CN203735187U - Tree pit structure - Google Patents

Tree pit structure Download PDF

Info

Publication number
CN203735187U
CN203735187U CN201320879592.XU CN201320879592U CN203735187U CN 203735187 U CN203735187 U CN 203735187U CN 201320879592 U CN201320879592 U CN 201320879592U CN 203735187 U CN203735187 U CN 203735187U
Authority
CN
China
Prior art keywords
metalling
aqueduct
layer
pit structure
plant pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320879592.XU
Other languages
Chinese (zh)
Inventor
刘佳
汪玥
胡玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Landscape Design Institute Co ltd
Original Assignee
SUZHOU INSTITUTE OF LANDSCAPE ARCHITECTURAL DESIGN CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU INSTITUTE OF LANDSCAPE ARCHITECTURAL DESIGN CO LTD filed Critical SUZHOU INSTITUTE OF LANDSCAPE ARCHITECTURAL DESIGN CO LTD
Priority to CN201320879592.XU priority Critical patent/CN203735187U/en
Application granted granted Critical
Publication of CN203735187U publication Critical patent/CN203735187U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a tree pit structure. The tree pit structure comprises a tree pit, a gravel layer, a planting soil layer, a turf layer and a water guide pipe. The gravel layer is arranged at the bottom of the tree pit, the planting soil layer is arranged on the gravel layer, the turf layer is arranged on the planting soil layer, the water guide pipe sequentially penetrates through the turf layer, the planting soil layer and the gravel layer, the top end of the water guide pipe is not higher than the top end of the turf layer and the bottom end of the water guide pipe is located at the bottom end of the gravel layer. The tree pit structure can effectively solve the problem of water draining of trees in rainy seasons and the problem of water shortage in drought seasons.

Description

A kind of plant pit structure
Technical field
The utility model relates to a kind of plant pit structure.
Background technology
At present, in general plant pit, be all only provided with drainage blanket, this plant pit is at impeded drainage in rainy season, easily ponding, and it is unfavorable that the trees of firm transplanting are survived; Arid season trees meeting serious water shortage, plant pit cannot, to the direct moisturizing of the root system of plant bottom, affect arboreal growth in this case.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of plant pit structure, can effectively solve the draining in trees rainy seasons and the water shortage problem of arid season.
For solving the problems of the technologies described above, the technical solution of the utility model is:
A kind of plant pit structure, comprises plant pit, metalling, plantation soil layer, divot, aqueduct,
Described metalling is arranged at the bottom of plant pit, and described plantation soil layer is arranged at the top of metalling, and described divot is arranged at the top of plantation soil layer,
Described aqueduct is successively through divot, plantation soil layer, metalling, and the top of described aqueduct is not higher than the top of divot, and the bottom of described aqueduct is positioned at the bottom of metalling.
Further, aqueduct described in the utility model is arranged on the tube wall of part of metalling and offers some water-guiding holes.
Further, aqueduct described in the utility model is obliquely installed.
Preferably, the length of aqueduct described in the utility model is 80 ~ 100cm, and the diameter of described aqueduct is 8 ~ 10cm, and the length that described aqueduct is arranged in the part of crushed stone soil layer is 30 ~ 35cm.
Preferably, aqueduct described in the utility model is made up of UPVC.
Preferably, the thickness of metalling described in the utility model is 20 ~ 25cm.
Preferably, metalling described in the utility model is made up of rubble, and the particle diameter of described rubble is 40 ~ 60mm.
Therefore compared with prior art, the utility model has following beneficial effect:
When rainy season, aqueduct, metalling can effectively be got rid of unnecessary ponding, when arid season, aqueduct can be connected in to external water source, the bottom that the water of external water source is imported to metalling is to realize effective moisturizing, efficiently solve the draining in trees rainy seasons and the water shortage problem of arid season, also can promote plant root growth, and it is more convenient to construct.
Brief description of the drawings
Accompanying drawing described herein is used to provide further understanding of the present utility model, forms the application's a part, does not form to improper restriction of the present utility model, in the accompanying drawings:
Fig. 1 is the structural representation of the utility model embodiment.
Embodiment
Describe the utility model in detail below in conjunction with accompanying drawing and specific embodiment, be used for explaining the utility model in this illustrative examples of the present utility model and explanation, but not as to restriction of the present utility model.
Be illustrated in figure 1 the embodiment of a kind of plant pit structure described in the utility model, comprise plant pit 1, metalling 2, plantation soil layer 3, divot 4, aqueduct 5, metalling 2 is arranged at the bottom of plant pit 1, plantation soil layer 3 is arranged at the top of metalling 2, divot 4 is arranged at the top of plantation soil layer 3, aqueduct 5 is successively through divot 4, plantation soil layer 3, metalling 2, and the top of aqueduct 5 is not higher than the top of divot 4, and the bottom of aqueduct 5 is positioned at the bottom of metalling 2.
Further, in the present embodiment, aqueduct 5 is arranged on the tube wall of part of metalling 2 and offers some water-guiding holes, can improve like this water penetration of aqueduct 5, and when moisturizing, water more easily penetrates in metalling 2.
Further, in the present embodiment, aqueduct 5 is obliquely installed, and draining is more convenient like this.
Preferably, in the present embodiment, the length of aqueduct 5 is 80 ~ 100cm, and the diameter of aqueduct 5 is 8 ~ 10cm, and the length that aqueduct 5 is arranged in the part of crushed stone soil layer is 30 ~ 35cm.
Preferably, in the present embodiment, aqueduct 5 is made up of UPVC, and UPVC mechanical strength is high, more durable, and quality is lighter, installs more conveniently, and cost is lower.
Preferably, in the present embodiment, the thickness of metalling 2 is 20 ~ 25cm.
Preferably, in the present embodiment, metalling 2 is made up of rubble, and the particle diameter of rubble is 40 ~ 60mm.
The technical scheme above the utility model embodiment being provided is described in detail, applied principle and the embodiment of specific case to the utility model embodiment herein and set forth, the explanation of above embodiment is only applicable to help to understand the principle of the utility model embodiment; , for one of ordinary skill in the art, according to the utility model embodiment, in embodiment and range of application, all will change, in sum, this description should not be construed as restriction of the present utility model meanwhile.

