CN203758287U - Cogeneration sedimentation room inner barrel - Google Patents

Cogeneration sedimentation room inner barrel Download PDF

Info

Publication number
CN203758287U
CN203758287U CN201320852284.8U CN201320852284U CN203758287U CN 203758287 U CN203758287 U CN 203758287U CN 201320852284 U CN201320852284 U CN 201320852284U CN 203758287 U CN203758287 U CN 203758287U
Authority
CN
China
Prior art keywords
cogeneration
expansion chamber
inner core
link plate
chamber inner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320852284.8U
Other languages
Chinese (zh)
Inventor
周桂华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINHUA HUALUNDA CAST STEEL CO Ltd
Original Assignee
XINHUA HUALUNDA CAST STEEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINHUA HUALUNDA CAST STEEL CO Ltd filed Critical XINHUA HUALUNDA CAST STEEL CO Ltd
Priority to CN201320852284.8U priority Critical patent/CN203758287U/en
Application granted granted Critical
Publication of CN203758287U publication Critical patent/CN203758287U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to a cogeneration sedimentation room inner barrel. The inner barrel comprises a fixed seat, hanging plates and locking plates, wherein the fixed seat is arranged on a flange plate which is fixed to the inner wall of a sedimentation room; a group of the hanging plates which are mutually connected is arranged around the inner wall surface of the sedimentation room; the hanging plate at the top layer is mounted on the fixed seat; the locking plates used for fixation are arranged on the hanging plates. The cogeneration sedimentation room inner barrel has the advantages that the structure is simple, the assembly is easy, the strength is high, the maintenance is convenient, and the service life is long.

Description

A kind of cogeneration expansion chamber inner core
Technical field
The utility model relates to a kind of cement kiln residual heat generating expansion chamber inner core.
Background technology
The Technology in Surplus Heat Power Generation of Cement Factory expansion chamber inner core of existing dry-process production line, adopts overall inner core, by sheet material welding forming, yielding, forms distortion, heatproof and wearing no resistance, and the bottom of inner core easily cracks, and life cycle is short, thereby affects the normal use of inner core.
Summary of the invention
Problem to be solved in the utility model is to provide a kind of split type inner core, and assembling is simple, easy to maintenance, a kind of cogeneration expansion chamber inner core that life cycle is long.
The utility model is realized by following technology: a kind of cogeneration expansion chamber inner core, this inner core comprises holder, link plate, jam plate, described holder is arranged on the ring flange being fixed on expansion chamber inwall, one group of interconnective link plate is around being arranged on expansion chamber inner wall surface, and top layer link plate is arranged on holder, on link plate, be provided with the jam plate being used for fixing.
Described link plate is made up of body, hook, groove; Described hook and groove lay respectively at the interior outside of body; The outer wall of described groove extends downwards, and inwall is provided with hook groove; Described hook slot length is greater than two hook width sums.
Described holder is made up of straight plate, hook groove; Described straight plate upper end is provided with screw; Described hook groove inner side is provided with recess one and recess two; Described recess one length is greater than two hook width sums.
Described body is smoothed curve type.
Described hook has two, is arranged at the right and left of body one end.
The fillet of described hook both sides is 2-20mm.
The fillet of described groove is 5-30mm.
Described jam plate is arranged on bottom link plate.
The link plate of described top layer hangs on holder, and one group of link plate is staggered installation of, and the link plate of bottom is connected by jam plate.
When the utility model is assembled at cogeneration expansion chamber inner core, holder is fastened on ring flange by three screws, between adjacent two rows link plate, circumferential misalignment is connected, form integral cylinder, adjacent two hooks are hung on respectively in the corresponding hook groove of last layer, and the bottom connects with jam plate, pass through to install jam plate between link plate, prevent from coming off, thereby form cogeneration expansion chamber inner core; The utility model is simple in structure, and intensity is high, and dismounting easily, easy to maintenance, long service life.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the longitudinal scheme of installation of link plate;
Fig. 3 is the structural representation of link plate;
Fig. 4 is that Fig. 3 C-C is to cut-away view;
Fig. 5 is that the A-A of Fig. 3 is to cut-away view.
Fig. 6 is the structural representation of holder;
Fig. 7 is that Fig. 6 B is to diagram;
Fig. 8 is that the D of Fig. 6 is to diagram;
Fig. 9 is the structural representation of jam plate.
detailed description of the invention:
as shown in Figure 1, Figure 2, shown in Fig. 9a kind of cogeneration expansion chamber inner core, this inner core comprises holder 1, link plate 3, jam plate 20, described holder 1 is arranged on the ring flange being fixed on expansion chamber inwall, one group of interconnective link plate 3 is around being arranged on expansion chamber inner wall surface, and top layer link plate 3 is arranged on holder 1, on link plate 3, be provided with the jam plate 20 being used for fixing.As in Figure 3-5, link plate 3 is made up of body 6, hook 7, groove 8; Body 6 is smoothed curve type, and hook 7 and groove 8 lay respectively at the interior outside of body; The fillet of groove 8 is 15mm, and outer wall extends downwards, and inwall is provided with hook groove 9; Hook groove 9 length are greater than two hook width sums.As shown in Fig. 6-8, holder 1, is made up of straight plate 30, hook groove 31; Straight plate 30 upper ends are provided with screw 10; Hook groove 31 inner sides are provided with recess 1 and recess 2 18; Recess one 19 length are slightly larger than two hook width sums.Hook 7 on body 6 has two, and the fillet of both sides is 10mm, is arranged at the right and left of body one end.
Jam plate 20 is arranged on bottom link plate 3, and the link plate 3 of top layer hangs on holder 1, and one group of link plate 3 is staggered installation of, and the link plate 3 of bottom is connected by jam plate 20.
In the time that cogeneration expansion chamber inner core is assembled, between adjacent two rows link plate, circumferential misalignment is connected, form integral cylinder, adjacent two hooks are hung on respectively in the corresponding hook groove of last layer, the bottom connects with jam plate, between link plate, be screwed, thereby be mounted to cogeneration expansion chamber inner core.

