CN203760876U - Simple grounding grid overhaul device - Google Patents
Simple grounding grid overhaul device Download PDFInfo
- Publication number
- CN203760876U CN203760876U CN201320896237.3U CN201320896237U CN203760876U CN 203760876 U CN203760876 U CN 203760876U CN 201320896237 U CN201320896237 U CN 201320896237U CN 203760876 U CN203760876 U CN 203760876U
- Authority
- CN
- China
- Prior art keywords
- grounding
- earth rod
- rod
- ironware
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Measurement Of Resistance Or Impedance (AREA)
Abstract
本实用新型提供了一种简易接地网检修装置,包括有检修接地机构与能够对故障进行维修的维修电焊机;检修接地机构包括有具有接地功能的接地棒A、具有接地功能的接地棒B、具有绝缘功能的绝缘钳,接地棒A与接地棒B上都设有铁件;本实用新型针对现有的技术设备接地线脱离接地体或接地网会产生漏电的问题,采用检修接地机构与能够对故障进行维修的维修电焊机,因此就能够显著的降低接触电压和跨步电压,大部分故障电源通过接地网到垂直极流入大地相应减少了水平导体的散流量。
The utility model provides a simple grounding network maintenance device, which includes a maintenance grounding mechanism and a maintenance electric welding machine capable of repairing faults; the maintenance grounding mechanism includes a grounding rod A with a grounding function, a grounding rod B with a grounding function, Insulating pliers with insulating function, the grounding rod A and the grounding rod B are equipped with iron parts; the utility model aims at the problem that the grounding wire of the existing technical equipment will be separated from the grounding body or the grounding grid will cause leakage, and adopts the maintenance grounding mechanism and can Therefore, the maintenance welding machine for repairing the fault can significantly reduce the contact voltage and step voltage, and most of the fault power flows into the ground through the ground grid to the vertical pole, which reduces the dissipation of the horizontal conductor accordingly.
Description
技术领域technical field
本实用新型涉及接地网电力检修的技术领域,具体涉及一种简易接地网检修装置。The utility model relates to the technical field of grounding grid power maintenance, in particular to a simple grounding grid maintenance device.
背景技术Background technique
近年来,随着电网规模的迅速增长,变电站及线路数量急剧增加,由于设备长时间运行,一些关系生命安全的变电、线路、台区设备的接地体或接地网一旦发生腐蚀脱离,将会引发重大的安全事故。在这种情况下,一方面要求运维部门加强设备巡视及维护,另一方面需要通过采用简易接地检修装置来提高设备检修效率,从而提高设备运行的的安全稳定性。In recent years, with the rapid growth of the grid scale, the number of substations and lines has increased sharply. Due to the long-term operation of equipment, once the grounding body or grounding grid of some life-related substations, lines, and station area equipment corrodes and detaches, it will lead to major safety accidents. In this case, on the one hand, the operation and maintenance department is required to strengthen equipment inspection and maintenance; on the other hand, it is necessary to improve the efficiency of equipment maintenance through the use of simple grounding maintenance devices, so as to improve the safety and stability of equipment operation.
当运行中的变电、线路设备因雷击或绝缘降低而出现接地时,线路的接地体、接地网就发挥了重要安全作用。高压变电或线路产生高压漏电通过接地,将引起保护接地跳闸,但若设备接地线脱离接地体或接地网,将会产生跨步高电压,危害人员安全;同时,设备一旦漏电,人接触到漏电设备时会造成触电伤亡事故,电气设备漏电时,若不及时切断电源将会引发为短路故障,烧毁设备。When the substation and line equipment in operation are grounded due to lightning strikes or insulation degradation, the grounding body and grounding grid of the line play an important role in safety. The high-voltage substation or the high-voltage leakage of the line passes through the ground, which will cause the protection ground to trip, but if the equipment ground wire is separated from the ground body or the ground grid, it will generate step high voltage, which will endanger the safety of personnel; at the same time, once the equipment leaks, people touch Leakage of equipment will cause electric shock casualties. When electrical equipment leaks, if the power supply is not cut off in time, it will cause a short circuit fault and burn the equipment.
实用新型内容Utility model content
针对以上现有技术中存在的问题,本实用新型提供了一种简易接地网检修装置,这样就能在安装时就可以避免了小间隔安装维修需停电工作的做法。Aiming at the above existing problems in the prior art, the utility model provides a simple grounding grid maintenance device, which can avoid the practice of power outage for small interval installation and maintenance during installation.
