CN203754468U - High-temperature operation system with heat supply and straight condensation double modes for fine treatment of condensed water - Google Patents

High-temperature operation system with heat supply and straight condensation double modes for fine treatment of condensed water Download PDF

Info

Publication number
CN203754468U
CN203754468U CN201320855198.2U CN201320855198U CN203754468U CN 203754468 U CN203754468 U CN 203754468U CN 201320855198 U CN201320855198 U CN 201320855198U CN 203754468 U CN203754468 U CN 203754468U
Authority
CN
China
Prior art keywords
resin
heat supply
mixed bed
flow rate
high flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320855198.2U
Other languages
Chinese (zh)
Inventor
成渫畏
苏振勇
孙德政
高存方
宋岩
姜维军
王兰花
周闽
时国梁
陈志勇
宋涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUADIAN QINGDAO POWER GENERATION Co Ltd
SHANDONG HONGAO ELECTRIC POWER TECHNOLOGY Co Ltd
SHANDONG BRANCH OF HUADIAN POWER INTERNATIONAL Corp Ltd
Original Assignee
HUADIAN QINGDAO POWER GENERATION Co Ltd
SHANDONG HONGAO ELECTRIC POWER TECHNOLOGY Co Ltd
SHANDONG BRANCH OF HUADIAN POWER INTERNATIONAL Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUADIAN QINGDAO POWER GENERATION Co Ltd, SHANDONG HONGAO ELECTRIC POWER TECHNOLOGY Co Ltd, SHANDONG BRANCH OF HUADIAN POWER INTERNATIONAL Corp Ltd filed Critical HUADIAN QINGDAO POWER GENERATION Co Ltd
Priority to CN201320855198.2U priority Critical patent/CN203754468U/en
Application granted granted Critical
Publication of CN203754468U publication Critical patent/CN203754468U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Abstract

The utility model relates to transformation of a fine treatment system of condensed water in a second unit in a power plant, and particularly relates to a high-temperature operation system with heat supply and straight condensation double modes for fine treatment of condensed water. Three high-speed mixed beds of butyl rubber linings (temperature resistance at 100-120 DEG C) are added on the basis of the existing equipment, and arranged at the positions of the original three high-speed mixed beds of the second unit; resin storage tanks are replaced with the original three high-speed mixed beds with natural rubber linings, are arranged at the zero expansion end of the second unit, and are moved to the south sides of the positions of the original high-speed mixed beds; a resin conveying pipeline, a rinse water pipeline and a compressed air pipeline are connected between the resin storage tanks and the additionally arranged three high-speed mixed beds, so as to switch and convey between homemade resin and imported resin under heat supply and straight condensation conditions. Thus, normal work of over-high temperature precision processing equipment when the second unit is in back pressure operation during the heat supply period is ensured, and meanwhile, normal operation and regeneration of the fine treatment system of the condensed water in the first unit are not affected.