Claims (9)

1. a cogeneration expansion chamber inner core, it is characterized in that: this inner core comprises holder (1), link plate (3), jam plate (20), described holder (1) is arranged on the ring flange being fixed on expansion chamber inwall, one group of interconnective link plate (3) is around being arranged on expansion chamber inner wall surface, and it is upper that top layer link plate (3) is arranged on holder (1), is provided with the jam plate (20) being used for fixing on link plate (3).
2. a kind of cogeneration expansion chamber inner core according to claim 1, is characterized in that: described link plate (3) is made up of body (6), hook (7), groove (8); Described hook (7) and groove (8) lay respectively at the interior outside of body; The outer wall of described groove (8) extends downwards, and inwall is provided with hook groove (9); Described hook groove (9) length is greater than two hook width sums.
3. a kind of cogeneration expansion chamber inner core according to claim 2, is characterized in that: described holder (1) is made up of straight plate (30), hook groove (31); Described straight plate (30) upper end is provided with screw (10); Described hook groove (31) inner side is provided with recess one (19) and recess two (18); Described recess one (19) length is greater than two hooks (7) width sum.
4. a kind of cogeneration expansion chamber inner core according to claim 2, is characterized in that: described body (6) is smoothed curve type.
5. a kind of cogeneration expansion chamber inner core according to claim 2, is characterized in that: described hook (7) has two, is arranged at the right and left of body one end.
6. a kind of cogeneration expansion chamber inner core according to claim 2, is characterized in that: the fillet of described hook (7) both sides is 2-20mm.
7. a kind of cogeneration expansion chamber inner core according to claim 2, is characterized in that: the fillet of described groove (8) is 5-30mm.
8. a kind of cogeneration expansion chamber inner core according to claim 1, is characterized in that: described jam plate (20) is arranged on bottom link plate (3).
9. a kind of cogeneration expansion chamber inner core according to claim 1, is characterized in that: it is upper that the link plate (3) of top layer hangs over holder (1), and one group of link plate (3) is staggered installation of, and the link plate (3) of bottom is connected by jam plate (20).
CN201320852284.8U 2013-12-23 2013-12-23 Cogeneration sedimentation room inner barrel Expired - Fee Related CN203758287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320852284.8U CN203758287U (en) 2013-12-23 2013-12-23 Cogeneration sedimentation room inner barrel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320852284.8U CN203758287U (en) 2013-12-23 2013-12-23 Cogeneration sedimentation room inner barrel

Publications (1)

Publication Number Publication Date
CN203758287U true CN203758287U (en) 2014-08-06

Family

ID=51253546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320852284.8U Expired - Fee Related CN203758287U (en) 2013-12-23 2013-12-23 Cogeneration sedimentation room inner barrel

Country Status (1)

Country Link
CN (1) CN203758287U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107344040A (en) * 2017-08-29 2017-11-14 南京西普水泥工程集团有限公司 A kind of new hanging plate and inner cylinder
CN112807863A (en) * 2021-02-05 2021-05-18 南京西普水泥工程集团有限公司 Hanging plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107344040A (en) * 2017-08-29 2017-11-14 南京西普水泥工程集团有限公司 A kind of new hanging plate and inner cylinder
CN112807863A (en) * 2021-02-05 2021-05-18 南京西普水泥工程集团有限公司 Hanging plate

Similar Documents

Publication Publication Date Title
CN203758287U (en) Cogeneration sedimentation room inner barrel
CN202902877U (en) A ceramic inner cylinder hanging piece installation structure for a cement kiln preheater
CN103203285B (en) The novel insulator incubator maintaining easily
CN205811458U (en) Many cables high intensity mounting structure
CN202902878U (en) A ceramic inner cylinder hanging piece fixing base for a cement kiln preheater
CN202692711U (en) Preheater inner barrel hanging plate with transverse reinforcing ribs
CN202692709U (en) Inner barrel hanging board of high-intensity preheater
CN203731399U (en) Water-cooling coil pipe type center cylinder of circulating fluidized bed boiler
CN205692654U (en) A kind of mounting bracket of distribution transformer based on quick-disassembly structure
CN203261503U (en) High-efficiency energy-saving electrical radiant tube heater
CN203403238U (en) Split disc head of warp knitting machine
CN202640870U (en) Anchoring nail
CN203249493U (en) Coreless zinc pot for galvanization production line
CN104863826A (en) Method for mounting stuffing boxes
CN206706603U (en) Municipal warning lamp structure
CN204692789U (en) A kind of Novel warming siphunculus
CN204311354U (en) Hanger box
CN204269900U (en) A kind of inner structure of laser variable-focus luminaire
CN203220970U (en) Novel insulator insulation can convenient to maintain
CN207800287U (en) It is a kind of to facilitate the control lead installed
CN203202961U (en) Portable lamp rack
CN206410063U (en) A kind of photoelectric integral guardrail lamp
CN103060734A (en) Coreless zinc pot for galvanization production line
CN209597865U (en) Plug is used in stainless steel tube production
CN219328314U (en) Hanging piece seat for ceramic inner barrel of cyclone barrel of cement kiln

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140806

Termination date: 20171223