CN203738765U - Toolbox for borehole operation - Google Patents

Toolbox for borehole operation Download PDF

Info

Publication number
CN203738765U
CN203738765U CN201420108362.8U CN201420108362U CN203738765U CN 203738765 U CN203738765 U CN 203738765U CN 201420108362 U CN201420108362 U CN 201420108362U CN 203738765 U CN203738765 U CN 203738765U
Authority
CN
China
Prior art keywords
welded
depositing
bar
case
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420108362.8U
Other languages
Chinese (zh)
Inventor
彭海吉
张献军
王春江
李霞
刘德泉
刘军
张秀梅
吕新峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420108362.8U priority Critical patent/CN203738765U/en
Application granted granted Critical
Publication of CN203738765U publication Critical patent/CN203738765U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a toolbox for borehole operation. The toolbox adopts a case for storing tools and utensils in oil fieldremedial work construction, and is characterized in that a base adopts a hull shape; a base plate is welded at the upper part of the base; the case is formed by welding four upright columns, four horizontal pipes and four side pipes; vertical plates are used for longitudinal partition in the middle; a top plate is welded at the uppermost part; two main doors are mounted in the front and at the back respectively; a horizontal diaphragm plate is welded to the bottom surface of each horizontal pipe, and three layers with different heights are formed simultaneously; vertical plates are welded longitudinally on two side surfaces of the case; and side doors are formed on one side of the middle layer and one side of the lower layer respectively in a crossing manner. Therefore, heavy tools, utensils and special devices are convenient to take and place, and special working requirements are met; tool and utensil fixing racks and partition boards are welded in the case; upright column space of the case is sufficiently used for mountingan illuminating line rest and a wind vane rest,and the rests are fixed by set screws. The toolbox for borehole operation has the effects of reasonable tool and utensil arrangement, positioned storage and convenience in taking and placement.

Description

Underground operation tool case
Technical field:
The utility model relates in oil well repairing operation construction, the casing of depositing for construction tool, apparatus.
Background technology:
In oil well repairing operation construction, the workover tool of use, apparatus need be contained in the toolhouse of activity value jail, and site operation required value jail distance construction well head must be greater than 20 meters.When construction, must, by instrument, apparatus from a dead lift in the toolhouse of activity value jail to the well head of constructing, after completion, move back to, because the instrument, the apparatus that use are heavier, worker's labour intensity is large again, and preparation of construction, construction ending time are long; Separately, for the apparatus such as Blowout prevention wellhead, blowout-prevention plug valve, because frequency of usage is high and easy to use, have to be placed on the tool stand of the well head 3-5 rice of constructing, put at randomly, easily cause loss; Again, for adapting to " upgrading, raise speed, put forward effect " requirement, for key tool, the apparatus of rapid wear, job site also needs to have stand-by equipment, drops to bottom line to guarantee to delay work; Due to the limited space of current activity value jail, a large amount of instruments, apparatus are deposited in toolhouse, are difficult to join and management.
Utility model content:
The purpose of this utility model is to provide in a kind of workover operation construction, and the casing of depositing for construction tool, apparatus has instrument, apparatus location and deposits, and picks and places advantage easily.
The utility model is achieved in that
Underground operation tool case is by base (1), base plate (2), column (3), transverse tube (4), side pipe (5), diaphragm plate (6), riser (7), top board (8), main door (9), side door (10), elevator stationary pipes (11), flange fixed mount (12), pipe bar hydraulic tongs fixed mount (13), bar elevator fixed bar (14), gate support (15), dividing plate (16), peg (17), door bolt (18), illuminating line hack lever (19), pulley (20), wind vane hack lever (21), wind vane (22), the compositions such as fixed screw (24).Base is " hull " shape, and top is welded with base plate, plays a supportive role, and it is dilatory to be convenient under adverse circumstances; Casing is welded by 4 root posts, 4 transverse tubes and 4 lateral canals, centre is longitudinally separated by riser, and topmost is welded with top board, and front-back is installed respectively the main door of two fans, be divided into highly different three layers at the bottom surface of transverse tube welding diaphragm plate, be convenient to depositing of instrument, apparatus; In the two sides of casing, longitudinally be welded with riser, one side of middle level and lower floor position is intersected out respectively a fan side door, is convenient to picking and placeing of heavy instrument, apparatus and particular device, has reached again particular job requirement (as: taking, putting of blowout prevention cock etc. is convenient); Make full use of the column space of casing, be provided with respectively illuminating line hack lever and wind vane hack lever, illuminating line hack lever and wind vane hack lever can be adjusted to suitable height, then fix with fixed screw respectively, make setting up and the fixing standardization more of wind vane of job site circuit.
The utility model has also adopted following technical scheme:
Elevator stationary pipes is welded in the middle outside of lower floor above of casing side by side, and for depositing with fixing of pipe elevator, there is certain space inner side, can deposit pipe, the long part instrument of bar class, apparatus; Another side lower floor is welded flange fixed mount, pipe bar hydraulic tongs fixed mount, bar elevator fixed bar successively, be respectively used to blowout prevention flange, standby pipes bar hydraulic tongs, bar elevator depositing and fixing, middle level welding gate support, for gate depositing and fixing; Welding diaphragm respectively in the upper strata of casing, is divided into multiple i.e. independent unified spaces again upper strata, for depositing of conventional smallclothes; The medial surface welding peg on upper strata, for depositing of suspension member; On illuminating line hack lever, pulley is installed, on wind vane hack lever, wind vane is installed; The inner side of side door is welded with respectively door bolt.
The utility model has the advantage of:
1, this tool box volume is little, and floor space is little, is applicable to the limited construction well of city working well, is convenient to the rationally fixing of lifting and stringing pole simultaneously; 2, instrument in tool box, apparatus are rationally distributed, and deposit location, well arranged, is convenient to handing-over and regular maintenance management, has avoided instrument, apparatus loss; 3, this tool box can be placed on the standard-required position apart from well head 3-5 rice to greatest extent, and instrument, apparatus pick and place conveniently, and worker's labour intensity is low.
Brief description of the drawings
Accompanying drawing 1 is front view of the present utility model
Accompanying drawing 2 is side view of the present utility model
Detailed description of the invention:
Below in conjunction with accompanying drawing, the utility model will be further described:
As shown in the figure, pipe bar hydraulic tongs fixed mount is " H " type, on the montant on both sides, string has vertical tube, weld with vertical tube respectively at middle cross bar two, cross bar can slide by vertical tube on montant, regulates the height of cross bar according to the height of hydraulic tongs, makes cross bar block hydraulic tongs, then the fixed screw on fastening vertical tube, reaches the object of fixer pressing tongs; The column bottom sides that illumination stringing pole and wind vane hack lever are installed has through hole; On the diaphragm plate of every layer box body, there is through hole.