Description

There is the double mode condensate fine of heat supply and pure condensate and process hot operation system
Technical field
The utility model relates to the transformation to No. 2 unit condensed water precision processing systems in the power plant of prior art, has heat supply and the double mode condensate fine of pure condensate is processed hot operation system in particular to a kind of.
Background technology
In prior art, condenser is at heating period, be high back pressure operating mode, condensing water temperature is 80-85 DEG C, No. 2 unit condensed water precision treatment device liner natural rubbers, the top temperature of the long-time running that natural rubber can bear is no more than 60 DEG C, has certain danger.
The tolerable temperature of pressurizing resin in domestic middle pressure or import in prior art, qualified positive resin does not substantially decompose in the time of 80 DEG C, negative resin all starts to decompose at 50 DEG C ~ 60 DEG C, volume-exchange capacity all has decline, at volume-exchange capacity loss approximately 10% time, the water quality of mixed bed water outlet can not reach the requirement of unit water quality.Conclusion (of pressure testing): resin can be used for the condensed water processing of 80 DEG C, but after volume-exchange capacity loss 16%, need to change resin.As from the foregoing, no matter be pressurizing resin in domestic middle pressure or import, in the time that condensing water temperature is 80-85 DEG C of heating period operations, the degraded of negative resin is inevitable, therefore, in annual working cost, need to increase an expense of changing resin, and the price of resin, also determined to a great extent that every annual operating cost drops into number.It is reported, the expensive several times of the more domestic middle pressurizing resin of pressurizing resin price in import, but while operation under non-heating period pure condensate operating mode, the more domestic middle pressurizing resin of the industrialization reliability of operation of pressurizing resin in import (aspect such as mechanical strength of resin, exchange capacity, regeneration period) has again obvious advantage, for this reason, need transform condensed water precision processing system, take into account security and economy under heat supply and pure condensate dual-membrane type.
The patent that for example application number is 201210224379.5, it discloses a kind of bypath system and control method of fired power generating unit condensed water precision processing system, it comprises the preposition filtering unit bypass of secondary, secondary high flow rate mixed bed unit bypass and associated conduit, by-pass valve control, the preposition filtering unit bypass of described secondary and secondary high flow rate mixed bed unit bypass are cascaded by bypass, and the condensed water import mother that bypass conduit is connected across condensed water precision processing system manages, exports on female pipeline; Described import female pipeline, bye-pass and export and on female pipeline, be provided with pipeline A self-acting valve, pipeline B self-acting valve and pipeline C self-acting valve.In the time that condensed water precision processing system work condition abnormality or pipeline, by-pass valve control need to be isolated maintenance; provide path by bypath system to condensed water; this bypath system is simple; control perfect in shape and function; can isolate fast or start a whole set of condensed water precision processing system by the pipeline automatic valve of setting up, still can not ensure the safe operation of system when the heat supply phase, temperature was higher.
The patent that for example application number is 201310232473.X again, it discloses a kind of method of condensed water precision processing system and condensate fine processing, pipeline entrance, cation exchanger, negative and positive mixed ion exchanger, strainer, boosting pump, pipeline outlet is connected in series successively by connecting pipeline, between pipeline entrance and cation exchanger, be provided with valve one and valve three, between negative and positive mixed ion exchanger and strainer, be provided with valve four and valve six, between strainer and boosting pump, be provided with valve seven; Connecting pipeline between boosting pump and pipeline outlet is provided with valve eight; Pipeline entrance exports by being communicated with without bypass with pipeline, the utility model can effectively be removed metallic corrosion products and suspended solids, and protection ion exchange resin, can meet again the condition that ion-exchanger puts into operation as early as possible, shorten the flushing of pipeline time, reduce water resource waste; Also can be after the normal operation of ion-exchanger, the tiny resin particle of effectively catching, the operating safety of maintenance secondary circuit heat power equipment.But resin is in the time that condensing water temperature is 80-85 DEG C of heating period operations, the degraded of negative resin is inevitably, changes resin and will produce expensive working cost.
Summary of the invention
In order to realize above-mentioned purpose of design, the scheme that the utility model adopts is as follows:
A kind of have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it comprises mixed bed, resin storage element system and regeneration unit system, and described mixed bed, resin storage element system comprise high flow rate mixed bed and three resin catchers of three liner natural rubbers; Described regeneration unit system comprises that cloudy regenerator column, positive regenerator column, resin separation tower, waste water resin catcher, resin add bucket and wastewater disposal basin, the high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers in described mixed bed, resin storage element system, it is arranged in the position of No. 2 original three high flow rate mixed beds of unit, change the high flow rate mixed bed of original three liner natural rubbers into three resin hold-up vessels, be arranged in zero meter of enlarging end of No. 2 units.
In above-mentioned arbitrary scheme, preferably, in described regeneration unit system, increase a set of regeneration system rapidly, move for No. 2 unit back pressure modes.
In above-mentioned arbitrary scheme, preferably, described No. 2 units adopt import resin at the high flow rate mixed bed of three newly-increased liner isoprene-isobutylene rubbers of non-heat supply phase.In the non-heat supply phase, No. 2 units adopt pure condensate mode to move, 100% deep desalting treatment, and bypass door complete shut-down, newly-increased three liner isoprene-isobutylene rubber high flow rate mixed beds adopt import resins, dual-purpose one standby, use original regeneration system rapidly regeneration after import efficiency lost resin.
