CN203744823U - Dredging device for floor heating pipe - Google Patents

Dredging device for floor heating pipe Download PDF

Info

Publication number
CN203744823U
CN203744823U CN201420107094.8U CN201420107094U CN203744823U CN 203744823 U CN203744823 U CN 203744823U CN 201420107094 U CN201420107094 U CN 201420107094U CN 203744823 U CN203744823 U CN 203744823U
Authority
CN
China
Prior art keywords
dredging
heating pipe
floor heating
drill
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420107094.8U
Other languages
Chinese (zh)
Inventor
刘胜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420107094.8U priority Critical patent/CN203744823U/en
Application granted granted Critical
Publication of CN203744823U publication Critical patent/CN203744823U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Cleaning By Liquid Or Steam (AREA)

Abstract

The utility model provides a dredging device for a floor heating pipe. The device comprises a dredging drill and a dredging rope, wherein the dredging drill comprises a dredging drill body, a secondary drill floor and a dredging drill rack, and the dredging drill body and the secondary drill floor can be arranged on the dredging drill rack in a lifting manner respectively; and the dredging drill body is arranged at the upper part of the secondary drill floor, a rotating device is arranged on one side, far away from the dredging drill rack, of the dredging drill body and comprises a roller located at the upper part of the dredging drill body and a drill chuck located at the lower part of the dredging drill body, a through hole is formed in the position, corresponding to the drill chuck, of the secondary drill floor, and a pipeline connected with the floor heating pipe is fixed at the lower end of the through hole. The dredging device can effectively crush and clear scale in the wall of the pipe and dirt completely blocking the floor heating pipe with a rotary stirring friction method, so that the floor heating pipe can be effectively cleaned, dredged and heated, and cost and trouble of a user for replacing the floor heating pipe are reduced to a great extent.

