CN203742574U - Heat insulation oil casing well completion pipe string - Google Patents

Heat insulation oil casing well completion pipe string Download PDF

Info

Publication number
CN203742574U
CN203742574U CN201420068385.0U CN201420068385U CN203742574U CN 203742574 U CN203742574 U CN 203742574U CN 201420068385 U CN201420068385 U CN 201420068385U CN 203742574 U CN203742574 U CN 203742574U
Authority
CN
China
Prior art keywords
casing
heat insulation
oil
string
insulation tubing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420068385.0U
Other languages
Chinese (zh)
Inventor
王新国
谢甲伟
杨元亮
王淑斌
宿行俊
殷凤仕
王加德
李长山
郝继开
李文刚
于海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zibo Furuite Thermal Energy Technology Co ltd
Original Assignee
SHENGLI OIL FIELD FURUITE PETROLEUM EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENGLI OIL FIELD FURUITE PETROLEUM EQUIPMENT CO Ltd filed Critical SHENGLI OIL FIELD FURUITE PETROLEUM EQUIPMENT CO Ltd
Priority to CN201420068385.0U priority Critical patent/CN203742574U/en
Application granted granted Critical
Publication of CN203742574U publication Critical patent/CN203742574U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Thermal Insulation (AREA)

Abstract

The utility model relates to a heat insulation oil casing well completion pipe string. The heat insulation oil casing well completion pipe string is characterized by comprising a surface layer casing, well cementation cement, a heat insulation oil casing, a sub-coupling, an oil-string casing, a float collar and a guiding shoe, wherein the heat insulation oil casing is connected with the oil-string casing through the sub-coupling, the surface-layer casing is arranged around the upper end of the heat insulation oil casing in a spaced and sleeved mode, the position between the heat insulation oil casing and the surface-layer casing is filled with the well cementation cement, the positions around the heat insulation oil casing, the sub-coupling, the oil-string casing, the float collar, the guiding shoe and the oil-string casing are filled with the well cementation cement, and holes are perforated in the portion, located in the position of an oil-string segment, of the oil-string casing. The heat insulation oil casing well completion pipe string has three layers of steel pipes and is of a two-insulation-layer structure, and therefore the heat insulation performance is greatly improved, inert gas is injected in the second insulation layer so that hydrogen seepage is slowed down, the heat insulation service life is prolonged, and the heat loss problem in the thread connecting position is fundamentally solved due to the two-layer structure in the thread connecting position.