In above-mentioned arbitrary scheme, preferably, described No. 2 units are in the heat supply phase, and the high flow rate mixed bed of three newly-increased liner isoprene-isobutylene rubbers adopts high temperature resistant domestic middle pressurizing resin.When the Winter heat supply phase, thermal load was higher, No. 2 unit adopts back pressure mode to move, 100% deep desalting treatment, bypass door complete shut-down, newly-increased three liner isoprene-isobutylene rubber high flow rate mixed beds adopt high temperature resistant domestic middle pressurizing resin, remain in the resin separation tower that a set of domestic middle pressurizing resin is placed on newly-increased regeneration system rapidly for subsequent usely, after domestic middle pressurizing resin lost efficacy, use newly-increased a set of regeneration system rapidly regeneration.
In above-mentioned arbitrary scheme preferably, between the high flow rate mixed bed of described resin hold-up vessel and newly-increased three liner isoprene-isobutylene rubbers, be provided with resin supplying channel, wash-down water pipeline and compressed air line, be convenient to switching and carrying between domestic resin and import resin under heat supply and pure condensate operating mode.
In above-mentioned arbitrary scheme, preferably, the high flow rate mixed bed of described newly-increased three liner isoprene-isobutylene rubbers is provided with condensed water entrance, and below is provided with condensed water outlet, goes recirculating pump entrance and mixed bed main water outlet pipe.
In above-mentioned arbitrary scheme, preferably, the top of the high flow rate mixed bed of described newly-increased three liner isoprene-isobutylene rubbers is provided with compressed air interface and wash tub pipe interface.
In above-mentioned arbitrary scheme, preferably, in the high flow rate mixed bed of three liner isoprene-isobutylene rubbers that newly increase in described mixed bed, resin storage element system, increase by three high temperature resistant domestic middle pressurizing resins.
In above-mentioned arbitrary scheme, preferably, three high temperature resistant domestic middle pressurizing resins that newly increase in described high flow rate mixed bed are placed in resin hold-up vessel.
In above-mentioned arbitrary scheme, preferably, in a set of regeneration system rapidly newly increasing in described regeneration unit system, increase a set of high temperature resistant domestic middle pressurizing resin.
In above-mentioned arbitrary scheme, preferably, in a set of regeneration system rapidly newly increasing in described regeneration unit system, newly increase a set of high temperature resistant domestic middle pressurizing resin and be placed in resin separation tower.
In above-mentioned arbitrary scheme, preferably, described cloudy regenerator column, positive regenerator column, resin separation tower, waste water resin catcher are placed between precision processing regeneration.
In sum, the purpose of this utility model is to provide a kind of have heat supply and the double mode condensate fine processing hot operation system of pure condensate, on the basis with existing installation, increase the high flow rate mixed bed of three liner isoprene-isobutylene rubbers (100-120 DEG C of heatproofs) newly, be arranged in the position of No. 2 original three high flow rate mixed beds of unit; Change the high flow rate mixed bed of original three liner natural rubbers into resin hold-up vessel, be arranged in zero meter of enlarging end in No. 2 unit rooms, move to the southern side of former high flow rate mixed bed position, between resin hold-up vessel and newly-increased three high flow rate mixed bed equipment, be connected with resin supplying channel, wash-down water pipeline and compressed air line, be convenient to switching and carrying between domestic resin and import resin under heat supply and pure condensate operating mode.Thereby ensured heating period, the normal work of excess Temperature accurate process equipment when No. 2 unit back pressure operations, does not affect normal operation, the regeneration of No. 1 unit condensed water precision processing system simultaneously.
Brief description of the drawings
Fig. 1 has heat supply and the double mode condensate fine of pure condensate is processed mixed bed and resin storage element system diagram in hot operation system according to of the present utility model.
Fig. 2 has heat supply and the double mode condensate fine of pure condensate and processes mixed bed and resin storage element piping layout in Fig. 1 of hot operation system according to of the present utility model.
Fig. 3 is the sectional view that has heat supply and the double mode condensate fine of pure condensate and process 1-1 direction in Fig. 2 of hot operation system according to of the present utility model.
Fig. 4 is the sectional view that has heat supply and the double mode condensate fine of pure condensate and process 2-2 direction in Fig. 2 of hot operation system according to of the present utility model.
Fig. 5 has heat supply and the double mode condensate fine of pure condensate is processed regeneration unit system diagram in hot operation system according to of the present utility model.
Fig. 6 has heat supply and the double mode condensate fine of pure condensate and processes regeneration unit equipment pipe plot plan in Fig. 5 of hot operation system according to of the present utility model.
Fig. 7 is the sectional view that has heat supply and the double mode condensate fine of pure condensate and process 1-1 direction in Fig. 6 of hot operation system according to of the present utility model.
Fig. 8 is the sectional view that has heat supply and the double mode condensate fine of pure condensate and process 2-2 direction in Fig. 6 of hot operation system according to of the present utility model.
Fig. 9 is the sectional view that has heat supply and the double mode condensate fine of pure condensate and process 3-3 direction in Fig. 6 of hot operation system according to of the present utility model.
Figure 10 is the sectional view that has heat supply and the double mode condensate fine of pure condensate and process 4-4 direction in Fig. 6 of hot operation system according to of the present utility model.
Graphical symbol explanation:
Table one
Table two
Table three
Embodiment
To there is heat supply and the double mode condensate fine of pure condensate is processed hot operation system in order understanding better according to of the present utility model, to describe the specific embodiment that there is heat supply and the double mode condensate fine of pure condensate and process hot operation system according to of the present utility model below in conjunction with accompanying drawing.