Description

A kind of floor heating pipe dredger
Technical field
the utility model relates to a kind of dredger of floor heating pipe, is specifically related to a kind of floor heating dredging drill.
Background technology
current domestic geothermal heating system mode is widely used by modern architecture, and geothermal tube uses after 3-5, and the extension dirt of inside pipe wall and stockpile thing and will get more and more will cause floor heating pipe to stop up cannot normally heating if do not note cleaning on time.Stop up situation serious and that floor heating pipe blocks completely for floor heating pipe, the cleaning equipment of domestic market circulation can only play the ground heating pipe that dredge blockage that cleaning action but cannot be real is serious or block, most domestic floor heating user is still in and looks for the broken floor tile of maintenance mans and floor for problems now, remove the once visited place heating coil stopping up and reinstall again in the state of new floor heating pipe, floor heating user has been caused to life inconvenience and unnecessary property loss.In prior art, there are several cleaning methods:
1, clear water cleans, with clear water, the ground heating pipe not stopping up is completely cleaned exactly, clear water cleans, and can only clean out mobile partial impurities in floor heating pipe, and the extension dirt of floor heating pipe inwall cannot clean, in the situation that floor heating pipe stops up, utilize clear water also cannot dredge.
, medicine corrosion cleans, exactly with being with mordant liquid medicine to clean floor heating pipe.Very serious because medicine cleaning tape is corrosive to the injury of floor heating pipe, shorten to a great extent the service life of floor heating pipe, nowadays on market, this ablution has been used seldom, utilize medicine to clean and can only be used for simply cleaning the extension dirt of floor heating pipe inwall and stopping up not serious floor heating pipe, and clean not thoroughly, have residual, cannot dredge stopping up and stop up serious floor heating pipe completely, thus be cleaning and dredging that class methods can only simplicity and cannot be strong accomplish to stop up dredging.
, physics missile type clean, put in floor heating pipe with the projectile of foam property exactly, utilize air pressurized mode to clean.Because the projectile in projectile cleaning is foam sponge character, can only clean wall hanging dirt in softer floor heating pipe, floor heating pipe inwall hard is hung dirt and cannot thoroughly be removed, also cannot dredge for stopping up floor heating pipe serious and that stop up completely, force dredging can cause floor heating pipe to rise brokenly if strengthen braking pressure, can also cause projectile to be stayed for a long time in floor heating pipe cannot take out, bring and again change a series of unnecessary troubles and the economic losses such as floor heating pipe to floor heating user, thus be cleaning and dredging that class methods can only simplicity and cannot be strong accomplish to stop up dredging.
, impulse geothermal clean, use exactly clear water or corrosivity liquid medicine with air pressure, floor heating pipe is carried out to the cleaning of suppressing of discontinuity.Owing to being clear water or the corrosivity liquid medicine of using with air pressure, floor heating pipe is carried out to the cleaning of suppressing of discontinuity, can only play the simple cleaning of floor heating pipe inwall being hung to dirt, and floor heating pipe inwall hard extension dirt is still and cannot thoroughly removes, also cannot dredge for stopping up floor heating pipe serious and that stop up completely.Force dredging can cause floor heating pipe to rise brokenly, leak if strengthen braking pressure, bring and again change a series of unnecessary troubles and the economic losses such as floor heating pipe to floor heating user, thus be cleaning and dredging that class methods can only simplicity and cannot be strong accomplish to stop up dredging.
, rigidity spring dredging method, these class methods have certain field to thick supply channel and dredging sewer, but spring suppleness cannot be put to good use tiny floor heating pipe not, junction easy fracture between spring and spring, cause being reserved in pipe, if meet hard dirt card master, due to be rigidity spring it cannot take out, spring diameter is generally more than 1.5cm, and the internal diameter of floor heating pipe is generally two kinds of 1.6cm and 2.0cm, it between spring and spring, is the connector having more than length 3cm, so run into corner and be heating coil road impenetrably, everybody knows that the thinner connector of spring is just more fragile in fact, so cannot implement in this field of dredging is stopped up in floor heating always, this field one is directly subordinate to clear area.
Utility model content
for problems of the prior art, the utility model provides a kind of floor heating pipe dredger, this floor heating dredger stirs the effectively interior floor heating pipe dirt of hanging dirt and stopping up completely of broken, removing tube wall of rubbing manipulation by rotation, thereby make that floor heating pipe gets effective washing, dredging and temperature increase, reduced expense and the trouble of changing floor heating pipe to a great extent floor heating user.
in order to realize this object, the utility model application adopts following technical scheme:
a kind of floor heating pipe dredger, comprise dredging drill and dredging rope, described dredging drill comprises dredging drill body, secondary rig floor and dredging drill frame, described dredging drill body and secondary rig floor be liftable being arranged in dredging drill frame respectively, dredging drill body is arranged on the top of secondary rig floor, dredging drill body is provided with whirligig away from a side of dredging drill frame, whirligig comprises the cylinder that is positioned at dredging drill body upper and the drill chuck that is positioned at dredging drill underpart, on described secondary rig floor, the position corresponding with drill chuck is provided with through hole, through hole lower end is fixed with the pipeline being connected with floor heating pipe.
described dredging drill frame comprises dredging drill base and is vertically set on the dredging drill column on dredging drill base.
described dredging rope is stainless steel plastic-cladded wirerope, and steel wire rope front is the end socket not scattering, and rear is with spiral hairbrush, and hairbrush adopts plastic material.
on described dredging drill body, be provided with lifting handle, by rotation and lifting the lifting of hand control dredging drill body.
described cylinder lower end arranges belt pulley, and belt pulley is connected with motor by belt.
described cylinder outside is provided with cylinder protective cover, and belt outer end is provided with belt hood, and drill chuck outer setting has waterproof to spray guard shield, and the through hole outer setting on secondary rig floor has waterproof spray lower shield.
the described pipeline being connected with floor heating pipe is threeway.
the utlity model has following technique effect:
1, to floor heating pipe dredging technique filled up blank.
