecting rod (21) and an insulation rod body (1) are connected through a round positioning rod (41), a positioning column (42), a positioning groove (43), an embedded top ring (24), an annular groove (25) and a sleeve tube (3). The outer wall of the sleeve tube (3) is provided with edges and corners (31), the bottom end of the insulation rod body (1) is provided with a protection plate (12), and the middle part of the insulation rod body (1) is provided with a pull ring (11). The front side and the rear side of the deicing head of the electric power equipment deicing tool are provided with the openings, convenience of bidirectional deicing operation is realized, the connecting rod is firmly connected with the insulation rod body, ease of replacement is realized, the insulation rod body is provided with the pull ring of a safety rope, the tool can be prevented from slide and fall and loss, and work personnel can be prevented from being accidental injuries.
Description
Technical field
The utility model belongs to power equipment maintenance tool technical field, relates in particular to a kind of power equipment deicing tool for power equipment upkeep operation.
Background technology
In the time there is the natural calamity such as freezing, make transmission line wire around with icing, these icing have had a strong impact on normal supply of electric power, when serious, cause transmission tower collapse or damage, therefore must remove in time, the method of removing at present line ice coating mainly contains following two kinds: one, artificial removing method, operating personnel pass through instrument manual removal by manned coaster, between the deicing head of deicing tool and the body of rod, be bolted, because environment is severe and bolt is smaller, after long-time use, cause bolt surface to freeze, should not change deicing head; They are two years old, adopt small-sized machine deicing, although the method has overcome above-mentioned defect, but be subject to the impact of geographical position and surrounding environment, under the environment such as mountain area, be difficult to machinery to transport, and freezing weather is not long-term existence, once machinery needed long-time maintenance in several years for even large freezing disaster weather, and maintenance cost increases greatly.
Summary of the invention
For the deficiencies in the prior art, the purpose of this utility model is to provide a kind of easy to carry, Stability Analysis of Structures, power equipment deicing tool that coefficient of safety is high of using, and can effectively carry out deicing operation, has reduced staff's labour intensity.It is as follows that the utility model solves the problems of the technologies described above adopted technical scheme: a kind of power equipment deicing tool, include the insulation body of rod, deicing head and connecting rod, the front side of described deicing head is provided with an open front, the rear side of deicing head is provided with two after-openings, after-opening is positioned at connecting rod both sides, on open front and after-opening, is equipped with bore spine, has avoided deicing in the past to exert oneself toward a direction, facilitate deicing, increase work efficiency, it is semicircular backstay that described connecting rod bottom surface is equipped with cross section with a side of insulation body of rod end face, connecting rod bottom surface is equipped with location notch with the opposite side of insulation body of rod end face, described backstay end is provided with the reference column with location notch adaptation, reference column and location notch are polygon cylinder, described backstay outside and the outer hand hay cutter on insulation body of rod top are equipped with screw thread, on described connecting rod, be also provided with apical ring, in apical ring, be provided with cannelure, the external side screw joint casing of described insulating bar, the reference column of connecting rod and insulating bar end of body inserts respectively the other side's location notch, screw thread by backstay outside is upwards tightened sleeve pipe, sleeve pipe is embedded in the cannelure of top board.Described in above-mentioned structure, connecting rod bottom surface is equipped with the symmetrical combined mechanism that is connected with insulation body of rod end face, compound mode is firm, can effectively avoid the drawback that in prior art, the fixed form of bolt is brought, even if this structure also can be by TOs such as pipe wrench after thawing, and outside sleeve pipe is flexibly connected, and can change according to fact damaged situation, the outer wall of sleeve pipe is provided with corner angle, for convenience detach.Described insulation body of rod bottom is provided with backplate, under rugged environment extremely, deicing tool is easy to landing in staff's hand, this backplate can reduce the probability of landing, insulation body of rod middle part is provided with a draw ring, this draw ring can be connected with cable by safety telescopic rope, in ice detachment, staff protects by safety telescopic rope, while generation once unexpected, tending to the subconscious deicing tool of throwing away catches cable to save oneself, the insulation body of rod is now owing to being connected with safety line equally, just can not drop, the instrument avoided is lost and has been ensured staff's safety on ground.
The utility model Stability Analysis of Structures, reasonable in design, connecting rod is connected by improved mode with the insulation body of rod, easily change, before and after deicing head, both sides are equipped with opening, can carry out deicing by two-way operation, the insulation body of rod is provided with the draw ring for connecting safety line, prevents that instrument landing from losing or accidental injury staff.