Description

Heat insulation tubing and casing completion tubular column
Technical field
The utility model relates to a kind of heat insulation tubing and casing completion tubular column, belongs to thick oil thermal extraction string technology field.
Background technology
Steam soak and two kinds of techniques of steam flooding are taked in thickened oil recovery both at home and abroad at present conventionally, and these two kinds of techniques all need to use insulated tubing as steam injection instrument, in the annular space of oil jacket, companion's note nitrogen is auxiliary heat insulation, must adopt the pressure of packer or nitrogen to stop high temperature and high pressure steam to contact with sleeve pipe simultaneously.This technique at protection oil well casing, reduce wellbore heat loss, promote note and adopt aspect effect and played positive effect; but after application for many years, find that it exists that complex process, tubing string reliability are low, production efficiency and recovery ratio low; and the unavoidable shortcoming of box cupling junction heat waste, causes the waste of steam in heavy crude heat extraction process and the generation of cover damage problem.
Utility model content
The purpose of this utility model is to provide a kind of heat insulation tubing and casing completion tubular column that can overcome above-mentioned defect, excellent working performance.Its technical scheme is:
A kind of heat insulation tubing and casing completion tubular column, it is characterized in that: comprise surface pipe, cementing concrete, be positioned at heat insulation tubing and casing more than oil layer section, sub-coupling, production string, float collar and guide shoe, wherein heat insulation tubing and casing is connected with production string by sub-coupling, surface pipe gap is sleeved on the surrounding of heat insulation tubing and casing upper end, between heat insulation tubing and casing and surface pipe and heat insulation tubing and casing, sub-coupling, production string, the surrounding of floating reed and guide shoe production string is filled with cementing concrete, and be positioned on the production string at oil layer section place and cementing concrete and be evenly equipped with the pore that level runs through.
Described heat insulation tubing and casing completion tubular column, heat insulation tubing and casing is propped up gas thread serial connection by many groups and is formed, each group arm includes outer tube, intervalve and the inner tube of steel gap suit, wherein intervalve one end machining internal thread, other end threading, one end of intervalve machining internal thread and outer tube weld at pipe end place, weld at reserved internal thread length place with inner tube, and one end of intervalve threading and outer tube, in the welding of reserved external thread length place, weld at pipe end place with inner tube; Filling with insulation material vacuumize and form the first isolation layer in the annular space that outer tube and intervalve form, vacuumizes rear inert gas injecting, formation the second isolation layer in the annular space of intervalve and inner tube.
Compared with prior art, its advantage is the heat insulation tubing and casing completion tubular column of the utility model:
1) heat insulation tubing and casing has double thermal insulation layer, has greatly promoted the heat-proof quality of product;
2) in the inner tube of heat insulation tubing and casing and the annular space of intervalve, inert gas injecting has slowed down " hydrogen oozes " phenomenon, has extended the heat insulation life-span;
3) junction between heat insulation tubing and casing is double-decker, has thoroughly solved the heat waste problem at this place.The heat-proof quality of the heat insulation tubing and casing completion tubular column of the utility model is promoted to D~E level by current A~E level, junction heat waste 70% is reduced to 10% by what originally accounted for the total heat waste of tubing string, it is estimated that, the heat insulation life-span of the heat insulation tubing and casing completion tubular column of the utility model can extend to 8~10 years by current 2 years;
4) cover that has solved junction between heat insulation tubing and casing damages problem;
5) the heat insulation tubing and casing completion tubular column of the utility model has internal diameter unification, and junction is without turbulent advantage.
Brief description of the drawings
Fig. 1 is the structural representation of the heat insulation tubing and casing completion tubular column of the utility model embodiment.
Fig. 2 be embodiment illustrated in fig. 1 in the structural representation of heat insulation tubing and casing.
In figure: 1, surface pipe 2, cementing concrete 3, heat insulation tubing and casing 4, sub-coupling 5, production string 6, float collar 7, guide shoe 8, pore 9, outer tube 10, intervalve 11, inner tube 12, the first isolation layer 13, the second isolation layer 14, oil layer section
Detailed description of the invention
Describe in detail according to the utility model and be described further below in conjunction with accompanying drawing.In the embodiment shown in Fig. 1-2: comprise surface pipe 1, cementing concrete 2, be positioned at the more than 14 heat insulation tubing and casing 3 of oil layer section, sub-coupling 4, production string 5, float collar 6 and guide shoe 7, wherein heat insulation tubing and casing 3 is propped up gas thread serial connection by many groups and is formed, each group arm includes the outer tube 9 of steel gap suit, intervalve 10 and inner tube 11, wherein intervalve 10 one end machining internal threads, other end threading, one end of intervalve 10 machining internal threads and outer tube 9 weld at pipe end place, weld at reserved internal thread length place with inner tube 11, one end of intervalve 10 threadings and outer tube 9 weld at reserved external thread length place, weld at pipe end place with inner tube 11, filling with insulation material vacuumize and form the first isolation layer 12 in the annular space that outer tube 9 and intervalve 10 form, vacuumizes rear inert gas injecting in the annular space of intervalve 10 and inner tube 11, forms the second isolation layer 13.The lower end of heat insulation tubing and casing 3 is connected with production string 5 by sub-coupling 4, surface pipe 1 gap is sleeved on the surrounding of heat insulation tubing and casing 3 upper ends, between heat insulation tubing and casing 3 and surface pipe 1 and around heat insulation tubing and casing 3, sub-coupling 4, production string 5, float collar 6 and guide shoe 7 production strings 5, be filled with cementing concrete 2, and be positioned on the production string 5 at oil layer section 14 places and cementing concrete 2 and be evenly equipped with the pore 8 that level runs through.
Novel heat-insulation tubing and casing completion tubular column is for oil producing operation test.By SY/T5324-94 standard, the heat insulation tubing and casing in completion tubular column (newly pipe) and the heat insulation tubing and casing (old pipe) of use after 2 years are tested to its heat-proof quality, the results are shown in Table 1.Visible, the heat-proof quality of the new pipe of tubing and casing in novel heat-insulation tubing and casing completion tubular column all, between D~E, is used apparent heat conductivity after 2 years to change not quite, and data accordingly, can calculate, the heat insulation life-span of the heat insulation tubing and casing completion tubular column of the present invention can reach 8~10 years.
The heat-proof quality of heat insulation tubing and casing in table 1 completion tubular column of the present invention

Claims (2)

1. a heat insulation tubing and casing completion tubular column, it is characterized in that: comprise surface pipe (1), cementing concrete (2), be positioned at the above heat insulation tubing and casing (3) of oil layer section (14), sub-coupling (4), production string (5), float collar (6) and guide shoe (7), wherein heat insulation tubing and casing (3) is connected with production string (5) by sub-coupling (4), surface pipe (1) gap is sleeved on the surrounding of heat insulation tubing and casing (3) upper end, between heat insulation tubing and casing (3) and surface pipe (1) and heat insulation tubing and casing (3), sub-coupling (4), production string (5), the surrounding of float collar (6) and guide shoe (7) production string (5) is filled with cementing concrete (2), and be positioned on production string (5) that oil layer section (14) locates and cementing concrete (2) and be evenly equipped with the pore (8) that level runs through.
2. heat insulation tubing and casing completion tubular column claimed in claim 1, its characteristic is: heat insulation tubing and casing (3) is propped up gas thread serial connection by many groups and formed, each group arm includes the outer tube (9) of steel gap suit, intervalve (10) and inner tube (11), wherein intervalve (10) one end machining internal thread, other end threading, one end and the outer tube (9) of intervalve (10) machining internal thread weld at pipe end place, weld at reserved internal thread length place with inner tube (11), one end of intervalve (10) threading and outer tube (9) weld at reserved external thread length place, weld at pipe end place with inner tube (11), filling with insulation material vacuumize and form the first isolation layer (12) in the annular space that outer tube (9) and intervalve (10) form, in the annular space of intervalve (10) and inner tube (11), vacuumize rear inert gas injecting, form the second isolation layer (13).
CN201420068385.0U 2014-02-17 2014-02-17 Heat insulation oil casing well completion pipe string Expired - Lifetime CN203742574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420068385.0U CN203742574U (en) 2014-02-17 2014-02-17 Heat insulation oil casing well completion pipe string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420068385.0U CN203742574U (en) 2014-02-17 2014-02-17 Heat insulation oil casing well completion pipe string