, what adopt is that stainless steel plastic-cladded wirerope rotates broken dredging method, can rotate, stir, broken, friction dredges ground heating pipe.Reduce expense and the trouble of changing floor heating pipe to a great extent floor heating user.
, as long as the model of conversion cylinder model and dredging rope just can dredge the pipeline of various different models.
Brief description of the drawings
fig. 1 is the structural representation of dredging drill described in the utility model.
Detailed description of the invention
below with reference to appended accompanying drawing, a preferred embodiment of the present utility model is described.
embodiment 1
floor heating pipe dredger described in the utility model comprises dredging drill and dredging rope, and dredging rope in the rotatable floor heating pipe that enters obstruction, stirs friction by rotation under the drive of dredging drill, and the blockage will in floor heating pipe is removed.
as shown in Figure 1, dredging drill comprises dredging drill base 1, dredging drill column 2, dredging drill body 3 and secondary rig floor 4, dredging drill column 2 is vertically defined on dredging drill base 1, dredging drill body 3 is arranged on dredging drill column 2 tops and can slides up and down along dredging drill column 2, on dredging drill body 3, be provided with lifting handle 11, can control dredging drill body 3 and slide up and down on dredging drill column 2 by rotating this lifting handle 11, secondary rig floor 4 bores by secondary that lift dog 5 is liftable to be arranged on dredging drill column 2, and secondary rig floor 4 is between dredging drill base 4 and dredging drill body 3.Dredging drill body 3 is provided with rotating mechanism away from a side of column, and rotating mechanism is used for rotating dredging rope.Described rotating mechanism comprises cylinder 6 and drill chuck 7, cylinder 6 bottoms are provided with belt pulley 8, belt pulley 8 is connected with the motor 10 that is arranged on dredging drill body 3 opposite sides by belt 9, motor is driven the rotation of cylinder 6 and then is driven drill chuck 7 to rotate by belt 9, drill chuck 7 is for fixing dredging rope, by the rotation that rotarily drives dredging rope of drill chuck 7, cylinder 6 is for being wound around the dredging rope of outer end;
in order to protect the normal work of member, cylinder 6 outsides are provided with cylinder protective cover 14, and belt 9 outer ends are provided with belt hood 15; In order to prevent the dredging drill splash of water in the course of the work, drill chuck 7 outer setting have waterproof to spray guard shield 16, and the through hole outer setting on secondary rig floor has waterproof spray lower shield 17.
on cylinder 6, be also provided with rope closing handle 15, by this handle, dredging rope can be wrapped on this cylinder 6.
on dredging drill body 3, be also provided with power switch.
position corresponding with drill chuck 7 on secondary rig floor 4 is provided with through hole, and through hole lower end is fixed with threeway 12, and threeway 12 is for being connected with the water inlet pipe of floor heating pipe, and dredging rope enters in floor heating pipe by through hole and threeway 12, completes dredging function by rotation.
described dredging rope can be stainless steel plastic-cladded wirerope, and steel wire rope front is not scattering of end socket, rear with screw type hairbrush, and the material of hairbrush is the plastic material adopting.Hairbrush can, effectively as steel wire rope guiding and fixing point, make stainless steel plastic-cladded wirerope can not cause easily damage to floor heating pipe.Can also effectively utilize extension dirt, the hard of hairbrush to floor heating pipe inwall to hang dirt and stockpile thing and reach the removing of friction agitating type, the stirring that utilizes stainless steel plastic-cladded wirerope is the build-up of dirt in bad land heating coil effectively, make the flow through spiral hairbrush part at rear of broken floor heating pipe dirt by the stirring fragmentation of stainless steel plastic-cladded wirerope, make dirt bring rear into by spiral hairbrush again, outside current are taken floor heating pipe out of.
when use, this device carries out dredging work, comprises the steps:
one, preparation
1, complete work blanket.
, installed floor heating pipe dredging drill and backwater bucket.
, floor heating pipe dredging drill power supply access.
, close the entering of floor heating water divider, backwater total valve.
, take obstruction apart seriously or completely stop up floor heating pipe (water inlet pipe and return pipe all will be pulled down).
two, connection work
1, the vertical duct of threeway on the water inlet pipe side of floor heating pipe and floor heating pipe dredging drill secondary rig floor is connected.
, the transverse pipe of the threeway on floor heating pipe dredging drill secondary rig floor is connected with backwater bucket.
, the return pipe side of floor heating pipe and close water source are linked, and water source fine setting is opened.
three, dredging work
1, the stainless steel plastic-cladded wirerope on floor heating pipe dredging drill is incorporated in floor heating tube connector, manually stainless steel plastic-cladded wirerope is inputed to the position that floor heating pipe stops up seriously or stop up completely.
, lifting platform and floor heating pipe dredging drill position suitably finely tune.
, the drill chuck of floor heating pipe dredging drill is clamped to stainless steel plastic-cladded wirerope.
, unnecessary stainless steel plastic-cladded wirerope is wound on cylinder.
, opening power makes floor heating pipe dredging drill drive stainless steel plastic-cladded wirerope to be rotated.
, hand-held lifting handle drives dredging drill body to press down, and starts to carry out dredging work.
, in the time that dredging drill is depressed into secondary rig floor, stop bore.
, open the drill chuck of floor heating pipe dredging drill, rotation and lifting handle makes dredging drill body be raised to the top of dredging drill column.
, again the drill chuck of floor heating pipe dredging drill is clamped to stainless steel plastic-cladded wirerope, iterative cycles, until the floor heating pipe of obstruction is opened in dredging.
, dredging turn up the soil after heating coil, stainless steel plastic-cladded wirerope is reclaimed in floor heating pipe.
, the return pipe water source flow of floor heating pipe is tuned up, the build-up of dirt in floor heating pipe is gone out fast, flow in backwater bucket or sewer in.
four, recovery operation
1, dredging is turned up the soil after heating coil, and the entering of floor heating pipe, return pipe are linked on floor heating pipe water knockout drum, and that opens floor heating pipe water knockout drum enters backwater total valve, and the gas of opening in the vent valve door knob floor heating pipe of floor heating pipe top is emitted.
, after floor heating pipe dredged, floor heating pipe dredging drill is carried out to dirt, water stain cleaning recovery.
for person of ordinary skill in the field, along with the development of technology, the utility model design can realize by different way.Embodiment of the present utility model is not limited in embodiment described above, and can change within the scope of the claims.