There is the high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers (100-120 DEG C of heatproofs) on the basis of existing installation in the improvement of the utility model precision processing section, be arranged in the position of No. 2 original three high flow rate mixed beds of unit; Change the high flow rate mixed bed of original three liner natural rubbers into resin hold-up vessel, be arranged in zero meter of enlarging end in No. 2 unit rooms, move to the southern side of former high flow rate mixed bed position, between resin hold-up vessel and newly-increased three high flow rate mixed bed equipment, be connected with resin supplying channel, wash-down water pipeline and compressed air line, be convenient to switching and carrying between domestic resin and import resin under heat supply and pure condensate operating mode.Thereby ensured heating period, the normal work of excess Temperature accurate process equipment when No. 2 unit back pressure operations, does not affect normal operation, the regeneration of No. 1 unit condensed water precision processing system simultaneously.
Shown in figure 2, there is heat supply and the double mode condensate fine of pure condensate is processed hot operation system diagram according to of the present utility model.This has heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it comprises mixed bed, resin storage element system and regeneration unit system, and described mixed bed, resin storage element system comprise high flow rate mixed bed and three resin catchers 2 of three liner natural rubbers; Described regeneration unit system comprises that cloudy regenerator column 20, positive regenerator column 30, resin separation tower 10, waste water resin catcher 40, resin add bucket 50 and wastewater disposal basin 60, the high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers in described mixed bed, resin storage element system, it is arranged in the position of No. 2 original three high flow rate mixed beds of unit, change the high flow rate mixed bed of original three liner natural rubbers into three resin hold-up vessels 3., be arranged in zero meter of enlarging end of No. 2 units, move to the southern side of former high flow rate mixed bed position.
In the present embodiment, described resin hold-up vessel 3. and the high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers be provided with resin supplying channel 12, wash-down water pipeline 14 and compressed air line 13 between 1., be convenient to switching and carrying between domestic resin and import resin under heat supply and pure condensate operating mode.In addition, be provided with and unload resin pipeline 11 at the high flow rate mixed bed of resin supplying channel 12 and liner isoprene-isobutylene rubber top 1..The high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers 1. below is equipped with a resin catcher, and be provided with elbow in the outside of every resin catcher, this elbow connects No. 2 unit recirculating pump inlet pipes 17, connects No. 1 unit recirculating pump inlet pipe 18 and communicate with going to, and is provided with No. 1 unit recirculating pump and No. 2 unit recirculating pumps on First high flow rate mixed bed side 1.; The high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers top 1. by pipe connecting with connect recirculating pump outlet pipe 15, connect original condensed water inlet pipe 16 and communicate.
As shown in Figure 3,1. the high flow rate mixed bed of described newly-increased three liner isoprene-isobutylene rubbers is provided with condensed water entrance 8, and below is provided with condensed water outlet 9, goes recirculating pump entrance 21 and mixed bed main water outlet pipe 22.Condensed water is flowed through mixed bed main water outlet pipe 22 from condensed water outlet 9 discharges at the high flow rate mixed bed clean water that 1. precision processing produces later of liner isoprene-isobutylene rubber; The high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers top is 1. equipped with condensed water water inlet pipe, from the condensed water of condensed water entrance by this water inlet pipe enter into high flow rate mixed bed 1. in.
As shown in Figure 4,1. outer compressed air interface 23 and the wash-down water interface 24 of being provided with of the high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers.Stopping valve is opened from the oil-free compressed air 7 of factory building and is carried through piping, for scouring and mixed bed output resin and the valve instrument gas of fore filter.
Next with reference to shown in figure 1, the principle of work of mixed bed and resin storage element system is: condensed water enter into before precision processing system from resin from the resin of storage tower 6 through safety valve, ball valve enter into resin hold-up vessel 3. in.Need to carry out precision processing to the condensed water from condenser time, pending condensed water enters into condensed water entrance 8, gate valve is opened, condensed water through carbon steel pipe enter into three high flow rate mixed beds 1. in, high flow rate mixed bed outside is 1. provided with butterfly valve, pressure indicator, flow gauge (FG) etc. and controls the amount that enters into the condensed water of high flow rate mixed bed in 1..High flow rate mixed bed 1. below be provided with butterfly valve, pneumatic actuator, pressure difference switch, in the time of the efficiency lost resin of high flow rate mixed bed in 1., these parts are opened and signal is delivered to resin are delivered in positive regenerator column 5, make regeneration system rapidly work.In addition, an external pipeline on high flow rate mixed bed sidewall 1., 3. this pipeline communicates with resin hold-up vessel, multiple butterfly valves on this pipeline, when needs to enter into high flow rate mixed bed 1. in condensed water while carrying out cation and anion exchange, these butterfly valves are opened, the resin of resin hold-up vessel in 3. enter into high flow rate mixed bed 1. in.2. high flow rate mixed bed below is 1. circumscribed with resin catcher, and in the time that high flow rate mixed bed discharging device 1. has broken resin to spill or leaks resin accident, 2. resin catcher can hold back resin, in case resin bleeds in therrmodynamic system, affects boiler water water quality.Resin is macromolecule organic, easily decomposites the material harmful to system under High Temperature High Pressure, certainly will affect greatly therrmodynamic system if leak feeding water system.