Claims (3)

1. in the two sides of casing, be longitudinally welded with riser, a side of middle level and lower floor position is intersected out respectively a fan side door, elevator stationary pipes is welded in the middle outside of lower floor above of casing side by side, for depositing with fixing of pipe elevator, there is certain space inner side, can deposit the long part instrument of pipe bar class, apparatus; Another side lower floor is welded flange fixed mount, pipe bar hydraulic tongs fixed mount, bar elevator fixed bar successively, be respectively used to blowout prevention flange, standby pipes bar hydraulic tongs, bar elevator depositing and fixing, middle level welding gate support, for gate depositing and fixing; Welding diaphragm respectively in the upper strata of casing, is divided into multiple i.e. independent unified spaces again upper strata, for depositing of conventional smallclothes; The side welding peg on upper strata, for depositing of suspension member.
2. underground operation tool case according to claim 1, is characterized in that: pipe bar hydraulic tongs fixed mount is " H " type.
3. underground operation tool case according to claim 1, is characterized in that: the inner side of side door is welded with respectively door bolt.
CN201420108362.8U 2014-03-06 2014-03-06 Toolbox for borehole operation Expired - Fee Related CN203738765U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420108362.8U CN203738765U (en) 2014-03-06 2014-03-06 Toolbox for borehole operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420108362.8U CN203738765U (en) 2014-03-06 2014-03-06 Toolbox for borehole operation

Publications (1)

Publication Number Publication Date
CN203738765U true CN203738765U (en) 2014-07-30

Family

ID=51338627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420108362.8U Expired - Fee Related CN203738765U (en) 2014-03-06 2014-03-06 Toolbox for borehole operation

Country Status (1)

Country Link
CN (1) CN203738765U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108942846A (en) * 2018-09-27 2018-12-07 西南石油大学 A kind of logging tool case and its component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108942846A (en) * 2018-09-27 2018-12-07 西南石油大学 A kind of logging tool case and its component

Similar Documents

Publication Publication Date Title
US20090272540A1 (en) Mobile hydraulic workover rig
CN201268937Y (en) Double-layer hanging cradle for working aloft
US20080296065A1 (en) Drill Floor Device
CN105798347B (en) A kind of industrial drilling equipment
CN203738765U (en) Toolbox for borehole operation
CN201666120U (en) Novel small oil-well repair work platform
CN207363620U (en) The tubing string automatic processing device of 3 points of support small four single upright columns of drilling tool of formula
CN201778660U (en) Dedicated liftable operation wellhead drill stand for beach oilfield workover operations
CN203925342U (en) Sucker rod discharge environmental protection tank tower
CN203441380U (en) Novel movable pedestal of marine workover rig
CN206844552U (en) The cladding supporting and limiting device of wall brick
CN203669721U (en) Hanging type inclined ladder
CN206549041U (en) A kind of hand fire extinguisher, which shakes, to be hit and flattening test device
CN206246071U (en) A kind of tubing string stores output device automatically
CN202016014U (en) Vertical valve switch spanner
CN203947454U (en) A kind of four leg wellhead platforms
CN202766217U (en) Lifting mechanism
CN203978299U (en) Integrated form petroleum rig base
CN203499643U (en) Operating platform for minor-repairing of well mouth
US10697258B2 (en) Dual racking board drilling rig
RU2426854C1 (en) Multiple drilling rig with simplified layout of assembly
CN204597374U (en) Cable fairlead
CN104653114A (en) Integrated petroleum drill base
RU2467146C2 (en) Cluster drilling rig with simplified arrangement
CN108678690B (en) In-plant debugging and testing device and method for automatic pipe column processing system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730

Termination date: 20150306

EXPY Termination of patent right or utility model