Brief description of the drawings
By the description of its exemplary embodiment being carried out below in conjunction with accompanying drawing, the above-mentioned feature and advantage of the utility model will become apparent and easily understand.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the syndeton schematic diagram of the body of rod and connecting rod of insulating in the utility model;
Fig. 3 is the structural representation of insulation body of rod end face;
Fig. 4 is the structural representation of connecting rod bottom surface.
In figure, 1, the insulation body of rod, 2, deicing head, 3, sleeve pipe, 11, draw ring, 12, backplate, 21, connecting rod, 22, open front, 23, bore spine, 24, top board, 25, cannelure, 26, after-opening, 31, corner angle, 41, backstay, 42, reference column, 43, location notch.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in detail.As shown in the figure, a kind of power equipment deicing tool, include the insulation body of rod 1, deicing 2 and connecting rod 21, the front side of described deicing 2 is provided with an open front 22, and the rear side of deicing 2 is provided with two after-openings 26, and after-opening 26 is positioned at connecting rod 21 both sides, on open front 22 and after-opening 26, be equipped with bore spine 23, avoid deicing in the past toward a direction firmly, to facilitate deicing, increased work efficiency, it is semicircular backstay 41 that described connecting rod 21 bottom surfaces are equipped with cross section with a side of the insulation body of rod 1 end face, connecting rod 21 bottom surfaces are equipped with location notch 43 with the opposite side of the insulation body of rod 1 end face, described backstay 41 ends are provided with the reference column 42 with location notch 43 adaptations, reference column 42 and location notch 43 are polygon cylinder, the outer hand hay cutter on described backstay 41 outsides and the insulation body of rod 1 top is equipped with screw thread, on described connecting rod 21, be also provided with apical ring 24, in apical ring 24, be provided with cannelure 25, the described insulation body of rod 1 outside screw joint sleeve 3, the reference column 42 of connecting rod 21 and the insulation body of rod 1 end inserts respectively the other side's location notch 43, screw thread by backstay 41 outsides is upwards tightened sleeve pipe 3, sleeve pipe 3 is embedded in the cannelure 25 of apical ring 24.Described in above-mentioned structure, connecting rod 21 bottom surfaces are equipped with the symmetrical combined mechanism that is connected with the insulation body of rod 1 end face, compound mode is firm, can effectively avoid the drawback that in prior art, the fixed form of bolt is brought, even if this structure also can be by TOs such as pipe wrench after thawing, and outside sleeve pipe 3 is flexibly connected, and can change according to fact damaged situation, the outer wall of sleeve pipe 3 is provided with corner angle 31, for convenience detach.The described insulation body of rod 1 bottom is provided with backplate 12, under rugged environment extremely, deicing tool is easy to landing in staff's hand, this backplate 12 can reduce the probability of landing, the insulation body of rod 1 middle part is provided with a draw ring 11, this draw ring 11 can be connected with cable by safety telescopic rope, in ice detachment, staff protects by safety telescopic rope, while generation once unexpected, tending to the subconscious deicing tool of throwing away catches cable to save oneself, the insulation body of rod 1 is now owing to being connected with safety line equally, just can not drop, the instrument avoided is lost and has been ensured staff's safety on ground.
Claims (3)
1. a power equipment deicing tool, include the insulation body of rod (1), deicing head (2) and connecting rod (21), it is characterized in that: the front side of described deicing head (2) is provided with an open front (22), the rear side of deicing head (2) is provided with two after-openings (26), after-opening (26) is positioned at connecting rod (21) both sides, on open front (22) and after-opening (26), is equipped with bore spine (23).
2. according to power equipment deicing tool claimed in claim 1, it is characterized in that: it is semicircular backstay (41) that described connecting rod (21) bottom surface is equipped with cross section with a side of the insulation body of rod (1) end face, connecting rod (21) bottom surface is equipped with location notch (43) with the opposite side of the insulation body of rod (1) end face, described backstay (41) end is provided with the reference column (42) adaptive with location notch (43), reference column (42) and location notch (43) are polygon cylinder, described backstay (41) outside and the outside on the insulation body of rod (1) top are equipped with screw thread, on described connecting rod (21), be also provided with apical ring (24), in apical ring (24), be provided with cannelure (25), the described insulation body of rod (1) outside screw joint sleeve (3), the reference column (42) of connecting rod (21) and the insulation body of rod (1) end inserts respectively the other side's location notch (43), screw thread by backstay (41) outside is upwards tightened sleeve pipe (3), sleeve pipe (3) is embedded in the cannelure (25) of top board (24).