Publications (1)

Publication Number Publication Date
CN203742574U true CN203742574U (en) 2014-07-30

Family

ID=51342391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420068385.0U Expired - Lifetime CN203742574U (en) 2014-02-17 2014-02-17 Heat insulation oil casing well completion pipe string

Country Status (1)

Country Link
CN (1) CN203742574U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867173A (en) * 2014-02-17 2014-06-18 胜利油田孚瑞特石油装备有限责任公司 Well-completion pipe column for heat-insulated oil casing and manufacturing method thereof
CN106368633A (en) * 2016-08-30 2017-02-01 中国石油大学(华东) Annulus closed pressure control tubular column system for deepwater oil and gas producing well
CN109424325A (en) * 2017-08-22 2019-03-05 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 A kind of flow string and oil extraction system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867173A (en) * 2014-02-17 2014-06-18 胜利油田孚瑞特石油装备有限责任公司 Well-completion pipe column for heat-insulated oil casing and manufacturing method thereof
CN106368633A (en) * 2016-08-30 2017-02-01 中国石油大学(华东) Annulus closed pressure control tubular column system for deepwater oil and gas producing well
CN106368633B (en) * 2016-08-30 2018-06-29 中国石油大学(华东) Deep water hydrocarbon producing well annular space seal-off pressure regulates and controls tubular column system
CN109424325A (en) * 2017-08-22 2019-03-05 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 A kind of flow string and oil extraction system
CN109424325B (en) * 2017-08-22 2021-09-17 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 Oil production pipe and oil production system

Similar Documents

Publication Publication Date Title
CN103850653B (en) The manufacture method of insulation oil sleeve pipe
CN203742574U (en) Heat insulation oil casing well completion pipe string
CN201972682U (en) Gas-injection oil-exploitation tubular column adopting packer technology for horizontal well
CN110145287B (en) Thickened oil heating viscosity reduction composite oil production system
CN104847322A (en) Method for improving recovery efficiency for deep common thickened oil water drive-converting into-steam flooding
CN103883263A (en) Aerogel composite heat insulation sleeve
CN102644442A (en) Ultra-viscous crude oil injection-production integrated technique tubular pile
CN202108462U (en) Combined type inserted sealing device
CN103867173A (en) Well-completion pipe column for heat-insulated oil casing and manufacturing method thereof
CN203978312U (en) Heat insulation box cupling
CN105201416A (en) Titanium alloy heat-insulation oil pipe and producing method thereof
CN200958368Y (en) Vacuum thermal-insulating double pipe of oil well
CN104847281A (en) Direct connection type vacuum thermal-insulating oil pipe
CN103470241B (en) Two bunches of jetting tubing strings and two bunches of jetting annular fracturing methods
CN107060654A (en) A kind of heat-insulated gas injection tube column of anticorrosion
CN203742573U (en) Thermal insulation oil casing pipe
CN203961897U (en) A kind of cement paste filling tube external packer envelope is altered instrument
CN103850654B (en) The manufacture method of the heat insulation tubing and casing of prestressing force
CN206299367U (en) A kind of metal sealing packer
CN105089631A (en) Horizontal well rod conveying dynamic logging method
WO2021160083A9 (en) Downhole preheating starting method for super heavy oil reservoir developed by means of dual-horizontal-well sagd
CN204899838U (en) Compound bridging plug of ball cage
CN201517374U (en) Gas production well completion column jacket
CN209799880U (en) inside and outside thermal-insulated directly links type heat-insulated oil pipe
CN203476307U (en) Double-cluster hydraulic jetting string

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200302

Address after: 255000 west head of Weisi Road, Qilu Chemical Industry Zone, Linzi District, Zibo City, Shandong Province

Patentee after: ZIBO FURUITE THERMAL ENERGY TECHNOLOGY Co.,Ltd.

Address before: 257082 No. 203, South Road, Dongying District, Shandong, Dongying

Patentee before: SHENGLI OILFIELD FREET PETROLEUM EQUIPMENT CO.,LTD.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Insulated casing completion string

Effective date of registration: 20220530

Granted publication date: 20140730

Pledgee: Qi commercial bank Limited by Share Ltd. Linzi branch

Pledgor: ZIBO FURUITE THERMAL ENERGY TECHNOLOGY Co.,Ltd.

Registration number: Y2022980006527

PE01 Entry into force of the registration of the contract for pledge of patent right
CX01 Expiry of patent term

Granted publication date: 20140730

CX01 Expiry of patent term