本实用新型是通过以下技术方案实现的:The utility model is achieved through the following technical solutions:
一种简易接地网检修装置,包括有检修接地机构与能够对故障进行维修的维修电焊机,检修接地机构包括有具有接地功能的接地棒A、具有接地功能的接地棒B、具有绝缘功能的绝缘钳,接地棒A与接地棒B上都设有铁件,所述接地棒A的铁件与接地棒B的铁件都通过铜线鼻子压接有具有绝缘功能的绝缘铜芯线,接地棒A上连接的绝缘铜芯线的另一端通过铜线鼻子与绝缘钳压连接,接地棒B上连接的绝缘铜芯线的另一端连接在与接地棒A连接的绝缘铜芯线上。A simple grounding network maintenance device, including a maintenance grounding mechanism and a maintenance electric welding machine capable of repairing faults, the maintenance grounding mechanism includes a grounding rod A with a grounding function, a grounding rod B with a grounding function, and an insulating wire with an insulating function. There are iron parts on the ground rod A and the ground rod B, and the iron parts of the ground rod A and the iron parts of the ground rod B are all crimped with insulated copper core wires with insulation function through the copper wire nose, and the ground rod The other end of the insulated copper core wire connected to A is connected to the insulating clamp through the copper wire lug, and the other end of the insulated copper core wire connected to the ground rod B is connected to the insulated copper core wire connected to the ground rod A.
维修电焊机的外壳上通过绝缘铜芯线连有接地棒C,接地棒C上设有铁件,绝缘铜芯线的一端通过铜线鼻子与接地棒C上的铁件压接。The shell of the maintenance electric welding machine is connected to the grounding rod C through an insulated copper core wire. There is an iron piece on the grounding rod C. One end of the insulated copper core wire is crimped with the iron piece on the grounding rod C through the copper wire nose.
接地棒A、接地棒B与接地棒C均为圆柱钢,圆柱钢的Φ为16mm,圆柱钢的长度为80cm,圆柱钢一端为打尖度为20层面,圆柱钢上的距圆柱钢的打尖端70cm处设有铁件。Grounding rod A, grounding rod B and grounding rod C are all cylindrical steel, the diameter of the cylindrical steel is 16mm, the length of the cylindrical steel is 80cm, one end of the cylindrical steel is sharpened to 20 layers, and the distance from the cylindrical steel to the tip of the cylindrical steel is There is an iron piece at 70cm.
铁件的厚度为20mm,铁件的长度为60mm,铁件的宽度为40mm。The thickness of the iron piece is 20mm, the length of the iron piece is 60mm, and the width of the iron piece is 40mm.
接地棒A连接的绝缘铜芯线总长度为10m,接地棒B连接的绝缘铜芯线的总长度为6m,接地棒C连接的绝缘铜芯线的总长度为4m,绝缘铜芯线的半径为5mm。The total length of the insulated copper core wires connected to ground rod A is 10m, the total length of the insulated copper core wires connected to ground rod B is 6m, the total length of the insulated copper core wires connected to ground rod C is 4m, and the radius of the insulated copper core wires is is 5mm.
铁件与铜线鼻子的压接处设有压孔。There is a pressure hole at the crimping place between the iron piece and the copper wire lug.
压孔的直径为12mm。The diameter of the press hole is 12mm.
铜线鼻子的面积为25mm2。The area of the copper wire lug is 25mm 2 .
本实用新型的有益效果为:针对现有的技术设备接地线脱离接地体或接地网会产生漏电的问题,采用检修接地机构与能够对故障进行维修的维修电焊机,因此就能够显著的降低接触电压和跨步电压,大部分故障电源通过接地网到垂直极流入大地相应减少了水平导体的散流量。The beneficial effects of the utility model are as follows: aiming at the problem of electric leakage caused by the grounding wire of the existing technical equipment detached from the grounding body or the grounding grid, the maintenance grounding mechanism and the maintenance electric welding machine capable of repairing the fault can be used, so that the contact can be significantly reduced. Voltage and step voltage, most of the fault power flows into the ground through the ground grid to the vertical pole, which reduces the dissipation of the horizontal conductor accordingly.
附图说明Description of drawings
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图中:1为检修接地机构;2为维修电焊机;3为接地棒A;4为接地棒B;5为接地棒C;6为绝缘铜芯线;7为铁件;8为铜线鼻子;9为压孔;10为绝缘钳。In the figure: 1 is the maintenance grounding mechanism; 2 is the maintenance electric welding machine; 3 is the ground rod A; 4 is the ground rod B; 5 is the ground rod C; 6 is the insulated copper core wire; 7 is the iron piece; 8 is the copper wire nose ; 9 is a pressure hole; 10 is an insulating pliers.