Above-mentioned mixed bed and resin storage element system are cyclicity system, in this system, be provided with recirculating pump 4., in condensate fine treating processes, form a recycle system: from the condensed water of condenser enter into high flow rate mixed bed 1. in carry out cation and anion exchange from resin hold-up vessel resin 3., the clean condensed water obtaining after exchange by condensed water export 9 discharge after collection recycle; When the efficiency lost resin of high flow rate mixed bed in 1., will deliver to positive regenerator column 5 by resin and regenerate, after the regeneration of band regeneration system rapidly, resin will be entered into resin hold-up vessel through resin from storage tower 6 and store in 3. and prepare against high flow rate mixed bed and 1. use.
Shown in figure 6-10, regeneration unit equipment pipe plot plan.This regeneration unit system comprises that condensate fine is processed between regeneration, between soda acid metering plant, blower fan, watch-keeping cubicle, lavatory, staircase, diesel motor compartment, condensate fine is processed in regeneration and is comprised cloudy regenerator column, positive regenerator column and resin separation tower, and processes in regeneration and be provided with waterways at condensate fine.
As shown in Figure 7, condensed water is provided with the female pipe 51 of resin transfer, waste pipe 52 in processing and regenerating, the female pipe 51 of resin transfer is circumscribed with and connects original acid solution pipe 43, connects original No. 2 unit exhausted resin pipes 44, connects original positive regenerating tank and enters pitch tube 53 connecing original acid solution pipe 43 and connect to be provided with between original No. 2 unit exhausted resin pipes 44.Described waste pipe 52 is connected with waste water resin catcher 40.
The resin losing efficacy in mixed bed and resin storage element system enters into original plastic resin treatment tank 42 by connecing original No. 2 unit exhausted resin pipes 44, completes after waterpower separation, and the anionite-exchange resin on upper strata is transferred in original cloudy regenerating tank 46.Near hybrid resin yin and yang resin surface of separation is transported in resin separation tower, and the yin and yang resin of then regenerating respectively will be sent back in original positive regenerating tank 45 and carry out secondary separation during for the next regeneration of the resin in resin separation tower.In the time that entering into original plastic resin treatment tank 42, opens exhausted resin the total water intaking valve of mixed bed, backwash water discharge valve, anti-water intaking valve (meanwhile connect the female pipe 36 of original No. 1, No. 2 mixed bed precision processing gas-holder air inlets, connect original Roots's airduct 37, connect original wash tub pipe 14, connect original compressed air pipe 13 and connect), make resin to peephole medullary ray, flow is as the criterion not run resin, be washed till water outlet transparent, yin and yang resin is obviously when layering, slowly close backwash water intaking valve, backwash water discharge valve, make the complete sedimentation of resin, yin and yang resin layering.In the time that backwash layering is not obvious, stop backwash, connect original alkali liquor pipe 38 and connect into a small amount of alkali, when splashing in draining sample and have micro-red can stopping into alkali with phenol wine indicator, continue backwash to obviously layering.
When positive resin after layering is moved to original positive regenerating tank 45, connecing original acid solution pipe 43 connects, the acid door that goes out of original sour batch meter 31 is opened, original sour volume pump 32 is worked, meanwhile connect original wash tub pipe 14, connect original compressed air pipe 13, connect original roots blower airduct 37 and connect, adjust acid strength, carry out positive resin regeneration.
When negative resin after layering is moved to original cloudy regenerating tank 46, connecing original alkali liquor pipe 38 connects, the alkali door that goes out of original alkali batch meter 33 is opened, original alkali volume pump 34 is worked, meanwhile connect original wash tub pipe 14, connect original compressed air pipe 13, connect original roots blower airduct 37 and connect, adjust flow, carry out negative resin regeneration.
In the present embodiment, in described regeneration unit system, increase a set of regeneration system rapidly, move for No. 2 unit back pressure modes, in this system, be also provided with No. 2 unit gas-holder 49 of precision processing, on No. 2 unit gas-holder 49 of this precision processing, be circumscribed with connect original No. 1, No. 2 mixed bed precision processing tanks give vent to anger female pipe 26, connect the female pipe 36 of mixed bed precision processing canister incoming gas original No. 1, No. 2.
In the present embodiment, described No. 2 units adopt import resin at the high flow rate mixed bed of three newly-increased liner isoprene-isobutylene rubbers of non-heat supply phase.In the non-heat supply phase, No. 2 units adopt pure condensate mode to move, 100% deep desalting treatment, and bypass door complete shut-down, newly-increased three liner isoprene-isobutylene rubber high flow rate mixed beds adopt import resins, dual-purpose one standby, use original regeneration system rapidly regeneration after import efficiency lost resin.
In the present embodiment, described No. 2 units are in the heat supply phase, and the high flow rate mixed bed of three newly-increased liner isoprene-isobutylene rubbers adopts high temperature resistant domestic middle pressurizing resin.When the Winter heat supply phase, thermal load was higher, No. 2 unit adopts back pressure mode to move, 100% deep desalting treatment, bypass door complete shut-down, newly-increased three liner isoprene-isobutylene rubber high flow rate mixed beds adopt high temperature resistant domestic middle pressurizing resin, remain in the resin separation tower that a set of domestic middle pressurizing resin is placed on newly-increased regeneration system rapidly for subsequent usely, after domestic middle pressurizing resin lost efficacy, use newly-increased a set of regeneration system rapidly regeneration.
Next with reference to shown in figure 5, the principle of work of newly-increased regeneration unit system is: after entering pipeline from the exhausted resin that connects No. 2 unit mixed bed exhausted resin transfer limes 64, manual ball valve is opened, an exhausted resin part is sent in original regeneration unit 63, and another part is sent to resin separation tower 10.When sending into resin separation tower 10, connect original compressed air pipe 13, connect original wash tub pipe 14, connect original roots blower airduct 37 and open, be provided with flow transmitter connecing on original wash tub pipe 14; Connect original compressed air pipe 13 and be provided with pneumatic normally closed diaphragm valve.