Claims (7)

1. a floor heating pipe dredger, comprise dredging drill and dredging rope, described dredging drill comprises dredging drill body, secondary rig floor and dredging drill frame, described dredging drill body and secondary rig floor be liftable being arranged in dredging drill frame respectively, dredging drill body is arranged on the top of secondary rig floor, dredging drill body is provided with whirligig away from a side of dredging drill frame, whirligig comprises the cylinder that is positioned at dredging drill body upper and the drill chuck that is positioned at dredging drill underpart, on described secondary rig floor, the position corresponding with drill chuck is provided with through hole, through hole lower end is fixed with the pipeline being connected with floor heating pipe, as long as the model of conversion cylinder model and dredging rope just can be dredged the floor heating pipe of different model.
2. a kind of floor heating pipe dredger as claimed in claim 1, is characterized in that, described dredging drill frame comprises dredging drill base and is vertically set on the dredging drill column on dredging drill base.
3. a kind of floor heating pipe dredger as claimed in claim 1, is characterized in that, described dredging rope is stainless steel plastic-cladded wirerope, and steel wire rope front is the end socket not scattering, and rear is with spiral hairbrush, and hairbrush adopts plastic material.
4. a kind of floor heating pipe dredger as claimed in claim 2, is characterized in that, on described dredging drill body, is provided with lifting handle, by rotation and lifting the lifting of hand control dredging drill body.
5. a kind of floor heating pipe dredger as claimed in claim 4, is characterized in that, described cylinder lower end arranges belt pulley, and belt pulley is connected with motor by belt.
6. a kind of floor heating pipe dredger as claimed in claim 5, it is characterized in that, described cylinder outside is provided with cylinder protective cover, and belt outer end is provided with belt hood, drill chuck outer setting has waterproof to spray guard shield, and the through hole outer setting on secondary rig floor has waterproof spray lower shield.
7. a kind of floor heating pipe dredger as claimed in claim 1, is characterized in that, the described pipeline being connected with floor heating pipe is threeway.
CN201420107094.8U 2014-03-11 2014-03-11 Dredging device for floor heating pipe Withdrawn - After Issue CN203744823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420107094.8U CN203744823U (en) 2014-03-11 2014-03-11 Dredging device for floor heating pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420107094.8U CN203744823U (en) 2014-03-11 2014-03-11 Dredging device for floor heating pipe

Publications (1)

Publication Number Publication Date
CN203744823U true CN203744823U (en) 2014-07-30

Family

ID=51344611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420107094.8U Withdrawn - After Issue CN203744823U (en) 2014-03-11 2014-03-11 Dredging device for floor heating pipe

Country Status (1)

Country Link
CN (1) CN203744823U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103822531A (en) * 2014-03-11 2014-05-28 刘胜伟 Floor heating pipe dredging device and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103822531A (en) * 2014-03-11 2014-05-28 刘胜伟 Floor heating pipe dredging device and use method thereof

Similar Documents

Publication Publication Date Title
US20190254495A1 (en) Roller mop capable of self-cleaning
CN107374525A (en) Wall cleaning equipment between a kind of bathing
CN203737681U (en) Agentia bottle cleaning device
CN107470188A (en) A kind of natural gas line service kit purpose-built washing equipment easy to remove
CN107961999A (en) A kind of Quick cleaning device of hydraulic engineering safety net
CN203744823U (en) Dredging device for floor heating pipe
CN106676827B (en) Antiscale rotary drum washing machine
CN105728403A (en) Drum structure of hydraulic pipe cleaning machine
CN103822531B (en) Floor heating pipe dredging device and use method thereof
CN206199827U (en) A kind of test tube cleaning device
CN111014142B (en) Cable construction device of cable well and construction method thereof
CN204034953U (en) A kind of liquid roll-on device with Rapid Cleaning system
CN108371505A (en) A kind of full-automatic handwashing facilities
CN106121023A (en) A kind of sewage purification sedimentation tank sewage disposal apparatus
CN107105945A (en) Shower and bathtub cleaning automation equipment
CN212799702U (en) Waste water recycling equipment
CN107630506A (en) Indoor drainage pipeline leads to stifled cleaning machines people
CN104563277B (en) A kind of folding door type flushing device for Drain pipe network
US20160122958A1 (en) Method for cleaning up powder or other contaminants
CN104014507B (en) A kind of brush washer
CN210621908U (en) Pipeline dredging equipment for urban pipeline drainage
CN205379256U (en) Inner loop water electric scrape glass ware
CN210381619U (en) Electric appliance cabinet convenient to clean
CN204122408U (en) A kind of brush washer
CN203821586U (en) Eccentric jacking quick flushing gate used for box culvert

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140730

Effective date of abandoning: 20150722

RGAV Abandon patent right to avoid regrant