3. according to power equipment deicing tool claimed in claim 2, it is characterized in that: the outer wall of described sleeve pipe (3) is provided with corner angle (31), the described insulation body of rod (1) bottom is provided with backplate (12), and the described insulation body of rod (1) middle part is provided with a draw ring (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420086313.9U CN203760993U (en) | 2014-02-28 | 2014-02-28 | Electric power equipment deicing tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420086313.9U CN203760993U (en) | 2014-02-28 | 2014-02-28 | Electric power equipment deicing tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203760993U true CN203760993U (en) | 2014-08-06 |
Family
ID=51256230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420086313.9U Expired - Fee Related CN203760993U (en) | 2014-02-28 | 2014-02-28 | Electric power equipment deicing tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203760993U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105257063A (en) * | 2015-09-22 | 2016-01-20 | 国网河南偃师市供电公司 | Deicing device of high-voltage tower |
CN108879444A (en) * | 2018-07-16 | 2018-11-23 | 芜湖辉林奥远自动化科技有限公司 | A kind of high-voltage insulating rod snow-removal tool |
PL423279A1 (en) * | 2017-10-26 | 2019-05-06 | Univ Warminsko Mazurski W Olsztynie | Device for manual deicing of electric tramway traction |
WO2021189166A1 (en) * | 2020-03-22 | 2021-09-30 | 南京唐壹信息科技有限公司 | Ice breaker for use with unmanned aerial vehicle |
-
2014
- 2014-02-28 CN CN201420086313.9U patent/CN203760993U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105257063A (en) * | 2015-09-22 | 2016-01-20 | 国网河南偃师市供电公司 | Deicing device of high-voltage tower |
PL423279A1 (en) * | 2017-10-26 | 2019-05-06 | Univ Warminsko Mazurski W Olsztynie | Device for manual deicing of electric tramway traction |
CN108879444A (en) * | 2018-07-16 | 2018-11-23 | 芜湖辉林奥远自动化科技有限公司 | A kind of high-voltage insulating rod snow-removal tool |
WO2021189166A1 (en) * | 2020-03-22 | 2021-09-30 | 南京唐壹信息科技有限公司 | Ice breaker for use with unmanned aerial vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203760993U (en) | Electric power equipment deicing tool | |
CN103414125B (en) | A kind of electric line foreign matter method for dismounting and removal tool | |
CN206820434U (en) | Power line deicing robot | |
CN204424672U (en) | European cable plug head stripping attachment | |
CN206309110U (en) | Electric pole pole centralizing device | |
CN101834415B (en) | Method and special tool for live replacement of zinc oxide lightning arrester | |
CN204289737U (en) | Cable inspection earthing pricker | |
CN209860562U (en) | Power line deicing hammer for transformer substation power transmission tower | |
CN201674160U (en) | Special tool for electrified replacement of zinc oxide arresters | |
CN205863867U (en) | A kind of voltage wire ice removing device | |
CN106711720A (en) | Distribution high-voltage ground wire grounding device | |
CN102510040B (en) | Deicing device for ground wire | |
CN205183191U (en) | Insulator icing removing tool | |
CN203504068U (en) | Bird driving device installation tool | |
CN202308991U (en) | Device for deicing ground wire | |
CN104967077B (en) | Button type electric pole cable grounding protection pipe | |
CN204587326U (en) | Blimp draw bar | |
CN204024549U (en) | A kind of auxiliary catcher taking out for core sample in engineering geologic investigation core barrel pipe | |
CN203086054U (en) | Porcelain vase bolt fastening operating lever | |
CN203399642U (en) | Bird repeller live mounting bracket | |
CN203135277U (en) | Nest dismantling apparatus | |
CN204967129U (en) | Clear away insulating combination tool of screen of trees with electricity | |
CN204376301U (en) | A kind of twister scavenge unit of transmission line | |
CN202353101U (en) | Post insulator live tightening device | |
CN204835431U (en) | Transmission tower drives special installation device of bird ware |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140806 Termination date: 20150228 |
|