The resin losing efficacy in mixed bed and resin storage element system enters into resin separation tower 10 by No. 2 unit exhausted resin transfer limes 64, completes after waterpower separation, and the anionite-exchange resin on upper strata is transferred in Zhiyin regenerating tank 20.Near hybrid resin yin and yang resin surface of separation is transported in resin separation tower, and the yin and yang resin of then regenerating respectively will be sent back in original positive regenerating tank 45 and carry out secondary separation during for the next regeneration of the resin in resin separation tower.In the time that entering into resin separation tower 10, opens exhausted resin the total water intaking valve of mixed bed, backwash water discharge valve, anti-water intaking valve, meanwhile connect original No. 1, the female pipe 36 of No. 2 mixed bed precision processing gas-holder air inlets, connect original Roots's airduct 37, meeting original wash tub pipe 14(connects water in original wash tub pipe 14 and is transported in cloudy regenerator column 20 and positive regenerator column 30 by flexible pipe), connecing original compressed air pipe 13 connects, make resin to peephole medullary ray, flow is as the criterion not run resin, be washed till water outlet transparent, yin and yang resin is obviously when layering, slowly close backwash water intaking valve, backwash water discharge valve, make the complete sedimentation of resin, yin and yang resin layering.In the time that backwash layering is not obvious, stop backwash, connect original alkali liquor pipe 38 and connect into a small amount of alkali, when splashing in draining sample and have micro-red can stopping into alkali with phenol wine indicator, continue backwash to obviously layering.
When positive resin after layering is moved to positive regenerator column 30, connecing original acid solution pipe 43 connects B side bypass valve and opens, original sour volume pump work, meanwhile meeting original wash tub pipe 14(connects water in original wash tub pipe 14 and is transported in cloudy regenerator column 20 and positive regenerator column 30 by flexible pipe), connect original compressed air pipe 13, connect original roots blower airduct 37 and connect, adjust acid strength and carry out positive resin regeneration.
When negative resin after layering is moved to cloudy regenerator column 20, connecing original alkali liquor pipe 38 connects A side bypass valve and opens, the work of alkali volume pump, meanwhile connect original wash tub pipe 14, connect original compressed air pipe 13, connect original roots blower airduct 37 and connect, adjust flow, carry out negative resin regeneration.
In sum, improvement project of the present utility model is: the high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers (100-120 DEG C of heatproofs) in original precision processing operational system, be arranged in the position of No. 2 original three high flow rate mixed beds of unit, change the high flow rate mixed bed of original three liner natural rubbers into resin hold-up vessel, be arranged in zero meter, unit room enlarging end No. 2, move to southern side, former high flow rate mixed bed position, resin hold-up vessel 3. and newly-increased three high flow rate mixed beds 1. between equipment, be connected with resin supplying channel, wash-down water pipeline and compressed air line, be convenient to switching and carrying between domestic resin and import resin under heat supply and pure condensate operating mode.At heating period, there is mixed fat when preventing the regeneration of the import resin regeneration of No. 1 unit high flow rate mixed bed and the domestic resin of No. 2 unit high flow rate mixed beds, newly-increased a set of regeneration system rapidly is specialized in No. 2 units and is adopted back pressure modes to move.In order to make yin, yang resin have good separating effect, to ensure effluent quality, investigate and compare by many-side, this transformation adopts high tower method regeneration isolation technique, wherein resin separation tower 10, cloudy regenerator column 20, positive regenerator column 30 are all arranged between existing first phase condensate fine processing regeneration, the newly-increased high temperature resistant domestic middle pressurizing resin of quadruplet simultaneously.
This transformation utilizes existing factory building, place to implement as far as possible, does not consider newly-increased factory building.Implement after this programme, when the Winter heat supply phase, thermal load was higher, No. 2 unit adopts back pressure mode to move, 100% deep desalting treatment, bypass door complete shut-down, newly-increased three liner isoprene-isobutylene rubber high flow rate mixed beds adopt domestic high temperature resistant middle pressurizing resins, remain in the resin separation tower that a set of domestic middle pressurizing resin is placed on newly-increased regeneration system rapidly for subsequent usely, use newly-increased a set of regeneration system rapidly regeneration after domestic middle pressurizing resin lost efficacy.For subsequent use in the resin hold-up vessel that the high flow rate mixed bed that original three cover import resins are positioned over original three liner natural rubbers changes; No. 1 unit condensed water 100% deep desalting treatment mode is constant, and original quadruplet import resin adopts original regeneration system rapidly regeneration.
In the non-heat supply phase, No. 2 unit adopts pure condensate mode to move, 100% deep desalting treatment, bypass door complete shut-down, newly-increased three liner isoprene-isobutylene rubber high flow rate mixed beds adopt import resins, dual-purpose one standby, use original regeneration system rapidly regeneration after import efficiency lost resin, No. 1 unit condensed water 100% deep desalting treatment mode is constant, and two units seven overlap import resin and all use original regeneration system rapidly regeneration.The domestic middle pressurizing resin of newly-increased quadruplet, wherein three covers are positioned in the resin hold-up vessel that the high flow rate mixed bed of original three liner natural rubbers changes for subsequent usely, remain a set of domestic middle pressurizing resin and are positioned in newly-increased regeneration system rapidly for subsequent use.
It will be apparent to those skilled in the art that and of the present utility modelly there is heat supply and the double mode condensate fine of pure condensate is processed the arbitrary combination that hot operation system comprises each several part in this specification sheets.As space is limited and in order to make specification sheets simple and clear, these combinations to be introduced one by one in detail at this, but seen after this specification sheets, the scope of the present utility model that the arbitrary combination of the each several part being made up of this specification sheets forms is self-evident.