Claims (7)

1. a plant pit structure, is characterized in that: comprise plant pit, metalling, plantation soil layer, divot, aqueduct,
Described metalling is arranged at the bottom of plant pit, and described plantation soil layer is arranged at the top of metalling, and described divot is arranged at the top of plantation soil layer,
Described aqueduct is successively through divot, plantation soil layer, metalling, and the top of described aqueduct is not higher than the top of divot, and the bottom of described aqueduct is positioned at the bottom of metalling.
2. plant pit structure according to claim 1, is characterized in that: described aqueduct is arranged on the tube wall of part of metalling and offers some water-guiding holes.
3. plant pit structure according to claim 1 and 2, is characterized in that: described aqueduct is obliquely installed.
4. plant pit structure according to claim 1 and 2, is characterized in that: the length of described aqueduct is 80 ~ 100cm, and the diameter of described aqueduct is 8 ~ 10cm, and the length that described aqueduct is arranged in the part of crushed stone soil layer is 30 ~ 35cm.
5. plant pit structure according to claim 1 and 2, is characterized in that: described aqueduct is made up of UPVC.
6. plant pit structure according to claim 1 and 2, is characterized in that: the thickness of described metalling is 20 ~ 25cm.
7. plant pit structure according to claim 1 and 2, is characterized in that: described metalling is made up of rubble, the particle diameter of described rubble is 40 ~ 60mm.
CN201320879592.XU 2013-12-30 2013-12-30 Tree pit structure Expired - Lifetime CN203735187U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320879592.XU CN203735187U (en) 2013-12-30 2013-12-30 Tree pit structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320879592.XU CN203735187U (en) 2013-12-30 2013-12-30 Tree pit structure

Publications (1)

Publication Number Publication Date
CN203735187U true CN203735187U (en) 2014-07-30

Family

ID=51335077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320879592.XU Expired - Lifetime CN203735187U (en) 2013-12-30 2013-12-30 Tree pit structure

Country Status (1)

Country Link
CN (1) CN203735187U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107820931A (en) * 2017-11-28 2018-03-23 佛山科学技术学院 A kind of greening band structure beneficial to tree stabilizing of municipal works
CN112064602A (en) * 2020-08-05 2020-12-11 一鼎(福建)生态园林建设有限公司 Ponding resource distribution equipment for keeping ponding alive and maintaining ponding of jungle hackberry tree pits

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107820931A (en) * 2017-11-28 2018-03-23 佛山科学技术学院 A kind of greening band structure beneficial to tree stabilizing of municipal works
CN112064602A (en) * 2020-08-05 2020-12-11 一鼎(福建)生态园林建设有限公司 Ponding resource distribution equipment for keeping ponding alive and maintaining ponding of jungle hackberry tree pits

Similar Documents

Publication Publication Date Title
CN203015568U (en) Tree fertilization vent pipe
CN202496187U (en) Severe saline -alkali area green plant-planting soil layer salt drainage system
CN204070022U (en) A kind of water Collecting device
CN203912797U (en) For the irrigation emitter unit of shrub plantation
CN204335476U (en) Nursery stock Special disc tubular type subsurface irrigation device
CN203735187U (en) Tree pit structure
CN205205920U (en) Rainwater garden
CN101793064A (en) Ecological wall
CN204305747U (en) The tree root irrigator of rainwater can be collected
CN201495534U (en) Emptying gate
CN204335480U (en) Intelligent water-saving afforestation subirrigation system
CN204335479U (en) A kind of trees irrigation installation
CN204343308U (en) A kind of water-collecting irrigation device for karst bank protection
CN203968764U (en) Afforestation tendril cultivation support
CN204259500U (en) A kind of drought-relief, waterlogging-preventing cultivation pit
CN205071830U (en) Polywater pipe
CN204335472U (en) Nursery stock Special disc tubular type subirrigation system general structure
CN204291911U (en) A kind of sandy land planting tree maintenance structure
CN204335475U (en) High-efficiency water-saving afforestation subirrigation system
CN204335478U (en) Intelligent water-saving nursery stock Special disc tubular type subsurface irrigation general structure
CN205694520U (en) A kind of dune-fixating forestation unit grid structure
CN204343309U (en) A kind of water-collecting irrigation device for karst bank protection
CN204335477U (en) Intelligent water-saving nursery stock Special disc tubular type subsurface irrigation device
CN204146094U (en) The flowerpot of watering, fertilizing directly can be carried out to plant bottom root system
CN204305695U (en) A kind of steady type side slope planting bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 202 Xujiang Road, Suzhou, Jiangsu Province

Patentee after: Suzhou Landscape Design Institute Co.,Ltd.

Address before: No. 115, Changxu Road, Suzhou, Jiangsu 215002

Patentee before: SUZHOU INSTITUTE OF LANDSCAPE ARCHITECTURE DESIGN CO.,LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140730