具体实施方式Detailed ways
以下结合附图和具体实施方式对本实用新型做进一步详细说明。The utility model will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
本实用新型提供了一种简易接地网检修装置,包括有检修接地机构与能够对故障进行维修的维修电焊机;检修接地机构包括有具有接地功能的接地棒A、具有接地功能的接地棒B、具有绝缘功能的绝缘钳,接地棒A与接地棒B上都设有铁件,接地棒A的铁件与接地棒B的铁件都通过铜线鼻子压接有具有绝缘功能的绝缘铜芯线,接地棒A上连接的绝缘铜芯线的另一端通过铜线鼻子与绝缘钳压连接,接地棒B上连接的绝缘铜芯线的另一端连接在与接地棒A连接的绝缘铜芯线上;维修电焊机的外壳上通过绝缘铜芯线连有接地棒C,接地棒C上设有铁件,绝缘铜芯线的一端通过铜线鼻子与接地棒C上的铁件压接;接地棒A、接地棒B与接地棒C均为圆柱钢,圆柱钢的Φ为16mm,圆柱钢的长度为80cm,圆柱钢一端为打尖度为20层面,导电性能最好,圆柱钢上的距圆柱钢的打尖端70cm处设有铁件,连接效果最好;铁件的厚度为20mm,铁件的长度为60mm,铁件的宽度为40mm,导电的效果最好,且连接最牢固;接地棒A连接的绝缘铜芯线总长度为10m,接地棒B连接的绝缘铜芯线的总长度为6m,接地棒C连接的绝缘铜芯线的总长度为4m,绝缘铜芯线的半径为5mm;铁件与铜线鼻子的压接处设有压孔;压孔的直径为12mm,对降低接触电压和跨步电压具有非常显著的作用,接地装置接地垂直桩的引力,降低了地电位,直接触及跨步电压均有着直接的关系(引流),大部分故障电源通过接地网到垂直极流入大地相应减少了水平导体的散流量。接地网的检修简易装置是临时性的,接地或接地网修复好以后就拆除,以防两个接地体产生电位差。The utility model provides a simple grounding network maintenance device, which includes a maintenance grounding mechanism and a maintenance electric welding machine capable of repairing faults; the maintenance grounding mechanism includes a grounding rod A with a grounding function, a grounding rod B with a grounding function, Insulating pliers with insulation function, iron parts are installed on ground rod A and ground rod B, the iron parts of ground rod A and the iron parts of ground rod B are crimped with insulated copper core wires with insulation function through copper wire noses , the other end of the insulated copper core wire connected to the ground rod A is connected to the insulating clamp through the copper wire lug, and the other end of the insulated copper core wire connected to the ground rod B is connected to the insulated copper core wire connected to the ground rod A ;The shell of the maintenance electric welding machine is connected with the grounding rod C through the insulated copper core wire, the grounding rod C is provided with iron parts, and one end of the insulated copper core wire is crimped with the iron part on the grounding rod C through the copper wire nose; the grounding rod A. The grounding rod B and the grounding rod C are both cylindrical steel. The Φ of the cylindrical steel is 16mm, the length of the cylindrical steel is 80cm, and one end of the cylindrical steel is sharpened to 20 layers, which has the best electrical conductivity. The distance between the cylindrical steel and the cylindrical steel There is an iron piece at 70cm from the tip of the striker, and the connection effect is the best; the thickness of the iron piece is 20mm, the length of the iron piece is 60mm, and the width of the iron piece is 40mm, the effect of conductivity is the best, and the connection is the most secure; grounding rod A The total length of the insulated copper core wires connected is 10m, the total length of the insulated copper core wires connected to the ground rod B is 6m, the total length of the insulated copper core wires connected to the ground rod C is 4m, and the radius of the insulated copper core wires is 5mm; There is a pressure hole at the crimping place between the iron piece and the copper wire lug; the diameter of the pressure hole is 12mm, which has a very significant effect on reducing the contact voltage and step voltage. The gravity of the grounding vertical pile of the grounding device reduces the ground potential and directly There is a direct relationship (drainage) between the step voltage and most of the faulty power supply flowing into the ground through the ground grid to the vertical pole, which reduces the dissipation of the horizontal conductor accordingly. The simple maintenance device of the grounding grid is temporary. After the grounding or the grounding grid is repaired, it will be removed to prevent the potential difference between the two grounding bodies.