Claims (12)

1. have the double mode condensate fine of heat supply and pure condensate and process a hot operation system, it comprises mixed bed, resin storage element system and regeneration unit system,
Described mixed bed, resin storage element system comprise high flow rate mixed bed and three resin catchers of three liner natural rubbers;
Described regeneration unit system comprises that cloudy regenerator column, positive regenerator column, resin separation tower, waste water resin catcher, resin add bucket and wastewater disposal basin;
It is characterized in that: the high flow rate mixed bed of newly-increased three liner isoprene-isobutylene rubbers in described mixed bed, resin storage element system, it is arranged in the position of No. 2 original three high flow rate mixed beds of unit, change the high flow rate mixed bed of original three liner natural rubbers into three resin hold-up vessels, be arranged in zero meter of enlarging end of No. 2 units.
2. as claimed in claim 1 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: in described regeneration unit system, increase a set of regeneration system rapidly, move for No. 2 unit back pressure modes.
3. as claimed in claim 1 or 2 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: described No. 2 units adopt import resin at the high flow rate mixed bed of three newly-increased liner isoprene-isobutylene rubbers of non-heat supply phase.
4. as claimed in claim 1 or 2 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: described No. 2 units are in the heat supply phase, and the high flow rate mixed bed of three newly-increased liner isoprene-isobutylene rubbers adopts high temperature resistant domestic middle pressurizing resin.
5. as claimed in claim 1 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: described resin hold-up vessel is provided with resin supplying channel, wash-down water pipeline and compressed air line with increasing newly between the high flow rate mixed bed of three liner isoprene-isobutylene rubbers.
6. as claimed in claim 1 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: the high flow rate mixed bed of described newly-increased three liner isoprene-isobutylene rubbers is provided with condensed water entrance, below is provided with condensed water outlet, goes recirculating pump entrance and mixed bed main water outlet pipe.
7. as claimed in claim 1 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: the top of the high flow rate mixed bed of described newly-increased three liner isoprene-isobutylene rubbers is provided with compressed air interface and wash tub pipe interface.
8. as claimed in claim 1 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: in the high flow rate mixed bed of three liner isoprene-isobutylene rubbers that newly increase in described mixed bed, resin storage element system, increase by three high temperature resistant domestic middle pressurizing resins.
9. as claimed in claim 8 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: three high temperature resistant domestic middle pressurizing resins that newly increase in described high flow rate mixed bed are placed in resin hold-up vessel.
10. as claimed in claim 1 or 2 have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: in a set of regeneration system rapidly newly increasing in described regeneration unit system, increase a set of high temperature resistant domestic middle pressurizing resin.
11. as claimed in claim 10ly have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: in a set of regeneration system rapidly newly increasing in described regeneration unit system, newly increase a set of high temperature resistant domestic middle pressurizing resin, it is placed in resin separation tower.
12. as claimed in claim 1ly have heat supply and the double mode condensate fine of pure condensate is processed hot operation system, it is characterized in that: described cloudy regenerator column, positive regenerator column, resin separation tower, waste water resin catcher are placed between precision processing regeneration.
CN201320855198.2U 2013-12-24 2013-12-24 High-temperature operation system with heat supply and straight condensation double modes for fine treatment of condensed water Withdrawn - After Issue CN203754468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320855198.2U CN203754468U (en) 2013-12-24 2013-12-24 High-temperature operation system with heat supply and straight condensation double modes for fine treatment of condensed water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320855198.2U CN203754468U (en) 2013-12-24 2013-12-24 High-temperature operation system with heat supply and straight condensation double modes for fine treatment of condensed water

Publications (1)

Publication Number Publication Date
CN203754468U true CN203754468U (en) 2014-08-06

Family

ID=51249767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320855198.2U Withdrawn - After Issue CN203754468U (en) 2013-12-24 2013-12-24 High-temperature operation system with heat supply and straight condensation double modes for fine treatment of condensed water

Country Status (1)

Country Link
CN (1) CN203754468U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103693713A (en) * 2013-12-24 2014-04-02 华电国际电力股份有限公司山东分公司 Condensate fine treatment high-temperature running system having heat supply and pure condensation modes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103693713A (en) * 2013-12-24 2014-04-02 华电国际电力股份有限公司山东分公司 Condensate fine treatment high-temperature running system having heat supply and pure condensation modes
CN103693713B (en) * 2013-12-24 2015-05-20 华电国际电力股份有限公司山东分公司 Condensate fine treatment high-temperature running system having heat supply and pure condensation modes

Similar Documents

Publication Publication Date Title
CN103693713B (en) Condensate fine treatment high-temperature running system having heat supply and pure condensation modes
CN203797762U (en) Double-backpressure circulating water heat supply system
CN103697524B (en) Two back pressure circulating water heating system
CN203848705U (en) Exhausted steam recycling system
CN203754468U (en) High-temperature operation system with heat supply and straight condensation double modes for fine treatment of condensed water
CN201458877U (en) Water processing device for industrial steam boiler
CN106439784B (en) A kind of full-automatic deaerator exhaust heat energy recycle method and its system
CN205878122U (en) Condensate water cleaning system
CN111033121B (en) Double-loop nuclear reactor steam generating device with purging and draining system
CN214360422U (en) Novel high-temperature heat supply network drainage recycling system
CN215712205U (en) Emergency treatment device for water polluted desalting water tank
CN206437905U (en) A kind of water-softening plant of centrifugal water resource heat pump
WO2013157989A1 (en) System of leakage drains for a main circulating pump assembly
CN204574918U (en) Cooling tower vacuum water-feeding system
CN208980473U (en) Boiler platoon water heats feed water by reverse osmosis device
CN216395309U (en) Steam condensate recycling equipment
CN207050492U (en) A kind of My heat recovery system of sewage
CN104864765A (en) Vacuum water-feeding system of cooling tower
CN210656456U (en) Boiler feed pump cooling water reuse system
CN220550021U (en) Condensate polishing system and device for water cooling unit
CN110486709A (en) A kind of nuclear power station steam generator drainage
CN214693524U (en) Mechanical seal cooling water supply device for pump of refining device
CN209885829U (en) Be used for power plant condensate water fine treatment positive resin regenerating unit
CN213266393U (en) Atmospheric tower desalination process system
CN211781024U (en) Boiler flue gas condensate water recycling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140806

Effective date of abandoning: 20150520

RGAV Abandon patent right to avoid regrant