施工时,一般变电站年检工作时,一、二次设备全部停电,进线线路侧带电,为防止施工时接触漏电产生的接触电压和跨步电压,制作了简易接地装置,施工时必须脚穿绝缘鞋,手带绝缘手套,用铁锤先将简易的临时接地线装置的两根接地桩先打下去70公分,再将绝缘钳钳到接地扁铁或圆钢上,需要焊接接地时立面也同样这样做,在电焊机外壳上面连接一根接地棒,对降低接触电压和跨步电压具有非常显著的作用,接地装置接地垂直桩的引力,降低了地电位,直接触及跨步电压均有着直接的关系(引流),大部分故障电源通过接地网到垂直极流入大地相应减少了水平导体的散流量。接地网的检修简易装置是临时性的,接地或接地网修复好以后就拆除,以防两个接地体产生电位差。During construction, during the annual inspection of general substations, all the primary and secondary equipment are powered off, and the incoming line side is charged. In order to prevent the contact voltage and step voltage generated by contact leakage during construction, a simple grounding device is made. During construction, the feet must wear insulation Shoes and insulating gloves, use a hammer to drive down the two grounding piles of the simple temporary grounding wire device by 70 cm, and then clamp the insulating pliers to the grounding flat iron or round steel. In the same way, connecting a grounding rod on the outer shell of the electric welding machine has a very significant effect on reducing the contact voltage and step voltage. The gravity of the grounding vertical pile of the grounding device reduces the ground potential, and directly touches the step voltage. The relationship (drainage), most of the fault power flows into the ground through the ground grid to the vertical pole, which reduces the dissipation of the horizontal conductor accordingly. The simple maintenance device of the grounding grid is temporary. After the grounding or the grounding grid is repaired, it will be removed to prevent the potential difference between the two grounding bodies.
本实用新型针对现有的技术设备接地线脱离接地体或接地网会产生漏电的问题,采用简易的能够临时性检修接地的检修接地机构与能够对故障进行维修的维修电焊机,因此就能够显著的降低接触电压和跨步电压,大部分故障电源通过接地网到垂直极流入大地相应减少了水平导体的散流量。The utility model aims at the problem that the grounding wire of the existing technical equipment is detached from the grounding body or the grounding grid, which will cause leakage. To reduce the contact voltage and step voltage, most of the fault power flows into the ground through the ground grid to the vertical pole, which reduces the dissipation of the horizontal conductor accordingly.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320896237.3U CN203760876U (en) | 2013-12-31 | 2013-12-31 | Simple grounding grid overhaul device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320896237.3U CN203760876U (en) | 2013-12-31 | 2013-12-31 | Simple grounding grid overhaul device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203760876U true CN203760876U (en) | 2014-08-06 |
Family
ID=51256113
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320896237.3U Expired - Fee Related CN203760876U (en) | 2013-12-31 | 2013-12-31 | Simple grounding grid overhaul device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203760876U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103746305A (en) * | 2013-12-31 | 2014-04-23 | 国家电网公司 | Simple and easy grounding grid overhauling device |
-
2013
- 2013-12-31 CN CN201320896237.3U patent/CN203760876U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103746305A (en) * | 2013-12-31 | 2014-04-23 | 国家电网公司 | Simple and easy grounding grid overhauling device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204516914U (en) | Earthing device when distribution line and equipment interruption maintenance | |
| CN207650315U (en) | Distribution line ground fault detection device | |
| CN202930802U (en) | Movable type distribution transformer allowing uninterruptible power supply mounting and dismounting | |
| CN201075318Y (en) | An insulator string arc discharge device | |
| CN202975127U (en) | Portable safe high-voltage electroscope | |
| CN203760876U (en) | Simple grounding grid overhaul device | |
| CN204407527U (en) | A kind of distribution board earthing device | |
| CN201742027U (en) | Special tool for replacing insulators in electriferous state for 110kV single tower double circuit | |
| CN202042864U (en) | Unbalance insulation earthing device for half-composite pole tower | |
| CN202422954U (en) | 10KV incoming bridge grounding conductor terminal for transformer | |
| CN205092332U (en) | Transformer substation uses earth connection | |
| CN205753300U (en) | 10kV distribution line lightning protection earthing device | |
| CN201466619U (en) | A gap lightning protection device | |
| CN103746305A (en) | Simple and easy grounding grid overhauling device | |
| CN203983531U (en) | 10kV drop switch ground connection connecting rod | |
| CN203365556U (en) | Temporary earthing device for public change earth resistance measurement | |
| CN203026397U (en) | Grounding hook | |
| CN104361959B (en) | Disconnection-preventing parallel-connected gap device | |
| CN202601858U (en) | Lightning-proof gap type grounding device | |
| CN103839657B (en) | A kind of neutral point for transformer and the two grounding system of shell | |
| CN201897861U (en) | Automatic electricity induction voice alarm device for grounding wires | |
| CN203596535U (en) | 10kV armoured switch plum-blossom-type moving contact ground wire | |
| CN202423580U (en) | Grounding-wire-falling preventing grounding contact for transformer substation | |
| CN207559427U (en) | A kind of penetration type high-tension fuse of high-voltage hot-line work | |
| CN202994909U (en) | Grounding state monitoring device for electrical equipment and grounding network of transformer station |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140806 Termination date: 20151231 |
|
| EXPY | Termination of patent right or utility model |